OVERVIEW, CURRENT SITUATION & FUTURE TREND THAILAND STEEL CONSTRUCTION Mr. Nuttapon Suttitam Advisor: Federation of Thai Industries (FTI) AVP, Sahaviriya Steel Industries (SSI) 14 Nov 2016

Thailand Steel Construction - SEAISIseaisi.org/.../Session2-Paper3-Thailand-Steel-Construction.pdf · Deficient innovation & technology through construction ... • Design skill and

Embed Size (px)

Citation preview

O V E R V I E W , C U R R E N T S I T U A T I O N & F U T U R E T R E N D

THAILAND STEEL

CONSTRUCTION

Mr. Nuttapon Suttitam

Advisor: Federation of Thai Industries (FTI) AVP, Sahaviriya Steel Industries (SSI)

14 Nov 2016

SYNOPSIS

• Steel construction stakeholders

• Problem statement & analysis

• Current situation

• Future trend

2

STEEL CONSTRUCTION STAKEHOLDERS

Producer

& Trader

Owner

Developer

Association

Academic & Researcher

Designer Contractor & Builder

Fabricator Detailer

Home builder

Regulator

3

Steel Construction Stakeholders

Producer

& Trader

Owner

Developer

Association

Academic & Researcher

Designer Contractor & Builder

Fabricator Detailer

Home builder

Regulator

4

PROBLEM STATEMENT & ANALYSIS

Deficient product standard, design & construction standards

Deficient skills of design engineers and fabricators

Deficient supports from government Deficient innovation & technology through construction supply chain

Internal Factor

5

PROBLEM STATEMENT & ANALYSIS

Solutions Causes Problem

Deficient Standard

Product Standard

TIS Committee

Company Standard

Design Standard

EIT Standard

DPT Standard

TSSS Standard

Construction Standard

Department of Public Works and Town & Country Planning have commissioned Kasetsart University to issue 4 standards on (1) steel product (2) seismic design (3) durability design (4) tool & manual

EIT 1227: Hot-Rolled Steel Design Standard

EIT 1228: Cold-Formed Steel Design Standard

Thai Structural Steel Society plan to issue fabrication design standard

Not yet available: In Need of a person in charge

TIS Standard

Exist. Product

Hot rolled section

Hot-rolled coil

Cold-formed section

Hollow Steel Section

New product ???

6

PROBLEM STATEMENT & ANALYSIS

Solutions Causes Problem

Deficient Skill

Deficient knowledge

Seminar & Training

More practices

Deficient Practice

More practices

Technology transfer

Deficient Tool

Developed

Adopt new technology

Action Plans

KU are developing design chart & manual under DPT project.

Steel producers shall develop design tools for their customers.

Promote the Use of Steel

Construction

Offer Right Benefit to Users

Consumer Need Identification

Operational Excellence

Right Communication

Exhibition, Events Contests & Viral

Interview

Focus Group

Questionnaire

7

PROBLEM STATEMENT & ANALYSIS

Solutions Causes Problem

Deficient Government

Support

Lack of Government Infrastructure Application

Steel Bridge

Exclude from Thailand 4.0 Industry Focus

Perform Rigorous Communication

Propose Steel Construction

Promotion Center

Encourage R&D Enforcement

Lack of Local Content Regulations

for Infrastructure Application

Railway

Introduction to Top Management & Bridge

Engineers

R&D - Trial Section – Monitoring – Calculation

Highway Construction

Standard Plug-In

Propose Steel Construction

Promotion Center

Fire Rating Demand

Steel Construction Audit Program

Energy Rebate Program

8

PROBLEM STATEMENT & ANALYSIS

Solutions Causes Problem

Deficient Innovation & Supply Chain

Lack of Collaboration

Academic Institutions

Collaboration

Collaboration with Other Associations and Other Sectors

No Steel Construction R&D

Center

Propose ISIT or EIT or TSSS to be National Innovation Center

Fragmented & Deficient Supply

Chain

Establish Supply Chain Integrated

System

Encourage SME Steel Fabricators

Establish Supply Chain Integrated

System

Mills to Transformers

Transformers to Traders

Mills or Transformers or Traders to Constructors

E – Marketplace

+

BIM Operation

Cut-to-Length

Cut-to-Size

Just-in-Time

Waste & Time &

Stock Optimization

Steel Producer

Contractor

Association

Other Sectors

Academic Institution

EIT

ASA

TREA

TCA

HBA

Machinery

Construction Product

9

PROBLEM STATEMENT & ANALYSIS

Solutions Causes Problem

Internal Factor

Deficient Internal R&D

Internal Communication

HR & Financial Investment

Production Inefficiency

Productivity Improvement

Waste Reduction

(Optimization)

Energy Saving Scheme

Incomplete Human Skill-Set

Develop Structural Steel

Knowledge

Identify Users’ Needs

Training R&D Survey Big

Data

Training R&D Optimization Technology

Automation Investment

Energy Reduction Investment

Activities

10

CURRENT SITUATION

• Based on the study “the cost effectiveness of steel construction in economics aspects” performed by ISIT in 2008,

it can be concluded that

• RC cost (baht/m2)

• 1,689 - 2640

• Steel cost (baht/m2)

• 2,034 - 3,383

• % More expensive

• 17%

No fire proofing

•2,550 baht/m3 Concrete

•19.5 baht/kg

Rebar

•25.0 baht/kg

HRS

•220 baht/day

Labor

Span

4m

6m

8m

No. of Stories

5

8

20

Live load

200

400

RC vs. Steel 18 cases each

2008

11

CURRENT SITUATION

• Based on latest unit cost together with following assumptions.

• % cost of steel rebar in RC structure • 40%

• % Labor cost

• 2008: 30% (expensive material + cheaper labor)

RC (2008) = 100

Labor

28 Rebar

42 Conc.

30

70

STL (2008) = 117

Labor

MAT. Steel

35

82

•2,550 baht/m3 Concrete

•19.5 baht/kg

Rebar

•25.0 baht/kg

HRS

•220 baht/day

Labor

2008

12

CURRENT SITUATION

• Based on latest unit cost together with following assumptions.

• % cost of steel rebar in RC structure • 40%

• % Labor cost

• 2008: 30% (expensive material + cheaper labor)

•2,850 baht/m3

Concrete

+12%

•15.0 baht/kg

Rebar

-23%

•20.5 baht/kg

HRS -22%

•330 baht/day

Labor +50%

RC (2016) = 114

Labor

22 Rebar

47 Conc.

45

69

STL (2016) = 117

Labor

MAT. Steel

53

64

2016

13

CURRENT SITUATION

• Conclusions from the above

• More optimization (value engineering) can be applied to steel

structures than concrete structures. • Design skill and construction efficiency for concrete structures are about to reach

the best possible practices for Thai engineers and constructors.

• High strength steel (Fy > 360 MPa) and innovative form of steel structures have been introduced to construction market.

• Construction cost of steel structures will no longer be much more

expensive than reinforced concrete structures. • Steel price in foreseeable future will unlikely be reaching steel price in 2008.

• Labor cost will never be reduced, however will be subject to political situation.

• Concrete cost will gradually increase based on labor cost, energy cost, etc.

Note: Steel construction has prevailed factory & warehouse segment, as well as petrochemical

segment. Therefore, it is reasonable to address segments at which steel construction has

potential growth.

14

CURRENT SITUATION

• FACTS

• Some home builders have started implementing structural steel

construction. • Prefabricated concrete load bearing wall system, which has been well developed

recently in Thailand, will not be used by homebuilder sector because it is not “economy of scale.”

• Homebuilder believe that steel framing will eventually be replacing RC framing. Therefore, the sooner they start, the more skills they will gain.

• Prefabricated steel framing can be erected from the ground up within 7-10 days, which is much faster than RC beams & columns since formworking, shoring and

concrete curing are all time consuming process.

• However, faster steel construction could not pick up construction speed because “brick wall manual construction” was time consuming.

15

16

FUTURE TREND

• Shop fabrication + Field installation system

• Prefabricated wall panel system with insulation capability

17

FUTURE TREND

• Shop fabrication + Field installation system

• Prefabricated wall panel system with insulation capability

• Prefabricated Prefinished Volumetric Construction (PPVC)

18

FUTURE TREND

• High strength steel products

• Seismic resistant steel structures

• Steel bridges for Highway Construction

19

THANK YOU VERY MUCH

For more information, please contact.

Nuttapon Suttitam

[email protected]

[email protected]

[email protected]

www.facebook.com/JTEPASteelConstruction

20