Page 1 of 27 BHARAT PETROLEUM CORPORATION LTD CENTRAL PROCUREMENT ORGANISATION-REFINERIES MUMBAI REFINERY, MAHUL MUMBAI – 400074 TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016 E-TENDER NO: 15798 Due Date and Time for Submission of Bids : 25 th October 2016- 13:00 hrs (IST) Pre-Bid Meeting : 4 th October 2016 -10:00 hrs

TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 1 of 27

BHARAT PETROLEUM CORPORATION LTD

CENTRAL PROCUREMENT ORGANISATION-REFINERIES

MUMBAI REFINERY, MAHUL

MUMBAI – 400074

TENDER FOR

DISPOSAL OF SPENT CATALYST CONTAINING NICKEL &

MOLYBDENUM AT BPCL - MUMBAI REFINERY.

REF. : TENDER NO: CPO(R)/DISP/02/2016

E-TENDER NO: 15798

Due Date and Time for Submission of Bids :

25th October 2016- 13:00 hrs (IST)

Pre-Bid Meeting : 4th October 2016 -10:00 hrs

Page 2: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 2 of 27

1.0 INTRODUCTION :

Bharat Petroleum Corporation Ltd., invites bids for the tender for Disposal of Spent Catalyst containing

Nickel & Molybdenum at BPCL-Mumbai Refinery on “As is Where is Basis “ as mentioned below:

Sr.

No. Tender No.

Item

No. Description

Approximate

Quantity

(excluding drum

weight)

1 CPO(R)/DISP/02/2016,

e-Tender No.15798

1 Disposal of Spent Catalysts containing Nickel

from Catalytic Reformer Unit. 6400 Kgs

2

Disposal of Spent Catalysts containing Nickel

& Molybdenum from Hydro de sulfurization

(HDS) unit of ARU

6535 Kgs

Interested bidders can visit our warehouse (BPCL, Mumbai Refinery, Mahul, Mumbai-400074) to obtain

the samples (Max. 5 Kgs each) from these 2 items and submit the two part bid through e-tendering

platform under two-bid system (i.e. Part 1 - Techno-commercial/Un priced Bid & Part 2 - Priced Bid), as

per requirements mentioned in the attached tender.

Tender can be downloaded from any of the following websites :

• e-Procurement Portal : https://bpcleproc.in

• BPCL Web : https://www.bharatpetroleum.in/tenders/view-tenders.aspx → Select Department

→ CPO (Refineries)

• Central Public Procurement Portal : http://eprocure.gov.in/cppp

Bids are to be submitted in the online bidding platform on BPCL’s e-tendering portal:

https://bpcleproc.in.

Important : All updates, amendments, corrigenda, due date extensions etc., (if any) will be posted on

the e-tendering portal / websites as and when required. There will not be any publication of the same

through newspapers or any other media.

Page 3: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 3 of 27

2.0 INDEX :

Techno-commercial Bids (un-priced bids) and Price bids can be submitted by uploading through BPCL’s

e-tendering portal: https://bpcleproc.in. For submission of bid through e-portal, bidder will need a

digital signature and should register in the e-portal. For any assistance in obtaining digital signature,

registration and submission of Bid documents through e-portal, bidders may contact our e-tendering

service provider. The complete set of tender documents consist of the following:

Part No. Sr. No. Description Annexure No.

Part-1

1 INSTRUCTION TO BIDDERS 1

2 SPECIAL TERMS & CONDITIONS 2

3 GENERAL TERMS & CONDITIONS 3

4 UN-PRICED BID 4

5 DEVIATION FORMAT 5

6 FORMAT OF ACCEPTANCE – CUM - REGISTRATION FORM 6

7 INTEGRITY PACT AGREEMENT FORMAT 7

8 INFORMATION ON E-TENDERING PORTAL 8

Part-1 (Techno-commercial Un-Priced bids) Scanned copy of signed and stamped documents to be uploaded

on BPCL e-tendering portal i.e. https://bpcleproc.in

Part-2 9 PRICED BID FORMAT 9

Part-2 (Price bid) to be filled on BPCL e-tendering portal i.e. https://bpcleproc.in

3.0 CONTACT PERSONS

1) Please note that the tender enquiry is invited through e-tendering mode. In case of any

clarification regarding the tender, following are the contact persons:-

FOR E-TENDERING RELATED ISSUES:

If tenderers need some clarifications or are experiencing difficulties while enrolling or while

participating in this e-Tender, please e-mail to the following E-Mail ID along with the snapshots

of the errors being faced to:

E-Procurement Technologies Limited (Procure Tiger)

Bidders Help Desk No. : 079-40016868

Email: [email protected]

Ajay Nandangi : Contact: 8433615195

E-Mail: [email protected]

FOR OTHER CLARIFICATIONS:

For any commercial clarifications regarding this RFQ, please contact:

Shri H.P.Panchal, Procurement Manager-CPO(R), BPCL – Mumbai Refinery, Mahul, Mumbai-

400074. Tel no. 022-25533117, e-mail: [email protected]

Shri S. Sriram, Procurement Leader-CPO(R), BPCL – Mumbai Refinery, Mahul, Mumbai-400074.

Tel no.: 022-2553 3202, e-mail: [email protected]

Page 4: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 4 of 27

ANNEXURE – 1

1. INSTRUCTION TO BIDDERS:

1.1. BPCL intends to dispose off spent catalyst containing Nickel & Molybdenum at BPCL- Mumbai

Refinery (MR) on “As is Where is Basis “ as details given below:

Item

No. Description

Quantity Net Weight in Kgs.

(without drum weight)

1 Disposal of Spent Catalysts containing Nickel

from Catalytic Reformer Unit *6400 Kgs

2

Disposal of Spent Catalysts containing Nickel

& Molybdenum from Hydro de sulfurization

(HDS) unit of ARU

*6535 Kgs

*Actual quantity may vary by + 10%.

1.2. Offers are invited from parties who are Recyclers/ Reclaimers approved by Central/State

Pollution Control Boards(CPCB/SPCB) or by other Statutory authorities and interested to take

the material from BPCL Mumbai Refinery on “As is Where is Basis “.

1.3. Actual quantity of spent catalyst and estimated Nickel content and Molybdenum therein will

be ascertained after carrying out actual weighment of filled drums at the time of delivery. For

technical details of spent catalyst under disposal, please refer Special Terms & Conditions,

Annexure-2.

1.4. The disposal would be through competitive bidding. The party interested in bidding shall visit

BPCL Mumbai Refinery, Mahul, Mumbai-400074 and collect the samples from 2 items (Lots)

as mentioned above. The bidder can analyses the samples and can submit their bids

mentioning the Rate per Kg of Spent Catalyst in the prescribed format as mentioned

elsewhere in the tender document. The rate per kg. quoted by the bidders shall be multiplied

with total quantity of spent catalyst including drum weight. The bidder with highest evaluated

price would be successful bidder.

1.5. Bidders should have valid license/ permission/ certificate issued by Central/ State Pollution

Control Board (CPCB/ SPCB)/ other statutory authorities for re-cycling/ reprocessing/

handling this type of hazardous waste. The bidder should have capacity to process entire lot

from BPCL.

1.6. Bidder should not have been previously blacklisted by BPCL or any other Public Sector

Undertaking.

2. PRE-BID MEETING:

2.1. A pre-bid meeting will be arranged at BPCL Mumbai Refinery on date as mentioned above.

Interested bidders may attend the meeting and seek clarifications if any required. CPO-

Refineries contact persons for this tender may be contacted over phone/e-mail for enabling

participation in the pre-bid meeting.

Page 5: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 5 of 27

3. Sampling and weighment and Earnest Money Deposit (EMD):

3.1.1. Interested Indian bidders are required to submit their Expression of Interest (in format

Annexure K) along with Copy of valid license/ permission/ certificate and Earnest Money

Deposit (EMD) amount of Rs. 1,00,000/- (Rupees One Lakhs only) by demand draft / Pay

Order (Cheque or Cash will not be acceptable) drawn on any Nationalised Indian Bank in

favour of “Bharat Petroleum Corporation Limited” payable at Mumbai. Demand Draft to be

submitted in a sealed envelope, by post/ courier to The General Manager, CPO-Refineries,

Bharat Petroleum Corporation. Ltd., Mumbai Refinery, Mahul, Mumbai – 400 074,

Maharashtra State, India, so as to reach on or before the bid due date.

3.1.2. EMD can be paid also through electronic funds transfer to BPCL Bank Account proof of which

may be enclosed with the Intention to Bid submitted to the above address: BPCL Bank details

are as under:

3.1.3. EMD will not carry any interest. BPCL will encash all the EMD received and EMD of successful

bidder (highest bidder) shall be returned after completion of upliftment. EMD of other

unsuccessful bidders will be returned after release of sale order to the successful bidder.

3.1.4. Bids without EMD will not be considered and will be rejected summarily

3.1.5. Bidders are required to sign a Non-Disclosure Agreement (NDA) with the original catalyst

supplier as per the prescribed format, before lifting the material if applicable.

3.2. Bidders, who have submitted their EMD amount as mentioned above, will be invited to attend

total weighment of filled drums of 2 items of the spent catalyst at BPCL Mumbai Refinery.

Bidders can witness packing activities. Packing and sealing of drums will be carried out in the

presence of the participating bidders. Final quantities in packed & sealed drums would be

recorded separately for both items. BPCL will not responsible, if bidder does not participate

for final weighment of filled drums.

3.3. After checking of the sample drawn, the bidders are required to submit their bids in two parts

i.e. Techno- Commercial (un-priced) bid and Price bid (in e-platform) on or before the bid due

date as mentioned above. Bids cannot be submitted in e-platform after the said bid due date.

Price bid opening date will be communicated to techno-commercially qualified bidders.

1 Name of the Beneficiary Bharat Petroleum Corporation Ltd

2 Name of the Bank Standard Chartered Bank

3 Branch Code 222

4 Branch Address 90, M G. Road, Mumbai 4000 001

5 Branch Telephone 18002663666/18001033666

Fax no 022-267588081/26758822

6 NEFT IFSC Code SCBL0036001

7 Account Type 11 (Current )

8 Account No. 22205020115

9 RTGS IFSC Code -

10 MICR Code 400036002

Page 6: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 6 of 27

3.4. Bidders are expected to submit their bids accepting all the terms & conditions set forth in this

tender document. Deviations, if any, shall be clearly mentioned in the format in Annexure 5.

of this tender document. Deviation if mentioned anywhere else may not be considered. In

case of no deviation, Annexure J may be submitted with NIL deviation.

4. Submission of Bids :

4.1. Part-1 : . Techno- Commercial bid, i.e., Un-priced Bid shall have the following information/

details:

a. Acceptance –cum-Registration Form (Annexure -6) duly filled in

b. Proof of submission of EMD – Scanned copy of Demand Draft / Copy of Bank Transfer

confirmation to be uploaded in e-procurement platform.

c. Duly attested copies of valid license/ permission/ certificates issued by Central/ State

Pollution Control Board (CPCB/ SPCB)/ other statutory authorities for re-cycling/

reprocessing/ handling this type of hazardous waste.

d. Integrity Pact Document (Annexure-7), duly signed and stamped.

a. Annexure 4 (Un-priced bid) with prices Blanked off, and filling up the information of

Factors in % and Ex. Duty, VAT/ CST & TCS applicability as required therein.

b. Any other relevant information.

c. Annexure 1, 2 and 3 (Instruction to Bidders, Special Terms & Conditions and General

Terms & Conditions) of this tender document, duly signed and stamped on all pages, as

a token of acceptance of terms & conditions mentioned therein.

d. Deviation Form in Annexure 5 duly filled and signed.

4.2. Part-3 i.e. Price Bid shall be filled in our e-procurement portal:

a. Price per Kg of Spent Catalyst.

Page 7: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 7 of 27

ANNEXURE – 2

SPECIAL TERMS & CONDITIONS :

1. Price:

1.1 Your bid should be for the Basic price, for delivery ex-BPCL, Mumbai Refinery. Quote shall remain

firm for 90 days after price bid opening date, for acceptance & placement of sale order by BPCL.

1.2 Excise Duty, taxes and other Govt. Levies as applicable on the date of delivery shall be payable by

the buyer, in addition to the basic sale price. Buyer will have to pay variations also if any, in

applicable government levies, till complete up liftment and final settlement.

1.3 As the Government of India is likely to introduce a uniform tax system across India i.e. The Goods

and Services Tax or GST which will replace various taxes & duties levied currently by the Central

and State governments. Hence if GST is applicable before finalization of this tender, the same shall

be applicable and price evaluation shall be done based on new GST.

1.4 Bid price shall be Rate per KG of the spent catalyst which shall be quoted by the bidders based on

recoverable Nickel and Molybdenum content as per the samples collected by the bidders and their

evaluation. Quoted rate per Kg shall be calculated for the total gross weight of Spent Catalyst

inclusive of the drum weight.

1.5 BID SUBMISSION PRICE:

1.5.1 Bidders will be required to quote for the following after final quantities including drum weight

(after packing) separately for 2 lots of Spent Catalyst in Techno commercial (Un-priced Bid).

Item

No. Description

Apporx. Net

Weight in Kgs.

(without drum

weight)

Apporx. Gross

Weight in Kgs.

(Inclusive with

drum weight)

Unit Price per Kg

of Spent Catalyst

inclusive with

filled Drum

1

Disposal of Spent Catalysts

containing Nickel from

Catalytic Reformer Plant.

6400 Kgs 8000 Kgs Quoted /

Non Quoted

2

Disposal of Spent Catalysts

containing Nickel &

Molybdenum from Hydro de

sulfurization (HDS) unit of

ARU

6535 Kgs 8120 Kgs Quoted /

Non Quoted

1.5.2 Bidders will be required to fill the PRICE BID in our e-procurement portal as per following details.

Item

No. Description

Total Gross Weight

of Spent catalyst

including drums in

Kgs.

Unit Price per Kg of

Spent Catalyst

inclusive with filled

Drum

1 Disposal of Spent Catalysts containing

Nickel from Catalytic Reformer Plant. 8000 Kgs Bidder to Quote

2

Disposal of Spent Catalysts containing

Nickel & Molybdenum from Hydro de

sulfurization (HDS) unit of ARU

8120 Kgs Bidder to Quote

Page 8: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 8 of 27

2. OPENING OF BIDS

2.1 Techno-commercial Bids (unpriced bids) will be opened in the e-tendering platform as per

tender opening schedule mentioned. Bidders can witness the price bid opening at BPCL CPO-

Refineries or view the information regarding bid opening by logging onto the e-tendering

platform.

2.2 Information / documents submitted in the un-priced bids would be evaluated by BPCL to

ascertain eligibility of bidders with reference to the terms & conditions mentioned in this

tender document. Only Bidders who are meeting the requirements as per the tender will be

qualified. Price bids of such qualified bidders only will be opened & evaluated by BPCL to

decide the successful bidder/bidders. Date & time of opening the price bids would be intimated

to the qualified bidders prior to price bid opening.

3. EVALUATION

The rate per kg. quoted by the bidders for item no. 1 & 2 shall be multiplied with total quantity of

respective spent catalyst including drum weight for item no.1 & 2. Evaluation of quotes shall be

done based on the total realizable value (basic price) for the total gross weight basis of Spent

Catalyst inclusive of the drum weight for both items (lots) separately. The bidder with highest

evaluated price in each items would be successful bidder. Evaluation of quotes shall be done on

item wise highest quote basis. Sale order shall be issued based on the rate quoted by the successful

bidders for the items.

4. Payment Terms & Material Lifting Time:

4.1 BPCL will issue a Sale Order to the successful Bidder and bidder shall make full payment

including taxes & duties, for the total quantity, in advance, before upliftment of the material.

Payment shall be made within 15 days after issue of Sale Order. Payment to be made by

demand draft OR electronic transfer. Cash/ Cheque will not be accepted.

4.2 Material Lifting Time for Indian Bidders:-

Material shall be lifted out of our Refinery premises within 7 days of effecting payment.

4.3 Bidder shall pay the full sale order value within 15 days after issue of Sale Order failing which

action as under will be taken without any recourse:

a) Buyer’s EMD will stand forfeited.

b) The Sale letter will be treated as cancelled and BPCL shall have right to dispose off the

materials. No claim whatsoever from the buyer shall be entertained, in such a case.

c) The buyer shall be black listed and debarred from participation in our future disposal

processes.

Note : EMD payment will not be adjusted against the Sale value. EMD of successful bidder will be

returned only after the completion of the disposal activity & submission of No Claim

Certificate.

4.4 Buyer will not have choice to select the materials, and has to uplift the materials from BPCL

Mumbai Refinery, within 7 days (Indian bidders) of making full payment, failing which BPCL is

at liberty to dispose off the un-lifted material any time after the 7 days are over. In addition,

100% payment and the EMD collected from the buyer will stand forfeited.

Page 9: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 9 of 27

5. Used Catalyst Management:

5.1 Bidder will take suitable steps for arranging spent catalyst utilisation at his works which may

include necessary processing, metal removal & residual catalyst disposal in accordance with

environmental norms.

5.2 Legislation :

All the applicable rules and regulations stipulated by Ministry of Environment and Forests

(MOE&F) under Govt. of India, Central and State (Maharashtra) Pollution control boards and

any statutory bodies must be complied by the Bidder.

Material is sold on As Is Where Is Basis. All expenses in getting clearances from the authorities

-- Government of India, State Governments of Maharashtra/ Governments in the bidders’

country of origin shall be borne by bidder. All the legal and other formalities including

Hazardous Wastes (Management, Handling and Transboundary Movement) Rules 2008 of

Ministry of Environment and Forests, Government of India for transportation shall be arranged

for and complied by the bidder. All expenses such as freight, incidental charges, transit

insurance, taxes etc., are also to be borne by bidder.

5.3 The successful Bidder shall issue a Certificate of Release of Responsibility to BPCL after the

spent catalyst is shifted outside the premises of BPCL - Mumbai Refinery. While BPCL - Mumbai

Refinery will help in arranging the documentation related to Road Transport of Spent catalyst,

the responsibility for handling the spent catalyst outside the premises of BPCL - Mumbai

Refinery shall lie solely with the successful Bidder.

6. TECHNICAL DETAILS OF SPENT CATALYST

Sl.

No. Description Lot-1 Lot-2

1 Tender Item No. 1 2

2 Description of item

Spent Catalysts containing

Nickel from Catalytic

Reformer Unit

Spent Catalysts containing

Nickel & Molybdenum from

Hydro de sulfurization (HDS)

unit of ARU

3 Catalyst Name and type ADS-11L Sulfur Guard Bed

Adsorbent (Granular form) TK527 Haldor Topse

4 Composition of Fresh Catalyst

Nickel < 70%wt,

Nickel oxide < 70%wt,

Aluminosilicate > 30%wt

80-90% Aluminium Oxide

7-13% Molybdenum trioxide

1-3% Nickel oxide

5

Approx. quantity of spent

catalyst excluding drum

weight.

6400 Kgs. Approx. 6535 Kgs. Approx.

6

Approx. quantity of spent

catalyst including drum

weight.

8000 Kgs. Approx. 8120 Kgs. Approx.

7

Approx. percentage of Metal

as per our sample analyses

(**)

24% Nickel as per BPCL Lab

analysis Lab Analysis not done

(**) Bidder has to do their analyses of the samples before quoting.

Page 10: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 10 of 27

ANNEXURE - 3

1. GENERAL TERMS & CONDITIONS :

1.1. The terms Buyer(s)/ Contractor(s) appearing anywhere in this tender document refers to the

successful bidder on whom sale order is placed by BPCL for the subject material.

1.2. Sale is on “AS IS WHERE IS BASIS, CLEAN SWEEP BASIS AND NO COMPLAINT BASIS”. No

complaint regarding quality, quantity, or composition of the material will be entertained.

1.3. The quantity indicated in this tender is only an approximate estimated quantity No additional

/ extra claims on account of variation in quantity will be entertained.

1.4. The Bidders cannot retract from their offers. If done so, the EMD will be forfeited & buyer will

be debarred from participating in our future tenders. Any taxes, duties, etc. payable by the

successful Bidder outside India shall have to be borne by the successful Bidder only.

1.5. BPCL reserves the right to withdraw wholly or partially any or all the items set for sale at any

time during the period of contract without assigning any reasons.

1.6. Rights of participation will be for bidders, who, after inspecting the material, pre-qualify

themselves by paying the EMD and whom BPCL has not previously blacklisted. Final decision

regarding participation of the bidder will be with BPCL.

1.7. Sale confirmation, Sale Order, Invoices, Delivery Challans, etc. will be released only in the name

of the Company that has initially registered and participated in the tender. There will not be

any changes between the registration and completion of transaction.

1.8. Successful bidder should make all arrangements for further packing, if required, for uplifting

and transportation.

1.9. The Buyer shall arrange for all tools and tackles, forklifts or hoists or cranes and/ or labour at

their own expenses. While inspecting of material and at the time of lifting of material, ALL

SAFETY RULES OF THE COMPANY HAVE TO BE FOLLOWED STRICTLY. The buyer also confirms

to have read all the general rules as laid by BPCL, with regard to employment of labour for the

removal of scrap material.

1.10. While taking delivery of the material, if any damage is done to the premises or other machinery

lying nearby, the Company shall recover all such costs required to rectify the damage and bring

the material back into the original position and stop delivery of the material till all the costs are

paid.

1.11. The decision of BPCL is final and binding in all matters related to this sale.

1.12. Material lifting shall be as per the guidelines of BPCL only. Buyer shall have no rights to choose

/ pick the material from the total lot.

1.13. Partial lifting shall result in forfeiture of EMD and Sale Value paid in advance. The lifting should

be completed within due time frame agreed. Failure to abide by the agreed terms and

conditions of the tender and shall result into forfeiture of EMD and BPCL will be at their liberty

to sell the subject lot to any third party and debit the differential amount to Buyer’s account.

1.14. No advantage shall be taken either by the company of the bidder who has been awarded the

contract/sale order (herein after referred to as the “Contractor”) of any clerical error or

mistake, which may occur in the specification, schedule of rates, plans tender or any other

papers supplied to or by the contractor in connection with the work.

Page 11: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 11 of 27

1.15. Inspection of Site :

The bidder has been given an opportunity before or at the time of the entrusting of the work

to him, of making an inspection of the site to set at rest any doubts he may have had about the

difficulties attending his offer, and any difficulties which may be met with by him in the course

of the execution of the work shall neither relieve him from fulfilling the terms of this

contract/Agreement, nor entitle him to claim extra payment or an extension of the period by

the Company’s authorized Engineer-in-Charge that such difficulties could not have been

foreseen.

1.16. Once the sale order is issued, permission to the successful Bidder to inspect the material under

disposal again prior to upliftment shall not be granted to the successful Bidder unless the

payment as per Sale order Terms & conditions is paid by the successful Bidder.

1.17. Subletting Agreement :

The contractor shall not sublet or assign the work or any part thereof to another party without

the written consent of the company first obtained and no such subletting or assignment shall

relieve the contractor from the full and entire responsibility of his obligation under this

Agreement.

1.18. Removal of Materials:

1.18.1. It will be the responsibility of successful buyer to weigh the empty truck at the

weighbridge and produce the necessary weigh certificate so that the weight of the

empty truck will be deducted from the weight of the fully loaded truck.

1.18.2. In order to facilitate the Company to complete the transaction before 3.30 P.M. The

goods should be collected before 3.00 P.M. on any working day with prior

appointment with the concerned Department within the stipulated delivery days.

1.18.3. Material must be removed by the buyer before stipulated time. Once the goods /

materials are taken out of the factory gate, buyer will be solely responsible for all sort

of claims like shortage, missing parts, damage, incident, accident, loss of material etc.

1.18.4. Once uplifted material left BPCL gate, BPCL should be indemnified with all kinds of

external effect, whatsoever may be.

1.18.5. Should the original buyer wish to take delivery of the material through a

representative, he must authorize the latter by a letter of authority or continuing

authority, which shall be presented to the officer concerned. The officer concerned

may in his entire discretion, decline to act on any such authority and it shall be for the

buyer to satisfy the officer concerned that the authority is genuine. Delivery to such

person shall be sole responsibility of the buyer and no claim shall lie against the

Company on any account whatsoever, if delivery is offered to a wrong person.

1.18.6. All workmen employed by the buyer has to use personal protective equipment’s like

hand gloves, safety shoes, & helmets etc., while loading and unloading of the

material. Buyer has to make arrangement for these equipment’s before entering the

Refinery.

1.18.7. Workers entering the Refinery premises for uplifting the material will be required to

fill up personal particular form and complete other formalities as directed by the

office of the Asst. Commandant, CISF and/or any other concerned Govt. authorities.

Page 12: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 12 of 27

1.18.8. The buyer has to ensure that his/their workers are covered under ESI/PF & submit

the proof to our IR department without which we will not be able to allow them inside

the Refinery.

1.18.9. Quantity is subject to the availability of material and BPCL’s ability to sell the same.

The material will be allotted to the buyer for uplifting strictly on “as is and where is

and clean sweep basis”. It is to be stated that the quantity mentioned above is only

indicative and there is no commitment whatsoever by us. BPCL does not and cannot

guarantee any specific quality of the material available for sale. The material is to be

lifted from site strictly on “as is where is & clean sweep” basis in its entirety

irrespective of the quantity allotted.

1.18.10. Only representative of the buyer authorized by the Company will be allowed for the

loading / handling of the material. However if the need arises for additional person,

the same may be allowed only at the discretion of the BPCL Management.

1.18.11. BPCL will in no way be responsible for any accident, damage or injury to the contract’s

workman or equipment while on site / premises. No claims for damages occurred due

to accidents at the time of inspection or at the time of Material lifting for men as well

as Machineries will be entertained.

1.18.12. Inspection must be done with prior appointment only.

1.18.13. Delivery of the material to be taken within the period given in our sale letter. Roaming

in the premises of the company, without permission, is strictly prohibited.

1.18.14. BPCL will allow only successful bidder to uplift the materials from the refinery

premises. No delivery would be effected by the Company to any person other than

the Buyer whose name is mentioned in the delivery order.. Under any circumstances,

BPCL will not permit the successful bidder to negotiate or sell the materials in any

lot or part of a lot to any other party while the goods are still lying within the premises

of the Company from inside the refinery premises.

1.18.15. The following also to be taken note of in this connection :

a) Lift & load all materials on trailer / truck using your own lifting equipment’s,

cranes and tools & tackles. All cranes, lifting equipment tools & tackles shall have

latest load testing certificates.

b) Clear the areas of all debris and waste materials on day-to-day basis and after

completion of all works.

c) No segregation of material will be allowed inside the refinery. Buyer shall lift the

material on “as is where is” condition.

d) All scrap and associated material / debris shall be taken out by the buyer outside

the Refinery without giving rise to any complaints from municipal and other local

authorities. Buyer shall keep BPCL indemnified from and against any such

complaints.

1.19. Termination of Contract:

The Company reserves the right to terminate the contract at any time by giving three days’

notice on any of the following grounds:

a. Unsatisfactory execution or performance of the contract by the Buyer.

b. Improper behavior of the Buyer or breach of the terms and conditions of the contract.

c. Delay in more than 15 days in picking up of the deliveries of the material, after the sale

order has been accepted.

d. Misbehavior with any of the staff of BPCL.

e. Picking up any materials, which is not sold to them and found in their truck or Vehicle.

Page 13: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 13 of 27

1.20. Workmen’s Compensation Liability

The contractor shall hold BPCL harmless and indemnified from and against all Claims, costs and

charges for which the company shall be liable under the Workman’s Compensation Act, 1923

and any amendments thereof and the expenses to which it shall put there under, both in respect

of personal injuries (within the meaning of the said Act) to be employees and servants of the

Contractor or Sub-Contractors, (if any), out of or occasioned during the currency of contractor,

sub-contractors and/or the company and/or their respective servants and employees and also

respect of the personal injuries (within the meaning of the said Act) to the servants and

employees of the company arising out of, or occasioned through the acts and omissions

whether due to negligence or not of the contractor, sub-contractor and or their servants and

employees in carrying out any of the provisions of this agreement. This indemnity shall be in

addition to and not in lieu of any indemnity to which the company shall be entitled in law. The

Contractor shall at his own expense effect and maintain, until the completion of the work, with

an approved office a Policy of Insurance in the joint names of the company and the contractor

against such risks and deposit such Policy or policies with the company from the time to time

during the currency of this agreement. The contractor shall be responsible for anything not

included in the Insurance Policies above referred to also for all other damage to person or

property, arising out of or incidental to the negligent or defective carrying out of this agreement

and shall keep the company harmless and indemnified.

1.21. Safety Regulation:

The contractor shall ensure that he, his sub- contractor and his, or their personnel or

representative shall comply with all safety regulations issued from time to time by the Company

or otherwise howsoever and should any injury resulting in death or not or damage to any

property occur as result of failure to comply with such regulations the Contractor shall be held

responsible for the consequences thereof shall keep the Company harmless and indemnified.

1.22. Jurisdiction

This agreement shall be deemed to have been made in Mumbai and shall be construed

according to the laws of India and the performance by the contractor of any contract on his

part therein contained shall be considered due in Mumbai for the purpose of jurisdiction.

1.23. Arbitration :

1.23.1. Any dispute or difference of any nature whatsoever, any claim, cross-claim, counter-claim or

set off of the Company against the Contractor or regarding any right, liability, act, omission or

account of any of the parties hereto arising out of or in relation to this agreement shall be

referred to and finally resolved by Sole Arbitrator, who shall be appointed by Director

(Refinery) of BPCL as per the procedure given in sub-clause (b) given herein below.

1.23.2. Procedure for appointing the sole arbitrator: A party wishing to commence an arbitration (the

“Claimant”) shall file with the Director (Refinery) of BPCL a Notice of Arbitration which shall

comprise:

i. a demand that the dispute be referred to arbitration;

ii. a reference to the arbitration clause or the arbitration agreement that is invoked and a copy

of it;

Page 14: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 14 of 27

iii. a reference to the contract out of or in relation to which the dispute arises and where

possible, a copy of it;

iv. a brief statement describing the nature and circumstances of the dispute, specifying the

relief claimed and, where possible, an initial quantification of the claim amount.

v. any other details which the claimant wishes to refer and rely upon.

Upon receipt of the above notice of arbitration, the Director (Refinery) of BPCL shall appoint

the Sole Arbitrator as per the provisions of the Arbitration and Conciliation Act, 1996.

1.23.3. The venue of arbitration shall be Mumbai (in case of Mumbai Refinery) or Kochi (in case of

Kochi Refinery). The award of the arbitrator so appointed shall be final, conclusive and binding

on all parties to the agreement subject to the provisions of the Arbitration & Conciliation Act,

1996 or any statutory modification or re-enactment thereof and the rules made thereunder

for the time being in force shall apply to the arbitration proceedings under this clause.

1.23.4. The arbitrator shall have power to order and direct either of the parties to abide by, observe

and perform all such directions as the arbitrator may think fit having regard to the matters in

difference i.e. dispute, before him. The arbitrator shall have all summary powers and may

take such evidence oral and/or documentary, as the arbitrator in his absolute discretion thinks

fit and shall be entitled to exercise all powers under the Indian Arbitration & Conciliation Act

1996 including admission of any affidavit as evidence concerning the matter in difference i.e.

dispute before him.

1.23.5. The parties against whom the arbitration proceedings have been initiated, that is to say, the

Respondents in the proceeding, shall be entitled to prefer a cross-claim, counter claim or set

off before the Arbitrator in respect of any matter in issue arising out of or in relation to the

Agreement without seeking a formal reference of arbitration for such counter-claim, cross

claim, or set off and the Arbitrator shall be entitled to consider and deal with the same as if

the matters arising therefrom has been referred to him originally and deemed to form part of

the reference made by the Director(Refinery).

1.23.6. The arbitrator shall be at liberty to appoint, if necessary any accountant or engineering or

other technical person to assist him, and to act by the opinion so taken.

1.23.7. The arbitrator shall have power to make one or more awards whether interim or otherwise

in respect of the dispute and difference and in particular will be entitled to make separate

awards in respect of claims of cross claims of the parties.

1.23.8. The arbitrator shall be entitled to direct any one of the parties to pay the costs to the other

party in such manner and to such extent as the arbitrator may in his discretion determine and

shall also be entitled to require one or both the parties to deposit funds in such proportion to

meet the arbitrators expenses whenever called upon to do so.

1.23.9. The parties hereby agree that the courts in the city of Mumbai (in case of Mumbai Refinery)

or Kochi (in case of Kochi Refinery) alone shall have jurisdiction to entertain any application

or other proceedings in respect of anything arising under this agreement and any award or

awards made by the Sole Arbitrator hereunder shall be filed (if so required) in the concerned

courts in the city of Mumbai (in case of Mumbai Refinery) or Kochi (in case of Kochi Refinery)

only.

Page 15: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 15 of 27

1.24. INTEGRITY PACT (IP)

1.24.1. All bidders who are submitting their offer against this tender issued by BPCL, CPO-Refineries

are required to sign the BPCL Integrity Pact Document. The Proforma of Integrity Pact (IP)-

Annexure M shall be returned by the Bidder/s along with the bid documents (technical bid in

case of 2 part bids), duly signed by the same signatory who is authorised to sign the bid

documents. All the pages of the Integrity Pact shall be duly signed. Bidder's failure to return

the IP duly signed along with bid documents shall result in the bid not being considered for

further evaluation.

1.24.2. If the Bidder has been disqualified from the tender process prior to the award of the contract

in accordance with the provisions of the IP, BPCL shall be entitled to demand and recovered

from Bidder Liquidated Damages amount by forfeiting the EMD/Bid Security as per provisions

of IP.

1.24.3. If the contract has been terminated according to the provisions of the IP, or if BPCL is entitled

to terminate the contract according to the provisions of the IP, BPCL shall be entitled to

demand and recovered from Contractor Liquidated Damages amount by forfeiting the Security

Deposit/Performance Bank Guarantee as per provisions of the IP.

1.24.4. Bidders may raise disputes/complaints, if any, with the nominated Independent External

Monitor (IEM). The IEM's name, address and contact number is given below :

Shri Brahm Dutt

Address : 1/8 Safdarjung Enclave, New Delhi - 110 029.

E-mail : [email protected]

Mobile No. : 09871920282

1.25. POLICY FOR ‘HOLIDAY LISTING’ OF VENDORS IN BPCL:

1.25.1. The guidelines for holiday listing shall be applicable as per web link given below:

https://bharatpetroleum.in/pdf/holidaylistingpolicyfinal.pd

1.26. GENERAL POINTS:

1.26.1. BPCL reserves the right to extend due dates of tender, accept or reject any tender in part or

full, without assigning any reason whatsoever. BPCL also reserves its right not to accept the

lowest rates quoted by the bidders and also to give purchase preference to Public Enterprises,

as admissible under the existing policies of Government of India and to JVs/ Subsidiaries as per

BPCL guidelines.

1.26.2. Offers and all correspondence must be in English language only.

1.26.3. Any effort by bidder or bidder’s agents, consultant or representative, howsoever described, to

influence the owner in any way concerning scrutiny/ consideration/ evaluation/ comparison of

the bid or decision concerning award of contract shall entail rejection of the bid.

1.26.4. BPCL reserves the right to reject any or all the tenders without assigning any reasons

whatsoever. Also BPCL reserves the absolute right to reject any or all the bids/tenders solely

based upon the past unsatisfactory performance by the bidder/bidders in BPCL, the opinion/

decision of BPCL regarding the same being final and conclusive.

Page 16: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 16 of 27

ANNEXURE - 4

UN-PRICED BID

“We have seen the lot/ lots described below, verified the quantity/material from Warehouse/ Site and

accordingly quote for the same”

Item

No. Description

Unit Price per Kg of Spent

Catalyst

1 Disposal of Spent Catalysts containing Nickel

from Catalytic Reformer Unit.

Quoted /

Non Quoted

2

Disposal of Spent Catalysts containing Nickel &

Molybdenum from Hydro de sulfurization (HDS)

unit of ARU

Quoted /

Non Quoted

Bidders are required to mention applicable/ not applicable against each of the points mentioned below:

Sr.

No. Description

Applicable /

Not Applicable

Remarks (If mentioned

as Not Applicable,

reasons to be

mentioned here)

1 Excise Duty @ 12.50% of basic price

2 Sales Tax (For Intra State Sale, VAT will be applicable. For Inter State Sale, CST will be

applicable. Bidders are required to strike out whichever not applicable)

2 (a) VAT Extra @ 12.5 % Basic price + Excise duty

(Without ‘C’ Form)

2 (b) CST Extra @ 2 % Basic price + Excise duty

(Against ‘C’ Form)

3

Income Tax-TCS @ 1 % of Basic price + Excise

Duty + Sales Tax (VAT/ CST) without Form 27C.

Income Tax-TCS will be NIL against Form 27 C.

VAT / TIN NO.: ______________________ PAN NO.: ___________________

Excise Registration No : ________________

“I/WE HAVE READ THE TERMS & CONDITIONS OF THIS TENDER & SAME ARE ACCEPTABLE TO

ME/US. ”.

Date : Signature of Authorised Signatory

with Name & designation and Co. Seal.

Name & full address of the Firm :

M/s. _______________________

Page 17: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 17 of 27

Annexure-5

DEVIATION FORMAT :

DISPOSAL TENDER NO. CPO(R)/DISP/02/2016

E-TENDER No.15798

Sl.No. /

Annexure

Reference Clause of Tender

Document

Deviation

Signature of Authorised Signatory

with Name & designation and Co. Seal.

Page 18: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 18 of 27

ANNEXURE - 6

Format of Acceptance – cum - Registration form (to be submitted in the bidder’s Letter Head )

Bidder’s Ref. No : Date :

To:

The General Manager (CPO-Refineries),

Bharat Petroleum Corporation. Ltd.,

BPCL Refinery,

Mahul, MUMBAI – 400074.

Dear Sir,

Sub : Tender No: . CPO(R)/DISP/02/2016 (E-TENDER NO.15798) issued by CPO-Refineries, BPCL for

Disposal of Spent Catalyst containing at BPCL-Mumbai Refinery.

I/We confirm having gone through the terms and conditions and agree to take part in the subject at

BPCL, MUMBAI refinery on ‘AS IS WHERE IS BASIS’, “CLEAN SWEEP BASIS “ and “NO COMPLAINT BASIS”.

Having inspected the material and satisfied with the condition and type of the same, I/we also

understand that I/we am/are legally bound to purchase the material at the Price at which I/we place

the bid.

Name of the Company ____________________________________________

Contact Person(s) _____________________________________________

Designation _____________________________________________

Address _________________________________________

______________________________________________________

______________________________________________________

Phone/ Fax No. _________________ Mobile No. ________________________

E Mail ___________________________________________________

Page 19: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 19 of 27

Central Excise Registration No:______________________________________

Income Tax PAN No. _________________

VAT/TIN No._______________________

I understand that in the event of any of the above information being found in-correct/ in-complete, the

Participation shall be liable for cancellation by BPCL at any time and I/we shall not be entitled to any

claim for Refund arising from the same.

Signature of Authorised Signatory

with Name & designation and Co. Seal.

Page 20: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 20 of 27

ANNEXURE - 7

BHARAT PETROLEUM CORPORATION LIMITED

Central Procurement Organisation (Refineries)

INTEGRITY PACT

Between

Bharat Petroleum Corporation Limited (BPCL) hereinafter referred to as "The Principal",

And

…………………………………………………………………………………………….. hereinafter referred to as "The Bidder/ Contractor/

Supplier".

Preamble

The Principal intends to award, under laid down organization procedures, contract/s for Tender for “DISPOSAL OF

SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL MUMBAI REFINERY” (TENDER NO.

CPO(R)/DISP/02/2016, E-TENDER NO.15798). The Principal values full compliance with all relevant laws and

regulations, and the principles of economic use of resources, and of fairness and transparency in its relations with

its Bidder/s, Contractor/s and Supplier/s.

In order to achieve these goals, the Principal cooperates with the renowned international Non-Governmental

Organisation "Transparency International" (TI). Following TI's national and international experience, the Principal

will appoint an Independent External Monitor who will monitor the tender process and the execution of the

contract for compliance with the principles mentioned above.

Section 1 - Commitments of the Principal

(1) The Principal commits itself to take all measures necessary to prevent corruption and to observe the

following principles:

a) No employee of the Principal, personally or through family members, will in connection with the

tender, or the execution of the contract, demand, take a promise for or accept, for himself/

herself or third person, any material or immaterial benefit which he/she is not legally entitled

to.

b) The Principal will, during the tender process, treat all Bidders with equity and reason. The Principal

will, in particular, before and during the tender process, provide to all Bidders the same

information and will not provide to any Bidder confidential/ additional information through

which the Bidder could obtain an advantage in relation to the tender process or the contract

execution.

c) The Principal will exclude from the process all known prejudiced persons.

(2) If the Principal obtains information on the conduct of any of its employees which is a criminal offence

under the relevant Anti-Corruption Laws of India, or if there be a substantive suspicion in this regard, the

Principal will inform its Vigilance Office and in addition can initiate disciplinary actions.

Page 21: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 21 of 27

Section 2 - Commitments of the Bidder/ Contractor/ Supplier

(1) The Bidder/ Contractor/ Supplier commits itself to take all measures necessary to prevent

corruption. He commits himself to observe the following principles during his participation in the tender

process and during the contract execution.

a) The Bidder/ Contractor/ Supplier will not, directly or through any other person or firm, offer,

promise or give to any of the Principal's employees involved in the tender process or the

execution of the contract or to any third person, any material or immaterial benefit which he/she

is not legally entitled to, in order to obtain in exchange, any advantage of any kind whatsoever

during the tender process or during the execution of the contract.

b) The Bidder/ Contractor/ Supplier will not enter with other Bidders into any undisclosed

agreement or understanding, whether formal or informal. This applies in particular to prices,

specifications, certifications, subsidiary contracts, submission or non-submission of bids or any

other actions to restrict competitiveness or to introduce cartelisation in the bidding process.

c) The Bidder/ Contractor/ Supplier will not commit any offence under the relevant Anti-Corruption

Laws of India; further the Bidder/ Contractor/ Supplier will not use improperly, for purposes of

competition or personal gain, or pass on to others, any information or document provided by

the Principal as part of the business relationship, regarding plans, technical proposals and

business details, including information contained or transmitted electronically.

d) The Bidder/ Contractor/ Supplier will, when presenting his bid, disclose any and all payments he

has made, is committed to, or intends to make to agents, brokers or any other intermediaries in

connection with the award of the contract.

(2) The Bidder/ Contractor/ Supplier will not instigate third persons to commit offences outlined above or

be an accessory to such offences.

Section 3 - Disqualification from Tender Process and Exclusion from Future Contracts

If the Bidder, before contract award, has committed a transgression through a violation of Section 2 or in any

other form such as to put his reliability or credibility as Bidder into question, the Principal is entitled to disqualify

the Bidder from the tender process or to terminate the contract, if already signed, for such reason.

(1) If the Bidder/ Contractor/ Supplier has committed a transgression through a violation of Section 2 such

as to put his reliability or credibility into question, the Principal is also entitled to exclude the Bidder/

Contractor/ Supplier from future contract award processes. The imposition and duration of the exclusion

will be determined by the severity of the transgression. The severity will be determined by the

circumstances of the case, in particular the number of transgressions, the position of the transgressors

within the company hierarchy of the Bidder and the amount of the damage. The exclusion will be imposed

for a minimum of 6 months and maximum of 3 years.

(2) A transgression is considered to have occurred if the Principal after due consideration of the available

evidences, concludes that no reasonable doubt is possible.

(3) The Bidder accepts and undertakes to respect and uphold the Principal's absolute right to resort to and

impose such exclusion and further accepts and undertakes not to challenge or question such exclusion

on any ground, including the lack of any hearing before the decision to resort to such exclusion is taken.

This undertaking is given freely and after obtaining independent legal advice.

(4) If the Bidder/ Contractor/ Supplier can prove that he has restored/ recouped the damage caused by him

and has installed a suitable corruption prevention system, the Principal may revoke the exclusion

prematurely.

Page 22: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 22 of 27

Section 4 - Compensation for Damages

(1) If the Principal has disqualified the Bidder from the tender process prior to the award according to Section

3, the Principal is entitled to demand and recover from the Bidder liquidated damages equivalent to

Earnest Money Deposit/Bid Security.

(2) If the Principal has terminated the contract according to Section 3, or if the Principal is entitled to

terminate the contract according to Section 3, the Principal shall be entitled to demand and recover from

the Contractor/ Supplier liquidated damages equivalent to Security Deposit/ Performance Bank

Guarantee.

(3) The Bidder agrees and undertakes to pay the said amounts without protest or demur subject only to

condition that if the Bidder/ Contractor/ Supplier can prove and establish that the exclusion of the Bidder

from the tender process or the termination of the contract after the contract award has caused no

damage or less damage than the amount of the liquidated damages, the Bidder/ Contractor/ Supplier

shall compensate the Principal only to the extent of the damage in the amount proved.

Section 5 - Previous Transgression

(1) The Bidder declares that no previous transgression occurred in the last 3 years with any other Company

in any country conforming to the TI approach or with any other Public Sector Enterprise in India that

could justify his exclusion from the tender process.

(2) If the Bidder makes incorrect statement on this subject, he can be disqualified from the tender process

or the contract, if already awarded, can be terminated for such reason.

Section 6 - Equal treatment of all Bidders/ Contractors/ Suppliers/ Subcontractors

(1) The Bidder/ Contractor/ Supplier undertakes to demand from all subcontractors a commitment in

conformity with this Integrity Pact, and to submit it to the Principal before contract signing.

(2) The Principal will enter into agreements with identical conditions as this one with all Bidders, Contractors/

Suppliers and Subcontractors.

(3) The Principal will disqualify from the tender process all Bidders who do not sign this Pact or violate its

provisions.

Section 7 - Punitive Action Against Violating Bidders/ Contractors/ Suppliers/ Subcontractors

If the Principal obtains knowledge of conduct of a Bidder, Contractor, Supplier or Subcontractor, or of an employee

or a representative or an associate of a Bidder, Contractor, Supplier or Subcontractor which constitutes corruption,

or if the Principal has substantive suspicion in this regard, the Principal will inform the Vigilance Office.

Page 23: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 23 of 27

Section 8 - Independent External Monitors

(1) The Principal has appointed competent and credible Independent External Monitors for this Pact. The

task of the Monitor is to review independently and objectively, whether and to what extent the parties

comply with the obligations under this agreement.

(2) The Monitor is not subject to instructions by the representatives of the parties and performs his functions

neutrally and independently. He reports to the Chairperson of the Board of the Principal.

(3) The Bidder/ Contractor/ Supplier accepts that the Monitor has the right to access without restriction to

all Project documentation of the Principal including that provided by the Bidder/ Contractor/ Supplier.

The Bidder/ Contractor/ Supplier will also grant the Monitor, upon his request and demonstration of a

valid interest, unrestricted and unconditional access to this project documentation. The same is

applicable to Subcontractors. The Monitor is under contractual obligation to treat the information and

documents of the Bidder/ Contractor/ Supplier/ Subcontractor with confidentially.

(4) The Principal will provide to the Monitor sufficient information about all meetings among the parties

related to the Project provided such meetings could have an impact on the contractual relations between

the Principal and the Bidder/ Contractor/ Supplier. The parties offer to the Monitor the option to

participate in such meetings.

(5) As soon as the Monitor notices, or believes to notice, a violation of this agreement, he will so inform the

Management of the Principal and request the Management to discontinue or heal the violation, or to

take other relevant action. The Monitor can in this regard submit non-binding recommendation. Beyond

this, the Monitor has no right to demand from the parties that they act in a specific manner, refrain from

action or tolerate action. However, the Independent External Monitor shall give an opportunity to the

Bidder/ Contractor/ Supplier to present its case before making its recommendations to the Principal.

(6) The Monitor will submit a written report to the Chairperson of the Board of the Principal within 8 to 10

weeks from the date of reference or intimation to him by the 'Principal' and, should the occasion arise,

submit proposals for correcting problematic situations.

(7) If the Monitor has reported to the Chairperson of the Board a substantiated suspicion of an offence under

relevant Anti-Corruption Laws of India, and the Chairperson has not, within reasonable time, taken visible

action to proceed against such offence or reported it to the Vigilance Office, the Monitor may also

transmit this information directly to the Central Vigilance Commissioner, Government of India.

(8) The word 'Monitor' would include both singular and plural.

Section 9 - Pact Duration

This Pact begins when both parties have legally signed it. It expires for the Contractor/ Supplier 12 months after

the last payment under the respective contract, and for all other Bidders 6 months after the contract has been

awarded.

If any claim is made/ lodged during this time, the same shall be binding and continue to be valid despite the

lapse of this pact as specified above, unless it is discharged/ determined by Chairperson of the Principal.

Page 24: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 24 of 27

Section 10 - Other Provisions

(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the Registered Office of the

Principal, i.e. Mumbai. The Arbitration clause provided in the main tender document/ contract shall not be

applicable for any issue/ dispute arising under Integrity Pact.

(2) Changes and supplements as well as termination notices need to be made in writing. Side agreements

have not been made.

(3) If the Bidder/ Contractor/ Supplier is a partnership or a consortium, this agreement must be signed by all

partners or consortium members.

(4) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement

remains valid. In this case, the parties will strive to come to an agreement to their original intentions.

H.P. Panchal ……………………………

For the Principal For the Bidder/ Contractor/

Supplier

Place ……………… Witness 1 : ………………

(Signature/Name/Address)

Date ………………. Witness 2 : ………………

(Signature/Name/Address)

Page 25: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 25 of 27

ANNEXURE - 8

INFORMATION ON E-TENDERING PORTAL

1) The bidder is requested to download the tender from BPCL’s e-tendering website

https://bpcleproc.in and participate in the tender as per the instructions given above

and herein, on or before the due date and time of the tender. The tender available on

the BPCL website can be downloaded for reading purpose only. For participation in the

tender, please fill up the tender online on the e-tender system available on

https://bpcleproc.in.

2) For registration on the e-tender site https://bpcleporc.in, bidder needs to download the

Instructions to Vendors document from the site and read it. They shall select “Register”

and complete the “Bidder Registration Form” by filling in all the information correctly.

Kindly remember the login id (e-mail), password entered therein. After completing this

process, you will receive a system generated e-mail, click on the link and complete

balance Registration process.

3) As a pre-requisite for participation in the tender, bidders are required to obtain a valid

Digital Certificate of Class III and above as per Indian IT Act from the licensed Certifying

Authorities operating under the Root Certifying Authority of India (RCIA), Controller of

Certifying Authorities (CCA). The cost of obtaining the digital certificate shall be borne

by the Bidder. In case any Bidder so desires, he may contact our e-procurement service

provider M/s. E Procurement Technologies Limited, (Contact Number +91 9099090830,

+91 7940016816) for obtaining the digital signature certificate. Please note that

generally, it takes 5 working days for obtaining a digital certificate after the submission

of all required documents / fees. Non availability of Digital Certificate shall be

considered as the bidder’s regret.

4) In case any corrigendum/amendment is issued after the submission of the bid by any

bidders, then such Bidders, who have submitted their bids, shall be intimated about the

corrigendum / amendment by a system-generated email. It shall be assumed that the

information contained therein has been taken into account by the Bidder. They have

the choice of making changes in their bid before the due date and time. No

communication other than the above will be circulated regarding Corrigendum /

amendment, if any.

5) Bidders are required to submit their bid online on or before the due date and time of

closing of the tender as depicted in this document. Bidders shall have to log on to the

website (https://bpcleproc.in) for submitting their bid. The system time (Indian

Standard Time - IST) that will be displayed on e-Procurement web page shall be the time

considered for determining the expiry of due date and time of the tender and no other

time shall be taken into cognizance. Bidders are advised in their own interest to ensure

that their bids are submitted in e-Procurement system well before the closing date and

time of bid. If the Bidder intends to change/revise the bid already entered, he may do

so any number of times till the due date and time of submission deadline. However, no

bid can be modified after the deadline for submission of bids. Once the entire process

of submission of online bid is complete, the Bidders are required to go to option ‘own

bid view’ through dashboard and take the print of the envelope receipt as a proof of

submitted bid.

Page 26: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 26 of 27

6) Bids / Offers shall not be permitted in e-procurement system after the due date /time

of tender. Hence, no bid can be submitted after the due date and time of submission

has elapsed.

7) No manual bids / offers along with electronic bids / offers shall be permitted.

8) Once the PQ Bid / Technical (or) un-priced bids are opened, bidders can see the list of

Bidders who have participated in the bid by logging on to the portal under their user ID

and password and clicking on “Other Bids” view. Subsequently, in case the price bids

are opened in E Tendering platform, Bidders can see the rates quoted by all the

participating bidders using the same option.

9) No responsibility will be taken by BPCL and / or the e-procurement service provider for

any delay due to connectivity and availability of website. They shall not have any liability

to Bidders for any interruption or delay in access to the site irrespective of the cause. It

is advisable that Bidders who are not well conversant with e-tendering procedures, start

filling up the tenders much before the due date / time so that there is sufficient time

available with him/her to acquaint with all the steps and seek help if they so require.

Even for those who are conversant with this type of e-tendering, it is suggested to

complete all the activities ahead of time. It should be noted that the individual bid

becomes viewable only after the opening of the bid on/after the due date and time.

Please be reassured that your bid will be viewable only to you and nobody else till the

due date/ time of the tender opening. The non-availability of viewing before due date

and time is true for e-tendering service provider as well as BPCL officials.

10) BPCL and/or the e-procurement service provider shall not be responsible for any direct

or indirect loss or damages and or consequential damages, arising out of the bidding

process including but not limited to systems problems, inability to use the system, loss

of electronic information etc.

Page 27: TENDER FOR DISPOSAL OF SPENT CATALYST CONTAINING … Catalyst Dispos… · DISPOSAL OF SPENT CATALYST CONTAINING NICKEL & MOLYBDENUM AT BPCL - MUMBAI REFINERY. REF. : TENDER NO: CPO(R)/DISP/02/2016

Page 27 of 27

Annexure - 9

Disposal of Spent Catalyst containing Nickel & Molybdenum at BPCL Mumbai

Refinery

REF: CPO(R)/DISP/02/2016, E-TENDER NO.15798

PRICE BID.

Bidders has to fill PRICES in BPCL e-Procurement

Portal only.