Page 1: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

US Army Corps of Engineers Hydrologic Engineering Center

Technical Factors in Small Hydropower Planning February 1979 Approved for Public Release. Distribution Unlimited. TP-61

Page 2: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

Standard Form 298 (Rev. 8/98) Prescribed by ANSI Std. Z39-18

REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ORGANIZATION. 1. REPORT DATE (DD-MM-YYYY) February 1979

2. REPORT TYPE Technical Paper

3. DATES COVERED (From - To)

5a. CONTRACT NUMBER

5b. GRANT NUMBER

4. TITLE AND SUBTITLE Technical Factors in Small Hydropower Planning

5c. PROGRAM ELEMENT NUMBER

5d. PROJECT NUMBER 5e. TASK NUMBER

6. AUTHOR(S) Darryl W. Davis

5F. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) US Army Corps of Engineers Institute for Water Resources Hydrologic Engineering Center (HEC) 609 Second Street Davis, CA 95616-4687

8. PERFORMING ORGANIZATION REPORT NUMBER TP-61

10. SPONSOR/ MONITOR'S ACRONYM(S) 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 11. SPONSOR/ MONITOR'S REPORT NUMBER(S)

12. DISTRIBUTION / AVAILABILITY STATEMENT Approved for public release; distribution is unlimited. 13. SUPPLEMENTARY NOTES Presented at the Water Systems Specialty Conference, American Society of Civil Engineers, 25-28 February 1979, Houston, Texas. 14. ABSTRACT The Hydrologic Engineering Center, corps of Engineers, is preparing a document entitled "Manual for the Determination fo the Feasibility of Adding Small Hydroelectric Power to an Existing Facility". The manual is designed for use by public agencies (federal, stat and local), public and private utilities, and private investors. It focuses upon the concepts, technology, and economic and financial issues unique to small hydropower additions. This paper discusses issues related to engineering and economic considerations in planning small hydropower additions, presents an overview of significant findings of the investigation to date, and provides a status report on manual preparation. 15. SUBJECT TERMS hydropower, planning, small-scale hydropower, feasibility studies, reconnaissance studies

16. SECURITY CLASSIFICATION OF: 19a. NAME OF RESPONSIBLE PERSON a. REPORT U

b. ABSTRACT U

c. THIS PAGE U

17. LIMITATION OF ABSTRACT UU

18. NUMBER OF PAGES 40 19b. TELEPHONE NUMBER

Page 3: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

Technical Factors in Small Hydropower Planning

February 1979 US Army Corps of Engineers Institute for Water Resources Hydrologic Engineering Center 609 Second Street Davis, CA 95616 (530) 756-1104 (530) 756-8250 FAX www.hec.usace.army.mil TP-61

Page 4: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

Papers in this series have resulted from technical activities of the Hydrologic Engineering Center. Versions of some of these have been published in technical journals or in conference proceedings. The purpose of this series is to make the information available for use in the Center's training program and for distribution with the Corps of Engineers. The findings in this report are not to be construed as an official Department of the Army position unless so designated by other authorized documents. The contents of this report are not to be used for advertising, publication, or promotional purposes. Citation of trade names does not constitute an official endorsement or approval of the use of such commercial products.

Page 5: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

1 / TECHNICAL FACTORS I N SMLL HYDROPOWER PLANNING -

a Darryl W. Davis , Member, ASCE

INTRODUCTION

The r ecen t focus on our n a t i o n a l energy resources has generated s i g n i f -

i c a n t renewed a t t e n t i o n i n h y d r o e l e c t r i c power development. I n p a r t i c u l a r ,

r ecen t s t u d i e s ( I ) , (2) t h a t ana lyze t h e undeveloped h y d r o e l e c t r i c p o t e n t i a l

a t e x i s t i n g r e s e r v o i r s i t e s i n d i c a t e t h a t d e t a i l e d s t u d i e s a r e warranted.

An a t t r a c t i v e f e a t u r e i s t h a t many of t h e d i f f i c u l t i e s i n developing new

power s i t e s have a l r eady been d e a l t w i th (e .g . , a n impoundment e x i s t s ) . An-

o t h e r f i n d i n g (3) was t h a t t h e need e x i s t s f o r updating and r e f i n i n g a n a l y s i s

d a t a and methods, e s p e c i a l l y f o r smal l power a d d i t i o n s of 15,000 k i l o w a t t s

o r l e s s .

To meet t h i s need, t he Hydrologic Engineering Center , Corps of Engineers,

is prepar ing a document e n t i t l e d "Manual f o r t h e Determination of t h e Feas-

i b i l i t y of Adding Small Hydroe lec t r ic Power t o an Ex i s t i ng F a c i l i t y . " The

p r o j e c t is being sponsored by t h e U.S. Department of Energy through t h e Corps

I n s t i t u t e f o r Water Resources. The manual is designed f o r u se by pub l i c

agencies ( f e d e r a l , s t a t e and l o c a l ) , pub l i c and p r i v a t e u t i l i t i e s , and p r i v a t e

i nves to r s . The major t h r u s t is t o assemble t e c h n i c a l d a t a and develop pro-

cedura l guidance f o r t h e sys temat ic a p p r a i s a l of t h e v i a b i l i t y of p o t e n t i a l

small hydropower a d d i t i o n s . It focuses upon t h e concepts , technology, and

economic and f i n a n c i a l i s s u e s unique t o smal l hydropower a d d i t i o n s .

I Presented a t t h e Water Systems S p e c i a l t y Conference, American Socie ty of C i v i l Engineers, 25-28 February, 1999, Houston, Texas,

a Chief, Planning Analysis Branch, t h e Hydrologic Engineering Center , U.S. Army Corps of Engineers, Davis, C a l i f o r n i a 9561.6.

Page 6: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

This paper d i scusses i s s u e s r e l a t e d t o engineering and economic consider-

a t i o n s i n planning small hydropower a d d i t i o n s , p re sen t s a n overview of s i g n i f -

i c a n t f i n d i n g s of t h e i n v e s t i g a t i o n t o d a t e , and provides a s t a t u s r e p o r t on

manual p r eparat i .on .

CMRACTER OF SMALL HYDROPOWER

Small hydropower p r o j e c t s i nc lude i n s t a l l a t i o n s t h a t have 15,000 k i i o -

w a t t s (kW) o r l e s s capac i ty . The concept i s no t l i m i t e d t o a d d i t i o n s t o

e x i s t i n g impoundments, a l though major a c t i v i t i e s by f e d e r a l , s t a t e , l o c a l

agencies and p r i v a t e o rgan iza t ions seem t o b e s o focused. "Small hydro" and

"low head" hydro a r e no t synonomous even though t h e tendency i n publ ished

documents is t o avoid t h e d i s t i n c t i o n (4 ) . Small hydro as def ined above has

been a n informal breaking p o i n t used f o r va r ious f e d e r a l agency s t a t i s t i c a l

t a b u l a t i o n s and informal communications. It has now been def ined by law (5)

t o b e 15 megawatts (MW) f o r purposes of s p e ~ i a l handling f o r l i c e n s i n g , loans ,

i n c e n t i v e s , and o t h e r promotional programs. Low head hydro is a term emana-

t i n g from a r e sea rch and development program managed by t h e Department of

Energy t h a t i s designed t o advance t h e technology f o r genera t ing hydropower

from s i t e s wi th heads of l e s s than 20 meters (66 f e e t ) . A l a r g e number of

t h e p r e s e n t l y i d e n t i f i e d s m a l l hydro sites f a l l w i t h i n t h e low head c r i t e r i a .

This d i s t i n c t i o n between s m a l l and low head hydro w i l l be preserved h e r e i n

f o r convenience i n communication and cons is tency wi th e x i s t i n g and emerging

f e d e r a l and state programs.

The underlying b a s i s f o r s m a l l hydro a s a concept ( a p a r t from hydropower

i n gene ra l ) is t h a t t h e impacts of implementation a r e l i k e l y t o b e modest

and thus p r o j e c t s w i l l be e s s e n t i a l l y non-controversial so t h a t s impler l i c e n -

s ing and permit g ran t ing a r e app ropr i a t e , and t h a t phys i ca l f a c i l i t i e s can

l i k e w i s e b e kept s imple and f u n c t i o n a l .

Ex i s t i ng and --- P o t e n t i a l Development. A s i g n i f i c a n t number of e x i s t i n g

Page 7: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

hydropower i n s t a l l a t i o n s i n t h e United S t a t e s could be c l a s s i f i e d as smal l

hydro. Current i n s t a l l e d hydropower capac i ty i s about 60 m i l l i o n kW i n

about 1400 p l a n t s , which r e s u l t s i n an average i n s t a l l e d capac i ty of about

40 MW per p l a n t . The l a t e s t publ ished inventory (1) l i s ts 142 p l a n t s as

having i n s t a l l e d c a p a c i t i e s g r e a t e r than 100 MW. Deducting t h e sum of t h e

c a p a c i t i e s f o r p l a n t s i n excess of 100 MW from t h e t o t a l r e s u l t s i n t h e aver-

age p l a n t s i z e f o r t h e remaining 1260 p l a n t s dropping t o 1 2 MFJ. There a r e ,

t h e r e f o r e , a g r e a t number of e x i s t i n g p l a n t s t h a t meet t h e smal l hydro c r i -

t e r i a and, i t would seem t h a t t h e U.S. should have a cons iderable body of

technology and t e c h n i c a l e x p e r t i s e . On t h e o t h e r hand, t h e smal le r p l a n t s

tend t o b e t h e o l d e r p l a n t s . It should be noted a s w e l l t h a t 385 MW ( 3 ) of

hydropower, most ly small p l a n t s , have been r e t i r e d from s e r v i c e i n t h e l a s t

15 yea r s , a t r end t h a t p re sen t a c t i v i t i e s a r e designed t o reverse .

Reported power p o t e n t i a l a t e x i s t i n g non-hydropower dams is about 30,000 MW

(3 ) , and t h i s sum may e x i s t a t g r e a t e r than 2000 sites. Other p o t e n t i a l

s i t e s no t i d e n t i f i e d i n previous s t u d i e s inc lude i r r i g a t i o n cana l drops

( s i g n i f i c a n t i n t h e wes t ) , municipal water supply d e l i v e r y systems such a s

i n southern C a l i f o r n i a and t h e no r th A t l a n t i c , and waste management systems,

such as t h e Chicago tunne l p l an . Data from t h e n a t i o n a l dam inventory

(50,000 dams) i n d i c a t e t h a t about 113 have heads i n t h e 6-20 f o o t range (con-.

s ide red q u i t e low i n t h e "low head" l i t e r a t u r e ) , about 2/3 have i n t e r m i t t e n t

flow ( inf low ceases some time during t h e y e a r ) , and t h a t s e v e r a l s i g n i f i c a n t

o b s t a c l e s e x i s t t h a t i n h i b i t b r inging a l a r g e number i n t o se rv i ce . The econ-

omical ly a t t r a c t i v e s i t e s under cu r r en t cond i t i ons would to t a l . s i g n i f i c a n t l y

l e s s than t h e 30,000 MW r epor t ed p o t e n t i a l bu t i t i s g e n e r a l l y agreed t h a t several

hnndr.ed economically a t t r a c t i v e sites are probably a v a i l a b l e f o r development.

The growing c o s t of f o s s i l f u e l s i s expected t o cont inue t o i nc rease t h e

economic v i a b i l i t y of hydropower i n gene ra l , and e s p e c i a l l y smal l hydropower

such t h a t w i t h i n t h e next t e n yea r s , upwards of 1000 s i t e s could be considered

as a reasonable count f o r t h e number of smal l hydro s i t e s warrant ing s e r i o u s

s tudy fo r implementation.

Page 8: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

Implementation I ssues . A s i g n i f i c a n t major p o s i t i v e f e a t u r e of s m a l l

hydro i s t h a t many of t h e important environmental i s s u e s have been reso lved

(e.g. , an impoundment e x i s t s and i s l i k e l y t o remain i n s e r v i c e ) . This sug-

g e s t s t h a t it w i l l be e a s i e r t o propose, a c q u i r e permi ts , i n i t i a t e , and con-

s t r u c t smal l hydro a d d i t i o n s t o e x i s t i n g impoundments than t o begin from

s c r a t c h f o r o t h e r hydro p r o j e c t s o r a l t e r n a t i v e thermal power gene ra t ion

p l an t s . The l a g time from conception t o implementation could be a s l i t t l e

a s 3 years (Fig. 1 ) compared t o che o f t e n 15-20 yea r s f o r major p r o j e c t s .

The c u r r e n t t rend i n smal l hydro is t o t ake advantage of t h e head and ex is -

t i n g f low r e l e a s e p a t t e r n s t o avoid t h e complexi t ies t h a t would ensue-wi th

a l t e r i n g water use, r e l e a s e p a t t e r n s , and adding s t o r a g e ( thus inc reas ing

pools l e v e l s ) . The i n f e r r e d judgement i s t h a t t h e problems t h a t would b e

generated by a l t e r i n g t h e e x i s t i n g r e l e a s e pat t .erns and u s e t o enable more

power genera t ion , and perhaps pe rmi t t i ng development of some dependable

capac i ty , are not worth t h e t i m e de l ays and added. implementation complexity

t h a t would ensue. A very pre l iminary e s t ima te ( 3 ) is t h a t perhaps 15 percent

of u sab le power output is a l l t h a t is foregone by us ing e x i s t i n g r e l e a s e pa t -

t e r n s . I n e f f e c t t h e t h r u s t i s "let 's develop what ' s p r e s e n t l y l o s t through

energy d i s s i p a t i o n s t r u c t u r e s and g e t i t on l i n e quick ly , s i n c e w e a r e a t

least a i d i n g i n meeting near term energy requirements."

The b e l i e f t h a t t h e r e w i l l no t be i n s t a n c e s of important environmental

i s s u e s i s no t c o r r e c t , however. Any a l t e r a t i o n of t h e f low p a t t e r n and r e -

l e a s e q u a l i t y w i l l r e q u i r e c a r e f u l documentation and a n a l y s i s . Also, and

perhaps most important , p a s t m i t i g a t i o n ommissions w i l l gene ra l ly need t o

be co r r ec t ed . A s p e c i f i c ca se i n p o i n t i s t h a t f i s h passage f a c i l i t i e s

( e s p e c i a l l y f o r anadromous f i s h e r i e s ) a r e l i k e l y t o be i n s i s t e d upon f o r

s i t e s i n which they were ommitted i n a p r i o r e r a and pre l iminary s t u d i e s (5)

i n d i c a t e t h e s t a t u t e s e x i s t t o s u b s t a n t i a t e t h e i n s i s t e n c e . Small hydro

o f f e r s a n oppor tuni ty f o r engineers t o provide t h e l eade r sh ip e a r l y i n p r o j e c t

development t o i d e n t i f y and formulate s o l u t i o n s t o p o t e n t i a l environmental

problems. The key po in t i s t o d e f i n e i s s u e s e a r l y i n i n v e s t i g a t i o n s so t h a t

they may be included a s a normal component of p r o j e c t f e a t u r e planning.

Page 9: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

t-'. n

P,

t-' i-t K P :

100 r

I

C

V)

75

-

2

0 - t- W

A

0.

*g

50-

U

- 50

L

0

I- 2

w U

CT w

25 -

a.

- 25

SHOR

T TE

RM F

INAN

CING

LETT

ER O

F PU

RCHA

SE

NEGO

TIAT

IONS

ENVI

RONM

ENTA

L AN

D OT

HER

1 PE

RM l T

S IN

STAL

LATI

ON

I 1

I I

I 1

1 I

I

0 I

4 8

12

16

20

2 4

28

3 2

3 6

4 0

TIME

IN

MON

THS

w *-

1

Page 10: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

Fac to r s Important f o r F e a s i b i l i t y . Severa l important i s s u e s t h a t can

be i n f e r r e d from t h e previous d i scuss ion a r e p e r t i n e n t t o e s t a b l i s h i n g t h e

conceptual base f o r t h e f e a s i b i l i t y guide manual t o b e d iscussed subsequent ly.

Most prominently i s underscanding t h e reason f o r t h e major n a t i o n a l a t t e n t i o n

t h a t is focused on smal l hydro, a n admi t ted ly s m a l l element of t h e n a t i o n a l

energy a r r a y . Simply s t a t e d they seem t o be: t h e n a t i o n a l d e s i r e t o move t o

energy independence, t h e c u r r e n t na t iona l concern f o r resource conserva t ion ,

t h e p o t e n t i a l f o r quick r e s u l t s from pub l i c and p r i v a t e e f f o r t s (an increas ing-

l y r a r e commodity i n today ' s world) , and most assuredly , non-firm energy

(used t o be r e f e r r e d t o with t h e t a i n t e d l a b e l "dump energy") i s now worth

20 t o 30 m i l l s per k i lowa t t hour a s compared t o 1 t o 2 m i l l s per k i lowa t t hour

s e v e r a l yea r s ago.

The g r e a t e s t p o t e n t i a l seems t o be a t e x i s t i n g s i t e s wi th t h e major c i v i l

works a l r e a d y i n p l ace . The sites t y p i c a l l y a r e i n non-federal ownership

(about one-half of e x i s t i n g hydropower p l a n t s a r e i n non-federal ownership).

The s i t e s a r e o f t e n i n t h e low head range (under 60 f e e t ) , w i th a s i g n i f i c a n t

number f a l l i n g i n head ranges l e s s than 20 f e e t . The marketable output w i l l

l i k e l y be energy only wi th l i t t l e , i f any, dependable capac i ty . This means

t h e v a l u e of s m a l l hydro output w i l l b e p r imar i ly due t o f u e l c o s t sav ings

and n o t due t o o f f s e t t i n g t h e need f o r new power p l a n t s t o supply capac i ty .

The f e a s i b i l i t y of p r o j e c t s is expected t o be q u i t e s e n s i t i v e t o s i t e

s p e c i f i c cond i t i ons , e .g . , t h e quan t i t y of power produced w i l l no t l i k e l y

support t h e usual a r r a y of " inc identa l" i tems such a s long t ransmiss ion l i n e s ,

acces s roads , s i g n i f i c a n t s i t e p repa ra t ion , e t c . The n a t u r e of t h e market

a r e a load c h a r a c t e r i s t i c s and p re sen t genera t ing f a c i l i t i e s s e r v i c i n g t h e load

a r e c r i t i c a l t o t h e va lue of power output . Areas served wi th major g o s s i l f u e l

based p l a n t s w i l l l i k e l y be more a t t r a c t i v e f o r small hydro because of t h e f u e l

t h a t can b e d i sp l aced . An important i s s u e t o p r o j e c t f e a s i b i l i t y , and t h e

engineer ing p ro fe s s ion f o r t h a t ma t t e r , i s t h a t i n v e s t i g a t i o n , design, cons t ruc-

t i o n management, admin i s t r a t i on and cont ingencies ( t h e non-5ardware elements

Page 11: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

of a p r o j e c t ) a r e a major p r o j e c t c o s t burden. Fig. 2 schemat ica l ly i l l u s -

t r a t e s t h e c o s t elements i n s m a l l hydro p r o j e c t s . I n f a c t , t h e f e a s i b i l i t y

s tudy i t s e l f is l i k e l y t o b e viewed a s a s i g n i f i c a n t f inanc ia l . burden

warrant ing an investment type dec i s ion by t h e p r o j e c t sponsor p r i o r t o i n i t i -

a t i o n of t h e s tudy. This i s e s p e c i a l l y t h e case w i t h p r i v a t e i n v e s t o r s and

is a n important reason f o r t h e r e c e n t l y passed l e g i s l a t i o n t h a t i nc ludes a

l oan program fo r performance of f e a s i b i l i t y s t u d i e s (6) .

FEASIBILITY MANTJAL CONCEPT

The previous paragraphs have cha rac t e r i zed t h e smal l hydro p o t e n t i a l

a s e x i s t i n g a t a r e l a t i v e l y l a r g e number of e x i s t i n g s i t e s , probably i n non-

f e d e r a l ownership, p r imar i ly of low head, l i k e l y t o gene ra t e "non-essential"

power, b e s e n s i t i v e t o s i te s p e c i f i c condi t ions , r equ i r ing i n v e s t i g a t i o n s

whose c o s t is a s i g n i f i c a n t p r o j e c t burden, and i s a concept p r e s e n t l y i n

t h e n a t i o n a l l i m e l i g h t , The guide manual (5) ha s been formulated t o be

respons ive t o t hese c h a r a c t e r i s t i c s and t o provide a foundat ion t o encourage

r e l a t i v e l y quick, e f f i c i e n t formula t ion and assessment of a t t r a c t i v e p r o j e c t s .

The guide manual desc r ibes procedures and inc ludes c o s t curves, pe r fo r -

mance curves and o t h e r t e c h n i c a l d a t a t o permit quick reconnaissance inves-

t i g a t i o n s ( t o determine whether a n investment i n a f e a s i b i l i t y s tudy i s

warranted) and procedural guidance and more d e t a i l e d informat ion f o r pe r fo r -

mance of f e a s i b i l i t y s t u d i e s ( t o formulate a p r o j e c t and t o permit a de f in -

i t i v e recommendation on p r o j e c t implementation). The manual is comprised of

s i x volumes: Volume I - "Technical Guide" t h a t overviews t h e i n v e s t i g a t i o n

process and documents ca se s tudy a p p l i c a t i o n s ; Volume 11 - "Economic and

F inanc ia l Analysis" t h a t i nc ludes c r i t e r i a and procedures f o r marketing and

va lu ing power output and f o r analyzing f i n a n c i a l requirements and i s s u e s

c r i t i c a l t o implementation; Volume I T 1 - "Hydrologic S tudies" t h a t d e s c r i b e s

i n v e s t i g a t i o n s necessary t o eva lua t e t h e hydrologic i n t e g r i t y of t h e dam

and t o e s t ima te t h e power output of p l a n t a d d i t i o n s ; Volume I V - "Exis t ing

Page 12: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

ACCESSORY

INDIRECTS 30 O/o

MINIMUM CIVIL FEATURES COSTS

CIVIL FEATURES

ACCESSORY

Figure 2. Range of Civ i l Features C o s t s

Page 13: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

F a c i l i t y I n t e g r i t y " t h a t provides guidance f o r a s se s s ing the a b i l i t y of a

s i t e t o s a f e l y accommodate a power a d d i t i o n ( t h e t h e s i s i s t h a t e x i s t i n g

dams w i l l b e requi red t o meet dam s a f e t y s tandards be fo re power a d d i t i o n s

would be p r a c t i c a l ) ; Volume V - "Electromechanical Equipment" t h a t desc r ibes

s e l e c t i o n c r i t e r i a and performance c h a r a c t e r i s t i c s of smal l hydro genera t ion

and a n c i l l i a r y equipment; and Volume V I - "Civil Features" t h a t provides

des ign and c o s t gu ide l ines f o r t h e civi.1 f e a t u r e s of power a d d i t i o n s , The

fol lowing s e c t i o n s provide a b r i e f overview of each volume and provide samples

of t h e d a t a and guidance included i n each.

VOLUME L - TECHNICAL GUIDE

This volume de f ines s m a l l hydropower and d i scusses t h e i s s u e s and tech-

nology a s s o c i a t e d wi th power a d d i t i o n s t o e x i s t i n g impoundments. The i n t r o -

ductory m a t e r i a l contained i n t h i s paper is included i n an expanded form i n

e a r l y s e c t i o n s of t h e volume. The Guide provides an overview of t h e manual,

p r e s e n t s t h e purpose, concept, and conf igu ra t ion of t h e manual, and desc r ibes

t h e components of a f e a s i b i l i t y s tudy and t h e i r r e l a t i o n s h i p s . F e a s i b i l i t y

i n v e s t i g a t i o n s a r e cha rac t e r i zed a s a continuim t h a t begins w i t h gene ra l i zed

r e sou rce assessments , such a s t h e many r e source assessments underway a c r o s s

t h e U . S . , and concludes when cons t ruc t ion i s i n i t i a t e d . Decis ion p o i n t s e x i s t

a t s e v e r a l c r i t i c a l s t a g e s . The guide manual provides guidance f o r t h e

reconnaissance s t a g e (should a f e a s i b i l i t y s tudy b e i n i t i a t e d ) and t h e f e a s -

i b i l i t y s t a g e (should a n implementation commitment b e made) dec i s ion p o i n t s .

It i s recognized t h a t subsequent f i n d i n g s could a l t e r t h e implementation

dec is ions ; such a s undiscovered s i t e problems of i n t e g r i t y , o r foundat ion com-

pe tance o r f i nanc ing d i f f i c u l t i e s (problems i n bond marketing f o r i n s t a n c e ) ,

o r unfavorable b i d openings ( t h e p r i c e of equipment p r e s e n t l y f l u c t u a t e s con-.

s i d e r a b l y because of t h e small market f o r equi.pment and l i m i t e d product ion

c a p a b i l i t y ) . The manual i.s su f f i c i en t1 .y complete t h a t unpleasant s u r p r i s e s

should be minimized.

The volume inc ludes an o u t l i n e and f low c h a r t of major t a s k elements

Page 14: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

needed t o perform t h e reconnaissance and f e a s i b i l i t y s t u d i e s . Emphasis i s

placed on t h e f a c t t h a t t h e planning s t u d i e s need t o be cons iderably d e t a i l e d

and s p e c i f i c no t ing t h a t s i t e s p e c i f i c condi t ions a r e important and i n v e s t i -

ga t ion c o s t s must be kept t o a minimum. The contents and use of t h e o t h e r

volumes a r e descr ibed (much a s i n t h i s paper) and t h e i r u se conceptua l ly i n t e -

g ra t ed i n t o t h e a n a l y s i s process . The seve ra l key elements of l i c e n s e s and

permits , environmental i s s u e s , and implementation cons ide ra t ions a r e catalogued

and d iscussed .

Included a s e x h i b i t s t o t h e "Technical Guide" a r e two c a s e s t u d i e s of

e x i s t i n g p r o j e c t s , one from t h e West nearing completion of cons t ruc t ion and

start up and one from the Northeast c u r r e n t l y i n t h e f i n a l des ign s t age .

The case s t u d i e s re formula te t h e two p r o j e c t s fol lowing t h e d a t a and guidance

i,n t h e manual and se rve both a s a t e s t of t h e manual and i l l u s t r a t e d examples

of manual use.

VOLUME I1 - ECONOMIC AND FINANCIAL ANALYSIS

This volume provides documented procedures f o r performing t h e economic

and f i n a n c i a l s t u d i e s necessary f o r f e a s i b i l i t y determinat ion. The t h r e e

major s u b j e c t s covered i n t h e volume a r e market a n a l y s i s , economic f e a s i b i l i t y

de te rmina t ion , and f i n a n c i a l f e a s i b i l i t y determinat ion. The pe r spec t ives

a p p r o p r i a t e f o r pub l i c agencies , pub l i c and p r i v a t e u t i l i t i e s , and p r i v a t e

i n v e s t o r s are presented .

Market Analysis . The p o t e n t i a l markets f o r ou tput from s m a l l hydro a r e

pub l i c and inves to r owned u t i l i t i e s (IOU's), p r i v a t e i n d u s t r i a l u s e r s and

o t h e r l e s s e r important e n t i t i e s . The market a n a l y s i s t akes t h e pe r spec t ive

of a n owner/project sponsor eva lua t ing t h e b e n e f i t s and c o s t s of t h e s a l e of

power from t h e smal l hydro p r o j e c t . I n d u s t r i a l u s e r s and p u b l i c l y owned

u t i l i t i e s and coopera t ives a r e cha rac t e r i zed a s p o t e n t i a l l y more f avo rab le

markets than I O U ' s simply because of t h e p r e v a i l i n g p r o f i t r e g u l a t o r y methods

Page 15: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

(e .g. , u n l e s s more c a p i t a l is inves ted by an I O U , p r o f i t s may n o t s i g n i f i c a n t -

l y i nc rease ) . The c h a r a c t e r of t h e a v a i l a b l e power i s important , e s p e c i a l l y

i n t h e event t h a t some dependable capac i ty might b e a v a i l a b l e . A proposed

concept f o r c r e d i t i n g hydropower wi th equiva len t thermal capac i ty i s presented

i n which an adjustment f o r thermal equ iva l en t forced outage i s proposed. The

seasonal and annual a v a i l a b i l i t y of energy are important parameters i n market

nego t i a t i ons . The va lue of a smal l hydro p r o j e c t i s determined by t h e power

purchasers oppor tuni ty t o reduce e x i s t i n g c o s t whi le maintaining equiva len t

s e r v i c e . Examples of power va lue c a l c u l a t i o n s f o r an i n d u s t r i a l purchaser

and a u t i l i t y purchaser a r e included.

The types of marketing arrangements a r e descr ibed and comments on t h e

s i g n i f i c a n t f e a t u r e s of each a r e i d e n t i f i e d . The f o u r t ypes of arrangements

d iscussed a re : ( a ) Cost P lus Percentage of Debt Se rv i ce - i n which t h e

p r o j e c t sponsor (owner) agrees t o d e l i v e r a l l o r p a r t of t h e ou tpu t , and, i n

r e t u r n , t h e purchaser agrees t o pay "in a l l events" a p r o r a t a s h a r e of " a l l

cos ts ' ' of t h e p l a n t , p l u s a n a d d i t i o n a l f i x e d percentage of t h e p r o r a t a s h a r e

of debt s e r v i c e ; (b) Cost P lus a Royalty Subjec t t o Esca l a t ion - i n which t h e

d i f f e r e n c e from t h e previous arrangement i s t h a t i n l i e u of having t h e p r o j e c t

sponsor r e c e i v e a f i x e d percentage of deb t s e r v i c e a s compensation, t h e spon-

s o r r ece ives a minimum pe r kWh payment, which i s s u b j e c t t o e s c a l a t i o n ; (c)

Sa l e s per Kilowatt-Hour - i n which output i s so ld a s power i s generated, w i t h

t h e p r i c e s u b j e c t t o adjustment based on a n index. The d i f f i c u l t i e s i n

a s su r ing deb t s e r v i c e payments because of widely f l u c t u a t i n g annual revenues

w i l l u sua l ly prec lude ob ta in ing p r o j e c t f i nanc ing f o r a s m a l l hydro p r o j e c t ;

(d) Sa l e s pe r Kilowatt-Hour wi th Cost Guarantee and Balancing Account - i n

which t h e weakness i n t h e previous s a l e s per kilowatt-hour arrangement i s

managed t o i n c r e a s e revenue s e c u r i t y t o enhance f inanc ing p o s s i b i l i t i e s . I n

e f f e c t , t h e power purchaser i s providing pe r iod ic s h o r t term f inanc ing .

Economic Analysis . Economic f e a s i b i l i t y is c l e a r l y d i s t i ngu i shed from - f i n a n c i a l a n a l y s i s . Economic f e a s i b i l i t y i s de f ined a s p o s i t i v e when p r o j e c t

b e n e f i t s exceed p r o j e c t c o s t s . P r o j e c t b e n e f i t s a r e def ined a s t h e i n c r e a s e

Page 16: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

i n economic va lue ( t h e sponsor 's pe r spec t ive taken) generated by t h e pro-

j e c t t h a t i s o f t e n l imi t ed i n small. hydro a n a l y s i s t o t h e s t ream of c o s t s

t h a t would be r e p r e s e n t a t i v e of t h e l e a s t c o s t l y source of equiva len t power.

P r o j e c t c o s t s a r e def ined a s t h e t ime stream of economic va lue requi red t o

produce h y d r o e l e c t r i c power from t h e p r o j e c t and i s o f t e n l i m i t e d t o manage-

ment and cons t ruc t ion c o s t s r equ i r ed t o develop t h e power p l a n t , and t h e

admin i s t r a t i on , ope ra t ions , maintenance and replacement c o s t s requi red t o

cont inue t h e power p l a n t i n s e r v i c e . Conventional cons tan t p r i c e l e v e l

economic concepts a r e presented and d iscussed a s r e p r e s e n t a t i v e of most cur-

r e n t f e d e r a l and o t h e r pub l i c agency eva lua t ion procedures. I n a d d i t i o n , a

s t r a t e g y f o r i nco rpora t ing gene ra l p r i c e e s c a l a t i o n and resource c o s t i n f l a -

t i o n ( i n which important commodities (e.g. , f u e l ) e s c a l a t e s a t r a t e s d i f f e r e n t

from o t h e r f a c t o r s ) i n b e n e f i t c o s t a n a l y s i s i s presented and i l l u s t r a t e d

w i t h an example. Concepts of r i s k and u n c e r t a i n t y a r e presented and an ana l -

y t i c a l s t r u c t u r e f o r dea l ing wi th each i s proposed. The s e v e r a l methods of

determining f e a s i b i l i t y and p r o j e c t ranking of Net Present Value (discounted

b e n e f i t s minus c o s t s ) , I n t e r n a l Rate of Return (d iscount r a t e a t which t h e

p re sen t va lue of c o s t and b e n e f i t s t reams a r e equal) and Benef i t t o Cost

Rat io (discounted b e n e f i t s d iv ided by discounted c o s t s ) a r e presented,

d i scussed and examples included. The i n t e r n a l r a t e of r e t u r n i s emphasized

a s a common p r i v a t e s e c t o r a n a l y s i s method.

F i n a n c i a l F e a s i b i l i t y . F i n a n c i a l f e a s i b i l i t y i s def ined a s p o s i t i v e when - - i t can be demonstrated t h a t t h e p r o j e c t can secu re t h e needed f inanc ing f o r

implementation and t h a t t h e revenue r e c e i p t p a t t e r n w i l l provide debt s e r v i c e

f o r loans t h a t may be incur red . I n e f f e c t , t h e t a s k i s t o show t h a t t h e pro-

j e c t i s s e l f - l i q u i d a t i n g w i t h accep tab le r i s k a t r e a l i s t i c i n t e r e s t r a t e s .

F i n a n c i a l a n a l y s i s is p a r t i c u l a r l y important i n s m a l l hydro because of t h e

l i k e l i h o o d of p r i v a t e investment and t h e v a r i e t y of p o t e n t i a l sponsors. In-

f l a t i o n i s d iscussed t o i d e n t i f y i t s r o l e i n determining f i n a n c i a l f e a s i b i l i t y

and t o provide gu ide l ines i n its accommodation i n p r o j e c t f inanc ing . The

range of funding of sources a r e presented: ( a ) f e d e r a l programs - U.S.

Page 17: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

Department of Energy ( f e a s i b i l i t y and cons t ruc t ion loans ) ; (b) f inanc ing

by pub l i c e n t i t i e s t h a t i nc lude i ssuance of genera l o b l i g a t i o n bonds and

revenue bonds ( t h e s e a r e discussed i n d e t a i l ) , (c) i n v e s t o r owned p r o j e c t

f inanc ing t h a t inc ludes a range of bond types , warran ts , and s tock .

Implementation f a c t o r s a r e discussed a s r e l a t e d t o economic and f inan-

c i a l i s s u e s . F ig . 1 i s a n example implementation schedule d i sp l ay ing

important t a s k s and a range of p o s s i b l e expendi ture p a t t e r n s .

A d e t a i l e d d i scuss ion of t h e need f o r and n a t u r e of t h e f i n a n c i a l

adv i so r s r o l e i n a f e a s i b i l i t y study and p r o j e c t implementation i s presented .

The f i n a n c i a l s p e c i a l t y a r e a of bond consu l t an t s is presented t o encourage

t h a t f e a s i b i l i t y s tudy managers a l l o c a t e adequate resources f o r t h e per for -

mance of t h i s important phase of f i n a n c i a l ana lys i s .

VOLUME I T 1 - HYDROLOGIC STUDIES

This volume desc r ibes t h e s t u d i e s needed t o determine t h e i n t e g r i t y of

t h e e x i s t i n g s t r u c t u r e during t h e passage of major f l ood events and t o deter- ,

mine t h e c a p a c i t y and energy p o t e n t i a l a t t h e s i t e . The t o p i c s of sp i l lway

adequacy, b a s i c streamflow development methods, and capac i ty and energy ca l -

c u l a t i o n s a r e d iscussed i n major s e c t i o n s .

Spi l lway Adequacy. - The sp i l lway i s t h e s a f e t y va lve of a dam and i s

t h e primary f a c i l i t y p r o t e c t i n g i t s i n t e g r i t y from f a i l i n g from overtopping

from occurrences of l a r g e hydrologic events . The c u r r e n t c r i t e r i a f o r needed

sp i l lway performance a s a func t ion of r e s e r v o i r capac i ty , dam he igh t , and

v u l n e r a b i l i t y of downstream a r e a s t h a t has emerged from dam s a f e t y s t u d i e s

by t h e Corps of Engineers is descr ibed (Table 1 ) . The hydrau l i c cha rac t e r i s -

t i c s of sp i l lways and o u t l e t works a r e descr ibed and t e c h n i c a l r e f e rences

f o r a n a l y s i s procedures included. Flow-exceedance frequency and hydrograph

techniques t o enable c a l c u l a t i o n of t he range of events t abu la t ed i n Table 1,

p a r t C are presented .

Page 18: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

Category - Small

In te rmedia te

Large

TABLE I.

SPILLWAY PERFORMANCE CRITERIA

a. S ize C l a s s i f i c a t i o n

Impoundment

S torage (Ac. F t . ) -.--- Height (F t . ) ---

50 t o 1.,000 25 t o 40

1,000 t o 50,000 40 t o 100

over 50,000 over 100

b. Hazard C l a s s i f i c a t i o n

Category Development Downstream -- - Economic Loss

Low No Permanent S t r u c t u r e s Minimal

S i g n i f i c a n t Few rnhab i t ab l e S t r u c t u r e s Appreciable (Ag. & Indus t ry)

High More than a few Extensive (Urban, Ag, Indus t ry)

c. Spi l lway Design Floods

Hazard ---

Low

S i g n i f i c a n t

High

* Probable Maximum Flood

S i z e Spi l lway Flood

Small 50 y r . t o 100 y r . frequency

In te rmedia te 100 y r . t o 1 / 2 PMF*

Large 1 / 2 PMF t o PMF

Small 100 t o 1 / 2 PMF

In termedia te 1 / 2 PMF t o PMF

Large PMF

Smal.1 1 / 2 PMF t o PMF

In termedia te PMF

Large PMF

Page 19: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

Basic Streamflow Data. Streamflow d a t a a r e needed t o permit capac i ty

and energy computations. Small hydro proposals i n which t h e r e l e a s e p a t t e r n

i s no t t o be changed and f o r which adequate observed h i s t o r i c r e l e a s e p a t t e r n s

e x i s t are t h e most s imple f o r which t o assemble needed streamflow da ta . It

might a l s o be noted t h a t t hese in s t ances a r e n o t t h e most common. The degree

t o which r eco rds a r e s h o r t , con ta in gaps, poorly recorded o r t o which changes

i n ope ra t ing po l i cy have occurred o r a r e p o s s i b l e i n t h e f u t u r e , determines

t h e added complexity and e f f o r t needed t o assemble a r e p r e s e n t a t i v e record.

On one extreme, r econs t ruc t ion of a long per iod of record by s imula t ion of

t h e hydro logic process and ope ra t ion of t h e p r o j e c t i s p o s s i b l e b u t could be

beyond t h e e f f o r t a p p r o p r i a t e f o r a s p e c i f i c s m a l l hydro s tudy. On t h e o t h e r

extreme, adap ta t ion of processed s y n t h e t i c d a t a from genera l ized s t u d i e s such

a s f low d u r a t i o n curves r equ i r ing minimal e f f o r t a r e p o s s i b l e and u s e f u l b u t

could p o t e n t i a l l y b e of poor q u a l i t y . The appropr i a t e s t r a t e g y f o r a smal l

hydro s tudy w i l l c e r t a i n l y vary between s i t e s bu t is l i k e l y t o inc lude a mid-

po in t between t h e two extremes r e q u i r i n g using one o r more simple approaches

and even tua l ly adopting a l i k e l y r e p r e s e n t a t i v e record . Some elementary

l e v e l of c o r r e l a t i o n and r eg iona l a n a l y s i s can o f t e n be a p p r o p r i a t e and a r e

descr ibed i n t h e volume. Techniques f o r cons t ruc t ing records given va r ious

d i f f i c i e n c i e s a r e presented and methods f o r processing t h e adopted record

t o c h a r a c t e r i z e t h e v a r i a b i l i t y of flow a r e descr ibed . Several examples a r e

included us ing c o r r e l a t i o n , s imula t ion and t r a n s f e r methods.

Capaci ty and Energy Ca lcu la t ions . Power a n a l y s i s procedures of du ra t ion

curve a n a l y s i s , mass inf low curves , low flow frequency and sequen t i a l per iod

of record rou t ing a r e descr ibed and examples included. Durat ion curve analy-

sis is cha rac t e r i zed as t h e most approximate b u t e a s i e s t t o perform (and

many t imes is e n t i r e l y adequate) and s e q u e n t i a l per iod of record rou t ing as

t h e most a c c u r a t e (depending on t h e q u a l i t y of t h e a v a i l a b l e record) bu t r e -

qu i r ing t h e most e f f o r t . Fig. 3 i s a n example power computation us ing flow

d u r a t i o n a n a l y s i s techniques. Computational a i d s i n t h e form of r e f e rences

and computer programs a r e descr ibed .

Page 20: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

FIGURE 3

EXAMPLE POWER COMPUTATION-DURATION CURVE METHOD

% Time Flow Exceeded

8 5 4 8 2 8 19 1 5 12

9 6 4 3 2

Turbine Design

a . Head = 30 f t , Q = 15% Exceedance Flow

c . Turbine Flow Range 30 t o 110% design Flow 6 0 cfs - 58%

d. High T a i l Water above 3000 c f s - 2%

e . Energy generated 58f2 o r 60% of t ime Weighted du ra t ion f low = 54.5 c f s @ 100% t ime

Energy = (54.5) (30) (8760) (. 86) 6

11.8 = 1.04 x 10 ki4h

f o r 2 t u rb ines @ 100 c f s , Energy i s added 200,000 kwh

VOLUME I V - EXISTING FACILITIES INTEGRITY

It is c l e a r t h a t a p r e r e q u i s i t e t o s e r i o u s cons ide ra t ion of a s i t e f o r

a s m a l l hydro a d d i t i o n i s t h a t it b e capable of meeting c u r r e n t dam s a f e t y

s tandards . I f t h e dam meets requirements a s is, then o ther i n v e s t i g a t i o n s

can b e pursued i n ea rnes t . I f d e f i c i e n c i e s e x i s t , i t i s l i k e l y t h a t un le s s

t h e problems can be remedied wi th a modest investment, t h e s i t e w i l l n o t be

a t t r a c t i v e f o r adding power f a c i l i t i e s , a t l e a s t i n t h e near term. The smal l

hydro a d d i t i o n could be expected t o make modest improvements t o meet i n t e g r i t y

d e f i c i e n c i e s bu t would not o f t e n genera te adequate b e n e f i t s t o "carry" s i g n i -

f i c a n t remedial work. This observa t ion changes i f a l t e r n a t i v e f inanc ing f o r

s a f e t y r e l a t e d remedial work i s s e p a r a t e l y provided.

The i n t e g r i t y volume i s designed t o i d e n t i f y e a r l y i n t h e f e a s i b i l i t y

s tudy, any d e f i c i e n c i e s that might e x i s t and thus provide a d e c i s i o n po in t

Page 21: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

f o r s tudy terminat ion. Guidance f o r formulat ing a range of s u i t a b l e remedial

measures i s included.

The volume can by no means provide inexperienced engineers t h e c a p a b i l i t y

t o perform d e f i n i t i v e s a f e t y s t u d i e s . The i n t e n t is t o provide a s t r a t e g y

t h a t w i l l alert i n v e s t i g a t o r s t o p o t e n t i a l problems. Should t h e problems

appear c r i t i c a l , t h e volume recommends te rmina t ing t h e power a d d i t i o n f e a s i -

b i l i t y s tudy and n o t i f y i n g appropr i a t e s t a t e and f e d e r a l a u t h o r i t i e s of t h e

ex i s t ence of t h e i d e n t i f i e d i n t e g r i t y d e f i c i e n c i e s .

The volume c l a s s i f i e s and desc r ibes t h e p r i n c i p a l dam types (concre te ,

masonry, e a r t h and r o c k f i l l ) l i k e l y t o be encountered i n a small hydro addi-

t i o n f e a s i b i l i t y s tudy. The appurtenant works a s s o c i a t e d wi th dams (sp i l lway,

o u t l e t works, power p l a n t s , l ocks and f i s h l adde r s ) a r e descr ibed by type

and func t ion .

The t y p i c a l def i .c ienc ies and f a i l u r e modes of dam overtopping, uncont ro l led

o r excess ive seepage, foundat ion i n s t a b i l i t y , embankment s l o p e i n s t a b i l i t y ,

s lope p r o t e c t i o n d e t e r i o r a t i o n on embankment dams, conc re t e d e t e r i o r a t i o n , ex-

c e s s i v e u p l i f t p r e s su re s , sp i l lway /ou t l e t works f a i l u r e , and e ros ion a r e des-

c r ibed and t h e p r i n c i p a l mechanism causing t h e d e f i c i e n c i e s a r e d iscussed .

P o t e n t i a l adverse e f f e c t s of power a d d i t i o n s a r e h igh l igh ted t o a l e r t i n v e s t i -

g a t o r s t o problems t h a t may be c rea t ed by t h e modi f ica t ion of e x i s t i n g f a c i l -

i t i e s t o accommodate a power p l a n t .

The i n t e g r i t y i n v e s t i g a t i o n i s ou t l i ned a s a t h r e e s taged process ; t h e

f i r s t cons i s t i ng of records c o l l e c t i o n and examination, t h e second inc ludes

supplemental d a t a c o l l e c t i o n and a n a l y s i s t o suppor t conclusions r e l a t i v e t o

i n t e g r i t y , and t h e last t h e formula t ion of r e p a i r schemes, i f they prove

necessary, f o r r e h a b i l i t a t i o n work. The elements of each s t a g e and s t r a t e g y

for t h e i r performance a r e ou t l i ned .

R e h a b i l i t a t i o n measures s u i t a b l e f o r t h e s e v e r a l dam types and t y p i c a l

Page 22: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

d e f i c i e n c i e s a r e descr ibed and gu ide l ines a r e included f o r es t imat ing t h e i r

c o s t . The dam and appurtenances, and foundat ion a r e di.scussed i n s e p a r a t e

s e c t i o n s b u t t h e emphasis i s placed on t h e need t o cons ider t h e i n t e g r i t y of

t h e dam a s a f u n c t i o n of a l l of i t s i n t e r r e l a t e d components.

Appended as e x h i b i t s a r e (a ) "Universal Checkl i s t f o r Inspect ions",

adapted from t h e U.S. Bureau of Reclamation (7) and (b) "Considerations and

Procedures f o r Impoundment I n t e g r i t y Evaluations", a l s o adapted from t h e

USBR

VOLUME V - ELECTROMECHANICAL EQUIPMENT

Electromechanical equipment a r e t h e f e a t u r e s and systems needed t o har-

ness t h e energy, bo th p o t e n t i a l and k i n e t i c , a v a i l a b l e i n impounded o r flow-

ing wa te r , t o convert i t t o e l e c t r i c a l energy, t o c o n t r o l i t , and t o t r ansmi t

i t t o a r e g i o n a l power g r i d . The major equipment i tems a r e t h e hydrau l i c

t u rb ine , t h e e l e c t r i c genera tor , and a switchyard c o n s i s t i n g of a t r a n s f o r -

mer, c i r c u i t b reaker , and swi t ch gea r . Included a r e suppor t ing systems

which c o n t r o l and p r o t e c t t h e s e major equipment i t e m s . Maintenance f a c i l -

i t i e s such a s a crane f o r l i f t i n g , a r e a l s o included i n a broad d e f i n i t i o n

of e lec t romechanica l equipment.

Several domestic and f o r e i g n equipment manufacturers have h i s t o r i c a l l y

provided sma l l t u r b i n e s and a r e a c t i v e i n s t anda rd iz ing u n i t s i z e s and

packaging r e l a t i v e l y complete gene ra t ing s e t s f o r marketing. These c u r r e n t

t r e n d s a r e def ined . Relaxing t h e need f o r some c o n t r o l and p r o t e c t i o n equip-

ment is becoming accepted as t h e s c a l i n g down t o smal l f a c i l i t i e s t akes r o o t

w i t h i n t h e indus t ry . Simpler low c o s t governors and s i m i l a r i tems a r e appear-

ing on t h e market. Smaller h y d r o e l e c t r i c p l a n t s can a l s o be designed w i t h

less f low c o n t r o l than l a r g e r p l a n t s . The flow of water t o most t u r b i n e s is

c o n t r o l l e d by a s e t of wicket g a t e s . These g a t e s a r e r egu la t ed by s i g n a l s

from t h e governor t o c o n t r o l t h e amount of power produced. Where power con-

t r o l is n o t needed (many s m a l l p l a n t s ) t h e g a t e s can b e e l imina ted and t h e

c o s t of t h e t u r b i n e reduced by a s much a s 10%.

Page 23: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

The volume o u t l i n e s a procedural s t r a t e g y f o r s i z i n g and s e l e c t i n g t h e

genera t ing equipment (Fig. 4 ) , and inc ludes d e s c r i p t i o n , c o s t , and per for -

mance d a t a f o r Franc is , Crossflow, P r o p e l l e r , Tube, Bulb, S l a n t and R i m

tu rb ines s u i t a b l e fox t h e range of heads and power output f o r a small p l a n t .

A common parameter used among d a t a and r e l a t i o n s h i p s w i th in t h e electromechan-

i c a l volume i s t h e t u r b i n e t h r o a t diameter . This parameter i s c a r r i e d forward

t o t h e C i v i l Fea tures volume (d iscussed next ) as t h e indexing parameter t o

determine powerhouse l ayou t dimensions and c o s t s . The s e r i e s of example

curves (Figs. 5, 6, 7 , 8) i l l u s t r a t e t h e type of d a t a included and manner

of performance and c o s t d a t a p re sen ta t ion . Each t u r b i n e type i s cha rac t e r i zed

by a set of s i m i l a r func t ions .

A s e c t i o n desc r ib ing gene ra to r s s u i t a b l e f o r small hydro i s included and

d a t a on dimensions and weight t abu la t ed . Desc r ip t ive d a t a , performance curves,

and c o s t a r e l i kewise included f o r gene ra t ion c o n t r o l and p r o t e c t i o n equip-

ment, and switchi.ng, t ransmiss ion and miscel laneous equipment.

A c o s t summary form t h a t is ca tagor ized by t h e Federa l Energy Regulatory

Commission (FERC) Account Number is included t o encourage sys temat ic u se of

t h e m a t e r i a l presented i n t h e volume.

VOLUME V I - CIVIL FEATURES

The c i v i l f e a t u r e s of small hydropower a d d i t i o n s inc lude s i te prepara-

t i o n works, hydrau l i c conveyance f a c i l i t i e s , and powerhouse and appurtenant

f a c i l i t i e s . S i t e p repa ra t ion inc ludes grading, foundat ion excavat ion, drain-

age and e ros ion c o n t r o l , access roads and parking f a c i l i t i e s , and cons t ruc t ion

n o i s e abatement and d u s t c o n t r o l . Hydraulic conveyance f a c i l i t i e s inc lude

penstocks, tunnels , cana l s , va lves and g a t e s , i n l e t and o u t l e t works and

t a i l r a c e s . Powerhouse and appurtenant f a c i l i t i e s inc lude a l l s t r u c t u r e s f o r

t h e powerhouse and equipment handling f a c i l i t i e s , foundat ions f o r bo th t h e

powerhouse and switchyard, and fencing around t h e p r o j e c t a rea .

Page 24: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

REQUIRED: N E T HEAD

OPTIONAL: LENGTH O F TRANSMISSION LINES MILES OPTIONAL: VOLTAGE NETWORK KV A

' COMPUTE KW CAPACITY COSTS O F TURBINEIGENERATOR AVAILABLE FROM SITE FROM FIG. 3-9 to 3-13 KW = Q x h x .85;111.81

USING KW AND h, SELECT COSTS OF STATION USABLE TU6BINE T Y P E ELECTRICAL EQUIPT. FROM FIG. 2-2 FROM FIG. 5-3 & 6-1

REVIEW TURBINE LIMITATIONS COSTS O F MISC. POWER IN SECTION 3 AND ELIMINATE P L A N T EQUIPT. FROM UNACCEPTABLE TYPES FIG. 6-4

SELECT TURBINE THROAT DIA. COSTS O F TRANSMISSION FROM FIG. 3-6 to 3-8 LINE FIG. 6-3

DETERMINE.7URBINE ESCALATE COSTS T O EFFICIENCY A T DESIGN HEAD CONSTRUCTION DATE FIG. 6-5 FROM FIG. 3.2

CALCULATE OVERALL PLANT COSTS O F DESIGN? CONSTRUCTION EFFICIENCY AND CAPACITY MGMT. CONTINGENCIES? ETC.

SECTION 6

COMPLETE COST ESTIMATE TOTALIZE & COMPUTE COST S H E E T FIG. 6-6 PER KW

Figure 4 . Turbine s e l e c t i o n methodology

2 0

Page 25: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

3 6 9 12 GENERATOR CAPACITY ( MW )

Figure 5 Turbine operating range

Page 26: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

VARIABLE PITCH PROPELLER WITHOUT WICKET GATES VERTICAL,TUBE ,BULB OR RIM

RATED GENERATOR CAPACITY, K W R (%)

FIXED BLADE PROPELLER WITH WICKET GATES VERTICAL,TUBE, BULB OR RIM

RATED GENERATOR CAPACITY, KWR (*A)

KWR * H R QR ER EG /11.82, kw

H R = Selected Design Head, ( f t )

QD = Turbine Discharge at HD & KWR, (cfs)

ER = Turbine efficien'cy'at HD 6 KyR, (%)

Figure 6 Propeller turbine performance curves

Page 27: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

TURBINE EFECTIVE HEAD (FT)

1. The approximate throat diameters are based upon typical values for'the turbine set with the centerline of the distribution or centerline of runner at minimum tail water.: Actual diameters vary Hith manufacturers.

2 . The estimated diameters may be used for both fixed and variable pitch propeller turbines, vertical, tube, slant, bulb and rim types. Dimensions for standardized tube turbines are shown on a separate sheet.

Figure 9 . Propeller turbine throat d f meters

Page 28: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

ilnd installation. 3 . Installation costs estimated at $250,000 for the large units, to

$75,000 for the small'uciits. 4. .For fixed blade units, deduct 10%. 5 . Cost of rim turbines are approximately the same as bulb turbines and

the above chart may be used for preliminary costs of same.

15 20 25 30 40 50 60 TURBINE EFFECTIVE HEAD (FT )

Figure 8. Bulbs and R i m turbine costs

Page 29: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

C i v i l f e a t u r e s can a t t imes comprise a s i g n i f i c a n t component of construc-

t i o n c o s t of small hydro a d d i t i o n s . Since major elements of t h e s i t e a r e f i x e d

(embankment, o u t l e t works, sp i l lway, e t c . ) i t i s important t o approach t h e

l ayou t t a s k w i t h a n open and innovat ive a t t i t u d e . The d i f f e r e n c e between a

f e a s i b l e and i n f e a s i b l e p r o j e c t may be determined by t h e c leverness wi th

which u s e i s made of t h e e x i s t i n g s i t e arrangement and f e a t u r e s . The c i v i l

f e a t u r e s d i f f e r from those of major hydropower p l a n t s both i n s c a l e and i n

substance. It i s appropr i a t e t o des ign adequate outdoor type p l a n t s f o r small

u n i t s and o f t e n p o r t a b l e l i f t i n g equipment w i l l s u f f i c e f o r maintenance ob-

v i a t i n g t h e need f o r enc los ing s t r u c t u r e s and f i x e d gant ry c ranes . P r o t e c t i o n

equipment can l i kewise o f t e n be minimized. Fig. 9 is a flow c h a r t d e f i n i n g

t h e c i v i l f e a t u r e s descr ibed and f o r which c r i t e r i a , performance, and c o s t d a t a

a r e included. F igs . 10, 11, 12 , and 1 3 a r e examples of t h e types of informa-

t i o n included and t h e s t y l e of d a t a p re sen ta t ion . Desc r ip t ive t e x t i s inc lu-

ded t o a l e r t t h e p r o j e c t i n v e s t i g a t o r t o circumstances i n which t h e gene ra l i zed

r e l a t i o n s h i p s a r e u n r e l i a b l e and guidance i s given f o r developing a l t e r n a t i v e

d a t a when necessary.

Cost e s c a l a t i o n indexes a r e i.ncluded so t h a t t h e c o s t d a t a ( a l l volumes

are J u l y 1978 d o l l a r s ) may b e s c a l e d t o t h e b a s e per iod used f o r t h e f e a s i -

b i l i t y a n a l y s i s . A c o s t summary shee t is included t h a t i s keyed t o t h e FERC

Account Numbers.

STATUS OF MANUAL

The manual is p r e s e n t l y (February 1979) i n t h e advanced p repa ra t ion s t age .

Severa l of t h e volumes have been completed and a r e p re sen t ly undergoing f i n a l

manuscript c r e a t i o n . Two volumes, t h e "Technical Guide" and "Hydrologic

Studies ' ' and t h e i l l u s t r a t e d case s t u d i e s f o r t h e "Technical Guide" a r e i n

t h e a c t i v e p repa ra t ion s t age . The t a r g e t f o r completion of a l l volumes inclu-

d ing i n t e r n a l agency reviews and subsequent a v a i l a b i l i t y f o r l i m i t e d wi th in

f e d e r a l agency d i s t r i b u t i o n i s J u l y 15 , 1979. The present expec ta t ion i s t h a t

Page 30: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources
Page 31: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

I. D = THRDAT DIAMETER 2. ALL DIMENSI8NS I N FEET 3. COST BASE JULY 1978 4 . CONCRETE STRUCTURE COST

AT s 2 2 0 PER CU. YD. 5. d = EXCAVATION DEPTH

(FIGURE 4-61

0 2 4 6 8 10 12 14 TURBINE THROAT DIAMETER (FT)

SECTION

Figure 1.0. Tube Turbine Powerhouse C i v i l Cost and Area

Page 32: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

0 10 20 30 40 50 60 70 80 90 100 110 120

INLET DIAMETER IN INCHES

NOTE: COST BASE JULY 1978

Figure 11. Costs for Butterfly, Hollow Jet, and Hollow Gone Valves

Page 33: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

0 200 400 600 800 1000 AREA (SQ.YDS.)

I

1. DRAINAGE SYSTEMS INCLUDE SURFACE AND SUBSURFACE SYSTEMS 2 . EROSION CONTROL INCLUDES SEEDING, TERRACING, DIKES,

TRENCHES, AND P I P E SPILLWAYS 3 . COST BASE JULY 1978 4 . USE SITE AREA FOR GRADING AND DRAINAGE

Figure 1 2 , Gradlng,I)rainage and Erosion Control Costs

Page 34: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

1000 2000 3000 4000 POWERHOUSE AREA ( sa. FT.

1. COST BASE JULY 1978 2. EXCAVATION COSTS; 50% COMMON AT 5 2 PER CU. YD. AND 5 0 %

Figure 13. Powerhouse Exeavat ion Costs

Page 35: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

general, pub1i.c d i s t r i b u t i o n w i l l , b e p o s s i b l e withi.n t h e 60 days fo l lowing

J u l y 15 .

ACKNOWLEDGMENTS

The manual p repa ra t ion is t h e r e s p a n s i b i l i t y of t h e Hydrologic Engineer-

ing Center, B i l l S. E iche r t , D i r ec to r . The Corps I n s t i t u t e f o r Water

Resources i s sponsoring t h e manual p repa ra t ion a s a complementary t a s k t o

t h e management of t h e National Hydropower P lan a c t i v i t i e s f o r which they

a r e r e spons ib l e . The Department of Energy is provid ing f undi.ng support .

The p repa ra t ion of t h e manual i s a j o i n t e f f o r t by s t a f f of t h e HEC and

s e v e r a l p r i v a t e c o n t r a c t o r s . The au tho r is t h e principal-in-charge. The

"Technical Guide" is be ing w r i t t e n by t h e au thor a ided by Br ian Smith of h i s

s t a f f . The "Hydrologic S tudies" volume i s being w r i t t e n by M r . Dale Burne t t

of t h e HEC a ided by h i s s t a f f . The remaining volumes were prepared under

c o n t r a c t t o t h e HEC as fo l lows : "Civil Features" and "Electromechanical

Equipment" - Tudor Engineering Co., San Francisco, CA; " F a c i l i t i e s I n t e g r i t y "

- W.A. Wahler & Assoc., Pa lo Al to , CA; "Economic and F inanc ia l Analysis tq - Development and Resources Corporat ion, Sacramento, CA.

Page 36: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

REFERENCES

(1) Federa l Power Commission, "Hydroelectr ic Power Resources of t h e United S t a t e s , Developed and Undeveloped," January 1976.

(2) Tr i sko , Ralph L., "Hydroelectr ic Power P o t e n t i a l a t Corps of Engineers P r o j e c t s , " IWR Report 75 R1, I n s t i t u t e f o r Water Resources, U.S. Army Corps of Engineers, J u l y 1975.

( 3 ) McDonald, Richard J., "Estimate of Nat ional Hydroe lec t r ic Power P o t e n t i a l a t Ex i s t i ng D a m s , " I n s t i t u t e f o r tJater Resources, U.S. Aymy Corps of Engineers, J u l y 1977.

(4) Gladwell, John S. and Warnick, Calvin C . , "Low-Head Hydro, An Examination of a n A l t e r n a t i v e Energy Source," Idaho Water Resources Research I n s t i t - u t e , September 1978.

(.5) The Hydrol.ogic Engi.neering Center , "Manual f o r t h e Determination of t h e F e a s i b i l i t y of Adding Small Hydroe lec t r i c Power t o an Ex i s t i ng Fac i l . i ty l ' i n s i x volumes, (Draf t ) , February 1979.

(6) House of Representa t ives , 95 th Congress," Pub l i c U t i l i t y Regulatory P o l i c i e s Act", HR 4018, October 1978.

(7) U.S. Bureau of Reclamation, ''Manual f o r Sa fe ty Evaluat ion of Ex i s t i ng Dams (Pre l iminary) , 1978.

Page 37: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

Technical Paper Series TP-1 Use of Interrelated Records to Simulate Streamflow TP-2 Optimization Techniques for Hydrologic

Engineering TP-3 Methods of Determination of Safe Yield and

Compensation Water from Storage Reservoirs TP-4 Functional Evaluation of a Water Resources System TP-5 Streamflow Synthesis for Ungaged Rivers TP-6 Simulation of Daily Streamflow TP-7 Pilot Study for Storage Requirements for Low Flow

Augmentation TP-8 Worth of Streamflow Data for Project Design - A

Pilot Study TP-9 Economic Evaluation of Reservoir System

Accomplishments TP-10 Hydrologic Simulation in Water-Yield Analysis TP-11 Survey of Programs for Water Surface Profiles TP-12 Hypothetical Flood Computation for a Stream

System TP-13 Maximum Utilization of Scarce Data in Hydrologic

Design TP-14 Techniques for Evaluating Long-Tem Reservoir

Yields TP-15 Hydrostatistics - Principles of Application TP-16 A Hydrologic Water Resource System Modeling

Techniques TP-17 Hydrologic Engineering Techniques for Regional

Water Resources Planning TP-18 Estimating Monthly Streamflows Within a Region TP-19 Suspended Sediment Discharge in Streams TP-20 Computer Determination of Flow Through Bridges TP-21 An Approach to Reservoir Temperature Analysis TP-22 A Finite Difference Methods of Analyzing Liquid

Flow in Variably Saturated Porous Media TP-23 Uses of Simulation in River Basin Planning TP-24 Hydroelectric Power Analysis in Reservoir Systems TP-25 Status of Water Resource System Analysis TP-26 System Relationships for Panama Canal Water

Supply TP-27 System Analysis of the Panama Canal Water

Supply TP-28 Digital Simulation of an Existing Water Resources

System TP-29 Computer Application in Continuing Education TP-30 Drought Severity and Water Supply Dependability TP-31 Development of System Operation Rules for an

Existing System by Simulation TP-32 Alternative Approaches to Water Resources System

Simulation TP-33 System Simulation of Integrated Use of

Hydroelectric and Thermal Power Generation TP-34 Optimizing flood Control Allocation for a

Multipurpose Reservoir TP-35 Computer Models for Rainfall-Runoff and River

Hydraulic Analysis TP-36 Evaluation of Drought Effects at Lake Atitlan TP-37 Downstream Effects of the Levee Overtopping at

Wilkes-Barre, PA, During Tropical Storm Agnes TP-38 Water Quality Evaluation of Aquatic Systems

TP-39 A Method for Analyzing Effects of Dam Failures in Design Studies

TP-40 Storm Drainage and Urban Region Flood Control Planning

TP-41 HEC-5C, A Simulation Model for System Formulation and Evaluation

TP-42 Optimal Sizing of Urban Flood Control Systems TP-43 Hydrologic and Economic Simulation of Flood

Control Aspects of Water Resources Systems TP-44 Sizing Flood Control Reservoir Systems by System

Analysis TP-45 Techniques for Real-Time Operation of Flood

Control Reservoirs in the Merrimack River Basin TP-46 Spatial Data Analysis of Nonstructural Measures TP-47 Comprehensive Flood Plain Studies Using Spatial

Data Management Techniques TP-48 Direct Runoff Hydrograph Parameters Versus

Urbanization TP-49 Experience of HEC in Disseminating Information

on Hydrological Models TP-50 Effects of Dam Removal: An Approach to

Sedimentation TP-51 Design of Flood Control Improvements by Systems

Analysis: A Case Study TP-52 Potential Use of Digital Computer Ground Water

Models TP-53 Development of Generalized Free Surface Flow

Models Using Finite Element Techniques TP-54 Adjustment of Peak Discharge Rates for

Urbanization TP-55 The Development and Servicing of Spatial Data

Management Techniques in the Corps of Engineers TP-56 Experiences of the Hydrologic Engineering Center

in Maintaining Widely Used Hydrologic and Water Resource Computer Models

TP-57 Flood Damage Assessments Using Spatial Data Management Techniques

TP-58 A Model for Evaluating Runoff-Quality in Metropolitan Master Planning

TP-59 Testing of Several Runoff Models on an Urban Watershed

TP-60 Operational Simulation of a Reservoir System with Pumped Storage

TP-61 Technical Factors in Small Hydropower Planning TP-62 Flood Hydrograph and Peak Flow Frequency

Analysis TP-63 HEC Contribution to Reservoir System Operation TP-64 Determining Peak-Discharge Frequencies in an

Urbanizing Watershed: A Case Study TP-65 Feasibility Analysis in Small Hydropower Planning TP-66 Reservoir Storage Determination by Computer

Simulation of Flood Control and Conservation Systems

TP-67 Hydrologic Land Use Classification Using LANDSAT

TP-68 Interactive Nonstructural Flood-Control Planning TP-69 Critical Water Surface by Minimum Specific

Energy Using the Parabolic Method

Page 38: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

TP-70 Corps of Engineers Experience with Automatic Calibration of a Precipitation-Runoff Model

TP-71 Determination of Land Use from Satellite Imagery for Input to Hydrologic Models

TP-72 Application of the Finite Element Method to Vertically Stratified Hydrodynamic Flow and Water Quality

TP-73 Flood Mitigation Planning Using HEC-SAM TP-74 Hydrographs by Single Linear Reservoir Model TP-75 HEC Activities in Reservoir Analysis TP-76 Institutional Support of Water Resource Models TP-77 Investigation of Soil Conservation Service Urban

Hydrology Techniques TP-78 Potential for Increasing the Output of Existing

Hydroelectric Plants TP-79 Potential Energy and Capacity Gains from Flood

Control Storage Reallocation at Existing U.S. Hydropower Reservoirs

TP-80 Use of Non-Sequential Techniques in the Analysis of Power Potential at Storage Projects

TP-81 Data Management Systems of Water Resources Planning

TP-82 The New HEC-1 Flood Hydrograph Package TP-83 River and Reservoir Systems Water Quality

Modeling Capability TP-84 Generalized Real-Time Flood Control System

Model TP-85 Operation Policy Analysis: Sam Rayburn

Reservoir TP-86 Training the Practitioner: The Hydrologic

Engineering Center Program TP-87 Documentation Needs for Water Resources Models TP-88 Reservoir System Regulation for Water Quality

Control TP-89 A Software System to Aid in Making Real-Time

Water Control Decisions TP-90 Calibration, Verification and Application of a Two-

Dimensional Flow Model TP-91 HEC Software Development and Support TP-92 Hydrologic Engineering Center Planning Models TP-93 Flood Routing Through a Flat, Complex Flood

Plain Using a One-Dimensional Unsteady Flow Computer Program

TP-94 Dredged-Material Disposal Management Model TP-95 Infiltration and Soil Moisture Redistribution in

HEC-1 TP-96 The Hydrologic Engineering Center Experience in

Nonstructural Planning TP-97 Prediction of the Effects of a Flood Control Project

on a Meandering Stream TP-98 Evolution in Computer Programs Causes Evolution

in Training Needs: The Hydrologic Engineering Center Experience

TP-99 Reservoir System Analysis for Water Quality TP-100 Probable Maximum Flood Estimation - Eastern

United States TP-101 Use of Computer Program HEC-5 for Water Supply

Analysis TP-102 Role of Calibration in the Application of HEC-6 TP-103 Engineering and Economic Considerations in

Formulating TP-104 Modeling Water Resources Systems for Water

Quality

TP-105 Use of a Two-Dimensional Flow Model to Quantify Aquatic Habitat

TP-106 Flood-Runoff Forecasting with HEC-1F TP-107 Dredged-Material Disposal System Capacity

Expansion TP-108 Role of Small Computers in Two-Dimensional

Flow Modeling TP-109 One-Dimensional Model for Mud Flows TP-110 Subdivision Froude Number TP-111 HEC-5Q: System Water Quality Modeling TP-112 New Developments in HEC Programs for Flood

Control TP-113 Modeling and Managing Water Resource Systems

for Water Quality TP-114 Accuracy of Computer Water Surface Profiles -

Executive Summary TP-115 Application of Spatial-Data Management

Techniques in Corps Planning TP-116 The HEC's Activities in Watershed Modeling TP-117 HEC-1 and HEC-2 Applications on the

Microcomputer TP-118 Real-Time Snow Simulation Model for the

Monongahela River Basin TP-119 Multi-Purpose, Multi-Reservoir Simulation on a PC TP-120 Technology Transfer of Corps' Hydrologic Models TP-121 Development, Calibration and Application of

Runoff Forecasting Models for the Allegheny River Basin

TP-122 The Estimation of Rainfall for Flood Forecasting Using Radar and Rain Gage Data

TP-123 Developing and Managing a Comprehensive Reservoir Analysis Model

TP-124 Review of U.S. Army corps of Engineering Involvement With Alluvial Fan Flooding Problems

TP-125 An Integrated Software Package for Flood Damage Analysis

TP-126 The Value and Depreciation of Existing Facilities: The Case of Reservoirs

TP-127 Floodplain-Management Plan Enumeration TP-128 Two-Dimensional Floodplain Modeling TP-129 Status and New Capabilities of Computer Program

HEC-6: "Scour and Deposition in Rivers and Reservoirs"

TP-130 Estimating Sediment Delivery and Yield on Alluvial Fans

TP-131 Hydrologic Aspects of Flood Warning - Preparedness Programs

TP-132 Twenty-five Years of Developing, Distributing, and Supporting Hydrologic Engineering Computer Programs

TP-133 Predicting Deposition Patterns in Small Basins TP-134 Annual Extreme Lake Elevations by Total

Probability Theorem TP-135 A Muskingum-Cunge Channel Flow Routing

Method for Drainage Networks TP-136 Prescriptive Reservoir System Analysis Model -

Missouri River System Application TP-137 A Generalized Simulation Model for Reservoir

System Analysis TP-138 The HEC NexGen Software Development Project TP-139 Issues for Applications Developers TP-140 HEC-2 Water Surface Profiles Program TP-141 HEC Models for Urban Hydrologic Analysis

Page 39: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources

TP-142 Systems Analysis Applications at the Hydrologic Engineering Center

TP-143 Runoff Prediction Uncertainty for Ungauged Agricultural Watersheds

TP-144 Review of GIS Applications in Hydrologic Modeling

TP-145 Application of Rainfall-Runoff Simulation for Flood Forecasting

TP-146 Application of the HEC Prescriptive Reservoir Model in the Columbia River Systems

TP-147 HEC River Analysis System (HEC-RAS) TP-148 HEC-6: Reservoir Sediment Control Applications TP-149 The Hydrologic Modeling System (HEC-HMS):

Design and Development Issues TP-150 The HEC Hydrologic Modeling System TP-151 Bridge Hydraulic Analysis with HEC-RAS TP-152 Use of Land Surface Erosion Techniques with

Stream Channel Sediment Models

TP-153 Risk-Based Analysis for Corps Flood Project Studies - A Status Report

TP-154 Modeling Water-Resource Systems for Water Quality Management

TP-155 Runoff simulation Using Radar Rainfall Data TP-156 Status of HEC Next Generation Software

Development TP-157 Unsteady Flow Model for Forecasting Missouri and

Mississippi Rivers TP-158 Corps Water Management System (CWMS) TP-159 Some History and Hydrology of the Panama Canal TP-160 Application of Risk-Based Analysis to Planning

Reservoir and Levee Flood Damage Reduction Systems

TP-161 Corps Water Management System - Capabilities and Implementation Status

Page 40: Technical Factors in Small Hydropower Planning · 2013. 2. 25. · Technical Factors in Small Hydropower Planning February 1979 US Army Corps of Engineers Institute for Water Resources