7
The Bournemouth and Poole College Lansdowne Campus +

The Bournemouth and Poole College Lansdowne … Bournemouth and Poole College, Lansdowne Campus + REFERENCE CONTACT Ken Roberts Executive Director of Resources The Bournemouth and

Embed Size (px)

Citation preview

T h e B o u r n e m o u t h a n d Po o l e C o l l e g e

L a n s d o w n e C a m p u s

+

+T h e B o u r n e m o u t h a n d Po o l e C o l l e g e , L a n s d o w n e C a m p u s

REFERENCE CONTACT

Ken RobertsExecutive Director of ResourcesThe Bournemouth and Poole CollegeNorth Road, Poole BH14 OLST: 01202 205289M: 07831 413208E: kroberts@ bpc.ac.uk

TYPE OF CONTRACTJCT Design and Build 2011 (executed as Deed)

CONTRACT VALUE £1.6m

PROJECT DURATIONJan 2016 – Sep 2016

“This project was the first phase ofa three phase propertystrategy, located at our Lansdownecampus in Bournemouth.Challenges included being in aconservation area, in closeproximity to Grade II listedbuildings, restricted site access anda requirement to remainoperational throughout theprocess.The contrast between the Grade IIlisted buildings and the aluminumrainscreen overcladding hasworked well, visitors and newstudents believe that the 1950’sover-clad building is a new facility.For any institution considering anover-cladding project or a newbuild, with an aluminum claddedrainscreen, I would highlyrecommend the pro-active servicesof d&b facades.”

Ken Roberts,Executive Director of Resources

PROJECT BACKGROUNDThe three storey E Block was builtin 1958 and the two storey BBlock in 1925. These buildingswere scheduled for demolitionand planning consent was grantedfor new build replacement in2008. Following the withdrawal ofcentral funding, the Collegeembarked on refurbishment inorder to continue to reflect thebrand exemplified on its othercampuses. Insulated aluminiumrainscreen overcladding, high-performance aluminium-timbercomposite windows, over-roofingand other envelope worksincluding demolition of chimneysdelivered a building with theappearance and performance of anew-build for a fraction of thecost.

The projectincluded thedemolitionof chimneysand otherrooffeatures.

+T h e B o u r n e m o u t h a n d Po o l e C o l l e g e , L a n s d o w n e C a m p u s

+T h e B o u r n e m o u t h a n d Po o l e C o l l e g e , L a n s d o w n e C a m p u s

+T h e B o u r n e m o u t h a n d Po o l e C o l l e g e , L a n s d o w n e C a m p u s

+T h e B o u r n e m o u t h a n d Po o l e C o l l e g e , L a n s d o w n e C a m p u s

+T h e B o u r n e m o u t h a n d Po o l e C o l l e g e , L a n s d o w n e C a m p u s