  • 7/28/2019 Tender Document 56,57,58,59,54

    1/27

    Presented By:

    Group : 5

    0904054- Shovon Bossery

    0904055- Ariful Haque

    0904056- Apratim Chakrabartty0904057- Rajib Ahmed

    0904058- Mehnaz Shams

    0904059- Anwar Hossain

  • 7/28/2019 Tender Document 56,57,58,59,54

    2/27

    ABRM Fash ion L im ited

    DEPZ, Savar, Dhaka

    Construction of Residential Building for the Workers andLabourers

  • 7/28/2019 Tender Document 56,57,58,59,54

    3/27

    Contains instructions, forms, terms, and

    specifications.

    Employer may amend the tender document at

    any time.

  • 7/28/2019 Tender Document 56,57,58,59,54

    4/27

    Section 1. Instructions to Tenderers (ITT)

    Section 2. Tender Data Sheet (TDS)

    Section 3. General Conditions of Contract (GCC)

    Section 4. Particular Conditions of Contract (PCC)

    Section 5. Tender and Contract Forms

    Section 6. Bill of Quantities

    Section 7. General Specifications

    Section 8. Particular Specifications

    Section 9. Drawings

  • 7/28/2019 Tender Document 56,57,58,59,54

    5/27

    Criteria for eligibility or disqualification.

    Information on

    # Tender preparation

    # Tender submission

    # Tender opening & evaluation

    # Contract of award

  • 7/28/2019 Tender Document 56,57,58,59,54

    6/27

    Instructions to tenderers and Tender data sheet

    interrelated.

    INSTRUCTIONS TO TENDERERS

    17. Tender Security 17.1 Tender Security as specified is TDS.

    TENDER DATA SHEET

    ITT 17.1 The amount of the Tender Security shall be Sixty

    Thousands Taka.

  • 7/28/2019 Tender Document 56,57,58,59,54

    7/27

    Contains Detailed Information of The Tender

    Package

  • 7/28/2019 Tender Document 56,57,58,59,54

    8/27

    A. General The Procuring Entity is: Managing Director, ABRM

    Fashion Limited

    Title of The Work : Construction of ResidentialBuilding

    Single Lot

    Open Tender Method

  • 7/28/2019 Tender Document 56,57,58,59,54

    9/27

    B. Tender Document

    Managing Director, ABRM Fashion Limited, DEPZ,

    Savar, Dhaka.Address: DEPZ, Savar, Dhaka.

    Telephone: 01685737273.

    Fax No.: 666547

    e-mail address: [email protected]

  • 7/28/2019 Tender Document 56,57,58,59,54

    10/27

    C. Qualification Criteria completion of similar works of at least Tk 10 Lac

    undersingle number of contract(s) over a period

    ofone years The required average annual construction

    turnover shall be greater than Tk 20 Lac. over the

    last One year.

    The minimum amount of liquid assets or working

    capital or credit facilities of the Tenderer shall be

    Tk 10 lacs.

  • 7/28/2019 Tender Document 56,57,58,59,54

    11/27

    D. Tender Preparation Additional Documents-

    Professional and Technical Qualification

    Financial Resources

    Equipment and Physical Facilities

    Specific Experience

    Tender Validity Period 90days

    Tender Security : Taka 60,000/-

  • 7/28/2019 Tender Document 56,57,58,59,54

    12/27

    E. Tender Submission Deadline : 5 pm, 18th May,2013.

    F. Tender Opening Address: Managing Directors Office, ABRM

    Fashion Limited.Address: DEPZ, Savar, Dhaka. Time & Date: 9 am, 19th May, 2013.

    G. Contract Award Performance Security : 10% of Contract Price.

  • 7/28/2019 Tender Document 56,57,58,59,54

    13/27

    General

    Time Control

    Quality Control Cost Control

    Completion of Contract

    Termination and Settlement of Disputes Disputes and Arbitration

  • 7/28/2019 Tender Document 56,57,58,59,54

    14/27

    Definitions

    Corrupt, Fraudulent, Collusive or Coercive Practices

    Documents Forming the Contract and Priority of Documents

    Eligibility Possession of the Site

    Procuring Entitys Responsibilities

    Contractors Responsibilities

    Taxes and Duties

    Contractors Personnel

  • 7/28/2019 Tender Document 56,57,58,59,54

    15/27

    Start Date Intended Completion Date

    Programme of Works

    Extension of the intended completion time

    Quality Control

    Execution of Works

    Identifying Defects

    Testing

    Rejection of Works

    Remedial Work

    Correction of Defects

  • 7/28/2019 Tender Document 56,57,58,59,54

    16/27

    Contract Price

    Bill of Quantities (BOQ)

    Changes in the Quantities and Unit Rate or Price

    Variations Costing of Variation Orders

    Payment Certificates

    Payments to the Contractor

    Compensation Events

    Retention Money

    Liquidated Damages

    Performance Security

  • 7/28/2019 Tender Document 56,57,58,59,54

    17/27

    Completion

    Completion Certificate and Taking Over

    Amendment to Contract

    Final Account

    Release from Performance

  • 7/28/2019 Tender Document 56,57,58,59,54

    18/27

    Termination

    Payment upon Termination

    Property

    Disputes and Arbitration

    Amicable settlement

    Arbitration

  • 7/28/2019 Tender Document 56,57,58,59,54

    19/27

    Name & Address of Contractor .

    Procuring EntityManaging Director , ABRM Fashion Ltd.

    Project ManagerChief Executive Engineer , ABRM Fashion Ltd. Site Location DEPZ, Savar, Dhaka & Drawing No.07

    Working Scope One Storied Residential Building .

    Other Document -

    RAJUK approved construction work licence .

    Photocopy of pay-checks of a similar construction work .

  • 7/28/2019 Tender Document 56,57,58,59,54

    20/27

    Date Of Possession of the Site18th June, 2013.

    Starting Date20th July, 2013.

    Intended Completion Date 20th January, 2014.

    Working Programme should be submitted within 10 days

    of signing contract.

    Defects Liability Period12 months.

    Contract Price should be inserted.

    No Compensation Event.

    Retained Proportion Of Payment10 %.

  • 7/28/2019 Tender Document 56,57,58,59,54

    21/27

    Liquidated Damages0.05 % offinal Contract priceof the

    uncompleted Works per day of delay.

    Maximum Amount of Liquidated Damages10 %. Percentage of completing the uncompleted Works17 %.

    Arbitration placeManaging Directors Office,

    ABRM Fashion Limited.

    Address : DEPZ, Savar, Dhaka.

  • 7/28/2019 Tender Document 56,57,58,59,54

    22/27

    Form Contract Forms

    PW2 4 Notification of Award

    PW2 5 Contract Agreement

    PW2 6 Bank Guarantee for Performance

    Security (when this option is chosen)

    Form Tender Forms

    PW2 1 Tender Submission Letter

    PW2 2 Tenderers Information

    PW2 3 Bank Guarantee for Tender Security

    (when this option is chosen)

  • 7/28/2019 Tender Document 56,57,58,59,54

    23/27

    Outline of the Bill of Quantities

    Main parts of Bill of QuantitiesI. Item No-100: Earth Work

    II. Item No-200. RCC Works

    III. Item No-300: Reinforcements

    IV. Item No-400: Brick soling, CC, DPC

    V. Item No-500: Brickwork, Plastering & Floor finish

    VI. Item No-600: Door and Window Materials

  • 7/28/2019 Tender Document 56,57,58,59,54

    24/27

    Item No-100 includes earthwork excavation ,Sand filling in foundation etc.

    Item No-300 includes reinforcement in footing, in

    grade beam etc.

    Item No-600 includes door and window materials

    like frames, fittings, clamp etc.

  • 7/28/2019 Tender Document 56,57,58,59,54

    25/27

    The specifications of all the materials are given.

    Such as-

    400-grade deformed bar is to be used

    Mass concrete (1:3:6) in floorMinimum 12 mm thick cement sand (F.M. 1.2)

    plaster (1:4)

    Otherspecifications are given in the TenderDocument in details

  • 7/28/2019 Tender Document 56,57,58,59,54

    26/27

    The tenderers have to estimate the materials

    according to the design of the project

    The tenderers have to input unit price of thematerials as per specification given

    The tenderers have to provide with the sub total

    and gross total cost of the materials

  • 7/28/2019 Tender Document 56,57,58,59,54

    27/27

    The tenderer offering lowest gross total

    maintaining the specifications and demand will

    be preferred for the contract of the project