SubstationCommissioning

Page 2: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Topics• Project Overview

• Review Work Plan

• Substation Equipment TestingPower Circuit BreakersPower TransformersCapacitors

Page 3: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Project Overview• Reviewing the Work Plan

• Planning and Co-ordinating the Work Plan

• Communicating

• Verifying

• Testing

• Troubleshooting, Re-verifying, Re-testing

• Completing Project Documentation

Page 4: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics
Page 5: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Review the Work Plan

Review the Work Plan

• Identify what’s happening

• Who will be involved?

• Identify Responsibilities

• Review Project Documentation

• Develop Work Sequence

• Identify what’s happening

• Who will be involved?

• Identify Responsibilities

• Review Project Documentation

• Develop Work Sequence

Page 6: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics
Page 7: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics
Page 8: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Power Circuit Breakers

Page 9: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Power Circuit Breaker Guidelines

Test CTs

Measure Coils & Megger

Wiring & Jumpers

Physical Orientation

Verify Prints

Record Nameplate Data

Page 10: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Testing CTs

Ratio, Polarity, & Burden

Open Circuit Excitation

Buzz & Megger Cables

Terminate Hardwired Shorts on Spares

Verify CT circuits only grounded @ one point

Verify Shorting Bar is GROUNDED

Page 11: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Power Circuit Breaker Guidelines

Gas Fill & Measure

Test CTs

Measure Coils & Megger

Wiring & Jumpers

Physical Orientation

Verify Prints

Record Nameplate Data

Page 12: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

SF6 Parameters

Page 13: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Power Circuit Breaker Guidelines

Wiring Checks

Check Timing

Gas Fill & Measure

Test CTs

Measure Coils & Megger

Wiring & Jumpers

Physical Orientation

Verify Prints

Record Nameplate Data

Page 14: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Purpose:

Method:

Analysis:

Breaker Timing

Verifies Breaker Contacts are Opening & Closing within acceptable time limits

Measure Tripping & Closing Times

Contact Velocities & Inter-pole Spread

Page 15: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics
Page 16: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Time (ms)

Time & Travel for Close (Contact Velocity)

Distance

36 mm/ 14 ms =2.57 m/s

Page 17: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Breaker Timing Test Plan

Trip (Both Trip Coils)

Close w/ X Coil Included

Reclose using each Trip Coil

Trip-Free using each Trip Coil

Close w/ X Coil Excluded

Page 18: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Breaker Timing

Start w/ a Close Shot TC1 Reclose

Trip & Trip Free on TC1 App note 7 close

(Move leads to TC2)

App note 7 reclose w/TC2 connected

Trip & Trip Free on TC2

PCB Open PCB Closed

All done with only 8 operations

Page 19: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Power Circuit Breaker Guidelines

Wiring Checks

Energy Storage Checks

Primary Contact Resistance

Check Timing

Gas Fill & Measure (after 24 hrs)

Test CTs

Measure Coils & Hand Megger

Wiring & Jumpers

Physical Orientation

Verify Prints

Record Nameplate Data

Page 20: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Energy Storage Systems

Spring Pressure Rundown Checks

Spring Discharge

Overnight Sag

Motor Start/Stop

Low Spring Alarm

Operation Block

Page 21: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Energy Storage Systems

Temperature Compensated

SF6 Purity & Moisture

Gas Density Checks

Page 22: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics
Page 23: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Power Circuit Breaker Guidelines

Wiring Checks

Final Moisture

Accessory and Alarm Checks

Operational Checks / Load Overall

Power Factor

Energy Storage

Primary Contact Resistance

Check Timing

Gas Fill & Measure

Test CTs

Measure Coils & Megger

Wiring & Jumpers

Physical Orientation

Verify Prints

Record Nameplate Data

Final Checks

Page 24: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Final Checks

Trip Checks - Local & RemoteAlarms & Indications - Local & Remote - SCADA CT Final ChecksBridge & Dummy Load PT Circuits

Gas PressuresGround Switches Open / All Relays in Service

Hi-Pot w/ System Voltage

Close PCB & Pick-up Load

Page 25: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

QuickTime™ and aH.264 decompressor

are needed to see this picture.

Page 26: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

PCB Final Checks

Trip Checks - Local and RemoteAlarms - Local & Remote - SCADA

CT Final ChecksBridge & Dummy Load PT Circuits

Gas PressuresGround Switches Open / All Relays in Service

Hi-Pot w/ System Voltage

In Service Checks

Close PCB & Pick-up Load

Page 27: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics
Page 28: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Power Transformers

Page 29: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Transformer Testing Guidelines

Oil Processing / Sample

Test CTs

Hand Meggering

Wiring & Jumpers

Physical Orientation

Auxiliary Components

Record Nameplate Data

Insulation Power Factor

Page 30: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Insulation Power Factor

Page 31: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Insulation Power Factor

Capacitive Current Leakage Current

Capacitance represents ability to store energy when voltage is applied

Dissipated energy and heating from applied voltage across insulation

Measuring Dielectric Loss

Page 32: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Insulation Power Factor

Here it is Ratio of Dielectric Losses to Total Power supplied, or ratio of leakage current to total current.Example: Total Power = 460 mVA with 3.3 mW : Calculated % PF = 0.72

% Power Factor in general: Ratio of Watts to Total Power

Page 33: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Insulation Power Factor

• Grounded Specimen Test (Ground)

Page 34: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

• Grounded Specimen Test w/ LV guarded out (Guard)

Insulation Power Factor

Page 35: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

• Un-grounded Specimen Test (UST)

Insulation Power Factor

Page 36: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

• Ground, Guard, & UST

Insulation Power Factor

Page 37: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Ground

Page 38: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Guard

Page 39: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

UST

Page 40: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Ground

Page 41: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Guard + UST

Page 42: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Excitation Current

Page 43: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Excitation Current

Page 44: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics
Page 45: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Bushings

Page 46: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Bushings

Higher Voltages have potential taps w/ C2 > C1. Check Nameplate before applying voltages. Megger Bushing and its tap if no PF test set is available.

Page 47: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Transformer Testing Guidelines

Insulation Power Factor

Winding Ratio, Polarity

Oil Processing/ Sample

Test CTs

Hand Meggering

Wiring & Jumpers

Physical Orientation

Auxiliary Components

Record Nameplate Data

Page 48: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Winding Ratio, Polarity

Purpose: Checks Turns Ratio & Polarity on all tap connections

Method: TTR Test Set continually through all taps.

Analysis: Measured Ratio and Nameplate should match

very closely (0.2%)

Measured Ratio will be slightly lower than calculated due to slight losses in TTR test set.

Shorted turns & high contact resistance indicated by high excitation current. Ratio error greater

than 0.2% will be easily noted.

Page 49: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Transformer Testing Guidelines

Insulation Power Factor

Winding Ratio, Polarity

Oil Processing/ Sample

Test CTs

Hand Meggering

Wiring & Jumpers

Physical Orientation

Auxiliary Components

Record Nameplate Data

Impedance

Page 50: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Measuring Impedance

Purpose:

Method:

Analysis:

Detect shipping damage & basis for future tests

Compare with Nameplate at Nominal Taps

Useful for determining core and coil shifting, loose or high resistance connections

Page 51: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Measuring Impedance

Page 52: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Measuring Impedance

In General:

3 Phase wye-wye or wye-delta

3 Phase delta-delta

Zero-sequence

Page 53: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Transformer Testing Guidelines

Insulation Power Factor

Winding Ratio, Polarity

Oil Processing/ Sample

Test CTs

Hand Meggering

Wiring & Jumpers

Physical Orientation

Auxiliary Components

Record Nameplate Data

Impedance

Calibrate Temperature

Page 54: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics
Page 55: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Transformer Testing Guidelines

Insulation Power Factor

Winding Ratio, Polarity

Oil Processing/ Sample

Test CTs

Hand Meggering

Wiring & Jumpers

Physical Orientation

Auxiliary Components

Record Nameplate Data

Impedance

Calibrate Temperature

Bump Fans & Pumps

Bushing Pot Devices

DC Winding ResistanceMegger Core Ground &

WindingsTrip Checks

Page 56: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics
Page 57: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Capacitors

Page 58: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Testing Capacitors (Impedance)Start with Nameplate rating on

Can: 200 KVAR @ 22800 V

I = kVAR / kVI = 200 / 22.8 = 8.77 A

Xc (per can) = I / jw(C)Xc (per can) = 22800 / 8.77 = 2600 Ohms

C = 1 / 377 (Xc)C = 1 / 377 (2600) = 1.02 microF

Each Can is then rated @ 1.02 microF

Q (kVar)= V I sin (theta)

= V / I

Page 59: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

C (meas) = I (meas) / V (meas) * 377

Number of Cells in Test?

100.58 0.859 22.6100.44 0.867 22.8100.56 0.860 22.6

Vmeas Imeas Cmeas

with V (meas) @ 100V, measure I

221.02 * 22 = 22.4 microF Cap. per layer

Testing Capacitors (Cont’d)

Build Data Sheet

22.4 0.2 0.8922.4 0.4 1.7922.4 0.2 0.89

Ccalc d %d

Page 60: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Rack Wiring

Page 61: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

• Compare Schematics w/ Wiring Prints

• Buzz point to point

• Check Diodes

• Contact Makeups

• Test Switches

• Terminal Blocks

• Jumpers

• Wiggle Check Connections

Wiring Checks

Page 62: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Relay Testing

Page 63: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

In Service Checks

Page 64: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

In Service Checks• Pre-determine the measurements.

• Cutout your TRIPS

• Magnitude and polarity of each current and voltage (phase angle and rotation)

• Look for quantities where you do and don’t expect them to be.

• Open CTs & Shorted CTs

• Wrong Ratios

• Neutral Connections

• Proper Potentials

• Document your Reference Potential &

Page 65: Substation Commissioning - etouches · PDF fileSubstation Commissioning. Topics

Stay SAFE...

Thank you for joining us.