Page 1: Team Members and Roles Metric NoNameRole A0006361U AYE THET MON A0065958L NG SIEW LENG PRAGATI TIN LAI WAI VARUN TAK ZHANG SHUDONG

Team Members and RolesTeam Members and Roles

Metric No Name Role

A0006361U AYE THET MON

A0065958L NG SIEW LENG

PRAGATI

TIN LAI WAI

VARUN TAK

ZHANG SHUDONG

Page 2: Team Members and Roles Metric NoNameRole A0006361U AYE THET MON A0065958L NG SIEW LENG PRAGATI TIN LAI WAI VARUN TAK ZHANG SHUDONG

Team Organization StructureTeam Organization Structure

Team Team Members

Management TeamProject Manager (team leader)Business Analyst

Development TeamTechnical Lead (sub-team leader)DeveloperSystem Analyst

Quality TeamQuality Manager (sub-team leader)Tester

Name Role

Shudong Project Manager (main functional role)

Business Analyst

System Analyst

Developer

Varun Technical Lead (main functional role)

System Analyst

Developer

Pragati Quality Manager (main functional role)

Technical Lead

System Analyst

Developer

Tester

Lai Wai System Analyst (main functional role)

Business Analyst

Developer

Amy Developer (main functional role)

System Analyst

Developer

Tester

Siew Leng Business Analyst (main functional role)

Project Manager

System Analyst

Developer

Role Assignment Matrix

Sub-team classification

Organization Chart

Page 3: Team Members and Roles Metric NoNameRole A0006361U AYE THET MON A0065958L NG SIEW LENG PRAGATI TIN LAI WAI VARUN TAK ZHANG SHUDONG

Gantt ChartGantt Chart~ Baseline~ Baseline

Page 4: Team Members and Roles Metric NoNameRole A0006361U AYE THET MON A0065958L NG SIEW LENG PRAGATI TIN LAI WAI VARUN TAK ZHANG SHUDONG
Page 5: Team Members and Roles Metric NoNameRole A0006361U AYE THET MON A0065958L NG SIEW LENG PRAGATI TIN LAI WAI VARUN TAK ZHANG SHUDONG
Page 6: Team Members and Roles Metric NoNameRole A0006361U AYE THET MON A0065958L NG SIEW LENG PRAGATI TIN LAI WAI VARUN TAK ZHANG SHUDONG
Page 7: Team Members and Roles Metric NoNameRole A0006361U AYE THET MON A0065958L NG SIEW LENG PRAGATI TIN LAI WAI VARUN TAK ZHANG SHUDONG
Page 8: Team Members and Roles Metric NoNameRole A0006361U AYE THET MON A0065958L NG SIEW LENG PRAGATI TIN LAI WAI VARUN TAK ZHANG SHUDONG

Gantt ChartGantt Chart~ Tracking~ Tracking

Page 9: Team Members and Roles Metric NoNameRole A0006361U AYE THET MON A0065958L NG SIEW LENG PRAGATI TIN LAI WAI VARUN TAK ZHANG SHUDONG
Page 10: Team Members and Roles Metric NoNameRole A0006361U AYE THET MON A0065958L NG SIEW LENG PRAGATI TIN LAI WAI VARUN TAK ZHANG SHUDONG
Page 11: Team Members and Roles Metric NoNameRole A0006361U AYE THET MON A0065958L NG SIEW LENG PRAGATI TIN LAI WAI VARUN TAK ZHANG SHUDONG
Page 12: Team Members and Roles Metric NoNameRole A0006361U AYE THET MON A0065958L NG SIEW LENG PRAGATI TIN LAI WAI VARUN TAK ZHANG SHUDONG

Effort EstimatesEffort EstimatesCostar Vs Bottom-up EstimationCostar Vs Bottom-up Estimation

Estimated Costar effort = 27.0 man-monthsDuration = 11.9 months

Translating to man-day per team member:

Estimated Costar effort = 27.0 x 152hrs (Costar pre-defined)= 4104 man-hours= 4104 / 8 hr per man-day / 6 team members= 86 man-day per team member

Estimated Effort= 528.5 man-days / 6 team members= 88 man-day per team member

Total (man-day)

Activity 1 Initial Planning 30Activity 2 Project Monitoring, Controlling,

Administration 102.5Activity 3 Requirements Identification 32Activity 4 Prototyping 36.5Activity 5 Analysis Modelling 69Activity 6 Design Modelling 74Activity 7 Database Design 5Activity 8 Programming 116.5Activity 9 System Integration Testing 35.5Activity 10 User Acceptance 27.5

Total 528.5

Page 13: Team Members and Roles Metric NoNameRole A0006361U AYE THET MON A0065958L NG SIEW LENG PRAGATI TIN LAI WAI VARUN TAK ZHANG SHUDONG

Function Point CountFunction Point CountITEM LOW AVERAGE HIGH TOTAL

External Input

5x3 = 15 13x4 = 52 0x6 = 0 67

External Output

0x4 = 0 2x5 = 10 0x7 = 0 10

Internal File

15x7 = 105

2x10 = 20 0x15 = 0 125

External file

0x5 = 0 0x7 = 0 0x10 = 0 0

External Inquiry

15x3 = 45 9x4 = 36 0x6 = 0 81

Unadjusted Function Points 283

CHARACTERISTIC DI

Data Communications 4

Distributed Functions 4

Performance 1

Heavily Used configuration 0

Transaction Rate 1

On-line Data Entry 5

End User efficiency 3

On-line Update 3

Complex Processing 0

Re-usability 1

Installation Ease 1

Operational Ease 0

Multiple Sites 2

Facilitate Change 0

Total Degree of Influence 24

Adjustment Factor = 0.65 + (0.01 x Total Degree of Influence) = 0.65 + 0.24 = 0.89

Adjusted FPC = Unadjusted FPC* Adjustment Factor = 283 x 0.89 = 251.87