3
AHMED OSMAN Team Leader/Sr.Structural Engineer Page 1 of 3 Over Fourteen (14) years of professional experience in Construction and Engineering, Developing Structural Analysis and Design, Detailing, Construction Management and, Supervision. Acting as the key client liaison for several types of projects including Residential, Commercial, High Rise building, a Hospital and Off-Shore Oil and Gas Projects. Personal Information Nationality : Egyptian Date of Birth : 27/12/1980 Place of Birth : Qatar Marital Status : Married Phone : 00971508790285 Email : [email protected] EDUCATION AND PROFESSIONAL QUALIFICATIONS - B.Sc. Civil Engineering, Alexandria University, Egypt, 2002 , Grade : good - Master Degree Preliminary year. - Good understanding of International Standards (BS,ACI,UBC, FAA) . - Certified Project Management Professional (PMP no. : 1490041). - Certified Dubai Municipality Structural Engineer (G+12) / Registration No.:71270. - Certified Sharjah Municipality Construction Engineer. - Member of Project Management Institute (PMI) / ID No. : 2311965. - Member of Society of Engineer, Dubai. - Excellent Management Capability and Communication Skills. EXPERIENCE: 2012 - to Date: Dorsch Holding Gmbh; Abu Dhabi; UAE; Team Leader/Sr.Structural Engineer (PMC) Responsibilities include: Review Project Scope of Work, drawings, specification, FEED, plans and raise any potential conflicts. Managing, Integrating, Supervising, monitoring and controlling the ongoing site activities ensuring project deliverable are met as per project requirements and constrains. Co-ordination and Interface with other Packages/Projects as required. Leading the Construction team (Discipline Engineers, Inspectors, Surveyors, HSE supervisor) ensuring common understanding and awareness of on-going issues and areas of concern. Ensure Completion of and track all the required testing as required by Project Quality plan. Perform Conflict Resolution in efficient timely manner. Monitor site safety and ensure that all Health and Safety Regulations are enforced. Managing weekly Construction meeting to raise or discuss relevant issues.. Prepare daily and weekly progress reports to the Client providing comprehensive overview for Project Progress. Structural design review under EPC contract and Provide alternative to the proposed design (if required). Review civil/structural shop drawings to ensure compliance with the design. Review the activity method statement, quality control plan, inspection /test plan and Material approval request to ensure Compliance with Project specification. Provide Technical Support and assist in clear any ambiguity as required. Issue correspondence to contractor (NCR-site instructions) as required. Reply to contractor's Technical or Interface Query. Client: Abu Dhabi Marine Operating Company (ADMA) SARB Field Development Project (Abu Dhabi – Zirku Island – SARB artificial Island) - Package (1) EPC works for Early Site Preparation, Jetty and seawater Intake Structure, Runway Extension. - Package (7) Drill Pad Slab, Drill Pad Trenches, Well Cellars and Early Civil Work.

Team Leader Structural Engineer C.V

Embed Size (px)

Citation preview

Page 1: Team Leader Structural Engineer C.V

AHMED OSMAN Team Leader/Sr.Structural Engineer

Page 1 of 3

Over Fourteen (14) years of professional experience in Construction and Engineering, Developing Structural Analysis and Design, Detailing, Construction Management and, Supervision. Acting as the key client liaison for several types of projects including Residential, Commercial, High Rise building, a Hospital and Off-Shore Oil and Gas Projects.

Personal Information

Nationality : Egyptian Date of Birth : 27/12/1980 Place of Birth : Qatar Marital Status : Married Phone : 00971508790285 Email : [email protected] EDUCATION AND PROFESSIONAL QUALIFICATIONS

- B.Sc. Civil Engineering, Alexandria University, Egypt, 2002 , Grade : good

- Master Degree Preliminary year.

- Good understanding of International Standards (BS,ACI,UBC, FAA) .

- Certified Project Management Professional (PMP no. : 1490041).

- Certified Dubai Municipality Structural Engineer (G+12) / Registration No.:71270.

- Certified Sharjah Municipality Construction Engineer.

- Member of Project Management Institute (PMI) / ID No. : 2311965.

- Member of Society of Engineer, Dubai.

- Excellent Management Capability and Communication Skills.

EXPERIENCE:

2012 - to Date: Dorsch Holding Gmbh; Abu Dhabi; UAE; Team Leader/Sr.Structural Engineer (PMC) Responsibilities include: � Review Project Scope of Work, drawings, specification, FEED, plans and raise any potential conflicts.

� Managing, Integrating, Supervising, monitoring and controlling the ongoing site activities ensuring project

deliverable are met as per project requirements and constrains.

� Co-ordination and Interface with other Packages/Projects as required.

� Leading the Construction team (Discipline Engineers, Inspectors, Surveyors, HSE supervisor) ensuring

common understanding and awareness of on-going issues and areas of concern.

� Ensure Completion of and track all the required testing as required by Project Quality plan.

� Perform Conflict Resolution in efficient timely manner.

� Monitor site safety and ensure that all Health and Safety Regulations are enforced.

� Managing weekly Construction meeting to raise or discuss relevant issues..

� Prepare daily and weekly progress reports to the Client providing comprehensive overview for Project

Progress.

� Structural design review under EPC contract and Provide alternative to the proposed design (if required).

� Review civil/structural shop drawings to ensure compliance with the design.

� Review the activity method statement, quality control plan, inspection /test plan and Material approval

request to ensure Compliance with Project specification.

� Provide Technical Support and assist in clear any ambiguity as required.

� Issue correspondence to contractor (NCR-site instructions) as required.

� Reply to contractor's Technical or Interface Query.

Client: Abu Dhabi Marine Operating Company (ADMA)

SARB Field Development Project (Abu Dhabi – Zirku Island – SARB artificial Island)

- Package (1) EPC works for Early Site Preparation, Jetty and seawater Intake Structure, Runway

Extension.

- Package (7) Drill Pad Slab, Drill Pad Trenches, Well Cellars and Early Civil Work.

Page 2: Team Leader Structural Engineer C.V

AHMED OSMAN Team Leader/Sr.Structural Engineer

Page 2 of 3

Client: Abu Dhabi National Oil Company (ADNOC)

- Package (13): Five buildings (G+12) Bachelor flats accommodation, Ruwais , Abu Dhabi,

- Mosque and shopping facilities, Ruwais , Abu Dhabi,

- Recreation Center, Ruwais , Abu Dhabi,

2011 – 2012: Engineering Consultants Group ECG; Abu Dhabi; UAE; Senior Structural Engineer. Responsibilities include: � Review civil/structural shop drawings (Reinforcement shop drawings – Concrete layout drawings –

formwork drawings – Co-ordination drawings).

� Review materials and method statements submittals for approval.

� Supervising Piling, Pile load test (compression- Tension), raft foundation and super structure works.

� Managing site construction team (Four inspectors & two surveyors).

� Supervising and Review materials test and results (concrete- reinforcement).

� Issue correspondence to the contractor (NCR-Site instruction) as required.

� Reply to the contractor's requests for information (RFI).

� Attending progress meetings and Technical meetings with contractor-sub contractor – specialists

� Co-ordination between architectural, structural and M.E.P work.

� Review and comment the construction baseline schedule.

- (2B+G+10) Danat Al Emarat Women and Children Hospital, Officers City, Abu Dhabi,

Client: United Eastern Medical Services (UEMS)

2009 – 2011: dxb-Lab Architecture; Dubai; UAE; Senior Structural Engineer. Responsibilities include: � Developing structural design from schematic design to final detailed design and prepare

structural calculation for Authoriy(Dubai Municipality) approval as part of issuing Building Permit.

� Satisfy unique and featured modern architectueal design of dxb-lab Architecture .

� Determine the most safe and economic structural system that fits into architectural design.

� Build 3d model analysis through Etabs software and apply wind and seismic loads as per relevant codes

� Check the design of verticals ( columns-shear walls-Retaining walls )

� Design of (slabs-beams- raft foundations – pile caps) using safe software.

� Managing meetings with the client to discuss work progress during design phase.

� Discuss Dubai Municipality Comments on the design to achieve final approval.

� Review civil/structural shop drawings submittals for approval (Reinforcement shops drawings – Concrete

layout drawings – formwork drawings).

� Inspect all the structural elements during the construction phase (raft foundation, retaining walls, water

tanks, flat slab, columns and shear walls). � Inspect all the work done during finishes phase (block, plaster, water proofing, walls and floor tiles, false

ceiling, paints, external finishes, external works.) � Issue correspondence to the contractor (NCR-Site instruction) as required.

� Co-ordination between architectural, structural and M.E.P work.

- (G+4) Staff Housing for Four Season Hotel; Jebel Ali

Client: H.H. Investment and Development

- Three projects (G+4) Labors Accommodation; Jebel Ali Development; Jebel Ali

- (2B+G+10) Office Building; Al Barsha

- (2B+G+2) Private Villa; Al Barsha

- (B+G+1) Private Villa; Al Barsha

- (G+2) Private Villa; Nad Al Shiba

- (G+1) Townhouses; Jumeirah

Page 3: Team Leader Structural Engineer C.V

AHMED OSMAN Team Leader/Sr.Structural Engineer

Page 3 of 3

2006 – 2009: Horizon International Consulting Engineers, Sharjah – Dubai, UAE; Project Engineer.

Responsibilities include:

� Build 3d model analysis through Etabs software and apply wind and seismic loads as per relevant codes

� Check the design of verticals ( columns-shear walls-Retaining walls )

� Design of (slabs-beams – raft foundations – pile caps) using safe soft ware.

� Prepare all structural drawings (plans, sections and details).

� Review civil/structural shop drawings submittals for approval (Reinforcement shop drawings – Concrete

layout drawings – formwork drawings – Coordination drawings).

� Review materials and method of statements submittals for approval.

� Inspect all the structural elements during the construction phase (piles, pile load test, raft foundation, ,

water tanks, flat slab, post tensioned slabs, columns and shear walls).

� Review structural calculation for aluminum curtain walls.

- (G+30) Matrix Tower ;Dubai Marina - (G+4P+27+H.C+Helipad) Residential Tower, Al Khan; Sharjah

- (G+10) Residential Building; Al Qasemia, Sharjah

- (G+4P+16) Residential Building ; Sharjah

- Eight Projects (G+8+H.C) Residential Building; Dubai Silicon Oasis; Gulf General Investment Company

2004 – 2006:Consultancy Firm; Alexandria; Egypt; Junior Structural Engineer.

Responsibilities included:

� Model build and analysis for the structure using SAP software

� Application of seismic and wind load on the model analysis as per Egyptian code

� Design of pile caps, columns, walls and solid slab, paneled beams.

� Check as built piles layout with the design, conduct re-design of pile caps if required

� Drafting of the structural drawings ( plans and section details )

� Construction Supervision and Inspections.

� Perform quality control on concrete during construction.

- (G+10 ) Residential Building

- (G+4 ) School

2002 – 2004; Contracting Company; Alexandria, Egypt; Site Engineer.

Responsibilities include:

� Prepare the daily program of work based on the weekly program.

� Prepare reinforcement shop drawings for the store framing foundation.

� Construct isolated foundation, columns and slabs as per drawings. � Responsible for management of material and manpower at site.

� Perform Quality Control as per Quality Plan.

� Review and comment on steel structural shop drawings provided by steel structure subcontractor.

- G+12 Residential Building

- Ground Floor Steel Structure Store

LANGUAGES

Arabic, English (Fluent)

COMPUTER SKILLS

- ETABS-SAFE-SAP-PROKON

- AutoCAD

- MS Office Applications