19
Templeton Gap Landfill Jesse Silverstein Executive Director Colorado Brownfields Foundation

Templeton Gap Landfill

  • Upload
    wright

  • View
    108

  • Download
    2

Embed Size (px)

DESCRIPTION

Templeton Gap Landfill. Jesse Silverstein Executive Director Colorado Brownfields Foundation. Infill Sites, Brownfields Redevelopment & Sustainability. Energy Conservation and Energy Harvest opportunities Replacing or upgrading buildings for energy efficiency - PowerPoint PPT Presentation

Citation preview

Page 1: Templeton Gap Landfill

Templeton Gap Landfill

Jesse SilversteinExecutive Director

Colorado Brownfields Foundation

Page 2: Templeton Gap Landfill

Infill Sites, Brownfields Redevelopment& Sustainability

• Energy Conservation and Energy Harvest opportunities

• Replacing or upgrading buildings for energy efficiency

• Redesigning landscape to be environmentally friendly

• Reusing sites for renewable energy

Page 3: Templeton Gap Landfill

Utility Scale versus Infill Scale

• “Distributed Generation”– Connection to a distribution

network; and – Proximity to the end consumer

• Net metering versus direct utility purchase

• Consumer driven development versus utility driven development

Page 4: Templeton Gap Landfill

Site Criteria for Renewable Energy

• Buildable Land

• Resource Quality

• Transmission Infrastructure

• Permitting / Zoning

• Market for Energy

• Land Cost– Highest & Best Use?

• Limited Liability

Page 5: Templeton Gap Landfill

Templeton Gap Landfill

• CBF equity project/ CBF project lead

• Privately Owned

• El Paso County Enclave

• 44 Acre Footprint

• Landfill served the community from 1957 until 1980

• Now under Cleanup Order with the State

Page 6: Templeton Gap Landfill
Page 7: Templeton Gap Landfill

Colorado Springs Land Use Master Plan •Regional Center•Potential Annexation Area

•Surrounded by Buildable Parcels

Page 8: Templeton Gap Landfill

TGAP

PENROSEST. FRANCIS

HOSPITAL

Page 9: Templeton Gap Landfill

• Environmental Stewardship to maintain pollution prevention systems, possibly enhance

• Minimize future fiscal burden on local, state, and federal agencies to maintain systems

• Integrate renewable energy into local markets

• Enhance ability to attract new businesses seeking to locate in sustainable communities

Templeton Gap Opportunity

Page 10: Templeton Gap Landfill

Pollution Prevention

Page 11: Templeton Gap Landfill

Reduce Carbon Footprint

Page 12: Templeton Gap Landfill

Locally Generated Energy

Page 13: Templeton Gap Landfill

Existing Load

Page 14: Templeton Gap Landfill

Multiple Market Opportunities

Page 15: Templeton Gap Landfill

Site Specific Direct Job Creation

  Construction(One Time)

Operations & Maintenance(Annual)

Solar Photovoltaic    Construction and Installation 21.6  Related Services 15.1  Technicians   0.3

     Landfill Gas Extraction  

Construction and Installation 6.0  Technicians   0.5

     Wages    

Construction and Installation $27.50/hour  Technicians $25.00/hour  

Source: NREL JEDI; Colorado Brownfields Foundation

Page 16: Templeton Gap Landfill

Pre-Development• Market Analysis• Financial Analysis• Governmental activities

Asset Management• Insurance• Bookkeeping and accounting• Property Management• Property Maintenance• Equipment Maintenance

Related Job ActivitiesEnvironmental Protection• Remediation systems construct• Environmental Consulting• Governmental oversight

Decommissioning• Engineering• Deconstruction• Equipment removal• Materials recycling

Professions utilizedEngineers

Environmental ConsultantsFinancial Analysts

Real estate managementGovernment Specialists (funding, policy, regulatory)

Page 17: Templeton Gap Landfill

Implementation PlanDevelopment Prospectus

• Inform market to overcome hurdle of initial market investigation costs

• Identify renewable energy opportunities

• Identify development incentives and financing criteria

• Develop environmental liability management plan

• Establish entitlements and development requirements

• Identify community issues and solutions

Page 18: Templeton Gap Landfill

Development Prospectus as RFP• Written Investment Prospectus

• Inform market; overcome initial market investigation costs

• Identify renewable energy opportunities

• Identifies energy “loads”

• Identify development incentives

• Lays out environmental, entitlement, and utility challenges & solution

• Recommends stakeholder resolutions

• Introduces environmental liability management plan

Page 19: Templeton Gap Landfill

Jesse SilversteinExecutive Director

[email protected]

10184 West Belleview Ave., Ste 100Littleton, Colorado 80127

ColoradoBrownfieldsFoundation