Test Results Tracker template

  • Published on
    24-Nov-2014

  • View
    66

  • Download
    3

Transcript

<p>Test Results Summary as of for Execution StatusTotal % scripts Executed Total % scripts Passed</p> <p>%</p> <p>#REF! #REF!</p> <p>Defect CountSeverity P1 (Showstoppers) P2 (Majors) P3 (Minor) P4 (Cosmetic) Total Logged 0 0 0 0 0 Open 0 0 0 0 0 Fixed for Retest 0 0 0 0 0 Closed 0 0 0 0 0</p> <p>Test Results SummaryRegression testingStatus Passed Failed Deferred Not Run Incomplete Total # test cases #REF! 0 0 0 0 #REF! % of all scripts #REF! #REF! #REF! #REF! #REF! #REF!</p> <p>SPI*</p> <p>Test Results Summary120.00% 100.00%</p> <p>Test Execution</p> <p>% Pass Scripts</p> <p>80.00% 60.00% 40.00% 20.00% 0.00% 27 28 1 2 3</p> <p>Planned Actual</p> <p>Passed</p> <p>Failed</p> <p>Deferred</p> <p>Not Run</p> <p>Incomplete</p> <p>Testing Schedule</p> <p>* SPI is Schedule Performance Index : It is calculated on the cumulative basis as total actual scripts executed/total planned scripts executed</p> <p>HLS #</p> <p>High Level Script(HLS) Description</p> <p>Complexity</p> <p>Status</p> <p>Date</p> <p>Tester</p> <p>Comments</p> <p>HLS #</p> <p>Deferred Failed Pass Incomplete Not Run</p> <p>High Medium Low</p> <p>High Level Script(HLS) Description</p> <p>Complexity</p> <p>Status</p> <p>Date</p> <p>Tester</p> <p>Comments</p> <p>Script Execution Start Date End Date 27 1 02/27/06 03/08/06 28 2 Total Days Total Scripts 1 2 3 4</p> <p>DateDay</p> <p>Planned Total Cumulative Planned %</p> <p>13 13 21.31%</p> <p>13 26 42.62%</p> <p>13 39 63.93%</p> <p>13 52 85.25%</p> <p>Actual Total Cumulative Actual %</p> <p>0 0 0.00%</p> <p>0 0 0.00%</p> <p>0 0 0.00%</p> <p>0 0 0.00%</p> <p>5 61 3 5</p> <p>4 5</p> <p>5 5</p> <p>6 6</p> <p>7 7</p> <p>8 8</p> <p>9 61 100.00%</p> <p>0 61 0.00%</p> <p>0 61 0.00%</p> <p>0 0 0.00%</p> <p>0</p>