86
TENDER SUBMISSION FOR LONDON OFFICE BUILDINGS GROUP Report submitted as a part of K13IDM on 13/5/2015 4183047 | 4187823 | 4186893

Tender Submission for LOB

Embed Size (px)

DESCRIPTION

As a part of our 3rd year Services design module, we were invited to apply for tender for designing the services of a theoretical office block, including systems for Ventilation, Vertical Transport and Fire prevention. The tender application consisted of a written report supported by a short verbal presentation to a panel of judges and a poster summarising the tender details. We secured the highest mark of all 'companies', winning the tender from the 'client'.

Citation preview

Page 1: Tender Submission for LOB

TENDER SUBMISSION FOR LONDON OFFICE BUILDINGS GROUP

Report submitted as a part of K13IDM on 13/5/2015

4183047 | 4187823 | 4186893

Page 2: Tender Submission for LOB

i Tender Submission | K13IDM

Page 3: Tender Submission for LOB

EXECUTIVE SUMMARY ii

Long Eaton Services Consultants have been tasked by London Office

Buildings with designing the services for a new office block. The

proposed building stands 10 storeys tall, with 9 floors of open plan

offices. Heating, cooling and ventilation systems were to be specified,

whilst considering potential enhancements to the building’s performance.

The building’s vertical transport systems and fire protection were to be

assessed to ensure the building complies with Approved Document B and

British Standards 5655-6.

It was decided that a VAV Air Conditioning System would best suit the

needs of the building. Peak heating and cooling requirements were

determined as 482kW and 432kW respectively, with an annual energy

consumption of 1.16 GWh and carbon footprint of 305 tonnes p.a.

Inspection of the building’s fire exits found breaches of regulation;

appropriate solutions have been devised incorporating additional means

of escape. The vertical transport system more than adequately serves

the building, obtaining an ‘excellent’ service standard.

Installing triple glazing and additional insulation reduced energy

consumption and carbon emissions by 21%. Though environmentally

sound, they are not financially viable, as it would take 50 years to break

even.

Smaller savings of 1-2% could be attained by providing total solar shading

and additional thermal mass. Due to their minimal capital costs, they

provide immediate financial gains.

To achieve the greatest savings in energy consumption and carbon

emissions, all proposed changes should be implemented simultaneously.

Not only will LOB see net financial benefits, but will also help minimise

their impact on the environment.

(249)

EXECUTIVE SUMMARY

Page 4: Tender Submission for LOB

iii Tender Submission | K13IDM

Page 5: Tender Submission for LOB

NOMENCLATURE iv

Symbol Definition Unit

Q Heat Gains W

Also : Flow Rate (distinguished in text) 𝑚3/𝑠

λ Thermal Conductance W/K

A Area m2

U U-value W/m2K

φ Lag h

θ Hour of incidence h

f Decrement Factor [dimensionless]

Also Correction factor (distinguished in text) [dimensionless]

G G-Value [dimensionless]

T Temperature K or ℃

H Mean solar cooling load at incident hour W/m2

Also Height m

η Solar exposure ratio %

W Width m

xs Shadow x-component m

ys Shadow y-component m

R Overhang m

n Wall-solar azimuth angle °

a Altitude °

ρ Air density kg/m3

c Air specific heat capacity W/kgK

V Volume flow rate m3/s

𝐍 Air Change Rate h−1

𝐕 Volume m3

f3 Intermittence factor [dimensionless]

HDD Number of heat degree days [dimensionless]

m Mass flow rate kg/s

g Moisture content Kg/kg

M Mixing point %

RH Relative humidity %

h Specific enthalpy kJ/kg

β Contact factor of cooling coil [dimensionless]

p Pressure Pa

µ Fan efficiency %

t Time h

u Velocity m/s

C Hueretic constant [dimensionless]

x Throw m

L Total lift flight m

v Speed m/s

n Lift capacity [dimensionless]

N Number of lift cars [dimensionless]

RTT Round trip time s

ζ Component loss factor [dimensionless]

NOMENCLATURE

Page 6: Tender Submission for LOB

v Tender Submission | K13IDM

1 INTRODUCTION 2

2 BUILDING INFORMATION 4

2.1 Zoning 5 2.2 Occupancy 7 2.3 Building Fabric 8

3 EXTREME CONDITIONS: HEATING SEASON 10

3.1 Casual Heat Gains 10 3.2 Solar Heat Gains 10 3.3 Fabric Losses 11 3.4 Ventilation Losses 12 3.5 Local Enviornmental Conditions 13

4 EXTREME CONDITIONS: COOLING SEASON 16

4.1 Fabric Losses 17 4.2 Solar Gains 18 4.3 Ventilation Heat Transfer 20

5 BOILER PLANT 22

5.1 Sizing the Boiler 22 5.2 Annual Running Costs and Carbon Emissions 24

6 AIR CONDITIONING SYSTEM (ACS) 26

6.1 Sizing System 26 6.2 Air conditioning system specification 28 6.3 Annual Running Costs 31

7 VENTILATION 34

7.1 Design Criteria 34 7.2 duct configuration 34 7.3 Fans 37 7.4 supply diffuser choice 39

8 SENSITIVITY ANALYSIS 42

8.1 Potential Changes 42 8.2 Comparison of Changes 43 8.3 Reccommendations 44

9 FIRE PROTECTION 46

9.1 Horizontal Escape 46 9.2 Vertical Escape 48 9.3 Compartmentalisation of spaces 48 9.4 Protection of Ventilation Openings 49 9.5 Location of Fire-fighting servces 50

10 VERTICAL TRANSPORT 52

10.1 System Mechanics 53 10.2 Firefighting Lifts 55 10.3 Quality of service assessment 55

11 CONCLUSIONS 58

12 BACK MATTER I

12.1 References I 12.2 Appendix A I 12.3 Appendix B VI 12.4 Appendix C XII

CONTENTS

Page 7: Tender Submission for LOB

FIGURES vi

Figure 2-1: Proposed Building 4

Figure 2-2: Zoning arrangements 5

Figure 2-3: Exploded Building Iso 6

Figure 2-4: Occupancy Schedule 7

Figure 3-1: Fabric heat transfer 11

Figure 3-2: Graph to show ventilation and infiltration losses 13

Figure 4-1:Internal Gains Schedule 16

Figure 4-2: Effect of lag and decrement on heat transfer 17

Figure 4-3: Overhang providing solar shading on glazed surfaces (orange) 19

Figure 4-4: Range of Ventilation heat transfer for each Month 20

Figure 5-1: Graph showing pre-heat times prior to occupancy, [6] 22

Figure 5-2: Graph to show number of heating degree-days, CIBSE Guide A 24

Figure 6-1: Monthly peak sensible heat gains 26

Figure 6-2: Air Conditioning complete Psychometric Process 27

Figure 6-3: Fan Assisted VAV system schematic 29

Figure 7-1: Duct Layout in Plan 35

Figure 7-2: Supply Duct layout in Section 35

Figure 7-3: Supply Index Run 36

Figure 8-1: Comparison of changes 44

Figure 9-1: Typical office floor, not meeting maximum travel distances 47

Figure 9-2: Typical office floor, meeting maximum travel distances 47

Figure 9-3: Entrance floor, not meeting maximum travel distances 47

Figure 9-4: Entrance floor, not meeting maximum travel distances 47

Figure 9-5: Compartment floor configuration, meeting approved

document Bs guidelines. 49

Figure 9-6: Pipe sleeving, taken from Approved Document B, [12] 49

Figure 9-7: ground floor sprinkler system 50

Figure 9-8: Office floor sprinkler system 50

Figure 10-1: Exploded View of Building Showing Lifts 52

Figure 10-2: Plan of Lift Showing Dimensions around Car as given in CIBSE

Guide D 0 53

Figure 10-3: Comparison of Side Opening and Two-Speed Centre Opening

Doors 53

Figure 10-4: Single Wrap Pulley System 54

FIGURES

Page 8: Tender Submission for LOB

vii Tender Submission | K13IDM

Table 2-1: Building Geometry 4

Table 2-2: Zone Dimensions Ground Floor 6

Table 2-3: Zone Dimensions Typical Floor 6

Table 2-4: Zone Occupancy 7

Table 2-5: Fabric Properties 8

Table 2-6: Wall and Glazing Areas 8

Table 3-1: Casual Internal Heat Gains 10

Table 3-2: Fabric Properties 11

Table 3-3: Equation 1 parameters 11

Table 3-4: Ventilation Requirements 12

Table 4-1: Internal Gains 16

Table 4-2: Equation 4-1 parameters 17

Table 4-3: Material properties 17

Table 4-4: Equation 4-2 parameters 18

Table 4-5: Glazing parameters 18

Table 4-6: Peak solar cooling loads 18

Table 4-7: Equation 4-3 and 4-4 parameters 19

Table 4-8: Effect of Shading on Peak Solar Cooling loads 20

Table 4-9: Equation 4-5 parameters 20

Table 5-1: Equation 5-1 Parameters 22

Table 5-2: Building Specifications calculated in section 3.5 22

Table 5-3: Fuel Prices, taken from Table 12 SAP 2012, [4] 24

Table 6-1: Peak Cooling Loads 26

Table 6-2: Psychometric properties of air 27

Table 6-3: Factors to consider when specifying an ACS 28

Table 6-4: VAV system components 29

Table 6-5: Advantages and Disadvantages of a VAV system 30

Table 6-6: Three approaches to estimate ACS cooling load 31

Table 7-1: Ventilation Requirements 34

Table 7-2: Total extract for each sanitary zone 36

Table 7-3: Pressure Drop over Index Run 37

Table 7-4: Equation Parameters 38

Table 7-5: Fan and energy characteristics 38

Table 7-6: Supply Diffuser Sizing 39

Table 8-1: U-value comparison of Part L requirement and ACEB Gold

Standard 42

Table 8-2: Comparing performance of double glazing vs triple glazing 42

Table 8-3: Effect of increasing thermal mass 43

Table 8-4: Comparison of changes 43

Table 8-5: Recommendations 44

Table 9-1 Maximum travel distances, taken from Approved Document B,

[12] 46

TABLES

Page 9: Tender Submission for LOB

TABLES viii

Table 9-2: Number of routes required, taken from Approved Document B,

[12] 46

Table 9-3: Minimum exit widths, Approved document B, [12] 48

Table 9-4: Compartment regulations, Approved document B, [12] 48

Table 9-5: Maximum sprinkler distances, BSEN pg 77 , [13], [14] 50

Table 10-1: Lift Shaft Dimensions 52

Table 10-2: Breakdown of Car Capacity 53

Table 10-3: System specification 55

Table 10-4: Lift Calculations for Quality of Service 55

Table 12-1: Weather data used for Heating Season Calculations, taken

from CIBSE Guide J, Table 5.36 I

Table 12-2: Fabric gains/Losses (Wall, Roof, Glazing) II

Table 12-3: Total fabric gains/losses. (Wall, roof, glazing, Floor) III

Table 12-4: Plant Sizing IV

Table 12-5: Heating Degree Days, taken from CIBSE Guide A, Table 2.23 IV

Table 12-6: Annual Energy Consumption and Carbon Emissions, using

data from SAAP Building Regulations 2010, Table 12. V

Table 12-7: South Wall heat transfer (W) Example of Quasi-Dynamic Heat

transfer calculation VI

Table 12-8: Total Fabric heat transfer (W) VII

Table 12-9: Ventilation Heat transfer (W) VIII

Table 12-10: West Glazing unshaded solar gain (W) Example of solar

cooling load IX

Table 12-11: West glazing shaded solar gain (W) Example of solar cooling

load IX

Table 12-12: Total Solar Gains accounting for shading (W) X

Table 12-13: Total Sensible Heat transfer (W) XI

Table 12-14: Total pressure drop along pipes and method XII

Table 12-15: Total Pressure loss calculations XIII

Page 10: Tender Submission for LOB

1 Tender Submission | K13IDM

Page 11: Tender Submission for LOB

INTRODUCTION 2

Long Eaton Services Consultants would like to thank London Office

Buildings for the invitation to apply for tender for designing the services

of their newly proposed office block.

A requirement of the tender document was that consultants should

design the heating, cooling and ventilation systems for the 10-storey

building.

It was also requested that the plans should be examined to identify any

potential issues that exist. Areas of particular concern were the fire-safety

and vertical transportation systems that could potentially be in breach of

UK Building Regulations.

The primary aims of this report are:

To evaluate the thermal performance of the building to

determine peak heating and cooling loads.

To appropriately size the building’s boiler and air conditioning

systems capable of meeting these demands.

To quantify a series of potential improvements to evaluate their

economical and environmental feasibility.

To ensure that the building conforms to Approved Document B of

the UK Building Regulations with regards to fire protection.

To ensure that the proposed vertical transport systems are

capable of meeting the building’s requirements.

(178)

1 INTRODUCTION

Page 12: Tender Submission for LOB

3 Tender Submission | K13IDM

Page 13: Tender Submission for LOB

BUILDING INFORMATION 4

The building under investigation is a 10- storey office block that is

situated in London at the junction between City Road and King George

Street. Of the 10 storeys, floors one to nine are open plan offices, whilst

the ground floor serves as an entrance foyer. There is also a basement in

the building, and a services block on the roof. Since they both lie are

outside of the thermal envelope, neither and are considered in this

report.

Figure 2-1: Proposed Building

Table 2-1: Building Geometry

Parameter Value Unit

Height 37.8 m

Ground Floor to Ceiling 4.2 m

Typical Floor to Ceiling 3.6 m

Depth 19.7 m

Width 50.0 m

Volume 36674 m3

Envelope Area 6450 m2

Wall Area 5331 m2

Roof Area 985 m2

Ground Area 852 m2

Exposed Floor 133 m2

Surface Area: Volume 0.18 m-1

Usable Floor Space 9717 m2

Floors 10 (dimensionless)

Ground Floors 1 (dimensionless)

Typical Floors 9 (dimensionless)

2 BUILDING INFORMATION

Page 14: Tender Submission for LOB

5 Tender Submission | K13IDM

2.1 ZONING

Each floor is subdivided into distinct thermal zones. The ground floor is

dominated by a large entrance zone; with facilities located in the central

core, see Table 2-2. There is a void in the rear of the building, which

provides service access.

The upper floors follow a similar pattern; with large occupied open plan

office space, surrounding services and amenities, see Figure 2-2and Table

2-3.

Figure 2-2: Zoning arrangements

Page 15: Tender Submission for LOB

BUILDING INFORMATION 6

Table 2-2: Zone Dimensions Ground Floor

Code Zone Width (m) Depth (m) Area (m2) Volume (m

3)

001 Entrance 50.0 19.7 689.8* 2897.2

002 Lobby 9.0 4.5 40.5 170.1

003 Male WC 3.0 4.5 13.5 56.7

004 Female WC 3.0 4.5 13.5 56.7

005 Circulation [W] 8.6 4.5 38.7 162.5

006 Circulation [E] 8.6 4.5 38.7 162.5

007 Lifts [W] 1.9 4.5 8.6 35.9

008 Lifts [E] 1.9 4.5 8.6 35.9

Total 851.8 3577.6

*Area defined as total floor area not accounted for in other zones inc. services void.

Table 2-3: Zone Dimensions Typical Floor

Code Zone Width (m) Depth (m) Area (m2) Volume (m

3)

101 Office 50.0 19.7 793.8* 2857.5

102 Lobby 9.0 4.5 40.5 145.8

103 Male WC 7.5 4.5 33.8 121.5

104 Female WC 5.0 4.5 22.5 81.0

105 Circulation [W] 8.6 4.5 38.7 139.3

106 Circulation [E] 8.6 4.5 38.7 139.3

107 Lifts [W] 1.9 4.5 8.6 30.8

108 Lifts [E] 1.9 4.5 8.6 30.8

Total 985.0 3546.0

*Area defined as total floor area not accounted for in other zones

Figure 2-3: Exploded Building Iso

Page 16: Tender Submission for LOB

7 Tender Submission | K13IDM

2.2 OCCUPANCY

The occupancy for each zone in shown in Table 2 4. The total occupancy

for the building is 722 people, only 11 of whom are most in the office.

The occupancy profile is modelled on a typical 09:00 to 17:00 working

day, see Figure 2-4. To simulate gradual arrival and departure of

occupants it increases/decreases incrementally over the course of three

hours. Occupancy also drops to have capacity during lunch hours.

Figure 2-4: Occupancy Schedule

Table 2-4: Zone Occupancy

Code Zone Area (m2) Occupancy Density

(m2/person)

Occupancy (people)

001 Entrance 689.8 0* 0

002 Lobby 40.5 4† 11

003 Male WC 13.5 0 0

004 Female WC 13.5 0 0

005 Circulation [W] 38.7 0 0

006 Circulation [E] 38.7 0 0

007 Lifts [W] 8.6 0 0

008 Lifts [E] 8.6 0 0

101 Office 793.8 10 79

102 Lobby 40.5 0 0

103 Male WC 33.8 0 0

104 Female WC 22.5 0 0

105 Circulation [W] 38.7 0 0

106 Circulation [E] 38.7 0 0

107 Lifts [W] 8.6 0 0

108 Lifts [E] 8.6 0 0

*Occupancy specified as 0 as occupancy in entrance specified under lobby

†Occupancy Density specified using CIBSE guide A Table 6.2 for a Hotel Lobby [1]

0

0.25

0.5

0.75

1

1 2 3 4 5 6 7 8 9 101112131415161718192021222324Pro

po

rtio

n o

f p

eak

Occ

up

ancy

Hour number (hours)

Page 17: Tender Submission for LOB

BUILDING INFORMATION 8

2.3 BUILDING FABRIC

The building is assumed to be thermally lightweight. The dimensions and

U-values for each element of the building fabric are shown in Table 2-5.

The U-values comply to the limiting standards given in building

regulations document L2 [2]. The wall and glazing areas for each façade

are shown in Table 2-6

Table 2-5: Fabric Properties

Surface Construction Limiting U-Value (W/m

2K)

Surface Area

(m2)

Roof Waterproof roof covering, 35mm polyurethane insulation, vapour control layer, 19mm timber decking, unventilated airspace, 12.5 mm plasterboard

0.25 985

Wall 105mm brick, 50mm airspace, 19mm plywood sheathing, 95mm studding, 12.5mm plasterboard.

0.35 2432

Floor 10 m carpet, 19mm timber on100 mm joists, 100mm mineral fibre insulation between joists, 12mm cementitious building board on underside.

0.25 985

Glazing Double Glazing in aluminium frames 2.2 2762

Vehicle Access Doors

Metal roller doors 1.5 138

Table 2-6: Wall and Glazing Areas

Wall Glazing Ratios Wall total area (m2) Wall area (m2) Glazing Area (m2)

Wall N 61% 1814 713 1101

Wall E 34% 745 488 256

Wall S 61% 1890 743 1147

Wall W 34% 745 488 256

INFILTRATION

The infiltration rate is set at the standard value of 0.4𝑎𝑐ℎ−1 throughout

the building [1]. The resulting air permeability is 2.17𝑚3/ℎ/𝑚2*. This

outperforms best practice guidelines, predominantly due to the large

surface are to volume ratio of the building. In reality, the air leakage

would likely be higher, closer to 5𝑚3/ℎ/𝑚2.

(347)

Page 18: Tender Submission for LOB

9 Tender Submission | K13IDM

Page 19: Tender Submission for LOB

EXTREME CONDITIONS: HEATING SEASON 10

The building’s thermal performance is analysed to determine its heating

load and size its boiler. Heat is lost via convection due to ventilation and

conduction from the buildings fabric.

3.1 CASUAL HEAT GAINS

People, lighting and equipment generate internal heat gains, calculated

using CIBSE Guide A [1] for each zone totalling 24.6 kW, see Table 3-1.

Though not accounted for in plant sizing, casual heat gains effectively

reduce the heating requirement of the building and boiler.

3.2 SOLAR HEAT GAINS

Solar gains are not considered when assessing the building’s heating load.

This is because the peak-heating load is calculated for the worst-case

scenario, no solar exposure. Building form and orientation could be

considered to optimise the influence of solar gains.

Table 3-1: Casual Internal Heat Gains

Zone Floor Area (m

2)

QOcc, sensible (W)

QLighting, sensible (W)

QEquip, sensible (W)

Total Sensible Gains (W)

Entrance 689.8 - 10347 10347 10347 Lobby 40.5 825 405 405 405 Sanitary Accom. ♂

13.5 - - - -

Sanitary Accom. ♀

13.5 - - - -

Circulation [W]

38.7 - - - -

Circulation [E]

38.7 - - - -

Lifts [W] 8.55 - - - - Lifts [E] 8.55 - - - - Office 793.75 5530 7937 7937 7937 Lobby 40.5 - 405 405 405 Sanitary Accom. ♂

33.75 - - - -

Sanitary Accom. ♀

22.5 - - - -

Circulation [W]

38.7 - - - -

Circulation [E]

38.7 - - - -

Lifts [W] 8.55 - - - - Lifts [E] 8.55 - - - -

Total 50595 85834 109181 245611

3 EXTREME CONDITIONS: HEATING SEASON

Page 20: Tender Submission for LOB

11 Tender Submission | K13IDM

3.3 FABRIC LOSSES

The performance of the building’s thermal envelope determines the rate

of fabric heat lost/gained. The rate of heat lost per unit of temperature

difference through each surface is calculated using equation 3-1.

𝜆 = 𝑈𝐴 [3-1]

Example calculation: Total thermal conductance

Σ𝑈𝐴 = (0.25 𝑥 985) + (0.35 𝑥 2432) + (0.25 𝑥 985) + (2.2 𝑥762) +(1.5𝑥138) = 7626 W/K

Table 3-2: Fabric Properties

Surface Limiting U-Value (W/m

2K)

Floor Area

(m2)

Thermal Conductance (W/K)

Roof 0.25 985 246

Wall 0.35 2432 851

Floor 0.25 985 246

Glazing 2.2 2762 6075

Vehicle Access Doors 1.5 138 207

Total 7626

Table 3-3: Equation 1 parameters

Symbol Parameter Unit

𝜆 Thermal Conductance W/K A Area m

2

U U-Value W/m2K

Figure 3-1: Fabric heat transfer

Page 21: Tender Submission for LOB

EXTREME CONDITIONS: HEATING SEASON 12

3.4 VENTILATION LOSSES

Ventilation requirements for each zone were approximated using table

1.5, CIBSE Guide A [1], seen in Table 3-4. Ventilation provides fresh air to

the occupants, removing pollutants. Infiltration, via adventitious

openings, has also been considered.

Table 3-4: Ventilation Requirements

Example Calculation: Ventilation requirements for the Office

Ventilation: 79 people x 10 L/s = 790 L/s = 0.79 m3/s

Infiltration: 0.4 a𝑐ℎ−1 x 2857.5 m3 = 1143 m3/h = 0.3175 m3/s

Zone Floor Area

(𝒎𝟐)

Volume (𝒎𝟑) Occupancy (people)

Ventilation Rate

Required per person

(L/s)

Total ventilation rate per person per

zone (L/s)

Total ventilation

rate per zone (L/s)

Total ventilation

rate per

zone (𝒎𝟑/s)

Infiltration

(a𝒄𝒉−𝟏)

Infiltration

rate (𝒎𝟑/h)

Infiltration rate

(𝒎𝟑/s)

Entrance 689.8 2897.16 0 0 0 0.4 1158.864 0.321906667

Lobby 40.5 170.1 11 10 110 110 0.11 0.4 68.04 0.0189

Male WC 13.5 56.7 0 0 0 0.4 22.68 0.0063

Female WC 13.5 56.7 0 0 0 0.4 22.68 0.0063

Circulation [W] 38.7 162.54 0 0 0 0.4 65.016 0.01806

Circulation [E] 38.7 162.54 0 0 0 0.4 65.016 0.01806

Lifts [W] 8.55 35.91 0 0 0 0.4 14.364 0.00399

Lifts [E] 8.55 35.91 0 0 0 0.4 14.364 0.00399

Office 793.75 2857.5 79 10 790 790 0.79 0.4 1143 0.3175

Lobby 40.5 145.8 0 0 0 0.4 58.32 0.0162

Male WC 33.75 121.5 0 0 0 0.4 48.6 0.0135

Female WC 22.5 81 0 0 0 0.4 32.4 0.009

Circulation [W] 38.7 139.32 0 0 0 0.4 55.728 0.01548

Circulation [E] 38.7 139.32 0 0 0 0.4 55.728 0.01548

Lifts [W] 8.55 30.78 0 0 0 0.4 12.312 0.00342

Lifts [E] 8.55 30.78 0 0 0 0.4 12.312 0.00342

Total 35491 7220 7.22 3.94

Page 22: Tender Submission for LOB

13 Tender Submission | K13IDM

Ventilation requirements state that 7.22 𝑚3/s of air is needed for the

building. With infiltration set at 0.4 a𝑐ℎ−1 per zone, it results in a net loss

of 3.9𝑚3/s of air. Figure 3-2 shows infiltration making up 35% of the

ventilation losses.

Figure 3-2: Graph to show ventilation and infiltration losses

Example Calculation: Total Air Change Rate for whole building

7.22 𝑚3/s + 3.9𝑚3/s = 11.2 𝑚3/s x 3600 = 40188.6 𝑚3/h

40188.6 𝑚3/h / 35491 40188.6 𝑚3 = 1.13 𝒂𝒄𝒉−𝟏

3.5 LOCAL ENVIORNMENTAL CONDITIONS

The annual external temperatures in London for each hour of the day,

each month of the year are used to calculate the buildings peak-heating

load. Appendix B details the weather data. The internal design

temperatures for winter and summer, were 22˚ and 23˚ respectively,

taken from CIBSE Guide A, table 1.5.

(272)

65%

35%

Ventilation

Infiltration

Page 23: Tender Submission for LOB

EXTREME CONDITIONS: HEATING SEASON 14

Page 24: Tender Submission for LOB

15 Tender Submission | K13IDM

Page 25: Tender Submission for LOB

EXTREME CONDITIONS: COOLING SEASON 16

The internal gains are estimated using heat gain densities specific to a

zone’s function (Table 6.3, CIBSE Guide A [1]) and are compiled in Table

4-1. The gains operate proportionally to the occupancy schedule.

Table 4-1: Internal Gains

Figure 4-1:Internal Gains Schedule

0

100

200

300

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Cas

ual

He

at G

ain

s (k

W)

Hour

SensibleLatent

4 EXTREME CONDITIONS: COOLING SEASON

Zone Floor Area (m

2)

Occupancy (persons)

Sensible heat gains per

person (W)

Latent heat gains per

person (W)

Lighting gain, Area Weighted

(W/m2)

Equipment gains, Area Weighted

(W/m2)

QOcc, sensible

(W)

QOcc, latent

(W)

QLighting, sensible

(W)

QEquip, sensible

(W)

Total Sensible

Gains (W)

Total Latent

Gains (W)

Entrance 689.8 0 - - 15 - - - 10347 0 10347 0

Lobby 40.5 11 75 55 10 5 825 605 405 202 1432 605

Sanitary Accom. ♂ 13.5 0 - - - - - - - 0 0 0

Sanitary Accom. ♀ 13.5 0 - - - - - - - 0 0 0

Circulation [W] 38.7 0 - - - - - - - 0 0 0

Circulation [E] 38.7 0 - - - - - - - 0 0 0

Lifts [W] 8.55 0 - - - - - - - 0 0 0

Lifts [E] 8.55 0 - - - - - - - 0 0 0

Office 793.75 79 70 45 10 15 5530 3555 7937 11906 25374 3555

Lobby 40.5 0 - - 10 5 - - 405 202 608 0

Sanitary Accom. ♂ 33.75 0 - - - - - - - 0 0 0

Sanitary Accom. ♀ 22.5 0 - - - - - - - 0 0 0

Circulation [W] 38.7 0 - - - - - - - 0 0 0

Circulation [E] 38.7 0 - - - - - - - 0 0 0

Lifts [W] 8.55 0 - - - - - - - 0 0 0

Lifts [E] 8.55 0 - - - - - - - 0 0 0

Total 50595 50595 85834 109181 245611 32600

Page 26: Tender Submission for LOB

17 Tender Submission | K13IDM

4.1 FABRIC LOSSES

Fabric losses are calculated using quasi-dynamic calculations (equation 4-

1) that take into account both a time lag and decrement in the transfer of

heat through the building’s fabric, (Figure 4-2). These values are

approximated using construction of comparable performance in table

3.49 CIBSE guide A.

𝑄𝜃+𝜑 = 𝐴𝑈(𝑇𝑒𝑚 − 𝑇𝑟𝑜𝑜𝑚) + 𝐴𝑈(𝑇𝑒0 − 𝑇𝑒𝑚)𝑓 [4-1]

Figure 4-2: Effect of lag and decrement on heat transfer

Example Calculation – Transfer through West Wall on June 21st at 17:00 For a west facing light coloured wall 𝑇𝑒0 = 19.2 & 𝑇𝑒𝑚 = 22.5 , 𝑇𝑟𝑜𝑜𝑚

𝑠𝑢𝑚𝑚𝑒𝑟 = 23 [2].

𝑄17:00 = 488 × 0.35(22.5 − 23) + 488 × 0.35(19.2 − 22.5) × 0.21

𝑄17:00 = −204𝑊

Table 4-2: Equation 4-1 parameters

Symbol Parameter Unit

𝑄𝜃+𝜑 Heat transfer at time 𝑡 = 𝜃 + 𝜑 𝑊

𝐴 Area 𝑚2

𝑈 U-value 𝑊/𝑚2𝐾

𝜑 Lag ℎ

𝜃 Hour of incidence ℎ

𝑓 Decrement Factor [𝑑𝑖𝑚𝑒𝑛𝑠𝑖𝑜𝑛𝑙𝑒𝑠𝑠]

𝑇𝑒𝑚 Mean sol-air temperature ℃

𝑇𝑒0 Room air temperature ℃

𝑇𝑒𝑚 Sol-air temperature at time 𝑡 = 𝜃 ℃

Table 4-3: Material properties

Surface U-Value (W/m2K) Area (m

2) f φ Colour

Wall North 0.35 713 0.21 9 Light

Wall East 0.35 488 0.21 9 Light

Wall South 0.35 743 0.21 9 Light

Wall West 0.35 488 0.21 9 Light

Glazing North 2.20 1101 - 0 -

Glazing East 2.20 256 - 0 -

Glazing South 2.2 1147 - 0 -

Glazing West 2.2 256 - 0 -

Roof 0.25 985 0.15 10 Dark

Exposed Floor 0.25 133 0.15 9 Light

Access Doors (delivery void) 1.5 138 1.00 1 Light

Calculations for hourly heat transfers for all surfaces can be found in Appendix B.

Page 27: Tender Submission for LOB

EXTREME CONDITIONS: COOLING SEASON 18

4.2 SOLAR GAINS

Solar gains though an un-shaded glazed surface are calculated using

Equation 4-2, where each parameter is defined by the building’s location

(London), response factor (fast), and the window’s glazing type and

orientation (Table 4-5).

𝑄𝑠𝑜𝑙𝑎𝑟 = 𝐴 × 𝐻 × 𝐺 × 𝑓 [4-2]

Example calculation – East façade glazing at 14:30 on September 4th

For an East facing surface in SE England at 14:30 on Sep 4th, 𝐻 is 132W/

m2 [3].

𝑄𝑠𝑜𝑙𝑎𝑟, 𝐸𝑎𝑠𝑡14:30,𝑆𝑒𝑝 4𝑡ℎ

= 256m2 × 132𝑊/𝑚2 × 0.41 × 0.50

𝑄𝑠𝑜𝑙𝑎𝑟, 𝐸𝑎𝑠𝑡14:30,𝑆𝑒𝑝 4𝑡ℎ

= 6927W

The shortcoming using this approach is that no solar cooling loads are

provided outside of 07:30 to 17:30. This is not too significant as they

would fall outside of the office’s operational times. They would also be

far smaller than solar gains inside the working day, making it highly

improbable that they would affect the peak cooling load of the building.

Table 4-4: Equation 4-2 parameters

Symbol Parameter Unit

𝑄𝑠𝑜𝑙𝑎𝑟 Solar heat gain 𝑊

𝐴 Area 𝑚2

𝐺 G-Value [𝑑𝑖𝑚𝑒𝑛𝑠𝑖𝑜𝑛𝑙𝑒𝑠𝑠]

𝑓 Correction factor [𝑑𝑖𝑚𝑒𝑛𝑠𝑖𝑜𝑛𝑙𝑒𝑠𝑠]

𝐻 Mean solar cooling load at incident hour 𝑊/𝑚2

Table 4-5: Glazing parameters

Window Azimuth (°) Area (m2) Glazing type G f

Glazing North 0 1101 Clear/reflective 0.41[3] 0.50 [3]

Glazing East 90 256 Clear/reflective 0.41 0.50

Glazing South 180 1147 Clear/reflective 0.41 0.50

Glazing West 270 256 Clear/reflective 0.41 0.50

Table 4-6: Peak solar cooling loads

Glazing Peak solar cooling load (W) Date Time

Whole Building 154495 April 28th 12:30

of which North 34772 June 21st 12:30 and 13:30

of which East 30432 June 21st 08:30

of which South 133124 November 4th 12:30

of which West 30379 June 21st 17:30

Ground Floor 35313 April 28th 12:30

Typical Floor 13242 April 28th 12:30

Calculations for full hourly solar gains for all glazed surfaces can be found in Appendix B.

Page 28: Tender Submission for LOB

19 Tender Submission | K13IDM

SOLAR SHADING

Recesses cause solar shading on the building’s windows, the extent of

which is calculated using equation 4-3. The portion of glazing in shade

receives no direct sunlight and is recalculated as a north facing window.

Where:

η =(𝑊𝑤 − 𝑥𝑠) × (𝐻𝑤 − 𝑦𝑠)

𝑊𝑤 × 𝐻𝑤

𝑥𝑠 = 𝑅 × tan 𝑛 and 𝑦𝑠 = 𝑅 × sec 𝑛 × tan 𝑎

[4-3]

The adjusted solar gain through a window is:

𝑄𝑠ℎ𝑎𝑑𝑒𝑑 = 𝜂 × 𝑄𝑢𝑛𝑠ℎ𝑎𝑑𝑒𝑑 + (1 − 𝜂) × 𝑄𝑁𝑜𝑟𝑡ℎ [4-4]

Figure 4-3: Overhang providing solar shading on glazed surfaces (orange)

Example – Window on South façade glazing at 14:30 on September 4th

𝑄𝑢𝑛𝑠ℎ𝑎𝑑𝑒𝑑 = 103253𝑊, 𝑄𝑁𝑜𝑟𝑡ℎ = 18515𝑊, 𝑎 = 37°, 𝑛 = 49°, 𝑊𝑊 =3.85𝑚, 𝐻𝑤 = 1.50𝑚 and 𝑅 = 0.5𝑚.

𝑥𝑠 = 0.5𝑚 × tan 49° = 0.58𝑚, 𝑦𝑠 = 0.5𝑚 × sec 49° × tan 37° = 0.57𝑚

η =(3.85 − 0.58) × (1.5 − 0.57)

3.85 × 1.50= 53%

Therefore the cooling load accommodating for shading is:

𝑄𝑠ℎ𝑎𝑑𝑒𝑑 = 53% × 103253𝑊 + 47% × 18515𝑊 = 63426𝑊

Table 4-7: Equation 4-3 and 4-4 parameters

Symbol Parameter Unit

𝐴 Area 𝑚2

𝜂 Solar exposure ratio %

𝑊𝑤 Window width 𝑚

𝐻𝑤 Window Height 𝑚

𝑥𝑠 Shadow x-component 𝑚

𝑦𝑠 Shadow y-component 𝑚

𝑅 Overhang 𝑚

𝑛 Wall-solar azimuth angle °

𝑎 Altitude °

𝑄𝑠ℎ𝑎𝑑𝑒𝑑 Solar gain of window accounting for shading 𝑊

𝑄𝑢𝑛𝑠ℎ𝑎𝑑𝑒𝑑 Solar gain of window without shading 𝑊

𝑄𝑁𝑜𝑟𝑡ℎ Solar gain of identical window facing North 𝑊

Page 29: Tender Submission for LOB

EXTREME CONDITIONS: COOLING SEASON 20

This shading only results in a 1% reduction in solar gain. It would be

advisable to implement shading devices that can provide total shading,

which would result in a reduction in peak solar gain by as much as 75%.

Table 4-8: Effect of Shading on Peak Solar Cooling loads

Glazing Peak solar cooling load,

un-shaded (W)

Peak solar cooling load, with shading

adjustment (W)

Reduction due to shading (%)

Whole Building 154495 153093 0.91%

North 34772 34772 0.00%

East 30432 30218 0.70%

South 133124 132787 0.25%

West 30379 30379 0.00%

Ground Floor 35313 34993 0.91%

Typical Floor 13242 13122 0.91%

4.3 VENTILATION HEAT TRANSFER

Combined losses due to purpose provided and adventitious ventilation is

calculated using equation 4-5 using the air flow rates defined earlier.

𝑄𝑣𝑒𝑛𝑡 = 𝜌 × 𝑐 × �� × (𝑇𝑟𝑜𝑜𝑚 − 𝑇𝑎𝑖𝑟) [4-5]

Table 4-9: Equation 4-5 parameters

Symbol Parameter Unit

𝑄𝑣𝑒𝑛𝑡 Heat loss due to ventilation 𝑊

𝜌 Air density 𝑘𝑔/𝑚3

𝑐 Air specific heat capacity 𝑊/𝑘𝑔𝐾

�� Volume flow rate 𝑚3/𝑠

𝑇𝑎𝑖𝑟 External air temperature 𝐾

𝑇𝑟𝑜𝑜𝑚 Room temperature 𝐾

Figure 4-4: Range of Ventilation heat transfer for each Month

(277)

-350

-300

-250

-200

-150

-100

-50

0

50

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Ve

nti

lati

on

He

at T

ran

sfe

r (k

W)

Page 30: Tender Submission for LOB

21 Tender Submission | K13IDM

Page 31: Tender Submission for LOB

BOILER PLANT 22

5.1 SIZING THE BOILER

The building’s boiler can be sized using the steady state equation

(equation 5-1). Heating systems are designed to heat the building when

unoccupied with no casual/solar gains, see Figure 5-1

Figure 5-1: Graph showing pre-heat times prior to occupancy, [6]

Qd = [Σ 𝑈𝐴 + 0.33𝑁𝑉](𝑇𝑖 − 𝑇𝑑𝑜) [5-1]

Table 5-1: Equation 5-1 Parameters

Symbol Parameter Unit

𝐔 U-Value 𝑤/𝑚2K

𝑨 Area 𝑚2

𝑵 Air Change Rate ℎ−1

𝑽 Building Volume 𝑚3

𝑻𝐼 Design Inside Temperature ˚C

𝑻𝒅𝒐 Design Outside Temperature ˚C

Using the internal design temperatures and weather data from CIBSE

Guide J, the annual energy demand is calculated using equation 5-1 and

Table 5-2.

Table 5-2: Building Specifications calculated in section 3.5

𝚺𝑼𝑨

(W/K)

N

(𝒂𝒄𝒉−𝟏)

V

(𝒎𝟑)

7626 1.13 36674

5 BOILER PLANT

Page 32: Tender Submission for LOB

23 Tender Submission | K13IDM

The peak-heating load occurs in December between 06:00 and 07:00.

Example Calculation: Peak heating load

Qd = 7626 + 0.33 𝑥 1.13 𝑥 36674𝑉](22−— 0.4)

= -482075 W of heat energy lost

Peak Heating load = 482075 W = 482 kW

Heating systems are designed to meet the maximum heating load likely to

occur. However, additional capacity is needed to overcome thermal

inertia so that the building may reach an operational temperature

quickly.

The required boiler capacity is calculated by applying an intermittence

factor,𝑓3,that takes into account the thermal response of the building and

the hours of plant operation (equation 5-3).

𝑃𝑒𝑎𝑘 ℎ𝑒𝑎𝑡𝑖𝑛𝑔 𝑙𝑜𝑎𝑑 = 𝑓3 𝑥 𝑠𝑝𝑎𝑐𝑒 ℎ𝑒𝑎𝑡 𝑙𝑜𝑎𝑑 [5-3]

Table 1.11 in CIBSE Guide B, [3], recommends plant size ratios according

to heating periods. The boiler must operate for 16 hours, to serve the 14

hours of occupancy and two additional hours of pre-heating, requiring an

𝑓3 value of 1.2 .

Example Calculation: Actual Peak Heating load

1.2 x 482075 = 578490 W

= 578 kW

Page 33: Tender Submission for LOB

BOILER PLANT 24

5.2 ANNUAL RUNNING COSTS AND CARBON EMISSIONS

The annual energy consumption of the heating system is calculated to

estimate its running costs and carbon emissions. This is done by

estimating the number of heating degree-days for which the external

temperature is below a base temperature, 15.5˚C taken from CIBSE guide

A[1]. Figure 5-2 shows the HDD for London for an average year.

Figure 5-2: Graph to show number of heating degree-days, CIBSE Guide A

Equation 5-4 shows the amount of heat lost in one year.

𝑄𝑦 = 24(Σ 𝑈𝐴 + 0.33𝑁𝑉)HDD [5-4]

Example Calculation: Heat lost in one year

𝑄𝑦 = 24(7626 + 0.33 𝑥 1.13 𝑥 36674𝑉)1936

= 988504 kWh of energy lost

Table 5-3 states the costs and carbon emissions per kWh.

Table 5-3: Fuel Prices, taken from Table 12 SAP 2012, [4]

Fuel Unit price (p/kWh) Emissions (kg CO2 per kWh)

Mains Gas 3.48 0.216

Example Calculation: Annual Cost

= 988 504 x 3.48=£34,399 p.a

Example Calculation: Annual carbon emissions

= 988 504 x 0.216 = 213 516 kg of carbon

= 214 tonnes CO2

(245)

0

50

100

150

200

250

300

350

Nu

mb

er

of

He

atin

g D

egr

ee

Day

s

Months of the Year

Page 34: Tender Submission for LOB

25 Tender Submission | K13IDM

Page 35: Tender Submission for LOB

AIR CONDITIONING SYSTEM (ACS) 26

6.1 SIZING SYSTEM

The ACS must be capable of offsetting both the peak sensible and latent

heat gains in the building, coinciding at 14:00- 15:00 on August 4th.

Table 6-1: Peak Cooling Loads

Type Load Date Time

Sensible 443.0kW August 4th 14:00 – 15:00

Latent 32.6kW Every day 9:00 – 13:00 and 14:00 – 17:00

Figure 6-1: Monthly peak sensible heat gains

AIR PROPERTIES

The sensible cooling load is used in conjunction with equation 6-1 to

determine the mass flow rate of supply air.

𝑄𝑠𝑒𝑛𝑠𝑖𝑏𝑙𝑒 = �� × 𝑐 × Δ𝑇𝑅−𝑆 [6-1]

To calculate the mass flow rate the temperature difference between the

supply and room (Δ𝑇𝑅−𝑆 ) must be specified, in this case as 9°𝐶 ,

recommended by Roy Jones of Gilberts [5].

Higher values of 𝛥𝑇𝑅−𝑆 may be used, reducing the required air supply rate. This may be

necessary if the diffusers specified are incapable of meeting design requirements at higher

air supply velocities.

�� = 𝑄𝑠𝑒𝑛𝑠𝑖𝑏𝑙𝑒/(𝑐 × Δ𝑇𝑅−𝑆 )

�� = 443.0𝑘𝑊/(1.02𝑘𝐽/𝑘𝑔𝐾 × 9°𝐶) = 48.3𝑘𝑔/𝑠

To find the properties of air at the supply point of the system, both

𝑇𝑑𝑟𝑦 𝑏𝑢𝑙𝑏 and 𝑅𝐻 must be fixed. 𝑇𝑑𝑟𝑦 𝑏𝑢𝑙𝑏 is calculated as 𝑇𝑅,𝑑𝑏 − ∆𝑇𝑅−𝑆

(23 − 9 = 14°𝐶) whilst RH is pre-set at a typical value of 95% [6].

443.0 kW

32.6kW 0

100

200

300

400

500

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Pe

ak H

eat

Gai

n (

kW)

Sensible

Latent

6 AIR CONDITIONING SYSTEM (ACS)

Page 36: Tender Submission for LOB

27 Tender Submission | K13IDM

The room air’s properties can be found by using 𝑇𝑅 combined with the

room moisture content (𝑔𝑟), calculated with the building’s latent gains:

𝑄𝑙𝑎𝑡𝑒𝑛𝑡 = 𝑚 × 𝐿 × Δ𝑔𝑅−𝑆 ∴ Δ𝑔𝑅−𝑆 = 𝑄𝑙𝑎𝑡𝑒𝑛𝑡/��𝐿

Δ𝑔𝑅−𝑆 = 32.6𝑘𝑊/(48.3𝑘𝑔/𝑠 × 2450𝑘𝐽/𝑘𝑔) = 0.00027𝑘𝑔/𝑘𝑔

Allowing for calculation of 𝑔𝑅 = 𝑔𝑆 + Δ𝑔𝑅−𝑆

𝑔𝑅 = 0.00946 + 0.00027 = 0.009743𝑘𝑔/𝑘𝑔

CONDITIONING PROCESS

The ACS in the building uses recirculation to reduce energy consumption.

To find the mixing point:

𝑀 = 100% − ��𝑓𝑟𝑒𝑠ℎ 𝑎𝑖𝑟/��𝑐𝑜𝑜𝑙𝑖𝑛𝑔

= 100% −7.22𝑚3/𝑠

39.8𝑚3/𝑠 = 81.9%

Where the volume flow rate of cooling air (��𝑐𝑜𝑜𝑙𝑖𝑛𝑔) is calculated from the

mass flow rate (��) derived above, using the specific volume of air (𝑣 ) at

the supply. ��𝑐𝑜𝑜𝑙𝑖𝑛𝑔 = �� × 𝑣 = 47.1𝑘𝑔/𝑠 × 0.825𝑚3/𝑘𝑔 = 7.22𝑚3/𝑠

Figure 6-2: Air Conditioning complete Psychometric Process

Table 6-2: Psychometric properties of air

Parameter Symbol Unit Air at Point:

Outside Supply Room Mixing

Dry Bulb Temperature 𝑇𝑑𝑟𝑦 𝑏𝑢𝑙𝑏 °𝐶 25.8* 14.0 23.0† 23.5

Wet bulb Temperature 𝑇𝑤𝑒𝑡 𝑏𝑢𝑙𝑏 °𝐶 16.7* 13.8 17.3 17.50

Relative Humidity 𝑅𝐻 % 39.3%* 95.0% 55.0% 55.5%

Specific Enthalpy ℎ 𝑘𝐽/𝑘𝑔 46.6* 38.0 47.6 49.0

Moisture Content 𝑔 𝑘𝑔/𝑘𝑔 0.00813* 0.00946 0.009743 0.00944

* Obtained from CIBSE Guide J design day data, August 4th

14:00-15:00

Page 37: Tender Submission for LOB

AIR CONDITIONING SYSTEM (ACS) 28

APPARATUS DEW POINT

The Apparatus Dew Point (ADP) of the cooling coil is marked on Figure 6-2

at 13.3°C. The contact factor of the cooling coil can also be

determined 𝛽 =𝑀→𝑆

𝑀→𝐴𝐷𝑃 = 0.92.

PLANT SIZING

To ensure the ACS can cool the building if the cooling load were ever to

exceed the peak design load, a Plant Size Ratio (𝑃𝑆𝑅) is employed, at a

typical value of 1.2.

𝑄𝑐𝑜𝑜𝑙𝑖𝑛𝑔 = �� × (ℎ𝑀 − ℎ𝑆)

= 48.3𝑘𝑔/𝑠 × (49.0𝑘𝐽/𝑘𝑔 − 38.0𝑘𝐽/𝑘𝑔) = 530.8𝑘𝑊

𝑄𝑃𝑙𝑎𝑛𝑡 = 𝑄𝐶𝑜𝑜𝑙𝑖𝑛𝑔 × 𝑃𝑆𝑅

= 530.8𝑘𝑊 × 1.2 = 637.0𝑘𝑊

6.2 AIR CONDITIONING SYSTEM SPECIFICATION

Natural ventilation is the preferred method of cooling a building for

environmental and financial reasons. However, natural ventilation

cannot disperse as much heat as mechanical systems. CIBSE recommend

any buildings with sensible gains of over 40𝑊/𝑚2 to employ mechanical

ACS’s. The building’s sensible gains are 44.4𝑊/𝑚2, implying it requires a

mechanical cooling system.

Table 6-3: Factors to consider when specifying an ACS

Factor Reason

Comfort The ability of the ACS to meet the variable requirements of the occupants is paramount to ensure that the workforce function effectively.

Financial If LOB intends to retain and operate the building it would be advisable to install a more efficient ACS, as the reduced maintenance and energy costs will make the greater capital investment worthwhile.

Control Since the cooling demand of the building varies greatly throughout the day, the ACS must be able to operate under a variable schedule. This prevents the ACS being active when it is not necessary, minimising energy use and environmental impact.

Noise Production

Noise production should adhere to an acceptable volume defined by occupants

Environmental CO2 production and energy consumption should be minimised by selecting an efficient ACS.

Page 38: Tender Submission for LOB

29 Tender Submission | K13IDM

SYSTEM SELECTION

Variable Air Volume (VAV) systems are the most widely employed ACS in

modern office buildings. A centralised VAV system is specified for this

building, with fan assisted terminals incorporated into the system.

Figure 6-3: Fan Assisted VAV system schematic

Table 6-4: VAV system components

Component Image Description

Chiller

The chiller provides a supply of chilled water to the AHU’s cooling coils

Air Handling Unit (AHU)

The AHU is the unit where air is treated. It contains the primary heating and cooling coils (powered by the boiler and chiller, controlling temperature), a steam humidifier (to control moisture content) and a large fan to circulate air though the duct network. It also contains a mixing box, which mixes fresh air with recirculated air.

VAV Terminal Units

VAV terminal units are located at each zone, where they can limit the flow rate of air passing into a specific zone (capped at 60% reduction). They also contain a fan to assist with local recirculation, and a heating coil (a legacy component from a time when energy costs were cheaper).

Room based Diffusers

The diffusers are mounted on the perimeter of occupied zones to distribute treated air to the spaces. They come in a variety of shapes, each working in a different manner, many by inducing the coanda effect.

Filters

Filters are placed in the network to remove particle based pollutants such as smoke or dust. If they were to build up it could cause decreased efficiency or health issues. An

Fans

Fans are used to move air through the duct network by increasing pressure at key points. All fans would need to be sized carefully to ensure adequate pressures to circulate air.

Page 39: Tender Submission for LOB

AIR CONDITIONING SYSTEM (ACS) 30

Table 6-5: Advantages and Disadvantages of a VAV system

Advantages Disadvantages

Good temperature control is achieved by thermoregulatory devices in VAV terminal units

Uneven heating or cooling requirements can be met by varying air flow rates at each zone’s VAV terminal unit. Perimeter zones will generally have a greater cooling load than core zones. (e.g. 𝑄𝑜𝑓𝑓𝑖𝑐𝑒 > 𝑄𝑐𝑖𝑟𝑐𝑢𝑙𝑎𝑡𝑖𝑜𝑛)

Very flexible system is able to accommodate any future changes in AC requirement

Fan assisted VAV units allow for zone by zone control of air flow rates, with up to 60% throttling of the system volume flow rate minimising energy wasting.

Recirculation can be employed easily within the terminal units, improving the efficiency of the ACS.

Fan assistance ensures proper mixing, preventing air dumping.

Fresh air is supplied in the system, so no additional ventilation system is required.

The complex system contains numerous components, and requires substantial maintenance.

A large plant room must be available to house the large boilers, chiller and AHU. Sufficient void space must also be available within the ceilings of the building to accommodate the large ducts that circulate treated air.

Requires careful planning and design of system as well as quality commissioning to ensure it functions correctly

Excess noise could occur if the fan assisted VAV terminal units are not acoustically insulated from occupied spaces.

Implementation of fan-assisted terminal units will increase capital and maintenance costs.

CONTROL

The ACS should be controlled via a schedule that is refined with feedback

from post-occupancy evaluation. Intuitive devices with partial local

control should also be employed, operated by occupants for real time

comfort adjustments. This should be through either real or perceived

control (e.g. thermostats and fan controls; or false switches).

Page 40: Tender Submission for LOB

31 Tender Submission | K13IDM

6.3 ANNUAL RUNNING COSTS

Table 6-6: Three approaches to estimate ACS cooling load

Estimation 1 Estimation 2 Estimation 3

𝑆𝑦𝑠𝑡𝑒𝑚 𝑃𝑟𝑖𝑐𝑒 = 𝐶𝑜𝑠𝑡 𝑝𝑒𝑟 𝑚2 × 𝑓𝑙𝑜𝑜𝑟 𝑎𝑟𝑒𝑎

𝐶𝑂2 𝑒𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑠𝑒 = 𝐸𝑚𝑖𝑠𝑠𝑖𝑜𝑛 𝑝𝑒𝑟 𝑚2 × 𝑓𝑙𝑜𝑜𝑟 𝑎𝑟𝑒𝑎

Using general operational costs from CIBSE Guide F Table 7.5

Centralised VAV system assumption:

Building occupied floor area: 9717𝑚2

CO2 emission: 40𝑘𝑔/𝑚2𝑝. 𝑎

Running Cost: £2.40/𝑚2𝑝. 𝑎

𝐸𝑛𝑒𝑟𝑔𝑦 𝑑𝑒𝑚𝑎𝑛𝑑 = 𝐸𝑛𝑒𝑟𝑔𝑦 𝑢𝑠𝑒 𝑝𝑒𝑟 𝑚2 × 𝑓𝑙𝑜𝑜𝑟 𝑎𝑟𝑒𝑎

Using general energy demand costs from CIBSE Guide B Table 2.2

Type 3 (standard air-conditioned office) cooling load:

Building occupied floor area: 9717𝑚2

Energy Consumption: 31𝑘𝑊ℎ/𝑚2𝑝. 𝑎

𝑇𝑀,𝑚𝑎𝑥 =𝑉𝑜𝑇𝑜 + 𝑉𝑟𝑇𝑟

𝑉𝑡=

7.22 × 25.8 + 32.6 × 23

39.8= 23.5°𝐶

Δ𝑇𝑀−𝑆,𝑚𝑎𝑥 = 𝑇𝑀,𝑚𝑎𝑥 − 𝑇𝑠 = 23.5 − 14.0 = 9.5°𝐶

𝑄𝑐𝑜𝑜𝑙,𝑎𝑣𝑒 = 𝑉𝑇 × 𝜌 × 𝑐 × (Δ𝑇𝑎𝑣𝑒 × 70.7%)

= 39.8 × 1.21 × 1020 × (9.5°𝐶 × 70.7%) = 330.9𝑘𝑊

𝑡𝑐𝑜𝑜𝑙 = 11.49% × 8760ℎ𝑟/𝑦𝑟 = 1007ℎ𝑟𝑠

Using method to calculate the annual energy consumption based on peak cooling demand, as described by Chadderton.

Find the peak temperature of mixed (𝑇𝑀,𝑚𝑎𝑥) air prior to

cooling (based on volume flow rates of outdoor air (𝑉𝑜), recirculated air (𝑉𝑟) and total air (𝑉𝑡) and the design outdoor temp (𝑇𝑂) and recirculation Temperature (𝑇𝑟).

Finding the average cooling required (Δ𝑇𝑎𝑣𝑒) required.

Assuming sinusoidal fluctuation in outdoor air temperature finds the mean mixed air temperature 𝑇𝑀,𝑎𝑣𝑒 by multiplying

𝑇𝑚𝑎𝑥by 70.7%. The average cooling power (𝑄𝑐𝑜𝑜𝑙,𝑎𝑣𝑒) of

the ACS can then be determined with the total volume flow rate of air, air density (𝜌) and specific heat capacity of air (𝑐).

Hours of operation (𝑡𝑐𝑜𝑜𝑙) are determined as any time when 𝑇𝑟𝑜𝑜𝑚 < 𝑇𝑒𝑥𝑡𝑒𝑟𝑛𝑎𝑙. The number is determined based on the proportion of hours during summer (CIBSE Guide A Table 2.13) that exceeds 𝑇𝑟𝑜𝑜𝑚, multiplied by hours in a year.

The annual energy can then be calculated as 𝑃𝑜𝑤𝑒𝑟 ×𝑇𝑖𝑚𝑒 × 𝐶𝑂𝑃. (Chadderton recommends 2.50 in cases where value is not specified)

Data provided is for 1992 cost so by applying inflation, according to the bank of England, the corrected running cost

is £4.43/𝑚2𝑝. 𝑎

† Energy load is converted to monetary value/ CO2 emission load using standard conversion factors as provided by the

energy savings trust, 1kWh = £0.1319 and 0.519kgCO2, dated 2015

Energy

Price

CO2

n/a

£43,045 p.a

388.7 tonnes p.a

301,227 kWh p.a

£42,322 p.a †

147.6 tonnes p.a †

133,215 kWh p.a

£17,571 p.a †

69.1 tonnes p.a †

Page 41: Tender Submission for LOB

AIR CONDITIONING SYSTEM (ACS) 32

The three approaches predict significantly different cost and CO2

emissions. However the costs are of a comparable magnitude, implying

an annual cost of £20-40,000 for cooling.

The CO2 emissions are far less coherent, with the older approach (1)

predicting carbon emissions over 500% higher than the modern approach

(3). This is potentially due to the increase in renewable electricity

production since 1992, reducing the amount of CO2 produced per kWh.

It would be expected that Estimation 3 would be most accurate, as it is

derived from the actual building’s performance, as opposed to generic

area-weighted assumptions. The only way to evaluate expenses

accurately would be by examining the building once it is in service.

(477)

Page 42: Tender Submission for LOB

33 Tender Submission | K13IDM

Page 43: Tender Submission for LOB

VENTILATION 34

7.1 DESIGN CRITERIA

To ensure that the ventilation system will adhere to Approved Document

F [9] it must:

Supply adequate fresh air

Supply the total air required for heating and cooling to occupied

zones

Ensure mixing of air

Not produce excessive noise

Provide extraction in sanitary accommodations

Table 7-1: Ventilation Requirements

Parameter Offices Lobby

Required Fresh Airflow Rate per Floor (m3/s) 0.79 0.11

Mixing Ratio [dimensionless] 0.82 0.82

Total Airflow Rate Per Floor (m3/s) 3.57 0.50

Number of Diffusers Per Floor [dimensionless] 8 2

Airflow per Diffuser (m3/s) 0.45 0.25

Throw length (m) 7 4.5

Sound Level dbA * 30 24

*from gilberts curved blade grills documentation [8]. Must not exceed 30 dbA in office

buildings. Can be reduced using more adjustable blades

7.2 DUCT CONFIGURATION

The primary vertical ductwork can be housed in the existing services

shafts. By dividing the system into two symmetrical networks pressure

losses are reduced.

The ducts to the supply diffusers will run within the ceiling void, see

Figure 7-1 and 7-2

7 VENTILATION

Page 44: Tender Submission for LOB

35 Tender Submission | K13IDM

Figure 7-1: Duct Layout in Plan

Figure 7-2: Supply Duct layout in Section

SANITARY AND NON-SANITARY ACCOMMODATION

The ventilation in the sanitary accommodations uses local extraction. The

zone is depressurised to avoid any mixing with air in non-sanitary zones

Approved document F [9] specifies the requirement for this is an

intermittent air extract of 6 L/s per WC or Urinal. The total extract for

each zone is shown Table 7-2.The supply air is drawn from other

ventilated zones.

Page 45: Tender Submission for LOB

VENTILATION 36

Table 7-2: Total extract for each sanitary zone

Sanitary Accommodation Configuration Total Extract for Zone (L/s)

Ground Floor Male 1 WC 2 Urinals 18

Ground Floor Female 3 WCs 18

Typical Floor Male 4 WCs 3 Urinals 42

Typical Floor Female 5 WCs 30

SUPPLY INDEX RUN

The supply index run shown in Figure 7-3 runs from the plant room to the

furthest supply terminal on the first floor (not the ground floor as

terminals are only located in the central core, close to the main riser).

Figure 7-3: Supply Index Run

Page 46: Tender Submission for LOB

37 Tender Submission | K13IDM

SUPPLY INDEX RUN PRESSURE DROP

The total pressure loss over the index run is a combination of the

pressure loss along the pipes due to friction and the pressure loss over

components.

The pressure loss along pipes is given by:

Δp = λ −1

2ρ𝑐2 [7-1]

Where λ is the friction factor found using chart 4.2 in CIBSE Guide C, ρ is

the density of air (1.2 kg/m3) and c is the specific heat capacity of air (1.0

kJ/kg.K). [10]

∆𝑝 = ζ 1

2ρ𝑐2 [7-2]

Where ζ is the component loss factor obtained from tables in CIBSE Guide

C Chapter 4.

The results of these calculations are found in Table 7-3 and detailed in

depth in Appendix C.

Table 7-3: Pressure Drop over Index Run

Parameter Value Unit

Pressure loss along Pipes (Friction)*

40.21 Pa

Pressure loss over components*

103.58 Pa

Total pressure drop over index run

143.79 Pa

Found using method CIBSE Guide B [3] and values from CIBSE Guide C [10] for breakdown

please see appendix C

7.3 FANS

The energy consumption of the system fans is calculated using the

method given in CIBSE Guide B chapter 3 [3]:

𝐴𝑖𝑟 𝑃𝑜𝑤𝑒𝑟 = 𝑄𝑇∆𝑝 [7-3]

𝐴𝑖𝑟 𝑃𝑜𝑤𝑒𝑟 = 16.3 × 143.79 = 2343𝑊

The electrical power required based on the fan’s efficiency (90% [6])

𝐸𝑙𝑒𝑐𝑡𝑟𝑖𝑐 𝑃𝑜𝑤𝑒𝑟 =𝐴𝑖𝑟 𝑃𝑜𝑤𝑒𝑟

𝜇 [7-4]

Page 47: Tender Submission for LOB

VENTILATION 38

Each fan’s energy consumption is given by:

𝐸𝑛𝑒𝑟𝑔𝑦 𝐶𝑜𝑛𝑠𝑢𝑚𝑝𝑡𝑖𝑜𝑛 = 𝑡𝑜𝑝𝐸𝑙𝑒𝑐𝑡𝑟𝑖𝑐 𝑃𝑜𝑤𝑒𝑟 [7-5]

Table 7-4: Equation Parameters

Term Definition

top operational time

(17 hours a day during warm up period and occupation, week days)

QT total flow rate (16.30 m/s)

Δp total pressure loss over the index circuit

System Calculations

Electric Power = 2343/0.9

= 2604W

Top= 17hours*240days

= 4080hrs

Therefore

Energy consumption = 4080*2.604

= 42491 kWhrs

There are four fans in the building; two supply and two extract. The total

energy consumption and a summary of data in this section are given in

Table 7-5

Table 7-5: Fan and energy characteristics

Parameter Value Unit

Total Pressure Drop 143.79 Pa

Air power 2,343 W

Fan Efficiency 90% [percentage]

Electric Power 2,604 W

Operational Time 4080 hr

Energy Consumption Fan 10,623 kWhr

Number of Fans 4 [dimensionless]

Total Electric Power 10,414.56 W

Total Energy Consumption 42,491 kWhr

Page 48: Tender Submission for LOB

39 Tender Submission | K13IDM

7.4 SUPPLY DIFFUSER CHOICE

The supply diffusers are situated in the ceiling due to the duct placement

and to take advantage of the coanda effect They are sized using equation

7-6.

𝑈𝑚𝑎𝑥 =𝐶𝑄

𝑥𝐴𝑒0.5 and𝐴𝑒 = 0.6𝐴𝑜 [7-6]

Table 7-6: Supply Diffuser Sizing

Term Definition Offices Lobby

Umax Umax (m/s) 0.25 0.25

C Hueretic Constant 5.5 5.5

x Throw (m) 7 4.5

Q Flow Rate (m3/s) 0.45 0.25

Ae Effective Area Opening (m2) 1.96 1.47

Ao Area Diffuser (m2) 3.27 2.46

Example calculation (office diffuser)

Ae = ((5.5*0.45)/(7*0.25))2 = 1.96m2

Ao = 1.96/0.6 = 3.27m2

Page 49: Tender Submission for LOB

VENTILATION 40

Page 50: Tender Submission for LOB

41 Tender Submission | K13IDM

Page 51: Tender Submission for LOB

SENSITIVITY ANALYSIS 42

Reductions in the building’s energy consumption and carbon emissions

can be achieved by making a series of changes to the building’s geometry

and thermal envelope.

8.1 POTENTIAL CHANGES

IMPROVING FABRIC THERMAL PERFORMANCE

Reduced conductive heat transfer though the

thermal envelope can be obtained by reducing

fabric U-values. To quantify the potential savings, the U-values are

reduced to 0.15𝑊/𝑚2𝐾 , in line with ACEB Gold Standard building

performance [11].

Table 8-1: U-value comparison of Part L requirement and ACEB Gold Standard

Fabric Element Part L Minimum (W/m2K) ACEB Gold Standard (W/m

2K)

Wall

Floor

Roof

0.35

0.25

0.25

0.15

0.15

0.15

INSTALLING TRIPLE GLAZING

The heat lost though the building’s glazing can be

reduced by installing triple glazing. The triple

glazing will slightly reduce the solar radiant gains as

well, reducing the cooling load during summer.

Table 8-2: Comparing performance of double glazing vs triple glazing

Window Type U-Value (W/m2K) G-Value Response Factor

Double Glazing (reflective coating) 2.2 0.41 0.50

Triple Glazing (reflective coating) 0.9 0.35 0.43

TOTAL SOLAR SHADING

The peak cooling load can be reduced by applying

total solar shading to the building. The solar load

on each façade is redefined as north facing.

8 SENSITIVITY ANALYSIS

Page 52: Tender Submission for LOB

43 Tender Submission | K13IDM

INCREASING THERMAL MASS

The effect of environmental changes can be offset

by increasing the thermal mass of the building;

changing it to a slow response building.

Table 8-3: Effect of increasing thermal mass

Building Element Lag, φ (hrs) Decrement Factor, f Response Factor

Fast Slow Fast Slow Fast Slow

Wall 5 9 0.58 0.21 - -

Roof 2 10 0.93 0.15 - -

Floor 2 9 0.91 0.15 - -

Vehicle Access Doors

1 1 1 1 - -

Glazing - - - - 0.50 0.43

8.2 COMPARISON OF CHANGES

Table 8-4: Comparison of changes

Alteration Affects Heating Load?

Affects Cooling Load?

Affects Ventilation

Load

Energy Demand

(kWh)

Saving (%)

CO2 Emissions (Tonnes)

Saving (%)

Original n/a n/a n/a 1164210 - 305 -

Triple Glazing

✓ ✓ ✓ 960134 18.0% 249 18.0%

Fabric U-values

✓ ✓ ✓ 1130812 3.0% 297 3.0%

Total Solar Shading

✓ ✓ 1137502 2.0% 291 5.0%

Increase Thermal Mass

✓ ✓ 1150135 1.0% 301 1.0%

Net effect 925,295 21.0% 241 21.0%

Note: Each of the changes only alters the sensible loads, not the latent loads, resulting in a

different room ratio. This slightly alters the psychometric process for the air conditioning

cycle. However, the changes in enthalpies are so small that the margin of error incurred

becomes negligible (<1%) when considering the inaccuracies in the original calculations.

The heating load is far greater than the cooling load. Changes that affect

only the cooling load of the building will therefore have a lesser impact

on the total energy demand, but comparatively high financial savings due

to the relative expense of electricity compared to gas.

Page 53: Tender Submission for LOB

SENSITIVITY ANALYSIS 44

8.3 RECCOMMENDATIONS

Table 8-5: Recommendations

Alteration Energy Saving (%)

CO2 Saving (%)

Feasibility

Triple Glazing 18.00% 18.00% By installing triple glazing, upwards of £8000 p.a could be saved. The expense of the upgrade is around £500,000 making the payback around 50 years [4]. Financially, it may not be in LOB’s best interests if they want a quick return on their investment. It would however be environmentally beneficial as significant amounts of energy and CO2 can be saved.

Fabric U-values 3.00% 3.00% A saving of around £1500 p.a. could be attained by adding insulation to the walls roof and floors. The payback time of such an upgrade would be in the region of 50 years [11]. Other elements of the building’s fabric could also be improved, seeing comparable benefits.

Total Solar Shading

2.00% 5.00% Up to £2000 p.a. could be saved by adding solar shading. Shading should definitely be implemented, either by adding louvres or increasing window recesses, as there are minimal capital costs for such modifications (an effective shading device should overhang the windows by 2.8m).

Increase Thermal Mass

1.00% 1.00% The response time of the building should be increased to save energy and money at no additional capital cost. Free night cooling could also be employed to further increase energy savings.

From an environmental standpoint all the above changes should be

made. However, it is only cost effective to employ most of the changes if

LOB plan to operate the building for 50 years to see payback on their

additional investment.

Figure 8-1: Comparison of changes

(226)

Page 54: Tender Submission for LOB

45 Tender Submission | K13IDM

Page 55: Tender Submission for LOB

FIRE PROTECTION 46

The building is assessed for fire protection, to ensure that it conforms to

Approved Document B of the UK Building Regulations. It must be

protected from the effects of heat, using fire resistant construction, and

protect occupants from smoke, using compartmentalisation.

9.1 HORIZONTAL ESCAPE

Escape routes and travel distances are assed. Maximum travel distances

from any point on a floor to that storey’s exit can be seen in Table 9-1.

Table 9-1 Maximum travel distances, taken from Approved Document B, [12]

Room Primary Direction (m) Secondary Direction (m)

Office (Floors 1-10) 18 45 Entrance (Ground floor) 18 45

For each upper floor there are two means of horizontal escape, and three

for the ground floor. Table 9-2 shows that the current conditions meet

required standards.

Table 9-2: Number of routes required, taken from Approved Document B, [12]

Floor Number of People Required number of exit routes

Office 79 2 Entrance 11 1

Figures 9-1 to 9-4 show the available exits and 18m travel routes from the

office and entrance floors respectively. Not all areas of the floor are

within 18m of a fire exit; so additional doors will need to be fitted to

meet the minimum guidelines.

Inner rooms such as the sanitary accommodation, must also adhere to

the guidelines, and open directly onto the access floor.

9 FIRE PROTECTION

Page 56: Tender Submission for LOB

47 Tender Submission | K13IDM

Figure 9-1: Typical office floor, not meeting maximum travel distances

Figure 9-2: Typical office floor, meeting maximum travel distances

Figure 9-3: Entrance floor, not meeting maximum travel distances

Figure 9-4: Entrance floor, not meeting maximum travel distances

Page 57: Tender Submission for LOB

FIRE PROTECTION 48

9.2 VERTICAL ESCAPE

Stair carrying capacities and widths are assessed. Table 9-3 shows the

minimum escape widths required. A fire may prevent one of the exits

from being used so all exit widths must adhere to these guidelines.

Table 9-3: Minimum exit widths, Approved document B, [12]

Floor Number of People Exit Width (mm)

Office 79 850 Entrance 11 750

Since the office is open plan, all staircases must be capable of

simultaneous evacuation.

Example Calculation: Width of Stairs, using table 7 Approved Document B

79 people x 9 upper floors = 711 people

711 people = 1400mm width of stairs required

9.3 COMPARTMENTALISATION OF SPACES

To control the spread of fire the internal spaces are compartmentalised,

separated by fire resistant walls and floors. The number of compartments

depends on:

Building use

Building height

Availability of a sprinkler system

Table 9-4 shows that the building requires all storeys to be separated by

compartment floors, but compartment walls will not be necessary. Figure

9-5 shows the configuration.

Table 9-4: Compartment regulations, Approved document B, [12]

Maximum Total Height without compartment floors (m)

Maximum Floor Area without compartment

walls (𝒎𝟐)

Guidelines 30 2000 LOB 37.5 985

Page 58: Tender Submission for LOB

49 Tender Submission | K13IDM

Figure 9-5: Compartment floor configuration, meeting approved document Bs guidelines.

9.4 PROTECTION OF VENTILATION OPENINGS

In some cases ventilation openings breach the dividers that separate

adjacent fire compartments. They need to be protected so the fire barrier

remains intact. They can be protected by:

Fire dampers

Fire-resisting enclosures

Fire resisting ductwork

Fire dampers should be installed around the openings with sufficient

tolerance to allow access for maintenance and room for expansion in the

heat of a fire. Pipes below 160mm internal diameter, that penetrate

through the fire-separating compartments will require sleeving of non-

combustible pipe, see Figure 9-6.

Figure 9-6: Pipe sleeving, taken from Approved Document B, [12]

Page 59: Tender Submission for LOB

FIRE PROTECTION 50

9.5 LOCATION OF FIRE-FIGHTING SERVCES

Hydrants, hoses, risers and sprinklers must be suitably placed to assist fire

fighters in time of need. Fire mains with valves must be installed within

the building so that fire fighters can connect hoses for water rapidly. The

fire fighting shafts and necessary escape stairs must be equipped with fire

mains. The mains can be ‘dry’ type due to the building being less than

50m tall.

A sprinkler system must be installed throughout the building since it is

taller than 30m. These systems ensure occupant safety and reduce fire

damage. Table 9-5 sets out the standards for a sprinkler system, and

Figures 9-7 and 9-8 shows an appropriate configuration for the building.

Table 9-5: Maximum sprinkler distances, BSEN pg 77 , [13], [14]

Hazard Class

Space required below roof and ceiling sprinklers (m)

Maximum area per

sprinkler (𝒎𝟐)

Maximum distances between sprinklers (m)

Ordinary 0.5 12 4

Figure 9-7: ground floor sprinkler system

Figure 9-8: Office floor sprinkler system

The main sprinkler riser should be placed centrally with primary pipelines

running horizontally across each floor.

(484)

Page 60: Tender Submission for LOB

51 Tender Submission | K13IDM

Page 61: Tender Submission for LOB

VERTICAL TRANSPORT 52

The building is served by four lift shafts, two on either side of the lobby.

The dimensions of each shaft are shown in Table 10-1. The building’s lift

to floor ratio of 1:2.5 places it in the excellent quality of service category

according to British standards lifts and lift services section 6.4.5 [16].

Table 10-1: Lift Shaft Dimensions

Figure 10-1: Exploded View of Building Showing Lifts

10 VERTICAL TRANSPORT

Parameter Value Unit

Width 0.95 m

Depth 4.5 m

Height 37.8 m

Area 4.3 m2

Volume 161.6 m3

Page 62: Tender Submission for LOB

53 Tender Submission | K13IDM

10.1 SYSTEM MECHANICS

PASSENGERS PER CAR

The total area of a lift shaft is 4.1m2. The corresponding car floor area is

2.4m2 to allow space for the counterweight and runners between car and

shaft walls, as shown in Figure 10-2.

The capacity of each car is calculated assuming each passenger requires

0.2m2 of floor space, see Table 10-2.

Figure 10-2: Plan of Lift Showing Dimensions around Car as given in CIBSE Guide D 0

Table 10-2: Breakdown of Car Capacity

Component Area (m2)

Total Lift Shaft Area 4.30

Counterweight including movement tolerance 0.68

Space for Runners 0.67

Car Area 2.41

Capacity 12 People

DOOR TYPE

Current plans suggest a side opening. As stated in section 5.2.4 of British

standards [16] a centre opening would provide improved operation (door

opening/closing) times and aesthetics

Figure 10-3: Comparison of Side Opening and Two-Speed Centre Opening Doors

Page 63: Tender Submission for LOB

VERTICAL TRANSPORT 54

ROPING MECHANISM

The roping mechanism is housed at the top of the building to allow the

load to act directly downwards. Since the lifts only have a capacity of 12

a single wrap pulley system can be used. This is the most economical and

efficient system.

Figure 10-4: Single Wrap Pulley System

CAR SPEED

The recommended car speed for a building 37m tall is 2.5 m/s, as

specified in table 6 of British standards lifts and lift services document

[16].

DESIGN CONSIDERATIONS FOR THE DISABLED

Lift is essential in this building for disabled access as it over one story. The

distance from a lift to the furthest point away from a lift is about 30m this

is well under the maximum walking distance limit of 45m [16] and so

allows for any deviation from the direct route due to, for example,

furniture layout.

Page 64: Tender Submission for LOB

55 Tender Submission | K13IDM

10.2 FIREFIGHTING LIFTS

Fire-fighting lifts are a requirement for the transportation of the disabled

in the event of a fire. These lifts must be situated within the fire-fighting

shaft enclosed by a fire resistant structure that also contains stairs.

All buildings with over 900m^2 must have two fire-fighting lifts installed.

However if a sprinkler system is in place, one lift is sufficient, providing

the entire floor area is within 60m of the lift shaft. [16].

10.3 QUALITY OF SERVICE ASSESSMENT

The round trip calculations are shown in Table 10-4. Table 10-3 collates

relevant values already established. 116 people can be carried by the

system in five minutes, well above the recommended 87. The maximum

waiting time of 31.1s puts the system in the excellent category for quality

of service. [16]

Table 10-3: System specification

Starting Values

No. of Stories 10

People Above Ground 722 Total Occupancy

Floor Height (m) 3.6 (typical) 4.2 (ground)

Total Lift Flight L (m) 33 4.2+8*3.6

Door Width w (m) 1

Door Speed vd (m/s) 0.4 typical CIBSE guide d

Lift Capacity n 12

Lift Speed v (m/s) 2.5

Number of Cars N 4

Aim (people in 5 minutes) 87 12% population in five minutes (CIbSE Guide D)

Table 10-4: Lift Calculations for Quality of Service

Page 65: Tender Submission for LOB

VERTICAL TRANSPORT 56

(382)

Calculations Calculated Value

Probable Number of Stops S1 𝑆1 = 𝑆 − 𝑆 (𝑆−1

𝑆)

𝑛 where S = Maximum number of stops = 9 n = lift capacity =12

= 9 − 9 (8

9)

12

6.8

Upward journey time Tu 𝑇𝑢 = 𝑆1 (𝐿

𝑆1𝑣+ 2𝑣) where L = Total lift flight = 33m v = Lift velocity = 2.5 m/s

= 6.8 (33

6.8∗2.5+ 2 ∗ 2.5)

43.0s

Downward journey time Td

= (33

2.5+ 2 ∗ 2.5)

𝑇𝑑 = (𝐿

𝑣+ 2𝑣) at peak demand car is assumed to run non=stop from top to bottom 18.2s

Door opening time To 𝑇𝑜 = 2(𝑆1 + 1)𝑊

𝑉𝑑 where W = door width = 1m Vd = door velocity = 0.4 m/s

= 2(6.8 + 1)1

0.4

39.1s

Passenger transfer time Tt 𝑇𝑡 = 2𝑛 2 seconds per passenger is assumed

= 2 ∗ 12

24.0s

Round trip time RTT

= 43 + 18.2 + 39.1 + 24

𝑅𝑇𝑇 = 𝑇𝑢 + 𝑇𝑑 + 𝑇𝑜 + 𝑇𝑡 124.3s

Interval for group

=124.3

4

𝐼𝑛𝑡𝑒𝑟𝑣𝑎𝑙 =𝑅𝑇𝑇

𝑁 where N = number of lift cars = 4 31.1s

Number of journeys in five minutes 𝐽𝑜𝑢𝑟𝑛𝑖𝑒𝑠 =

5 ∗ 60 ∗ 𝑁

𝑅𝑇𝑇

=5 ∗ 60 ∗ 4

124.3

9.7

Number of people carried in five minutes 𝑵𝒐. 𝒐𝒇 𝑷𝒆𝒐𝒑𝒍𝒆 = 𝑱𝒐𝒖𝒓𝒏𝒊𝒆𝒔 × 𝒏 = 𝟗. 𝟕 × 𝟏𝟐 116

Page 66: Tender Submission for LOB

57 Tender Submission | K13IDM

Page 67: Tender Submission for LOB

CONCLUSIONS 58

The key findings from this investigation are:

The peak-heating load for the building is 482 kW, occurring

between 06:00 and 07:00, December 4th. This requires a boiler

plant size of 578 kW capable of meeting peak requirements.

The peak-cooling load for the building is 443 kW, occurring

between 14:00 and 15:00, August 4th. This requires an air

conditioning system of 637 kW.

The series of potential improvements included altering:

o Fabric properties

o Glazing type

o Shading

o Thermal mass

The two changes that save the greatest amount of energy and

𝐶𝑂2 are installing triple glazing windows and upgrading the fabric

in line with ACEB Gold Standard regulations. They are however

less financially viable as they will take 50 years to see a financial

return.

In the short-term total solar shading and increased thermal mass

have less effect on energy and 𝐶𝑂2 savings, between 1 and 5%,

however they are more financially feasible.

The building does not conform to Approved Document B of the

UK Building Regulations with regards to fire protection, when

meeting maximum horizontal travel distances. Additional fire

doors must be implemented to rectify this.

It was seen that the current configuration of proposed vertical

transport system more than capable of meeting the building’s

requirements, putting the building into the ‘excellent’ category

according to British Standards for lifts and lift services.

(230)

11 CONCLUSIONS

Page 68: Tender Submission for LOB

59 Tender Submission | K13IDM

Page 69: Tender Submission for LOB

CONCLUSIONS 60

Page 70: Tender Submission for LOB

I Tender Submission | K13IDM

12.1 REFERENCES

[1] CIBSE. Guide A: Environmental Design. 2006

[2] HM Government. Approved Document L2: Conservation of Fuel

and Power in New Buildings Other than Dwellings (Building

Regulation). 2010

[3] CIBSE. Guide B: Heating, ventilating, air conditioning and

refrigeration. 2005

[4] BRE. The Government’s Standard Assessment Procedure for

Energy Rating of Dwellings. 2012

[5] R. Jones. Gilberts. Guest Lecture at the University of

Nottingham. 2015

[6] B. Jones. Air Conditioning Lecture notes. University of

Nottingham. 2015

[7] D. Oughton. Faber & Kell's Heating & Air-conditioning of

Buildings. 2008

[8] Gilberts. Series G curved blade Grilles. 2012

[9] HM Government. Approved Document F: Ventilation (Building

Regulations). 2000

[10] CIBSE. Guide C: Reference Data. 2007

[11] AECB. CarbonLite Program Guidance. 2009

[12] HM Government. Approved Document B volume 2: Fire Safety

– Buildings other than dwelling houses (Building Regulations).

2010

[13] British Standard. BS EN 12845:2004 +A2:2009: Fixed

firefighting systems – Automatic sprinkler systems – Design,

installation and maintenance. 2004, 2009.

[14] British Automatic Fire Sprinkler Association (BAFSA). Using

Sprinkler Systems in Buildings and Structures, Compliance with

Current Fire Safety Guidance. 2011

[15] CIBSE. Guide J: Weather, solar and illuminance data. 2002

[16] BSI Standards Publishing. BS 5655-6 Lifts and Lift Services. 2011

CIBSE. Guide D: Transportation in buildings. 2010

12 BACK MATTER

Page 71: Tender Submission for LOB

BACK MATTER II

Page 72: Tender Submission for LOB

I Tender Submission | K13IDM

12.2 APPENDIX A

Table 12-1: Weather data used for Heating Season Calculations, taken from CIBSE Guide J, Table 5.36

Hour January 29th

February 26th

March 29th April 28th May 29th June 21st July 4th August 4th September 4th

October 4th November 4th

December 4th

1 2.5 2.3 4.8 7.1 9.8 13.9 14.8 15.7 11.6 9 5.2 1.3

2 2 2 4.3 6.4 9.2 13.1 14.2 15 11.1 8.6 5 1.1

3 1.9 1.9 4.1 6 8.7 12.4 13.6 14.4 10.4 8.2 4.5 0.7

4 1.4 1.5 3.5 5.6 8.3 12 13.2 13.9 9.9 7.8 4.3 0.2

5 1.2 1.4 3.2 5.3 8.1 12.2 13.3 13.4 9.6 7.5 3.9 0

6 0.9 1.2 3 5.7 9.2 13.3 14.3 14 9.6 7.4 3.7 -0.2

7 0.7 1.1 3.2 7.4 10.9 15 15.9 15.6 10.6 7.8 3.7 -0.4

8 0.7 1.4 4.6 9.4 12.7 16.8 17.7 17.4 12.7 9.2 3.9 -0.3

9 1.2 2.5 6.6 11.1 14.4 18.5 19.5 19.4 15.1 11.4 5.4 -0.1

10 2.3 3.8 8.2 12.8 16 20.1 21 21.2 17.2 13.4 7 1.2

11 3.7 5.2 9.7 14.3 17.4 21.5 22.5 22.6 18.6 14.8 8.4 2.7

12 4.7 6.3 11.1 15.2 18.4 22.7 23.4 23.9 19.6 15.9 9.5 4

13 5.5 7.1 12.1 16 19.3 23.6 24.2 24.8 20.4 16.4 9.9 4.9

14 5.9 7.7 12.6 16.4 19.8 24.4 24.8 25.4 21 16.6 10.2 5.4

15 5.8 7.7 12.7 16.4 20.1 24.5 25.3 25.8 21.2 16.8 10 5.1

16 5.3 7.2 12.6 16.1 20 24.4 25.4 25.7 21.1 15.9 9.1 4.1

17 4.3 6.1 12.1 15.5 19.6 24.2 25 25.2 20.5 14.9 7.9 3.3

18 3.7 5 10.9 14.6 18.8 23.5 24.4 24.3 19.4 13.6 7.3 2.7

19 3.3 4.4 9.7 13.2 17.4 22.5 23.3 23 18 12.8 6.7 2.2

20 3 3.8 8.6 11.8 15.7 20.9 21.7 21.3 16.6 11.9 6.3 1.8

21 2.7 3.3 7.7 10.8 14.3 19.3 20.1 20 15.4 11.1 5.9 1.6

22 2.2 3 6.8 9.7 13.1 17.9 18.9 18.9 14.4 10.5 5.7 1.4

23 1.8 2.7 5.8 9.1 12.1 16.8 17.5 18 13.5 9.8 5.4 1.1

24 1.8 2.5 5.6 8.3 11.4 15.7 16.7 17.1 12.9 9.5 5 0.7

Average 2.9 3.8 7.6 11.0 14.4 18.7 19.6 19.8 15.4 11.7 6.4 1.9

Page 73: Tender Submission for LOB

BACK MATTER II

Table 12-2: Fabric gains/Losses (Wall, Roof, Glazing)

Hour January February March April May June July August September October November December

1 -415929 -420195 -366871 -339142 -281552 -194100 -174904 -155707 -243159 -277286 -358339 -441525

2 -426594 -426594 -377536 -354073 -294350 -211164 -187701 -170638 -253823 -285818 -362605 -445791

3 -428727 -428727 -381802 -362605 -305015 -226095 -200499 -183435 -268754 -294350 -373270 -454323

4 -439392 -437259 -394600 -371137 -313547 -234627 -209031 -194100 -279419 -302882 -377536 -464988

5 -443658 -439392 -400998 -377536 -317813 -230361 -206898 -204765 -285818 -309281 -386068 -469253

6 -450057 -443658 -405264 -369004 -294350 -206898 -185568 -191967 -285818 -311414 -390334 -473519

7 -454323 -445791 -400998 -332743 -258089 -170638 -151441 -157840 -264488 -302882 -390334 -477785

8 -454323 -439392 -371137 -290084 -219696 -132244 -113047 -119446 -219696 -273020 -386068 -475652

9 -443658 -415929 -328477 -253823 -183435 -95984 -74654 -76787 -168505 -226095 -354073 -471386

10 -420195 -388201 -294350 -217563 -149308 -61856 -42659 -38393 -123712 -183435 -319946 -443658

11 -390334 -358339 -262355 -185568 -119446 -31995 -10665 -8532 -93851 -153574 -290084 -411663

12 -369004 -334876 -232494 -166372 -98117 -6399 8532 19197 -72521 -130111 -266621 -383935

13 -351940 -317813 -211164 -149308 -78920 12798 25596 38393 -55457 -119446 -258089 -364738

14 -343408 -305015 -200499 -140776 -68255 29862 38393 51191 -42659 -115180 -251691 -354073

15 -345541 -305015 -198366 -140776 -61856 31995 49058 59723 -38393 -110914 -255956 -360472

16 -356206 -315680 -200499 -147175 -63989 29862 51191 57590 -40526 -130111 -275153 -381802

17 -377536 -339142 -211164 -159973 -72521 25596 42659 46925 -53324 -151441 -300749 -398865

18 -390334 -362605 -236760 -179170 -89585 10665 29862 27729 -76787 -179170 -313547 -411663

19 -398865 -375403 -262355 -209031 -119446 -10665 6399 0 -106649 -196233 -326344 -422328

20 -405264 -388201 -285818 -238893 -155707 -44792 -27729 -36260 -136510 -215430 -334876 -430860

21 -411663 -398865 -305015 -260222 -185568 -78920 -61856 -63989 -162106 -232494 -343408 -435126

22 -422328 -405264 -324211 -283685 -211164 -108781 -87452 -87452 -183435 -245292 -347674 -439392

23 -430860 -411663 -345541 -296483 -232494 -132244 -117313 -106649 -202632 -260222 -354073 -445791

24 -430860 -415929 -349807 -313547 -247425 -155707 -134377 -125845 -215430 -266621 -362605 -454323

Average -408375 -388289 -306170 -255779 -184235 -91362 -72254 -67544 -161395 -219696 -332477 -429705

Page 74: Tender Submission for LOB

III Tender Submission | K13IDM

Table 12-3: Total fabric gains/losses. (Wall, roof, glazing, Floor)

Hour January February March April May June July August September October November December

1 -420006 -424072 -369928 -341483 -283178 -194799 -175412 -156168 -244557 -279480 -361658 -445815

2 -430671 -430471 -380592 -356414 -295976 -211863 -188210 -171099 -255222 -288011 -365924 -450081

3 -432804 -432604 -384858 -364946 -306641 -226794 -201008 -183897 -270153 -296543 -376589 -458613

4 -443469 -441135 -397656 -373478 -315173 -235326 -209540 -194562 -280817 -305075 -380855 -469278

5 -447735 -443268 -404055 -379876 -319439 -231060 -207407 -205227 -287216 -311474 -389387 -473544

6 -454134 -447534 -408321 -371345 -295976 -207597 -186077 -192429 -287216 -313607 -393653 -477809

7 -458400 -449667 -404055 -335084 -259716 -171337 -151949 -158301 -265887 -305075 -393653 -482075 8 -458400 -443268 -374194 -292425 -221322 -132943 -113556 -119908 -221094 -275214 -389387 -479942

9 -447735 -419806 -331534 -256164 -185062 -96683 -75162 -77248 -169903 -228288 -357392 -475677

10 -424272 -392077 -297407 -219904 -150934 -62555 -43168 -38855 -125111 -185629 -323265 -447948

11 -394411 -362216 -265412 -187909 -121073 -32694 -11173 -8993 -95249 -155767 -293403 -415953

12 -373081 -338753 -235550 -168712 -99743 -7098 8023 18735 -73919 -132305 -269941 -388225

13 -356017 -321689 -214221 -151649 -80546 12099 25087 37932 -56856 -121640 -261409 -369028

14 -347485 -308891 -203556 -143117 -69881 29162 37885 50730 -44058 -117374 -255010 -358363

15 -349618 -308891 -201423 -143117 -63483 31295 48550 59262 -39792 -113108 -259276 -364762

16 -360283 -319556 -203556 -149516 -65616 29162 50683 57129 -41925 -132305 -278473 -386092

17 -381613 -343019 -214221 -162313 -74147 24896 42151 46464 -54723 -153634 -304068 -403156

18 -394411 -366482 -239816 -181510 -91211 9966 29353 27267 -78185 -181363 -316866 -415953

19 -402943 -379279 -265412 -211372 -121073 -11364 5890 -461 -108047 -198427 -329664 -426618

20 -409341 -392077 -288875 -241233 -157333 -45492 -28237 -36722 -137908 -217623 -338196 -435150

21 -415740 -402742 -308071 -262563 -187195 -79619 -62365 -64451 -163504 -234687 -346728 -439416

22 -426405 -409141 -327268 -286026 -212790 -109481 -87960 -87913 -184834 -247485 -350994 -443682

23 -434937 -415540 -348598 -298824 -234120 -132943 -117822 -107110 -204031 -262416 -357392 -450081

24 -434937 -419806 -352864 -315887 -249051 -156406 -134886 -126307 -216828 -268815 -365924 -458613

Mean -412452 -392166 -309227 -258119 -185862 -92061 -72763 -68005 -162793 -221889 -335796 -433995

Page 75: Tender Submission for LOB

BACK MATTER IV

Table 12-4: Plant Sizing

Peak Heating Load (W) 482075

PSR 1.2

Plant Heating Capacity (W) 578490

Plant Capacity (kW) 578

Table 12-5: Heating Degree Days, taken from CIBSE Guide A, Table 2.23

Month Number of Heating Degree Days

January 314

February 290

March 255

April 192

May 105

June 45

July 16

August 18

September 51

October 124

November 228

December 293

Total 1931

Page 76: Tender Submission for LOB

V Tender Submission | K13IDM

Table 12-6: Annual Energy Consumption and Carbon Emissions, using data from SAAP Building Regulations 2010, Table 12.

Parameter Value

Number of Degree Days 1931

Number of hours per day (h) 24

Σ𝑈𝐴 + 0.33NV 1330

Total Energy Used (kWh) 988504

Kg of Carbon per kWh 0.216

Total Carbon Used (Tonnes) 214

Price of Mains Gas per kWh (£) 0.0348

Price of energy used (£) 34, 400

Page 77: Tender Submission for LOB

BACK MATTER VI

12.3 APPENDIX B

Table 12-7: South Wall heat transfer (W) Example of Quasi-Dynamic Heat transfer calculation

Hour Effective Time Jan-29 Feb-26 Mar-29 Apr-28 May-29 Jun-21 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04

1 6 -5055 -4958 -4103 -3712 -3014 -1853 -1654 -1447 -2522 -3080 -4189 -5432

2 7 -5116 -5004 -4163 -3818 -3104 -2003 -1775 -1568 -2628 -3125 -4249 -5462

3 8 -5146 -5034 -4209 -3878 -3180 -2124 -1865 -1673 -2718 -3185 -4295 -5522

4 9 -5236 -5079 -4329 -3954 -3240 -2169 -1941 -1764 -2809 -3261 -4355 -5628

5 10 -5266 -5094 -4374 -4014 -3195 -2049 -1835 -1794 -2869 -3306 -4415 -5673

6 11 -5312 -5124 -4390 -3848 -2803 -1626 -1428 -1492 -2839 -3306 -4460 -5703

7 12 -5357 -5139 -4148 -3335 -2351 -1144 -976 -1055 -2311 -3200 -4475 -5718

8 13 -5357 -4642 -3063 -2446 -1747 -571 -388 -196 -1135 -1994 -4385 -5703

9 14 -4196 -3541 -2007 -1436 -843 469 592 890 71 -652 -2485 -5583

10 15 -3065 -2652 -1118 -622 -59 1344 1346 1734 900 403 -1294 -3125

11 16 -2206 -1943 -455 -64 469 1932 1904 2337 1382 915 -646 -1964

12 17 -1920 -1476 58 238 785 2248 2160 2624 1714 976 -254 -1557

13 18 -1874 -1506 118 343 876 2308 2341 2684 1895 991 -495 -1602

14 19 -2327 -1702 -108 87 740 2143 2175 2518 1729 795 -902 -1949

15 20 -3035 -2199 -515 -335 363 1690 1813 2111 1277 312 -1566 -2989

16 21 -3970 -2983 -1269 -953 -195 1072 1271 1478 598 -517 -2591 -4949

17 22 -4799 -3993 -2143 -1647 -828 424 592 754 -276 -1406 -3782 -5130

18 23 -4890 -4521 -3003 -2280 -1220 77 246 196 -1060 -2311 -3903 -5236

19 0 -4935 -4642 -3364 -2642 -1582 -254 -86 -120 -1527 -2492 -3978 -5296

20 1 -4980 -4732 -3530 -2928 -1974 -662 -478 -527 -1753 -2612 -4038 -5356

21 2 -5025 -4808 -3666 -3094 -2230 -993 -780 -738 -1934 -2748 -4099 -5387

22 3 -5116 -4883 -3832 -3260 -2426 -1204 -991 -919 -2100 -2838 -4129 -5432

23 4 -5161 -4928 -3982 -3381 -2607 -1400 -1217 -1070 -2251 -2944 -4189 -5447

24 5 -5176 -4943 -4013 -3501 -2743 -1581 -1368 -1221 -2357 -3004 -4234 -5537

Mean

-4355.0 -3980.3 -2733.7 -2270.1 -1504.4 -246.9 -97.5 72.6 -980.2 -1732.9 -3225.4 -4640.9

Page 78: Tender Submission for LOB

VII Tender Submission | K13IDM

Table 12-8: Total Fabric heat transfer (W)

Hour Jan-29 Feb-26 Mar-29 Apr-28 May-29 Jun-21 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04

1 -27958 -26862 -21541 -17888 -13090 -6560 -5617 -5726 -12487 -16725 -23458 -29997

2 -27944 -27178 -22161 -18951 -14568 -8354 -7107 -6996 -13557 -17353 -23648 -30129

3 -28115 -27467 -22920 -20047 -15800 -9764 -8415 -8166 -14484 -17864 -23798 -30160

4 -28408 -27757 -23556 -20706 -16675 -10854 -9435 -9034 -15283 -18393 -24138 -30344

5 -28634 -27921 -23898 -21285 -17331 -11670 -10212 -9834 -15931 -18775 -24447 -30889

6 -28458 -28091 -24487 -22212 -18218 -12429 -11266 -10771 -16736 -19213 -24508 -30787

7 -28793 -28284 -24806 -21915 -16808 -10683 -10269 -10095 -17100 -19462 -24894 -31050

8 -29008 -28455 -24794 -20883 -15250 -8952 -8513 -8900 -16651 -19513 -25140 -31320

9 -29382 -28464 -23660 -18945 -13813 -7373 -6728 -7151 -14507 -18957 -25261 -31625

10 -29277 -27446 -21385 -16940 -11620 -4572 -4111 -4651 -12024 -16872 -24700 -31626

11 -28202 -25755 -19364 -13051 -6489 1251 969 23 -9457 -14435 -23011 -30868

12 -26888 -24312 -16175 -9248 -3516 4532 4023 3421 -4696 -12235 -21318 -29052

13 -25664 -21740 -11926 -6336 -1214 6707 6519 6587 -1080 -7647 -19849 -27645

14 -22725 -18570 -8896 -3823 1044 9021 8816 9125 1815 -4570 -15153 -26519

15 -20520 -16898 -7288 -2334 2481 10420 10359 10556 3497 -2702 -13278 -22054

16 -19628 -16179 -6730 -2140 2914 10745 10751 11006 3768 -2392 -12918 -20856

17 -20234 -16491 -6949 -2807 2426 9935 10124 10360 3158 -3486 -13570 -21642

18 -21102 -17662 -8034 -3711 1591 8969 9341 9302 2254 -4827 -15134 -22665

19 -22051 -18826 -9583 -4905 895 8512 8355 8222 849 -6274 -16387 -23143

20 -23106 -20139 -11542 -6838 -633 6969 6730 6411 -1288 -8096 -17447 -24667

21 -24861 -21714 -13685 -9513 -3740 3509 3914 3520 -3696 -9962 -19359 -28181

22 -26825 -24145 -15720 -11759 -6398 581 1194 835 -5982 -12129 -22175 -28894

23 -27323 -25904 -18584 -13775 -8086 -1133 -636 -1179 -8435 -15175 -22690 -29376

24 -27688 -26467 -20697 -15835 -10005 -2955 -2569 -3186 -11295 -16066 -23095 -29672

Page 79: Tender Submission for LOB

BACK MATTER VIII

Table 12-9: Ventilation Heat transfer (W)

Hour Jan-29 Feb-26 Mar-29 Apr-28 May-29 Jun-21 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04

1 -266451 -269183 -235023 -217260 -180367 -124344 -112046 -99748 -155771 -177634 -229557 -282848

2 -273283 -273283 -241855 -226825 -188565 -135275 -120244 -109313 -162603 -183099 -232290 -285580

3 -274649 -274649 -244588 -232290 -195397 -144840 -128443 -117512 -172168 -188565 -239122 -291046

4 -281481 -280115 -252786 -237756 -200863 -150305 -133908 -124344 -179000 -194031 -241855 -297878

5 -284214 -281481 -256886 -241855 -203596 -147573 -132542 -131176 -183099 -198130 -247321 -300611

6 -288313 -284214 -259619 -236389 -188565 -132542 -118878 -122977 -183099 -199496 -250054 -303344

7 -291046 -285580 -256886 -213160 -165336 -109313 -97015 -101115 -169435 -194031 -250054 -306077

8 -291046 -281481 -237756 -185832 -140741 -84718 -72420 -76519 -140741 -174901 -247321 -304710

9 -284214 -266451 -210428 -162603 -117512 -61489 -47824 -49191 -107947 -144840 -226825 -301977

10 -269183 -248687 -188565 -139374 -95649 -39626 -27328 -24595 -79252 -117512 -204962 -284214

11 -250054 -229557 -168069 -118878 -76519 -20496 -6832 -5466 -60122 -98382 -185832 -263718

12 -236389 -214527 -148939 -106580 -62855 -4099 5466 12298 -46458 -83351 -170802 -245954

13 -225458 -203596 -135275 -95649 -50557 8198 16397 24595 -35527 -76519 -165336 -233657

14 -219993 -195397 -128443 -90183 -43725 19130 24595 32794 -27328 -73786 -161237 -226825

15 -221359 -195397 -127076 -90183 -39626 20496 31428 38260 -24595 -71053 -163970 -230924

16 -228191 -202229 -128443 -94283 -40992 19130 32794 36893 -25962 -83351 -176267 -244588

17 -241855 -217260 -135275 -102481 -46458 16397 27328 30061 -34160 -97015 -192664 -255519

18 -250054 -232290 -151672 -114779 -57389 6832 19130 17763 -49191 -114779 -200863 -263718

19 -255519 -240489 -168069 -133908 -76519 -6832 4099 0 -68321 -125710 -209061 -270550

20 -259619 -248687 -183099 -153038 -99748 -28695 -17763 -23229 -87450 -138008 -214527 -276015

21 -263718 -255519 -195397 -166702 -118878 -50557 -39626 -40992 -103847 -148939 -219993 -278748

22 -270550 -259619 -207695 -181733 -135275 -69687 -56023 -56023 -117512 -157138 -222725 -281481

23 -276015 -263718 -221359 -189931 -148939 -84718 -75153 -68321 -129809 -166702 -226825 -285580

24 -276015 -266451 -224092 -200863 -158504 -99748 -86084 -80618 -138008 -170802 -232290 -291046

Page 80: Tender Submission for LOB

IX Tender Submission | K13IDM

Table 12-10: West Glazing unshaded solar gain (W) Example of solar cooling load

Hour Jan 29th Feb 26th Mar 29th Apr 28th May 29th Jun 21st Jul 4th Aug 4th Sep 4th Oct 4th Nov 4th Dec 4th

07:30 1051 2365 4573 7253 8935 9723 8830 7043 5203 2838 1314 841

08:30 1367 2786 5308 8094 9671 10354 9566 7779 5887 3364 1629 841

09:30 1787 3416 6044 8777 10302 10880 10091 8462 6517 3994 2102 1261

10:30 2260 4100 6622 9250 10722 11300 10617 8935 7201 4520 2628 1682

11:30 2628 4520 7095 9671 11037 11563 10985 9250 7674 4941 2943 2102

12:30 3311 5308 7884 10459 11721 12194 11616 9934 8304 5729 3627 2628

13:30 4520 6570 9198 11878 12982 13508 12877 11300 9618 7043 4993 3837

14:30 8777 12089 15400 18448 19499 20078 18921 17555 16083 12772 9829 8094

15:30 10039 16030 20445 24440 25439 26122 24545 23126 21444 17029 12351 9723

16:30 8252 15663 22075 27226 28592 29486 27804 25228 23652 17082 11248 5887

17:30 4100 10985 19447 26963 29118 30379 28487 23862 21234 13981 5781 841

PEAK 10039 16030 22075 27226 29118 30379 28487 25228 23652 17082 12351 9723

Table 12-11: West glazing shaded solar gain (W) Example of solar cooling load

Hour Jan 29th Feb 26th Mar 29th Apr 28th May 29th Jun 21st Jul 4th Aug 4th Sep 4th Oct 4th Nov 4th Dec 4th

07:30 1050 2361 4563 7243 8933 9722 8829 7036 5192 2832 1313 841

08:30 1361 2770 5274 8050 9637 10326 9537 7744 5848 3343 1622 839

09:30 1769 3367 5944 8640 10179 10770 9985 8343 6401 3932 2076 1249

10:30 2194 3922 6279 8758 10248 10889 10196 8516 6796 4311 2528 1633

11:30 1970 2996 4362 5781 7201 7936 7463 5939 4520 3101 2011 1545

12:30 3311 5308 7884 10459 11721 12194 11616 9934 8304 5729 3627 2628

13:30 4520 6570 9198 11878 12982 13508 12877 11300 9618 7043 4993 3837

14:30 8777 12089 15400 18448 19499 20078 18921 17555 16083 12772 9829 8094

15:30 10039 16030 20445 24440 25439 26122 24545 23126 21444 17029 12351 9723

16:30 8252 15663 22075 27226 28592 29486 27804 25228 23652 17082 11248 5887

17:30 4100 10985 19447 26963 29118 30379 28487 23862 21234 13981 5781 841

PEAK 10039 16030 22075 27226 29118 30379 28487 25228 23652 17082 12351 9723

Page 81: Tender Submission for LOB

BACK MATTER X

Table 12-12: Total Solar Gains accounting for shading (W)

Hour Jan-29 Feb-26 Mar-29 Apr-28 May-29 Jun-21 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04

1 0 0 0 0 0 0 0 0 0 0 0 0

2 0 0 0 0 0 0 0 0 0 0 0 0

3 0 0 0 0 0 0 0 0 0 0 0 0

4 0 0 0 0 0 0 0 0 0 0 0 0

5 0 0 0 0 0 0 0 0 0 0 0 0

6 0 0 0 0 0 0 0 0 0 0 0 0

7 0 0 0 0 0 0 0 0 0 0 0 0

8 21910 36383 48797 62530 88279 104110 92134 66094 54458 42755 25606 19102

9 39266 56210 73908 87054 93381 103684 94306 82957 80263 70971 49191 21828

10 70915 87756 104959 112524 109403 113505 106278 104533 108357 105106 89878 55553

11 105372 118644 128615 131266 126666 129154 121857 123213 130088 133582 125953 101287

12 124441 132281 134317 133777 127803 129348 123148 126241 130949 136387 136347 122369

13 137007 149832 153093 152963 144259 145734 138925 141630 146250 145175 150365 134812

14 135250 146336 150161 150979 140674 142782 136801 138554 146655 142690 141415 129460

15 118303 137829 142750 141613 132276 133417 127769 131573 139987 137039 128038 116525

16 88561 119398 125140 123609 110905 110826 107156 112366 122211 120328 103797 89445

17 58886 87378 94904 77929 94177 105645 96773 77776 90769 88921 73097 46976

18 34162 54475 45529 86928 91748 99201 90974 80199 51436 60346 41603 19102

19 0 0 0 0 0 0 0 0 0 0 0 0

20 0 0 0 0 0 0 0 0 0 0 0 0

21 0 0 0 0 0 0 0 0 0 0 0 0

22 0 0 0 0 0 0 0 0 0 0 0 0

23 0 0 0 0 0 0 0 0 0 0 0 0

24 0 0 0 0 0 0 0 0 0 0 0 0

Page 82: Tender Submission for LOB

XI Tender Submission | K13IDM

Table 12-13: Total Sensible Heat transfer (W)

Hour Jan-29 Feb-26 Mar-29 Apr-28 May-29 Jun-21 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04

1 -412878 -415730 -361061 -331746 -273652 -186189 -167481 -149824 -237517 -273338 -355082 -438604

2 -422734 -421968 -371551 -346626 -286973 -203775 -180814 -164912 -248457 -281863 -359220 -442685

3 -424879 -424231 -376257 -355619 -298075 -219003 -193966 -177925 -263202 -290269 -369239 -450612

4 -435042 -432417 -388737 -364174 -306845 -227988 -202882 -188664 -273871 -298694 -373527 -460665

5 -439215 -434554 -395001 -370675 -311450 -224856 -201685 -199333 -280441 -304998 -381732 -465158

6 -444962 -438673 -399537 -363705 -290623 -203903 -182999 -188427 -281245 -307410 -385741 -469004

7 -387841 -379437 -334506 -268449 -194254 -107196 -89017 -94765 -200467 -238360 -324724 -411812

8 -304744 -275901 -196659 -104005 -7483 95578 101807 69458 -42704 -106618 -234014 -329604

9 -216490 -172966 -69532 17417 94016 191691 202697 188952 94021 26984 -119537 -261832

10 -101619 -53338 56780 139852 205218 297299 308299 309961 227455 164084 14697 -141044

11 -38452 6877 112066 192092 255247 346407 358567 360951 279388 222634 80096 -64943

12 1670 43670 148593 216172 279096 373569 380677 393038 304750 249351 113896 -16383

13 31253 79584 191356 254061 315619 409895 414742 429358 339458 272598 137279 15233

14 -82476 -31704 78519 139681 201357 302244 303953 317859 231796 154333 16141 -101930

15 23614 84267 197495 254609 323123 419057 429139 443010 353563 277303 123497 6485

16 -15106 56686 178469 230876 300212 394818 410893 422280 334085 243136 81851 -39137

17 -65126 2640 138144 172687 275099 384878 391987 377174 290189 190896 26811 -98184

18 -163964 -114551 2594 101613 194641 302248 312158 299371 166836 73915 -79494 -200328

19 -268374 -243436 -129573 -75547 13160 121448 137082 131027 24957 -65072 -195596 -291180

20 -336754 -317995 -214648 -166518 -83328 26919 42472 34257 -66218 -146063 -265954 -362002

21 -405833 -390843 -295960 -250335 -175474 -69527 -53330 -55699 -153717 -225122 -337165 -430867

22 -417667 -399196 -315760 -274294 -201819 -100090 -79738 -80097 -175741 -239133 -343929 -435528

23 -426061 -406876 -338364 -288154 -223247 -123518 -109203 -99876 -195961 -255996 -350366 -441932

24 -426426 -411388 -344425 -306005 -238984 -147053 -126928 -119649 -210664 -262810 -358666 -450124

Peak 31253 84267 197495 254609 323123 419057 429139 443010 353563 277303 137279 15233

Page 83: Tender Submission for LOB

BACK MATTER XII

12.4 APPENDIX C

Table 12-14: Total pressure drop along pipes and method

Section of Duct Q (m3/s) Velocity (m/s)* Duct CSA (m2) Duct Diameter (m) Pressure Drop per Unit Length (Pa)† Duct Length (m) Pressure Drop Along Pipe (pa)

1 16.30 10 1.63 1.44 0.5 4 2

2 14.51 10 1.45 1.36 0.6 3.6 2.16

3 12.73 10 1.27 1.27 0.6 3.6 2.16

4 10.95 10 1.09 1.18 0.7 3.6 2.52

5 9.16 10 0.92 1.08 0.8 3.6 2.88

6 7.38 10 0.74 0.97 0.9 3.6 3.24

7 5.60 10 0.56 0.84 1.1 3.6 3.96

8 3.81 10 0.38 0.70 1.4 3.6 5.04

9 2.03 10 0.20 0.51 2 3.6 7.2

10 0.89 4 0.22 0.53 0.35 13 4.55

11 0.45 4 0.11 0.38 0.5 9 4.5

Total Pressure Drop (Pa) 40.21

*values to prevent excessive fan power form CIBSE Guide B 2.3.11.4 [3]

†From Chart 4.2 CIBSE Guide C [10]

Page 84: Tender Submission for LOB

XIII Tender Submission | K13IDM

Table 12-15: Total Pressure loss calculations

Component Description Component Loss Factor ζ*

Velocity (m/s) Pressure Drop Due to Component (Pa)

Branch 1 - Unequal T Configuration A, Flow ratio 0.9, Straight factor,

Estimate for higher diameter than table provides

2 10 20

Branch 2 - Unequal T Configuration A, Flow ratio 0.9, Straight factor,

Estimate for higher diameter than table provides

2 10 20

Branch 3 - Unequal T Configuration A, Flow ratio 0.9, Straight factor,

Estimate for higher diameter than table provides

1.8 10 18

Branch 4 - Unequal T Configuration A, Flow ratio 0.8, Straight factor,

Estimate for higher diameter than table provides

1.2 10 12

Branch 5 - Unequal T Configuration A, Flow ratio 0.8, Straight factor,

Estimate for higher diameter than table provides

1.2 10 12

Branch 6 - Unequal T Configuration A, Flow ratio 0.8, Straight factor,

Estimate for higher diameter than table provides

1 10 10

Branch 7 - Unequal T Configuration A, Flow ratio 0.7, Straight factor,

Estimate for higher diameter than table provides

0.21 10 2.1

Branch 8 - Unequal T Configuration A, Flow ratio 0.5, Straight factor,

Estimate for higher diameter than table provides

0.1 10 1

Diverging flow - Unequal T Configuration A, Flow ratio 0.4, Branch factor,

Estimate for higher diameter than table provides

0.05 4 0.2

Smooth elbow Value Assumed tended to at higher diameters 0.7 4 2.8

Diverging flow - Equal T Configuration B, Flow ratio 0.5 0.67 4 2.68

Smooth elbow Value assumed tended to at higher diameters 0.7 4 2.8

Total Pressure Drop from Components (Pa) 103.58