National Iranian Steel Co.
Baft Steel Complex
DDR R && MMaatteerriiaall HHaannddlliinngg PPllaanntt
PPrroo j jeecctt
“Particular Conditions”
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 2/56
TARA TARHEngineering Technological Co.
DR & Material Handling Plant ProjectNISCO
Page 1 of 3Particular ConditionsBaft Steel Complex
Table of ContentsDoc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
PARTICULAR CONDITIONS
Clause Page
1 General Provisions 1
1.1 Laws and Language 1
1.2 Compliance with Laws 1
1.2.1 The Employer 1
1.2.2 The Contractor 1
1.3 Communications 2
2 The Employer 42.1 Right of Access to the Site 4
3 The Employer’s Administration 5
3.1 The Employer’s Representative 5
4 The Contractor 6
4.1 Scope of Work of the Contractor 6
4.2 Performance Securities 6
4.3 Contractor’s Representative 7
4.4 Subcontractor 7
4.5 Co-operation 7
4.6 Shipping 8
4.7 Delivery 8
4.8 Shipping and Delivery Documents 8
4.8.1 Shipping Documents 9
4.8.2 Delivery Documents 10
4.9 Employer’s Equipment 10
5 Staff and Labour 115.1 Foreign Staff and Labour 11
5.2 Alcoholic Liquor or Drugs 11
5.3 Arms and Ammunition 11
5.4 Festivals and Religious Customs 11
5.5 Epidemics 11
5.6 Disorderly Conduct 11
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 3/56
TARA TARHEngineering Technological Co.
DR & Material Handling Plant ProjectNISCO
Page 2 of 3Particular ConditionsBaft Steel Complex
Table of ContentsDoc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
5.7 Observance by Subcontractors 12
5.8 Other Conditions 12
5.9 Returns of Labour 12
6 Plant, Materials and Workmanship 13
6.1 Quality Control, Inspection and Testing During Manufacture 13
6.2 Pre-shipment Inspection (Surveying) 15
6.3 Release for Shipment 15
7 Commencement, Delays and Suspension 17
7.1 Date of Delivery 17
7.2 Delay Compensations 177.3 Prolonged Delay 18
7.4 Delays Caused by Authorities 18
8 Contract Price and Payment 19
8.1 The Contract Price 19
8.2 Advance Payment 21
8.3 Application for Interim Payments 22
8.4 Schedule of Payments 22
8.5 Delayed Payments 27
9 Employer’s Financial Arrangement 28
10 Independent Entity 29
11 Separability of Provisions and Waiver 30
12 Observance of local laws and Respect of Local Customs 31
13 Modification and Entirety of the Contract 32
14 Act of Non-Intervention in Government Transactions 33
15 Use Before Taking Over 34
16 Insurances 35
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 4/56
TARA TARHEngineering Technological Co.
DR & Material Handling Plant ProjectNISCO
Page 3 of 3Particular ConditionsBaft Steel Complex
Table of ContentsDoc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
17 Annexes to the Particular Conditions 36
Annex 1: Affidavit concerning Business Activities
Annex 2: Declaration concerning the Act of Non-Intervention in ……
Annex 3: Declaration of full acceptance of tender
Annex 3: Form of Performance Security
Annex 4: Form of Advance Payment Guarantee
Annex 5: From of Retention Money Guarantee
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 5/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 1 of 52
1. General Provisions
1.1 Laws and LanguageThe Conditions of Contract shall in all respects be read, construed, and governed by the Laws of
Islamic Republic of Iran.
Contractor hereby declares that, he is fully aware and cognizant of all laws, regulations, and
ordinances of the Government of the Islamic Republic of Iran having an impact on the Contract
upto the Base Date. Any possible future claims in this regard shall be disregarded.
The Contract Agreement, these Particular Conditions, and General Conditions are prepared in
English.
All Drawings, Employer’s Requirements, etc are in English and are valid as such.
All communications shall be written in English.
1.2 Compliance with Laws
1.2.1 The Employer
The Employer shall assist the Contractor to obtain all import permits or licences required for any
part of the Plant and Materials in reasonable time having regard to the time for delivery of the
Plant and Materials and for completion of the Works. However, the Contractor shall submit well
in advance the details of Plant and Materials to the Employer. Payment of costs for obtaining
such licences and permits (if any) shall be made by the Employer but all the follow ups and
formalities shall be done by the Contractor.
The Employer undertakes to pay all custom duties of any kind whatsoever which may occur in
Iran in connection with Contractor’s Foreign Supply under the Contract, but all customs
formalities shall be carried out and risks resulting therefrom shall be born by the Contractor.
1.2.2. The Contractor
(a) The Contractor shall pay any taxes and duties at present and in future levied in the countries
of origin of the Contractor including Iran and of the Subcontractors and of the Contractor’s
supervisory personnel in connection with the Contract.
(b) The Contractor undertakes to pay all custom duties of any kind whatsoever which may occur
in Iran in connection with any parts and items imported for Local Supply under the Contract.
(c) All taxes, levies, charges, including social security and apprenticeship dues, customs duties
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 6/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 2 of 52
pertaining to personal belongings of the Contractor’s personnel and payments imposed by
present Iranian Law to the Contractor, shall be paid by the Contractor, in accordance with the
said Law, provided that:
It is understood that the quotation of all rates, fees, and remuneration stated herein, is based
on the prevailing rate of the applicable taxes whatsoever, levies, charges, dues, customs
duties and other impositions in Iran on the Base Date.
In the event any additional taxes are required and/or effective change is made thereafter in
the said rates, necessary modification and adjustment to the Contract Price shall be made
accordingly.
(d) All taxes, levies, charges, including social security and apprenticeship dues related to civilconstruction works and erection works shall be paid by the Contractor according to
applicable Laws provided that:
It is understood that the quotation of all unit rates and prices is based on the prevailing rate of
applicable taxes whatsoever, levies, charges, dues and other impositions in Iran on the Base
Date.
In the event any additional taxes are required and/or effective change is made thereafter in
the said rates, necessary modification and adjustment to the Contract Price shall be made
accordingly.
Failure of the Employer to collect any legal deductions from payments to the Contractor shall not
relieve the Contractor of the obligation of payment of the same to the competent authorities.
1.3 Communications
The legal address of the Employer and Contractor are established as follows:
For the Employer
National Iranian Steel Company
No.685, Valiasr Ave., Tehran, Iran.
P.O.Box: 1594643118
Tel No. : (+9821) 88900995
Fax No. : (+9821) 88893279
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 7/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 3 of 52
For the Contractor
P.O.Box:
Tel No. :
Fax No. :
All correspondence and legal communication are to be addressed as specified above. In case of
change of address, each Party to this Contract agrees to notify the other accordingly in Writing,
otherwise each Party is entitled to continue to direct their correspondence to the address givenabove and such correspondence will be considered legally valid.
The Employer reserves the right to require the Contractor to establish a coordination address in
Iran during execution of the Contract.
All communications shall be in Writing and shall include facsimile transmissions. Original
writings shall be sent by the issuing Party to the other Party.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 8/56
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 9/56
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 10/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 6 of 52
4. The Contractor
4.1 Scope of Work of the ContractorIn consideration of the payments to be made by the Employer to the Contractor and subject to the
terms and conditions of the Contract, the extent of the Contractor’s obligations shall cover
conceptual design, process design, basic design, detailed design, engineering, fabrication, testing,
painting, protection, packing, marking, DDU Site delivery (as per INCOTERMS 2000) of
Foreign Supply (including all its related customs formalities and risks resulting therefrom) and
DDP Site delivery (as per INCOTERMS 2000) of Local Supply of the complete Plant and
Materials as defined in Conditions of Contract (including any custom duties and costs related to
imported parts and components for Local Supply), together with construction management, civil
construction works including Temporary Works, proper off-loading and storage of both Foreign
Supply and Local Supply at Site, erection works, Tests on Completion and in general putting into
operation the entire Works on Site as well as provision of training, licence and know-how to
construct and operate the Works properly and efficiently at highest western world standards.
4.2 Performance Security
The Contractor shall submit to the Employer within 28 days after both Parties have signed the
Contract Agreement and before Effective Date of the Contract an unconditional performance
bank guarantee for the due performance of the Contract through a reputable bank acceptable to
the Employer and Central Bank of Iran, in the form enclosed to Particular Conditions for ten
percent (10%) of Foreign Portion of the Contract Price. The cost of this guarantee shall be at the
expense of the Contractor.
The Contractor shall also submit to the Employer within 28 days after both Parties have signed
the Contract Agreement and before Effective Date of the Contract an unconditional performance
bank guarantee for the due performance of the Contract through a reputable bank acceptable to
the Employer, in the form enclosed to Particular Conditions for five percent (5%) of Iranian
Portion of the Contract Price. The cost of this guarantee shall be at the expense of the Contractor.
The Performance Security shall be maintained in force until the issuance of Performance
Certificate in accordance with the requirements of Clause 4.2 [Performance Security] and Clause
11.3 [Extension of Defects Notification Period] of General Conditions.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 11/56
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 12/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 8 of 52
4.6 Shipping
The Contractor shall make use of Islamic Republic of Iran Shipping Lines (I.R.I.S.L.). In case
due to non-availability of I.R.I.S.L. ships other carriers have to be selected by the Contractor,
approval of the Employer shall be required. Non-availability of I.R.I.S.L. ships shall have to be
substantiated by the Contractor. In such cases any possible additional cost of selection of other
carriers shall be born by the Contractor.
4.7 Delivery
The Contractor shall be responsible for DDU Site delivery (as per INCOTERMS 2000) of
Foreign Supply and DDP Site delivery (as per INCOTERMS 2000) of Local Supply according todelivery dates stated in Time Schedule.
The Contractor shall give the Employer notice of his intention to proceed with shipment of
itemized parts of Foreign Supply, 42 days before the expected date of shipment. This notice shall
indicate the following:
(a) Number of Contract
(b) Port of shipment/place of delivery including information and specification of ports of
arrival
(c) Approximate total volume and gross weight
(d) kind of cargo
(e) Additional information about long and/or heavy lifts
The Contractor shall give the Employer notice of his intention to proceed with shipment of Local
Supply 28 days before the expected date of shipment. The notice shall indicate the followings:
(a) Number of Contract
(b) Approximate total volume and gross weight
(c) Additional information about long and/or heavy lifts.
4.8 Shipping and Delivery Documents
As proof of shipping and delivery, certain documents are to be provided. In order to differentiate
such proof for Foreign Supply and Local Supply in these documents they will be referred to as
Shipping Documents and Delivery Documents for Foreign Supply and Local Supply
respectively.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 13/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 9 of 52
4.8.1. Shipping Documents
Regarding Foreign Supply, the Shipping Documents shall be the following:
(a) full set of clean negotiable ocean bill of lading or airway bill or bill of freight or
equivalent transport document as the case may be, marked “Freight Prepared” evidencing
that goods are actually en-route and four extra copies or photocopies bearing the flight
stamp consigned to Employer's name and address.
(b) four (4) copies of Certificate of Origin, two (2) copies of which shall be certified by the
local Chamber of Commerce and legalized by the relevant Islamic Republic of Iran
Consulate;
(c) four (4) copies of packing list;(d) six (6) signed original commercial Invoices, confirming that Plant and/or Materials are in
compliance with the Contract and the relevant proforma invoice, 2 (two) of which shall
be certified by Local Chamber of Commerce and legalized by the relevant Islamic
Republic of Iran Consulate;
(e) inspection certificate in one (1) original and two (2) duplicates issued by Surveyor as
specified in Sub-Clause 6.2 of this Particular Conditions. The inspection certificate shall
certify that the quality, quantity, packing and marking of the goods shipped are strictly in
compliance with Employer’s Requirements and its related Annexes;
(f) four (4) copies of "Release Certificate for Shipment" issued by the Employer as in Sub-
Clause 6.3 of Particular Conditions of Contract;
(g) evidence of insurance of Plant and Materials in one (1) original and four (4) copies.
The Employer reserves the right to check the commercial Invoices. For the purpose of such
checking the Employer shall delegate a duly authorized representative who shall be present after
Contractor's 14 days written notice advising the places to check and certify that the commercial
Invoices are correct and complete. Such certification shall be made at the place(s) advised withinthe shortest possible time but not exceeding 21 days from Contractor’s written notice as to
accommodate of the Commercial Invoices.
Proof of delivery of Plant and Materials transported by truck or aeroplane is to be constituted by
other documents in accordance with special arrangements between the Employer and the
Contractor.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 14/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 10 of 52
4.8.2 Delivery Documents
Proof of DDP Site delivery regarding Local Supply shall be pending on submission of
documents referred to as Delivery Documents which shall consist of the following:
(a) Full set of bill of freight marked "Freight Prepaid";
(b) four (4) copies of packing list;
(c) four (4) copies of "Release Certificate for Shipment" issued by the Employer as in Sub-
Clause 6.3 of Particular Conditions;
(d) Inspections certificate in one (1) original and two (2) duplicates, issued by Surveyor,
certifying that the quality, quantity, packing and marking of goods are in compliance with
Employer’s Requirements and its related Annexes;(e) six (6) signed original commercial Invoices, two of which shall be certified by the
Employer;
(f) Certificate of delivery of Plant and/or Materials to the Site, in one (1) original and four
(4) copies.
The Employer reserves the right to check the commercial Invoices. For such purpose the
Employer shall nominate a duly authorized representative who shall be present after
Contractor’s 14 days written notice advising the places to check and certify that the
commercial Invoices are correct and complete. Such certification shall be made at the
places advised within shortest possible time but not exceeding 14 days from Contractor’s
written notice as to accommodate of the commercial Invoices.
4.9 Employer’s Equipment
The Employer shall not make available any Employer’s Equipment for use by the Contractor.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 15/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 11 of 52
5. Staff and Labour
5.1 Foreign Staff and LabourThe Contractor shall import any personnel who are necessary for the execution of the Works.
The Contractor must ensure that these personnel are provided with the required residence visas
and work permits. The Contractor shall be responsible for the return to the place where they were
recruited or to their domicile of imported Contractor’s Personnel. In the event of the death in the
Country of any of these personnel or members of their families, the Contractor shall similarly be
responsible for making the appropriate arrangement for their return or burial.
5.2 Alcoholic Liquor or Drugs
The Contractor shall not sell, give, barter or otherwise dispose of any alcoholic liquor or drugs or
permit or suffer any such importation, sale, gift, barter or disposal by his Subcontractors, agents
or employees.
5.3 Arms and Ammunition
The Contractor shall not give, barter or otherwise dispose of to any person or persons any arms
or ammunition of any kind or permit or suffer the same as aforesaid.
5.4 Festivals and Religious Customs
The Contractor shall, in all dealings with labour in his employment, have due regard to all
recognized festivals, days of rest and religious or other customs.
5.5 Epidemics
In the event of any outbreak of illness of an epidemic nature the Contractor shall comply with
and carry out such regulations, orders and requirements as may be made by the Government or
the local medical or sanitary authorities for the purpose of dealing with and overcoming the
same.
5.6 Disorderly Conduct
The Contractor shall at all times take all reasonable precautions to prevent any unlawful riotous
or disorderly conduct by or amongst his employees and for the preservation of peace and
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 16/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 12 of 52
protection of persons and property in the neighborhood of the Works against the same.
5.7 Observance by Subcontractors
The Contractor shall be responsible for observance by his Subcontractors of the foregoing
provisions.
5.8 Other Conditions
Any other conditions affecting labour and wages shall be fulfilled by Contractor.
5.9 Returns of LabourThe Contractor shall, if required by the Employer, deliver to the Employer’s Representative or at
his office a return in detail, in such form and at such intervals as the Employer may prescribe,
showing the supervisory staff and the numbers of the several classes of labour from time to time
employed by the Contractor on the Site.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 17/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 13 of 52
6. Plant, Materials and Workmanship
6.1 Quality Control, Inspection and Testing During Manufacture(a) The Contractor shall submit to the Employer the quality control, inspection and testing
information called for in the Employer’s Requirements and its related Annexes and shall
carry out and adhere to the procedures approved, except where otherwise approved in
Writing by the Employer.
(b) The Contractor shall expedite the manufacture and the delivery of the Plant and
Materials. The Employer shall be entitled at all reasonable times during manufacture,
storage and packing, and as provided in the Employer’s Requirements and its related
Annexes, to inspect, examine and test on the Contractor’s or Subcontractor’s premises, in
warehouses, storage areas, piers and loading docks the qualities and workmanship of the
Plant and Materials, and the progress of the Works performed under the Contract.
If part of the said Plant and Materials is being manufactured, packed on the premises of
Subcontractors, it shall be the obligation of the Contractor to obtain for the Employer, the
permission to inspect, examine and test as if the said Plant and Materials were being
manufactured and/or packed on the Contractor’s own premises. Such inspection,
examination or testing if made shall not release the Contractor from any obligation underthe Contract.
(c) The Contractor shall furnish updated progress reports, and inspection and testing
schedules in a monthly basis. In order to facilitate the follow-up of the progress of work
by the Employer, the Contractor and/or Subcontractor shall provide the Employer all
pertinent information required, especially the quality control and testing manuals, as
approved by the Employer.
(d) If the quality control and testing manuals and/or the Employer’s Requirements and its
related Annexes call for testing of the Plant and Materials in the presence of the
Employer, the Contractor shall give the Employer at least 28 days notice by facsimile of
the date and place.
Testing procedures and methods shall be in accordance with the quality control
procedures of the above mentioned manuals and/or the Employer’s Requirements and its
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 18/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 14 of 52
related Annexes. The required documents of the Plant shall be available at the place of
inspection and testing. The Employer shall give the Contractor at least 24 hours notice by
facsimile or telex of their intention to attend the tests. If the Employer does not attend at
the test at the date which the Contractor has stated in his notice, the Contractor then may
proceed and shall forthwith forward to the Employer duly certified copies of the test
results.
(e) Where the Contract provides for tests on the premises of the Contractor or of any
Subcontractor, the Contractor shall provide free of charge such assistance, labour,
materials, electricity, fuel, stores, apparatus and instruments as may be required and as
may be reasonably demanded to carry out such tests efficiently.
(f) As and when any Plant and Materials shall have passed the tests referred to in this Clause
and the tests have been witnessed by the Employer, the test protocol prepared by the
Contractor will be counter signed by the Employer. Such document shall not relieve the
Contractor of any obligation under the Contract.
(g) If as a result of such inspection, examination or test of the Plant and Materials (other than
a test on completion) the Employer shall decide that such Plant and Materials is defective
or not in accordance with the Contract, he shall notify the Contractor accordingly stating
in Writing his objection and reasons therefore. The Contractor shall with all speed make
good the defect or ensure that the Plant and Materials complies with the Contract.
Thereafter, if required by the Employer, the test shall be repeated under the same terms
and conditions save that all reasonable expenses to which the Employer may be put by
the repetition of the tests shall be deducted from the Contract Price.
(h) All traveling and living expenses of the Employer’s Personnel arising in connection with
the quality control, inspection and testing covered by this Clause shall be paid by the
Employer.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 19/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 15 of 52
6.2 Pre-Shipment Inspection (Surveying)
Upon opening of the Letter of Credit (L/C), the Employer shall notify the Contractor in Writing
the name and address of the surveyor appointed thereby. Employer shall be allowed to change
the surveyor, provided that the L/C is amended accordingly not later than three (3) Months prior
to the first scheduled shipment. It is agreed that the surveyor in this Contract is
_______________________________________.
Thereupon, the Contractor shall contact the surveyor and all necessary arrangements for
surveying will be made by the Contractor and the surveyor. The surveyor so appointed by the
Employer shall, not later than fourteen (14) days prior to the scheduled date of shipment set forth
in the relevant notice of readiness, carry out a quality and quantity inspection to verify thecompliance of the Plant and/or Materials with the relevant requirements of the Contract.
If the Employer fails to appoint the surveyor or such a surveyor appointed by the Employer fails
to carry out the surveying at the respective time after receipt of a sixty (60) days notice from the
Contractor and a period of ten (10) days elapses, the Contractor shall inform the Employer
immediately upon receipt of such information, the Employer shall appoint second (another)
surveyor, subject to approval by Central Bank of Iran (Bank Markazi Iran).
If, and immediately after, the results of the inspection satisfy the requirements, the surveyour
shall sign one (1) original and two (2) duplicates of the certificate of quality and quantity and
packing, and deliver same to the Contractor and then the Plant and/or Materials will be released
for shipment (actual readiness for delivery date). Signing of this certificate by the surveyour shall
not relieve the Contractor from any responsibility he has under the Contract, including
responsibility for errors, omissions. discrepancies and non-compliances.
The cost of surveying shall be paid by the Contractor. Payment to the Surveyour shall only be
affected by the instruction of the Employer.
6.3 Release for Shipment
Any Materials and Plant to be supplied under the Contract require a release for shipment prior to
dispatch from the manufacturer’s premises. The document hereinafter called “Release Certificate
for Shipment” will be issued by the Employer under the conditions listed below:
(a) Compliance with the requirements of the quality control and testing manuals as
mentioned under Sub-Clause 6.1 above
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 20/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 16 of 52
(b) Notification by the Contractor to the Employer regarding cargo readiness for final
inspection; through facsimile 21 days before final inspection date
(c) Inspection and approval by the surveyor of cargo (Plant and Materials, boxes, crates and
the like)
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 21/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 17 of 52
7. Commencement, Delays and Suspension
7.1 Date of DeliveryFor the purposes of Sub-Clause 7.2 the actual date of delivery of the Plant and Materials shall
mean the date at which 97% of the value of the Plant and Materials is delivered to Site for
Foreign Supply and Local Supply, provided however, that the balance of the items of Plant and
Materials shall be delivered in such a way that erection is not delayed.
7.2 Delay Compensations
If the Plant and Materials is not delivered within the periods set out in the Contract, Employer
shall have the right to demand and receive from the Contractor for compensation and not by way
of penalty, a sum of money equal to one half of one percent of the Contract Price of the
respective part which can not in consequence of the said delay be put to the use intended, for
each complete week by which the actual delivery date exceeds the Contract delivery date.
The compensation for delay in delivery in accordance with this Clause to be paid by the
Contractor are limited to a maximum of 5% (five percent) of the Contract Price. The said
compensation will not be claimed by the Employer if delay in delivery of the Plant and Materials
would not affect take over of the Works (issuance of Taking-Over Certificate). In the event
delivery of the Plant an/or Materials or such parts of Plant and/or Materials that on delivery
thereof postpones commissioning of the Plant, for a period exceeding six(6) Months, the
Contractor shall be liable for breach of the Contract.
If the Contractor shall fail to complete the Works within the Time for Completion, the Employer
shall be entitled, on giving to the Contractor within a reasonable time notice in Writing to
reduction of 0.07 per cent of Contract Price for each day between the Time for Completion and
the actual date of completion stated in Taking-Over Certificate, but the reduction for delay in
Time for Completion shall not in any case exceed 10 percent of Contract Price. Except as
provided in Sub-Clause 7.3 of this Clause such reduction shall be to the exclusion of any other
remedy of the Employer in respect of Contractor’s failure to complete as aforesaid, but shall not
relieve the Contractor from any other of his obligations under Contract.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 22/56
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 23/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 19 of 52
8. Contract Price and Payment
8.1 The Contract Price(1) In consideration of the supply of Plant and Materials and performance of other parts of the
Scope of Contract, as specified in the Contract Documents, the Employer shall pay the
Contractor the sum ofEuro ………………
(……………… ……………… ……………… ……………
)
as Foreign Portion andIRR ……………… (……………… ……………… ……………… …………)
as Iranian Portion of the Contract Price. The above mentioned prices is the total sum of the
following amounts:
(A)Iranian Portion(a) the price of design and engineering (which includes cost of conceptual design,
process design, basic design and detailed design) of IRR ………………
.
(b) the price of DDP Site (as per INCOTERMS 2000) of Local Supply (including related
operating, capital and commissioning spare parts) ofIRR ………………
.
(c) the price of local transportation and insurance of Foreign Supply as per Conditions of
Contract ofIRR ………………
.
(d) the price of insurance of the Works (total insurance less insurance of Local Supply
and Foreign Supply) as per Conditions of Contract ofIRR ………………
.
(e) the price of training as per Conditions of Contract ofIRR ………………
.
(f) the estimated price of civil construction works (as defined in the Employer’s
Requirements) as per Conditions of Contract ofIRR ………………
.
(g) the price of erection works (including offloading of Local Supply and Foreign Supply
at Site and any related supervision) ofIRR ………………
.
(h) the price of construction management ofIRR ………………
.
(i) the price of Tests on Completion of IRR ……………… .
(j) the price of licence and know-how (if any) ofIRR ………………
.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 24/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 20 of 52
(B)Foreign Portion
(a) the price of design (which includes cost of conceptual design, process design, basic
design and detailed design) and engineering ofEuro ………………
.
(b) the price of FOB supply (as per INCOTERMS 2000) of Foreign Supply (including
related operation, capital and commissioning spare parts) ofEuro ………………
.
(c) the price of shipment and insurance of Foreign Supply as per Conditions of Contract
of Euro ………………
.
(d) the price of insurance of the Works (total insurance less insurance of Local Supply
and Foreign Supply) as per Conditions of Contract ofEuro ………………
.
(e) the price of training as per Conditions of Contract ofEuro ………………
.
(f) the price of erection works (including any supervision) ofEuro ………………
.
(g) the price of construction management ofEuro ………………
.
(h) the price of Test on Completion ofEuro ………………
.
(i) the price of licence and know-how (if any) ofEuro ………………
.
(2) Prices mentioned in Sub-Clause 8.1(1) above are based on item prices set out in Schedule of
Prices and Price Breakdown (Document B) and shall include costs of packing and marking,terminal handling charges, etc. as per Conditions of Contract.
(3) Price of items missed to be separately indicated in the Price Breakdown shall be deemed as
have been included in the price of other items. Price of items indicated to be zero means that
the Contractor shall provide such items free of charge under the Contract.
(4) The Contract Price as in sections A(a), A(b), A(c), A(d), A(e), A(f), A(h), A(i), A(j), A(k),
B(a), B(b), B(c), B(d), B(e), B(f), B(g), B(h), and B(i) of Sub-Clause 8.1(1) above is fixed
and not subject to escalation or any adjustment under Sub-Clause 13.8 [Adjustment for
Changes in Cost] of General Conditions.
(5) Final price of section A(g) of Sub-Clause 8.1(1) above shall be calculated considering actual
volumes of civil construction works using item prices as specified in the Schedule of Prices
and Price Breakdown. The Contractor’s multiplication factor for civil construction works
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 25/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 21 of 52
shall be …….. . Base adjustment indexes of the Contract (shakhese mabnaye peyman) shall be
the adjustment indexes declared by Management and Planning Organization of Iran for the……… quarter of Iranian year 1386.
(6) If the Contract shall not become effective within a period of 4 months after signature of the
Contract Agreement for reasons not attributable to the Contractor, the Contractor shall be
entitled to request revision of the Contract Price which however shall be fair and
substantiated by detailed documents and shall be agreed by both Parties.
8.2 Advance Payment
(1) Iranian Portion
Fifteen percent (15%) of Iranian Portion of the Contract Price equal to the amount of
IRR ………………………….. shall be made out of Local L/C (as defined in Sub-Clause 8.4(1))
and paid to the Contractor as Iranian Portion Advance Payment within the period set forth in
the General Conditions on presentation to the Local Bank (as defined in Sub-Clause 8.4(1))
of the Employer’s certificate that the Contractor has submitted the following documents to
the Employer:
(a) advance payment guarantee for the same amount in favour of the Employer in a form
according to Annex 4 of Particular Conditions.
(b) Performance Security in favour of the Employer in the amount set forth in Sub-
Clause 4.2 [Performance Security] of these Particular Conditions and in a form
according to Annex 3 of Particular Conditions.
(c) advance payment Statement addressed to the Employer in one original and five
duplicates.
After receipt of this advance payment by the Contractor, fifteen percent (15%) shall be
deducted from any Statement of Contractor regarding Iranian Portion as amortization rate
concerning Iranian Portion Advance Payment.
(2) Foreign Portion
Fifteen percent (15%) of Foreign Portion of the Contract Price equal to the amount of
Euro ……………….. shall be made out of Foreign L/C (as defined in Sub-Clause 8.4(2)) and
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 26/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 22 of 52
paid to the Contractor within the period set forth in the General Conditions on presentation to
the Foreign Bank (as defined in Sub-Clause 8.4(2)) of the Employer’s certificate that
Contractor has submitted the following documents to the Employer:
(a) advance payment guarantee for the same amount in favour of the Employer in a form
according to Annex 4 of Particular Conditions.
(b) Performance Security in favour of the Employer in the amount set forth in Sub-
Clause 4.2 [Performance Security] of these Particular Conditions and in a form
according to Annex 3 of Particular Conditions.
(c) advance payment Statement addressed to the Employer in one original and five
duplicates.After receipt of advance payment by the Contractor, fifteen percent (15%) shall be deducted
from any Statement of Contractor regarding Foreign Portion as amortization rate concerning
Foreign Portion Advance Payment.
8.3 Application for Interim Payments
From any Statement of the Contractor regarding Iranian Portion of Contract Price ten percent
(10%) shall be deducted for good performance of the Contract as Retention Money.
Any Statement of the Contractor shall include amounts to be deducted for retention, advance
payment amortization, legal deductions, and any other amount as specified under Sub-Clause
14.3 of General Conditions or other Clauses of Conditions of the Contract.
8.4 Schedule of Payments
The total Contract Price shall be paid to the Contractor in the following manner:
(1) Iranian Portion
Subject to fulfillment of items (a), (b), (c) and (d) of Clause 5 of the Contract Agreement an
irrevocable and transferable Letter of Credit (L/C) shall be opened by the Employer equal to
one hundred percent (100%) of Iranian Portion of the Contract Price, hereinafter referred to
as the “Local L/C”, amounting toIRR ……………………. in favour of the Contractor through
one of commercial banks of Islamic Republic of Iran with corresponding bank in ______
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 27/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 23 of 52
acceptable to Central Bank of Iran (Bank Markazi Iran) hereinafter referred to as the “Local
Bank”. The Local L/C shall expire thirty (30) Months after its opening date.
Partial shipment and partial payments shall be allowed under said Local L/C.
The text of Local L/C shall be in accordance with Uniform Customs and Practice for
Documentary Credits of the International Chamber of Commerce (Publication No. 600).
All the costs in Iran relevant to opening of the Local L/C shall be at the Employer’s account
and all the costs in Iran relevant to utilizing the Local L/C shall be at the Contractor’s
account. Transferring bank charges in respect of transfers shall be payable by the Contractor.
The transferable credit shall be transferred only once.
In the event of any delay in the performance of the Works with respect to the contractualTime Schedule, the Employer shall extend the validity of the Local L/C accordingly.
If the delay to perform the Contract according to the contractual Time Schedule is due to
reasons imputable to the Contractor, then the cost of extension of the Local L/C shall be
borne and paid by the Contractor keeping firm all other rights of the Employer under the
provisions of the Contract.
If the delay to perform the Contract according to the contractual Time Schedule is due to
reasons imputable to the Employer then the cost of extension of the Local L/C shall be borne
and paid by the Employer keeping firm all other rights of the Contractor under the provisions
of the Contract.
If the delay to perform the Contract according to the contractual Time Schedule is due to
Force Majeure in Iran the cost of the extension of the Local L/C shall be borne and paid by
the Employer and if the delay to perform the Contract according to the contractual Time
Schedule is due to Force Majeure outside Iran the cost of the extension of the Local L/C shall
be borne and paid by the Contractor.
Approved amounts of each Statement regarding following items shall be made out of the
Local L/C:
(1-1) Pro rata payment of price of design and engineering
The price of design and engineering shall be paid in proportion to design and
engineering works progress approved by the Employer’s Representative against
presentation to the Local Bank of monthly Statements approved by the Employer.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 28/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 24 of 52
(1-2) Pro rata payment of price of Local Supply
The price of DDP Site delivery of Local Supply shall be paid pro rata shipment of
Local Supply against presentation to the Local Bank of Delivery Documents, as defined
in Sub-Clause 4.8.2 herein for Local Supply, approved by the Employer.
(1-3) Pro rata payment of price of local transportation and insurance of Foreign Supply
The price of local transportation and insurance of Foreign Supply shall be paid pro rata
shipment of Foreign Supply against presentation to the Local Bank of DDU Site
delivery certificate approved by the Employer.
(1-4) Pro rata payment of price of insurance of the Works
The price of insurance of the Works (total insurance less insurance of Local Supply and
Foreign Supply) shall be paid in proportion to civil construction and erection works
progress approved by the Employer’s Representative against presentation to the Local
Bank of monthly Statement approved by the Employer.
(1-5) Pro rata payment of price of civil construction works
The price of civil construction works shall be paid in proportion to civil construction
works progress approved by the Employer’s Representative against presentation to the
Local Bank of monthly Statement approved by the Employer.
(1-6) Pro rata payment of price of erection works
The price of erection works shall be paid in proportion to erection works progress
approved by the Employer’s Representative against presentation to the Local Bank of
monthly Statement approved by the Employer.
(1-7) Monthly payment of price of construction managementThe price of construction management shall be paid in proportion to civil construction
and erection works progress approved by the Employer’s Representative against
presentation to the Local Bank of monthly Statement of the Contractor approved by the
Employer.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 29/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 25 of 52
(1-8) Monthly payment of price of Tests on Completion
The price of Tests on Completion shall be paid against presentation to the Local Bank
of monthly Statement of the Contractor approved by the Employer.
(1-9) Monthly payment of price of training
The price of training shall be paid in proportion to training progress against
presentation to the Local Bank of monthly Statement of the Contractor approved by the
Employer.
(2) Foreign Portion
Subject to fulfillment of items (a), (b), (c) and (d) of Clause 5 of the Contract Agreement an
irrevocable and transferable Letter of Credit (L/C) shall be opened by the Employer equal to
one hundred percent (100%) of Foreign Portion of the Contract Price, hereinafter referred to
as the “Foreign L/C”, amounting toEuro ……………
in favour of the Contractor through one
of commercial banks of Islamic Republic of Iran with corresponding bank in __________
acceptable to Central Bank of Iran (Bank Markazi Iran) hereinafter referred to as the
“Foreign Bank”. The Foreign L/C shall expire thirty (30) Months after its opening date.
Partial shipment and partial payments shall be allowed under said Foreign L/C.The text of Foreign L/C shall be in accordance with Uniform Customs and Practice for
Documentary Credits of the International Chamber of Commerce (Publication No. 600).
All the costs in Iran relevant to the Foreign L/C shall be at Employer’s account and all the
costs outside Iran relevant to the Foreign L/C shall be at the Contractor’s account.
Transferring bank charges in respect of transfers shall be payable by the Contractor. The
transferable credit shall be transferred only once.
In the event of any delay in the performance of the Works with respect to the contractual
Time Schedule, the Employer shall extend the validity of the Foreign L/C accordingly.
If the delay to perform the Contract according to the contractual Time Schedule is due to
reasons imputable to the Contractor, then the cost of extension of the Foreign L/C shall be
borne and paid by the Contractor keeping firm all other rights of the Employer under the
provisions of the Contract.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 30/56
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 31/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 27 of 52
(2-4) Monthly payment of price of training
The price of training shall be paid in proportion to training progress against
presentation to the Foreign Bank of monthly Statement of the Contractor approved by
the Employer.
(2-5) Monthly payment of price of construction management
The price of construction management shall be paid in proportion to civil construction
and erection works progress against presentation to the Foreign Bank of monthly
Statement of the Contractor approved by the Employer.
(2-6) Monthly payment of price of Tests on Completion
The price of Tests on Completion shall be paid against presentation to the Foreign
Bank of monthly Statement of the Contractor approved by the Employer.
(3) Payment at Take Over
Fifty percent (50%) of Retention Money shall be paid to the Contractor after issuance of
Taking-Over Certificate. Remaining fifty percent of the Retention Money shall be paid to the
Contractor after issuance of Performance Certificate to the Contractor.
The Employer shall pay remaining fifty percent of the Retention Money against a bank
guarantee of the same amount in the form of Annex 5 to these Particular Conditions and
through a bank acceptable to the Employer. The said bank guarantee shall be valid until 70
days after the expiry of the Defects Notification Period and shall be extended at the request
of the Employer.
Specimen of the signature of Employer's authorized representatives who will sign the documents
shall be introduced to the Local/Foreign Bank within 14 days after opening of Local/Foreign
L/C. The Employer shall have the right to change the authorized representative. Specimen of the
signature of such new (if any) representative shall be introduced to the Local/Foreign Bank.
8.5 Delayed Payment
No financing charges shall be paid by the Employer to the Contractor under Sub-Clause 14.8 of
the General Conditions for foreign payments.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 32/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 28 of 52
9. Employer’s Financial Arrangements
The Employer shall not provide any evidence to that effect under Sub-Clause 2.4 [Employer’sFinancial Arrangement] of the General Conditions if such matter is against the law, regulations,
or his company policy.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 33/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 29 of 52
10. Independent Entity
Subject to the provisions of this Contract, this Contract is binding upon the Parties hereto onlyand does not bind the Government of Iran, any agency or instrumentality thereof. No seizure or
confiscation of Government of Iran property shall be permitted therefore.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 34/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 30 of 52
11. Separability of Provisions and Waiver
If any provision, in whole or in part, of this Contract should be found legally invalid, void orunenforceable by the provision of law or waived for any other reason, provided that such waiver,
invalidity, voidness and/or unenforceability does not affect the validity and/or execution of the
Contract wholly or substantially, the remaining provisions of this Contract shall not be affected
thereby, and the Parties hereto shall, by amendment to this Contract, promptly replace such
provision by a reasonable new provision which, as far as legally possible, shall approximate what
the Parties intended by such original provision to carry out their purposes.
No Party shall be deemed to have waived any right, power or privilege under this Contract or any
provision thereof unless such waiver is duly executed in writing and acknowledged by the Party
to be charged with such waiver.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 35/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 31 of 52
12. Observance of Local Laws and Respect of Local Customs
The Contractor shall respect and observe local laws, regulations, decisions and order and shallobey orders and instructions issued by local authorities.
The Contractor shall respect local customs, traditions and refrain from any conduct inconsistent
with or prejudicial to them. The Contractor shall also avoid any action, which can be prejudicial
to security and public order.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 36/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 32 of 52
13. Modification and Entirety of the Contract
This Contract shall constitute the entire agreement between the Parties hereto and supersedes all previous negotiations, commitments and writings with respect to the subject matter hereof and
may not be terminated, discharged, abandoned, canceled or modified in any manner except by
and instrument in writing signed by duly authorized representatives of each of Parties.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 37/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 33 of 52
14. Act of Non-Intervention in Government Transactions
By signing the Contract Agreement the Contractor maintains that he is in no way liable to fallunder or contravene the terms and conditions of Act of Non-Intervention in Government
Transactions passed on 22 Day 1337 (12 January 1959). The Contractor shall sign a written
undertaking to this effect which shall be an integral part of the Contract.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 38/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 34 of 52
15. Use Before Taking Over
If, by reason of any default on the part of the Contractor, Taking-Over certificate has not beenissued in respect of the Works within six Month after the Time for Completion or extended time
as the case may be, the Employer shall be at liberty to use the Works, in respect of which
Taking-Over Certificate has not been issued , provided that the Works, so used as aforesaid shall
be reasonably capable of being used and that the Contractor shall be afforded the earliest
possible opportunity of taking such steps as may be necessary to permit the issue of the Works
Taking-Over Certificate. Exercising above right by the Employer shall not in any way affect the
obligations of the Contractor under the Contract.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 39/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 35 of 52
16. Insurances
Insuring Party in this Contract is the Contractor.Evidence of insurance of the Works shall be submitted by the Contractor to the Employer before
any shipment is effected or any activity started at Site.
Insurance of risk listed in Subparagraph (c) of Sub-Clause 17.3 (Employer’s Risks) shall also be
in the Contractor’s scope of obligation under the Contract. Amount of deductible per occurrence
shall not exceed ten percent of insured occurrence amount.
Insurance of Foreign Supply shall be trough an Iranian insurance company approved by Central
Bank of Iran.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 40/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 36 of 52
17. Annexes to the Particular Conditions
The following documents are annexed to and form an integral part of these Particular Conditions:1. Affidavit concerning Business Activities
2. Declaration concerning the Act of Non-Intervention in Government Transactions
3. Declaration of full acceptance of tender
4. Form of Performance Security
5. Form of Advance Payment Guarantee
6. From of Retention Money Guarantee
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 41/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 37 of 52
Annex 1
“Affidavit Concerning Business Activities”
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 42/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 38 of 52
This AFFIDAVIT should be completed and subscribed and sworn by the Contractor before the
CONSUL IN IRAN OF THE CONTRACTOR’S OWN COUNTRY.
AFFIDAVIT concerning BUSINESS ACTIVITIES in IRAN
IRAN CITY OF ____________________________________________________________ )
EMBASSY OF ____________________________________________________________ )
_______________________________________________________, being first duly sworn,
Name _____________________________________________
deposes and says:
1. I am _________________________________________________________________ of
(Position)
_______________________________________________________________________
(Name of Company or the Contractor)
(the "Company"), having its principal place of business at ________________________
_________________________________________ , which proposes to engage in certain
(City and Country)
Business Activities (the "Business Activities"), whether or not including a written Contract,
with, for, or involving the Government of Iran (the "Government"), or a corporation or other
entity owned or controlled by the Government and I have personal knowledge of the facts
hereinafter referred to.
2. The Business Activities referred to in Paragraph 1 hereof consist of
________________________________________________________________________
(Describe nature of business and/or Contract)
________________________________________________________________________
_______________________________________________________________________
________________________________________________________________________
3. Affiant expressly affirms that it has made no payment , inside or outside Iran , and has no
contract, arrangement, or understanding to make such payment, to any third party (whether as
agent, consultant, finder, broker or otherwise) for which no commensurate services have been
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 43/56
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 44/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 40 of 52
copy of this Affidavit, as signed, in the Record Book maintained by the Consulate in Iran and
to issue a certificate of recording in connection herewith.
_______________________________________
Signature of Affiant
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 45/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 41 of 52
Annex 2
“Declaration Concerning
Act of Non-Intervention in Government
Transactions”
Dated 22 Dey 1337
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 46/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 42 of 52
DECLARATION CONCERNING ACT OF NON-INTERVENTION IN GOVERNMENT
TRANSACTIONS (dated 22 DEY 1337)
In accordance with the attached interpretation of the Non-Intervention ACT We
.................................................. understanding the provisions of the above named Act undertake
to sign the following statement in the event of our being awarded the Contract and to observe in
full the implications of that Act during the period of tendering:
The Contractor states officially that he is not liable to the restriction mentioned in the Act dated
22 Dey 1337. If proved otherwise by National Iranian Steel Company, then National Iranian
Steel Company besides terminating the Contract, shall be empowered to encash the Contractor’s
deposit and guarantee. National Iranian Steel Company shall also assess at its discretion the
damages resulting from nullification and/or hold-up in the execution of the Contract and recover
these by drawing on the Contractor’s belongings.
The Contractor also covenants under no circumstances to take into partnership or share with any
of the individuals referred to in the Act any of the interests of the Contract until the completion
of the Contract and final settlement thereof. Failing which National Iranian Steel Company shall
be entitled to terminate the Contract, encash the Contractor’s guarantee and assess at its
discretion the losses arising from the cancellation and delay in execution of the Contract and
recover same from the Contractor’s properties.
The Contractor undertakes that if during the execution of the Contract any of his partners or
relatives of partners, directors or inspectors, supervisors and/or any of the partners referred to in
Note 1 of Article 1, the total of whose shares or interest and/or capital exceeds 20% shall attain
the position of a Minister or Assistant to the Minister and/or appointed to similar positions in the
National Iranian Steel Company, to report the matter to the National Iranian Steel Company at
once otherwise National Iranian Steel Company shall have the right to cancel the Contract.
In the event of failure on the part of the Contractor to report the case, National Iranian Steel
Company in addition to holding the power to cancel, shall be entitled to encash the Contractor’s
deposit and Letter of Guarantee, to assess directly the damages resulting from cancellation and
delay in execution of the Contract and to recover same from the Contractor’s properties.
Contractor __________________________________________________________________
By _______________________________ Signature ________________________________
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 47/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 43 of 52
Title ______________________________________________________________________
Date ______________________________________________________________________
Address ___________________________________________________________________
INTERPRETATION OF NON-INTERVENTION ACT
DATED 22nd DEY 1337
In compliance with the Iranian Act, dated 22nd Dey 1337, the participation of the following
companies in government transactions is prohibited:
1. The companies which at least five percent of their stocks, capitals or returns belong to one, or
at least twenty percent of their stocks, capitals or returns belong to a few of the following
Iranian persons:
(a) Members of parliament
(b) Members of City Council
(c) Ministers
(d) Ambassadors
(e) Province Governors
(f) Employees of Government, Municipalities or affiliated organizations.
(g) Employees of banks or any organization with major portion or their stocks, capitals or
returns belonging to the Government, Municipalities or affiliated organizations.
(h) Persons who in a way receive salaries from Government Fund or Municipalities.
(i) Managers or employees of Social Aids corporation who are under financial support of
Government, Municipalities or affiliated organizations.
2. The companies which the major portion or their stocks, capitals or returns belong to the above-
mentioned companies.
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 48/56
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 49/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 45 of 52
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 50/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 46 of 52
Annex 4
“Form of Performance Security”
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 51/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 47 of 52
Bank Guarantee Number _____________
On a request made by (*) _________________________________________________________
in connection with Contract for Baft DR & Material Handling Plant Project of National
Iranian Steel Company (whom the Contract defines as the Employer) dated
__________________ concluded between the aforesaid (*) _____________________
(hereinafter called the “Principal”) and National Iranian Steel Company (hereinafter called the
“Beneficiary”), and with a view to secure the good execution of the obligations deriving from the
above mentioned Contract; With a view also to consolidate the obligations therein undertaken by
the Principal.
This bank does hereby irrevocably and unconditionally undertake the following:In case and whenever the Beneficiary makes a claim to the effect that the Principal has somehow
derogated from any of the obligations undertaken by him under the aforementioned Contract;
this bank shall be bound to pay the Beneficiary (or on its order), any amount of money not
exceeding Euro .that may be claimed by the latter and at its discretion.
Such payment shall be made immediately upon receipt of the first intimation in writing whereby
this bank will be informed of such facts; and without there being any need for the
abovementioned interested party to issue any writ or official warrant in support of his claims; nor
to proceed with any further action through administrative or judicial channels; nor through any
other authority in order to prove the merits of such claims; nor shall he be bound to produce any
arguments or evidences in support of same. The present guarantee shall be valid until the closing
hour on (the date 70 days after the expected expiry of the Defects Notification Period for the
Works) ___________________ but may be extended on a request made by the Beneficiary for
any duration of time as indicated by same.
In case the bank is reluctant, or not in a position to extend the present Guarantee; or if the
Principal fails to create favorable circumstances for the extension of same prior to the expiration
of the aforementioned period of time, or if he fails to obtain from the bank an extension of the
guarantee, the bank shall be bound, in all such cases; to pay the Beneficiary (or its Locum
Tenens) the aforementioned amount without there being any need for the interested party to
claim same anew.
Date _______________ Bank’s Authorised Signature _________________
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 52/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 48 of 52
Annex 5
“Form of Advance Payment Guarantee”
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 53/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 49 of 52
We refer to the Contract concluded between National Iranian Steel Company (whom the
Contract defines as the Employer), Tehran/Iran, and …………… on ………… in …………….
for Baft DR & Material Handling Plant Project of National Iranian Steel Company
(hereinafter called the “Beneficiary”) with its principal office at 4th
floor, north tower, No.685,
Valiasr Ave., Tehran, Iran.
We have been informed that ……………………. (hereinafter called the “Principal”) is your
contractor under such Contract and wishes to receive an advance payment, for which the
Contract requires him to obtain a guarantee.
At the request of the Principal, we (name of bank) ……………………. hereby irrevocably and
unconditionally undertake to pay you, the Beneficiary/Employer, any sum or sums not exceedingin total the amount of ………………. (the “guaranteed amount”, say: ……………..) upon
receipt by us of your demand in writing stating that the Principal has failed to fulfil its
obligations under Contract.
The amount of this guarantee shall be reduced by the amounts of the advance payment repaid to
you, as evidenced by your notices issued under sub-clause 14.6 of the General Conditions.
Following receipt (from the Principal) of a copy of each purported notice, we shall promptly
notify you of the revised guaranteed amount accordingly.
Any demand for payment must contain your signature(s) which must be authenticated by your
bankers or by a notary public. The authenticated demand must be received by us at this office on
or before (the date 70 days after the expected expiry of the Time for Completion) …………..
(the “expiry date”), when this guarantee shall expire and shall be returned to us.
We have been informed that the Beneficiary may require the Principal to extend this guarantee if
the advance payment has not been repaid by the date 28 days prior to such expiry date. We
undertake to pay you such guaranteed amount upon receipt by us, within such period of 28 days,
of your demand in writing that the Principal has failed to fulfil its obligations under the Contract
and that this guarantee has not been extended.
This guarantee shall become effective upon receipt of the advance payment by the Principal and
shall be governed by the laws of Iran.
Date _______________ Bank’s Authorised Signature _________________
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 54/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 50 of 52
Annex 6
“Form of Retention Money Guarantee”
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 55/56
Contract No.:Doc No.: TA-143-D00-G-TD003 17-Sep-07 Rev 0
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 51 of 52
We refer to the Contract concluded between National Iranian Steel Company (whom the
Contract defines as the Employer), Tehran/Iran, and …………… on ………… in …………….
for Baft DR & Material Handling Plant Project of National Iranian Steel Company
(hereinafter called the “Beneficiary”) with its principal office at 4th
floor, north tower, No.685,
Valiasr Ave., Tehran, Iran.
We have been informed that ……………………. (hereinafter called the “Principal) is your
contractor under such Contract and wishes to receive early payment of [part of] the retention
money, for which the Contract requires him to obtain a guarantee.
At the request of the Principal, we (name of bank) ……………………. hereby irrevocably and
unconditionally undertake to pay you, the Beneficiary/Employer, in case and whenever theBeneficiary makes a claim to the effect that the Principal has somehow derogated from any of
the obligations undertaken by him under the aforementioned Contract, any sum or sums not
exceeding in total the amount of ………………….(the “guaranteed amount”,
say………………………………..) upon receipt by us of your demand in writing.
Such payment shall be made immediately upon receipt of the first intimation in writing whereby
this bank will be informed of such facts; and without there being any need for the Beneficiary to
issue any writ or official warrant in support of his claims; nor to proceed with any further action
through administrative or judicial channels; nor through any other authority in order to prove the
merits of such claims; nor shall he be bound to produce any arguments or evidences in support of
same.
Any demand for payment must contain your signature(s) which must be authenticated by your
bankers or by a notary public. The authenticated demand must be received by us at this office on
or before (the date 70 days after the expected expiry of the Defects Notification Period for the
Works) ……………………..,(the” expiry date”), when this guarantee shall expire and shall be
returned to us.
We have been informed that the Beneficiary may require the Principal to extend this guarantee if
the Performance Certificate under the Contract has not been issued by the date 28 days prior to
such expiry date. In case the bank is reluctant, or not in a position to extend the present
guarantee; or if the Principal fails to create favourable circumstances for the extension of same
before such period of 28 days, or if he fails to obtain from the bank an extension of the
guarantee, the bank shall be bound, in all such cases; to pay the Beneficiary (or its Locum
7/23/2019 TA-143-D00-G-TD003_0_Particular Conditions.pdf
http://slidepdf.com/reader/full/ta-143-d00-g-td0030particular-conditionspdf 56/56
TARA
TARHE i i T h l i l
NISCO
Baft Steel Complex
DR & Material Handling Plant Project
Particular Conditions Page 52 of 52
Tenens) the aforementioned amount without there being any need for the interested party to
claim same anew.
Date _______________ Bank’s Authorised Signature _________________