SUBSTATION AUTOMATION (FROM CONVENTIONAL SUBSTATION TO GSM/CDMA AUTOMATION SYSTEM) PREPARED BY GOPALA KRISHNA PALEPU ADE/400KV/ VS/HYD [email protected], Mobile:9440336984

Substation Automation

Embed Size (px)

Citation preview

Page 1: Substation Automation

SUBSTATION AUTOMATION(FROM CONVENTIONAL SUBSTATION TO GSM/CDMA AUTOMATION SYSTEM)

PREPARED BYGOPALA KRISHNA PALEPU

ADE/400KV/ VS/[email protected],

Mobile:9440336984

Page 2: Substation Automation

From substation control and protection to Fibre optics based Substation.

Fibre optics based Substation to GSM /CDMA based Substation Automation.

From modern to intelligent Substation Automation

System Architectures

Functional Structures

Application examples

Features and Benefits

Page 3: Substation Automation

IT based solution for protection and control offer cost effective measures to counteract large area system disturbances.

Effective fault location is mandatory for faster finding and fixing of problems.

Integrated numerical protection & control allows automated power restoration and load shedding.

On-line condition monitoring reduces maintenance costs and enables.

Substation Automation offers a cost effective infrastructure for implementing on-line condition monitoring of assets.

Voltage instability prediction is a new approach for early indication voltage collapses and enables to work plants and systems harder.

Integrated asset management improves overall utility performance and productivity.

Page 4: Substation Automation

General Principles of Substation Automation

The general principles of the substation operation have not changed, since their developing days. Therefore the control and protection tasks remain the same.

The objective of modern substation automation (SA) is to solve these tasks in a more efficient and economical way by using state of the art information technologies (IT) and to provide more functionality to work plant and systems harder.

Page 5: Substation Automation

CONVENTIONAL SUBSTATIONPRACTICES

PREPARED BYGOPALA KRISHNA PALEPU

ADE/400KV/ VS/[email protected],

Mobile:9440336984

Page 6: Substation Automation

CONVENTIONAL SUBSTATION1. Very Wide Cabling. i.e. from equipment to BMB/CTMB/CVT MB and from BMB/CTMB/CVT MB to

Control Room Dedicated Device.2. For each function Dedicated Device.I. Bay Control – Control Panels for the Bay

Circuit Breaker Control & Indication.Isolator Control & Indication.Earth Switch Indication.DC & AC Healthy Indication and Testing.Annunciation facia for Troubles.Panel Meters & Energy Meter.

II. Bay Protection – Relay & Protection Panels - Protective Relays of Concerned bayCircuit Breaker Relay Panel (A/R, LBB, TSR, CB Troubles, Master Trip Relays etc).Line Protection Panel (21L1, 21L2, 67, 59-1, 59-2, 50 Stub, 87 Teed-1, 87 Teed-2 etc).ICT Protection Panel (87T1, 87T2, 67HV, 67IV, 50O/L, 99HV, 99IV etc).Reactor Protection Panel (87R, 64R, 21R, 87Teed-1, 87Teed-2 etc).

III. Bus Bar Protection – Entire Substation Protection - Each Voltage Level Bus Bar Protection PanelsHigh Impedance Bus Bar Protection With Main & Check Panels for each Bus.Medium Impedance Bus Bar Protection Panels for each Bus.Low Impedance Bus Bar Protection Panels for Each Bus.Numerical Bus Bar Protection Panels for Centralised or Distributed Architecture.Redundant Numerical Bus Bar Protection for each Voltage Level.

III. Fault Recorder – Disturbance Recorder - For each Bay stand alone Disturbance RecorderLine, Transformer/ICT, Reactor & Bus bar

III. Event Recorder – SOE / EL / ER for all BaysThe Operation of all Equipments & Protective relays will be shown in a sequence with millisecond resolution. This is Time Synchronised with GPS.

IV. RTU – Remote Terminal UnitFor Monitoring the Substation information from Load Dispatch Centre

Page 7: Substation Automation

CONVENTIONAL CONTROL & PROTECTIONPr

oces

sLe

vel

Bay

Leve

lSt

atio

n Le

vel

GIS or AISSwitchgear

1-89B ISO

1-52 CB 1-89LE ES1-89L ISO

1-89A ISO

1

3

8

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

Fault Recording

Indactic 650 Indactic 650 Indactic 650

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

BAY CONTROL RELAY REC316*4

1

ABBABB Network Partner

REL316*4

2

4

3

5

6

7

8

9

12

11

13

14

15

16

10

LOCAL CONTROL METERING

LINE PROTECTION RELAY REL316*4

1

ABBABB Network Partner

REL316*4

2

4

3

5

6

7

8

9

12

11

13

14

15

16

10

BUSBAR PROTECTION REB500

ABBABB Network Partner

REB500

-Q1

=W1

=W2

FERMER

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

c

c

Veriosn4.2b

Bay Protection

LocalMarshalling

Boxes

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

Busbar ProtectionSCADA

RTU=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

ON/OFF

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

ON/OFF

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

ON/OFF

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

Indactic 650

Indactic 650

Indactic 650

Indactic 650

Event Recording

Bay Control

=D04+R01225kV LIGNE ABOBO 1ABB

ABB

-Q2SEL

-Q1SEL

-Q0SEL

=W1

=W2

FERMEROUVRIR

EXEESC

LAMPETESTE

DISTANCELOC

ABB ABB ABB

1-CT1-CVT

BMB/BMK/SyMB CT MB/JBCVT MB/JB

Page 8: Substation Automation

SUBSTATIONMONITORING

SYSTEM(Next Development)

PREPARED BYGOPALA KRISHNA PALEPU

ADE/400KV/ VS/[email protected],

Mobile:9440336984

Page 9: Substation Automation

SUBSTATION MONITORING SYSTEM1. Still Very Wide Cabling. i.e. from equipment to BMB/CTMB/CVT MB and from BMB/CTMB/CVT MB to

Control Room Dedicated Device.2. For each function Dedicated Device and some functions are Integrated due to Numerical Advantage.I. Bay Control – Control Panels for the Bay

Circuit Breaker Control & Indication.Isolator Control & Indication.Earth Switch Indication.DC & AC Healthy Indication and Testing.Annunciation facia for Troubles.Panel Meters & Energy Meter.

II. Bay Protection – Relay & Protection Panels - Protective Relays of Concerned bayCircuit Breaker Relay Panel (A/R, LBB, TSR, CB Troubles, Master Trip Relays etc).Line Protection Panel (21L1, 21L2, 67, 59-1, 59-2, 50 Stub, 87 Teed-1, 87 Teed-2 etc).ICT Protection Panel (87T1, 87T2, 67HV, 67IV, 50O/L, 99HV, 99IV etc).Reactor Protection Panel (87R, 64R, 21R, 87Teed-1, 87Teed-2 etc).

III. Bus Bar Protection – Entire Substation Protection - Each Voltage Level Bus Bar Protection PanelsNumerical Bus Bar Protection Panels for Centralised or Distributed Architecture.LBB is part of Bus Bar ProtectionRedundant Numerical Bus Bar Protection for each Voltage Level.

III. Fault Recorder – Disturbance Recorder - For each Bay stand alone Disturbance RecorderLine, Transformer/ICT, Reactor & Busbar – Part / Inbuilt Function of Numerical Relays

III. Event Recorder – SOE / EL / ER for all Bays – Inbuilt function of Numerical RelaysIV. RTU – Remote Terminal Unit

For Balance Events not Covered by Protective relays are wired to RTU.V. All are connected to System and from system to communication Media to ALDCVI. FBS – Fall Back Switch – FSK/NSK Modem.

Communication Media to ALDC / SLDC for Transfer of Data and Monitoring the Data from SLDC.

Page 10: Substation Automation

SUBSTATION MONITORING SYSTEMPr

oces

sLe

vel

Bay

Leve

lSt

atio

n Le

vel

GIS or AISSwitchgear

1-89B ISO

1-52 CB 1-89LE ES1-89L ISO

1-89A ISO

Bay Protection

LocalMarshalling

Boxes

Busbar ProtectionBay

Control=D04+R01225kV LIGNE ABOBO 1ABB

ABB

-Q2SEL

-Q1SEL

-Q0SEL

=W1

=W2

FERMEROUVRIR

EXEESC

LAMPETESTE

DISTANCELOC

ABB ABB ABB

1-CT1-CVT

BMB/BMK/SyMB CT MB/JBCVT MB/JB

InterbaybusStar coupler

d gi t al

Tx2

Rx1

Tx1

500SCM01

Rx3

Tx3

Rx2

Tx2

Rx1

Tx1 di gi t al

NCC / RCC

SCADA- SMS

ABBPower Automation AG COM581

C

CommunicationConverter

ABB Power Automation AG RER111

500SCM01

Rx3

Tx3

Rx2

Tx2

Rx1

Tx1

500SCM01

Rx3

Tx3

Rx2

Tx2

Rx1

Tx1

500SCM

01

Rx3

Tx3

Rx2

Tx2

Rx1

Tx1

500SCM01

Rx3

Tx3

Rx2

FBS

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

SCADARTU

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

ON/OFF

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

ON/OFF

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

ON/OFF

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

BAY CONTROL RELAY REC316*4

1

ABBABB Network Partner

REL316*4

2

4

3

5

6

7

8

9

12

11

13

14

15

16

10

LOCAL CONTROL METERING

LINE PROTECTION RELAY REL316*4

1

ABBABB Network Partner

REL316*4

2

4

3

5

6

7

8

9

12

11

13

14

15

16

10

BUSBAR PROTECTION REB500

ABBABB Network Partner

REB500

-Q1

=W1

=W2

FERMER

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

c

c

Veriosn 4.2b

Page 11: Substation Automation

COMMUNICATION: LEVELS OF SUBSTATION CONTROL

& AUTOMATION

Switchgear

Control Centre Level

Process Level

Bay Level

Substation Level

Page 12: Substation Automation

SUBSTATIONAUTOMATION

SYSTEM(Stage-1 Development)

PREPARED BYGOPALA KRISHNA PALEPU

ADE/400KV/ VS/[email protected],

Mobile:9440336984

Page 13: Substation Automation

SUBSTATION AUTOMATION SYSTEM(STAGE-1)1. This system is exciting Conventional System to convert Remote Control System.2. This is same as Substation Monitoring System.3. Additionally One More RTU is Provided for Remote Control & Operation.4. Normally RTU Having 3 Types of cards

1. Analog Input Card - To Monitor the Analog Values 2. Digital Input Card – To Monitor the Status of Equipment3. Digital Output Card – To Control & Operation of Substation Equipment

5. Exciting RTU for only Monitoring the Substation from Remote Control Station exclusively for ALDC / SLDC / RLDC / NLDC.

6. Without disturbing the exciting RTU the following works are carried.7. All Controls of Circuit Breakers & Isolators are Brought to RTU to Control Card.8. All Status of Circuit Breakers & Isolators are Brought to RTU to Digital Card.9. Each Bay is provided with Multifunction Meters. They are connected in Modbus

configuration and brought to network.10. Transformer OTI, WTI, Online DGA & Tap Changer Positions information is available in 4-

20mA. They are brought to RTU Analog Card.11. Switch yard is fixing with no of Digital Cameras and focusing the major equipment to View

the yard and this is having a facility to slow motion moving round to cover all the Major equipments. This also put in Network to Monitor from remote/ Local

12. The RTU, Energy Meters, MFM and Digital Cameras are connected in Network in Ethernet Switch and to Station Control System and connected to Modem & Router to Remote Control Center.

13. The Operator, those who are sitting at Remote control Center having a System and he can Monitor the substation and take a decision for any thing.

14. This is Stage-1 Substation Control System.

Page 14: Substation Automation

SUBSTATION AUTOMATION SYSTEM (STAGE-1)

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Proc

ess

Leve

lB

ayLe

vel

Stat

ion

Leve

l

GIS or AISSwitchgear

1-89B ISO

1-52 CB 1-89LE ES1-89L ISO

1-89A ISO

Bay Protection

LocalMarshalling

Boxes

Bay Control

1-CT1-CVT

BMB/BMK/SyMB CT MB/JBCVT MB/JB

InterbaybusStar coupler

d gi ta l

Tx2

Rx1

Tx1

500SCM01

Rx3

Tx3

Rx2

Tx2

Rx1

Tx1 di gi tal

NCC / RCC

SCADA- SCS

ABBPower Automation AG COM581

C

CommunicationConverter

ABB Power Automation AG RER111

500SCM01

Rx3

Tx3

Rx2

Tx2

Rx1

Tx1

500SCM01

Rx3

Tx3

Rx2

Tx2

Rx1

Tx1

500SCM01

Rx3

Tx3

Rx2

Tx2

Rx1

Tx1

500SCM01

Rx3

Tx3

Rx2

FBS

=D04+R01225kV LIGNE ABOBO 1ABB

ABB

-Q2SEL

-Q1SEL

-Q0SEL

=W1

=W2

FERMEROUVRIR

EXEESC

LAMPETESTE

DISTANCELOC

ABB ABB ABB

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

BAY CONTROL RELAY REC316*4

1

ABBABB Network Partner

REL316*4

2

4

3

5

6

7

8

9

12

11

13

14

15

16

10

LOCAL CONTROL METERING

LINE PROTECTION RELAY REL316*4

1

ABBABB Network Partner

REL316*4

2

4

3

5

6

7

8

9

12

11

13

14

15

16

10

BUSBAR PROTECTION REB500

ABBABB Network Partner

REB500

-Q1

=W1

=W2

FERMER

c

c

Veriosn4.2b

Busbar Protection

TOALDC / SLDC / RLDC

RTU RTU=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

ON/OFF

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

ON/OFF

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

ON/OFF

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

ON/OFF

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

ON/OFF

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

ON/OFF

Page 15: Substation Automation

SUBSTATIONAUTOMATION

SYSTEM(Stage-2 Development)

PREPARED BYGOPALA KRISHNA PALEPU

ADE/400KV/ VS/[email protected],

Mobile:9440336984

Page 16: Substation Automation

SUBSTATION AUTOMATION SYSTEM(STAGE-2)1. This system is adopted for New Substations, at the time of tendering.2. This is same as Substation Monitoring System except new IED is introduced in a Panel. It is

called Bay Control Unit.3. This Replaces additional one More RTU for Remote Control & RTU for ALDC / SLDC / RLDC /

NLDC as if it is new Substation.4. The Bay Control Unit IED is one unit per Bay and it is Provided in CB Relay Panel.5. This is almost RTU, but limited to one Bay and nothing but Mini RTU / Distributed RTU.6. All Controls & Status of Circuit Breakers & Isolators and Circuit Breaker Troubles and Alarms

are Brought to BCU of Particular Bay in addition to Conventional Control Panel.7. Each Bay is provided with Energy Meters &Multifunction Meters. They are connected in

Modbus configuration and brought to network. The control panel also having Panel Meters.8. Transformer OTI, WTI, Online DGA & Tap Changer Positions information is available in 4-

20mA. They are brought to BCU Analog Card.9. Transformer Troubles and Alarms and are brought to BCU Digital Card. 10. Transformer Tap Changer Control is brought to BCU Control Card.11. Switch yard is fixing with no of Digital Cameras and focusing the major equipment to View the

yard and this is having a facility to Move in slow motion, around the bay to cover all the Major equipments. This also put in Network to Monitor from remote/ Local.

12. The Numerical IEDs , Energy Meters, MFM and Digital Cameras are connected in Network in Ethernet Switch and to Station Control System and connected through Gateway to Remote Control Center and ALDC / SLDC / RLDC / NLDC.

13. The Operator, those who are sitting at Remote control Center having a System and he can Monitor the substation and take a decision for any thing.

14. This is Stage-2 Substation Control System. 15. Still Extensive Wide cabling and conventional Control Panels existing.

Page 17: Substation Automation

SUBSTATION AUTOMATION SYSTEM (STAGE-2)Pr

oces

sLe

vel

Bay

Leve

lSt

atio

n Le

vel

GIS or AISSwitchgear

1-89B ISO

1-52 CB 1-89LE ES1-89L ISO

1-89A ISO

Bay Protection

LocalMarshalling

Boxes

Bay Control

1-CT1-CVT

BMB/BMK/SyMB CT MB/JB CVT MB/JB

Inter bay busStar coupler

Tx2

Rx1

Tx1

500SCM01

Rx3

Tx3

Rx2

Tx2

Rx1

Tx1

NCC / RCC

SCADA- SCS

ABBPower Automation AG COM581

C

CommunicationConverter

d gi ta l

di gi tal

ABB Power Automation AG RER111

500SCM01

Rx3

Tx3

Rx2

Tx2

Rx1

Tx1

500SCM01

Rx3

Tx3

Rx2

Tx2

Rx1

Tx1

500SCM01

Rx3

Tx3

Rx2

Tx2

Rx1

Tx1

500SCM01

Rx3

Tx3

Rx2

=D04+R01225kV LIGNE ABOBO 1ABB

ABB

-Q2SEL

-Q1SEL

-Q0SEL

=W1

=W2

FERMEROUVRIR

EXEESC

LAMPETESTE

DISTANCELOC

ABB ABB ABB

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

Busbar Protection

TOALDC / SLDC / RLDC

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

BAY CONTROL RELAY REC316*4

1

ABBABB Network Partner

REL316*4

2

4

3

5

6

7

8

9

12

11

13

14

15

16

10

LOCAL CONTROL METERING

LINE PROTECTION RELAY REL316*4

1

ABBABB Network Partner

REL316*4

2

4

3

5

6

7

8

9

12

11

13

14

15

16

10

BUSBAR PROTECTION REB500

ABBABB Network Partner

REB500

-Q1

=W1

=W2

FERMER

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

c

c

Veriosn4.2b

? LOCALREMOTE

SETOPERATION

M

M

M

CommunicationGate way

FBS TO REMOTE CONTROL CENTER

Page 18: Substation Automation

SUBSTATIONAUTOMATION

SYSTEM(Stage-3 Development)

Distributed Control Room using Bay Kiosks or say Portable Relay Rooms

PREPARED BYGOPALA KRISHNA PALEPU

ADE/400KV/ VS/[email protected],

Mobile:9440336984

Page 19: Substation Automation

SUBSTATION AUTOMATION SYSTEM (STAGE-3)1. This system is adopted for New Substations, at the time of tendering.2. This is Distributed Control Rooms using Bay Kiosks and called Portable Relay Rooms.3. In this Conventional Control Panel is not required.4. The Bay Control Unit IED is one unit per Bay and it is Provided in CB Relay Panels for Control & Monitoring.5. This is almost RTU, but limited to one Bay and nothing but Mini RTU.6. All Controls & Status of Circuit Breakers & Isolators and Circuit Breaker Troubles and Alarms are Brought to

BCU of Particular Bay.7. Each Bay is provided with Energy Meters &Multifunction Meters. They are connected in Modbus

configuration and brought to network. 8. Transformer OTI, WTI, Online DGA & Tap Changer Positions information is available in 4-20mA. They are

brought to BCU Analog Card.9. Transformer Troubles and Alarms and are brought to BCU Digital Card. 10. Transformer Tap Changer Control is brought to BCU Control Card.11. Switch yard is fixing with no of Digital Cameras and focusing the major equipment to View the yard and this

is having a facility to Move in slow motion, around the bay to cover all the Major equipments. This also put in Network to Monitor from remote/ Local.

12. The Numerical IEDs , Energy Meters, MFM and Digital Cameras are connected in Network in Ethernet Switch and to Station Control System and connected through Gateway to Remote Control Center and ALDC / SLDC / RLDC / NLDC.

13. The Operator, those who are sitting at Remote control Center having a System and he can Monitor the substation and take a decision for any thing.

14. This is Stage-3 Substation Control System. 15. Still Extensive Wide cabling between Bay Kiosks/PRR to Switch yard equipment. But cables reduced to 60%

to 80%.16. The Main Control Room Having only Network system with Printer and Aux System Monitoring.17. But still Auxiliary system Location is Not Distributed and Centralised. This concept is not changing.18. All IEDs are connected to Fibre Optic cable and Ethernet Switches. Even if FO cables damaged, still

protection function is working and it is unable to Monitor and control from Control Room / RCC / ALDC / SLDC.

Page 20: Substation Automation

BAY LEVEL AUTOMATION (STAGE-3)

Interbay Bus

ABB Network Partner AG

C

E

COM581

Network ControlCenter NCC

-Q1

-Q0 -Q8-Q9

-Q2

Proc

ess

Leve

lB

ayLe

vel

Stat

ion

Leve

l

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

BAY CONTROL RELAY REC316*4

1

ABB ABB Network Partner REL316*4

2

43

5678

9

1211

13141516

10

LOCAL CONTROL METERING

LINE PROTECTION RELAY REL316*4

1

ABB ABB Network Partner REL316*4

2

43

5678

9

1211

13141516

10

BUSBAR PROTECTION REB500

ABB ABB Network Partner REB500

ABB

=D04 ABOBO 1

-Q2SEL

-Q1SEL

-Q0SEL

=W1

=W2

FERMEROUVRIR

EXEESC

LAMPETESTE

DISTANCE

LOC

ABBPOWER MONITORING UNIT

? LOCALREMOTE

SETOPERATION

M

M

M

Page 21: Substation Automation

BAY LEVEL AUTOMATION (STAGE-3)

Mainstream Hardware

Features

Mainstream Software platformsIntegrated SA System• Control (BCU)• Monitoring (BCU)• Metering (BCU)• Protection (BPU)• DR (BPU)• SOE / ER (BCU+BPU)• Billing (TVM/EM)• etc.Open SystemTCP / IP Ethernet communicationUsing fibre optic mediafor communicationCompact designDecentralised system structurecloser to processDistributed Control RoomsOr called Bay KiosksOr called Portable Relay RoomsNo conventional mimic board

Less inventories and spare partsBenefits

Less training & FamiliarisationLess Hardware and panelsLess operation and maintenancecostsMore availabilityMinimising outage breaksIntegration of third-party equipmentLess cabling and installation costsLess testing and commissioningcostsLess space and civil works

Page 22: Substation Automation

HIGHLIGHTS BAY LEVEL SAFeatures

Numerical Protection (BPU)

Numerical Control (BCU)

Benefits

Safe interlocking

Self supervision

Modern MMI / HMI

Operator guidance

Maintenance support

Easy to use and to customise

Efficient operation• Avoiding errors• Less hazards and breaks• Reduction of operation costs

Increasing availability

Reducing maintenance costs

Higher power quality

Page 23: Substation Automation

ENHANCED FUNCTIONALITY OF BAY LEVEL SAFeatures

Process status information

On-line Primary equipmentmonitoring

Benefits

SA System status information

Events and Alarms evaluation

Disturbance records

Trends and calculations

Reports

Better planning• more timely data

Efficient trouble shooting

All information at one glance

Better monitoring

Efficient asset management

Supports operation decisions

Page 24: Substation Automation

SUBSTATIONAUTOMATION

SYSTEM(Stage-4 Development)PROCESS LEVEL INTELLIGENT SUBSTATION

AUTOMATION

PREPARED BYGOPALA KRISHNA PALEPU

ADE/400KV/ VS/[email protected],

Mobile:9440336984

Page 25: Substation Automation

SUBSTATION AUTOMATION SYSTEM (STAGE-4)1. This system is adopted for New Substations, at the time of tendering.2. This is Distributed IEDs for each Switch Yard Equipment for Operation and Maintenance.This is

Called Process Bus Automation.3. Non Conventional Instrument Transformers for Voltage and Current Measurement . 4. In this Distributed Control Rooms / Bay Kiosks / Portable relay Rooms are not required.5. One complete Panel for one Bay. All control, Protection IEDs TVM/EM are available. 6. No Physical wiring from Switch Yard to Bay to Control. Total Fibre Optic Ethernet connection and

IEC61850 Communication. 7. No Cable Trenches. No DC Leakage. 8. But Centralised Auxiliary System and Physical Cabling to all Bay switch yard equipment and relays

and other accessory systems.9. Switch yard is fixing with no of Digital Cameras and focusing the major equipment to View the yard

and this is having a facility to Move in slow motion, around the bay to cover all the Major equipments. This also put in Network to Monitor from remote/ Local.

10. The Numerical IEDs , Energy Meters, MFM and Digital Cameras are connected in Network in Ethernet Switch and to Station Control System and connected through Gateway to Remote Control Center and ALDC / SLDC / RLDC / NLDC.

11. The Operator, those who are sitting at Remote control Center having a System and he can Monitor the substation and take a decision for any thing.

12. This is Stage-4 Substation Control System called Process Bus Substation Automation System. 13. Civil Engineering Cost in the yard reduces Drastically.14. The Main Control Room Having only Network system with Printer and Aux System Monitoring.15. But still Auxiliary system Location is Centralised, but Not Distributed. This concept is not changing.16. Redundant, alternative communication channels are required to safe guard if FO cable damages.17. The reliability of system Depends on availability of Fibre Optic System.

Page 26: Substation Automation

INTELLIGENT SA ARCHITECTURENetwork ControlCenter NCC

Interbay Bus

ABB Network Partner AG

C

E

COM581

Process Bus

PIS

A

PISA A

PISA B

PISA

A

-Q1

-Q2

-Q51

-Q0 -T1 -Q9 -Q8

Proc

ess

Leve

lB

ayLe

vel

Stat

ion

Leve

l

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

BAY CONTROL RELAY REC316*4

1

ABB ABB Network Partner REL316*4

2

43

5678

9

1211

13141516

10

LOCAL CONTROL METERING

LINE PROTECTION RELAY REL316*4

1

ABB ABB Network Partner REL316*4

2

43

5678

9

1211

13141516

10

BUSBAR PROTECTION REB500

ABB ABB Network Partner REB500

ABB

=D04 ABOBO 1

-Q2SEL

-Q1SEL

-Q0SEL

=W1

=W2

FERMEROUVRIR

EXEESC

LAMPETESTE

DISTANCE

LOC

ABBPOWER MONITORING UNIT

? LOCAL

REMOTE

SET

OPERATION

M

M

M

DISTANCE

LOC

ABB POWER MONITORING UNIT

EM

Page 27: Substation Automation

IMPLEMENTATION OF INTELLIGENT SAS

t

i i t l

Intelligent Primary Equipment

Interbay busEthernet Switches

d gi tal

di gi tal

NCC / RCC

MicroSCADA

ABBPower Automation AG COM581

C

CommunicationConverter

COM 581 -Q1

-Q0

-Q8

Feed

er M

arsh

allin

g

-Q9

-Q2PISA

PISAA

PISAB

PISA A

-Q1 -Q2

-Q51

-Q0

-T1

-Q9

-Q8

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

BAY CONTROL RELAY REC316*4

1

ABB ABB Network Partner REL316*4

2

43

5678

9

1211

13141516

10

LOCAL CONTROL METERING

LINE PROTECTION RELAY REL316*4

1

ABB ABB Network Partner REL316*4

2

43

5678

9

1211

13141516

10

BUSBAR PROTECTION REB500

ABB ABB Network Partner REB500

ABB

=D04 ABOBO 1

-Q2SEL

-Q1SEL

-Q0SEL

=W1

=W2

FERMEROUVRIR

EXEESC

LAMPETESTE

DISTANCE

LOC

ABBPOWER MONITORING UNIT

? LOCAL

REMOTE

SET

OPERATION

M

M

M

ProcessBus

Page 28: Substation Automation

INTELLIGENT SASABB

Inter bay bus 1Inter bay bus 2Phase L1

PISA

PISA

PISA PISA

PISA A

PISAA

PISAB

Abgangsschutz I

Feldleitgerät

Abgangsschutz II

Line Protection 1

Bay Controller

Line Protection 2

Bus Bar Protection

Star Coupler

Process Bus

Sensors forcurrent &voltage measurement

Actuator forcircuit breakercontrol

Actuator forisolator & earthingswitch control

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

BAY CONTROL RELAY REC316*4

1

ABB ABB Network Partner REL316*4

2

43

5678

9

1211

13141516

10

LOCAL CONTROL METERING

LINE PROTECTION RELAY REL316*4

1

ABB ABB Network Partner REL316*4

2

43

5678

9

1211

13141516

10

BUSBAR PROTECTION REB500

ABB ABB Network Partner REB500

ABB

=D04 ABOBO 1

-Q2SEL

-Q1SEL

-Q0SEL

=W1

=W2

FERMEROUVRIR

EXEESC

LAMPETESTE

DISTANCE

LOC

ABBPOWER MONITORING UNIT

? LOCAL

REMOTE

SET

OPERATION

M

M

M

Page 29: Substation Automation

INTELLIGENT SA: FEATURES AND BENEFITSFeatures

Bus (serial) communicationto primary equipment

Benefits

Further reduction in yardcabling and installation costs

More information from primaryequipment

Operation enhancements

Reducing operation and maintenance costs

Intelligent primary equipment

Sampling and signal processinglocally in primary equipment

Less primary equipment costs

Less project execution time

Page 30: Substation Automation

SUBSTATIONAUTOMATION

SYSTEM(Stage-5 Development)PROCESS LEVEL INTELLIGENT SUBSTATION

AUTOMATION WITH GSM / CDMA NETWORK

PREPARED BYGOPALA KRISHNA PALEPU

ADE/400KV/ VS/[email protected],

Mobile:9440336984

Page 31: Substation Automation

SUBSTATION AUTOMATION SYSTEM (STAGE-5)1. This system is adopted for New Substations, at the time of tendering.2. This is Distributed IEDs for each Switch Yard Equipment for Operation and Maintenance. This is

Called Process Bus Automation.3. Non Conventional Instrument Transformers for Voltage and Current Measurement . 4. In this Distributed Control Rooms / Bay Kiosks / Portable relay Rooms are not required.5. One complete Panel for one Bay. All control, Protection IEDs TVM/EM are available. 6. No Physical wiring from Switch Yard to Bay to Control. Total GSM/CDMA connection and IEC61850

Communication. 7. But Centralised Auxiliary System and Physical Cabling to all Bay switch yard equipment and relays

and other accessory systems.8. Switch yard is fixing with no of Digital Cameras and focusing the major equipment to View the yard

and this is having a facility to Move in slow motion, around the bay to cover all the Major equipments. This also put in Network to Monitor from remote/ Local.

9. The Numerical IEDs , Energy Meters, MFM and Digital Cameras are connected in Network in Ethernet Switch and to Station Control System and connected through Gateway to Remote Control Center and ALDC / SLDC / RLDC / NLDC.

10. The Operator, those who are sitting at Remote control Center having a System and he can Monitor the substation and take a decision for any thing.

11. This is Stage-5 Substation Control System called Process Bus Substation Automation System. 12. Civil Engineering Cost in the yard reduces Drastically.13. The Main Control Room Having only Network system with Printer and Aux System Monitoring.14. But still Auxiliary system Location is Centralised, but Not Distributed. This concept is not changing.15. Redundant, alternative communication channels are required with GSM / CDMA.16. The reliability of system Depends on availability of GSM / CDMA.

Page 32: Substation Automation

INTELLIGENT GSM/CDMA SA ARCHITECTURE

TO RCC/ALDC/SLDC

ABB Network Partner AG

C

E

COM581

PIS

A

PISA A

PISA B

PISA

A

-Q1

-Q2

-Q51

-Q0 -T1 -Q9 -Q8

Proc

ess

Leve

lB

ayLe

vel

Stat

ion

Leve

l

? LOCALREMOTE

SETOPERATION

M

M

M

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

BAY CONTROL RELAY REC316*4

1

ABBABB Network Partner

REL316*4

2

4

3

5

6

7

8

9

12

11

13

14

15

16

10

LOCAL CONTROL METERING

LINE PROTECTION RELAY REL316*4

1

ABBABB Network Partner

REL316*4

2

4

3

5

6

7

8

9

12

11

13

14

15

16

10

BUSBAR PROTECTION REB500

ABBABB Network Partner

REB500

DISTANCE

LOC

ABB POWER MONITORING UNIT

ABB

=D04 ABOBO 1

-Q2

SEL

-Q1

SEL

-Q0

SEL

=W1

=W2

FERMEROUVRIR

EXEESC

LAMPE

TESTE

? LOCALREMOTE

SETOPERATION

M

M

M

EM

GSM CDMAGSM CDMA

GSM

CDMA

GSM

CDMA

GSM CDMA

Page 33: Substation Automation

IMPLEMENTATION OF CDMA / GSM INTELLIGENT SAS

t

i i t l

Intelligent Primary Equipment

d gi tal

di gi tal

NCC / RCC

MicroSCADA

ABBPower Automation AG COM581

C

CommunicationConverter

COM 581 -Q1

-Q0

-Q8

Feed

er M

arsh

allin

g

-Q9

-Q2PISA

PISAA

PISAB

PISA A

-Q1 -Q2

-Q51

-Q0

-T1

-Q9

-Q8

=D04+R01225kV LIGNE ABOBO 1ABB

125VDC Distributuion Battery A 125VDC Distributuion Battery B

BAY CONTROL RELAY REC316*4

1

ABB ABB Network Partner REL316*4

2

43

5678

9

1211

13141516

10

LOCAL CONTROL METERING

LINE PROTECTION RELAY REL316*4

1

ABB ABB Network Partner REL316*4

2

43

5678

9

1211

13141516

10

BUSBAR PROTECTION REB500

ABB ABB Network Partner REB500

ABB

=D04 ABOBO 1

-Q2SEL

-Q1SEL

-Q0SEL

=W1

=W2

FERMEROUVRIR

EXEESC

LAMPETESTE

DISTANCE

LOC

ABBPOWER MONITORING UNIT

? LOCAL

REMOTE

SET

OPERATION

M

M

M

GSM

CDMA

GSM

CDMA

GSM

CDMA

GSM

CDMA

GSM

CDMA

Page 34: Substation Automation

ADVANTAGES OF SUBSTATION AUTOMATION

SYSTEMPREPARED BY

GOPALA KRISHNA PALEPUADE/400KV/ VS/HYD

[email protected], Mobile:9440336984

Page 35: Substation Automation

ADVANTAGES OF SA

PLANNING

ENGINEERING

PROTECTION

MAINTENANCE

Real-time Analysis that Avoids Interruptions

Precise and Confident Operator Decisions in Restoring Service

Reduction in the Need for Costly Field Visits

More Effective Long Term Planning & Loading Decisions

Page 36: Substation Automation

ADVANTAGES OF SUBSTATION AUTOMATION1. LOCAL & REMOTE GRAPHICAL VISUALISATION OF ELECTRICAL

DIAGRAMS OF BAY & SYSTEM VIEWS.2. ALARM PAGES & SOE ARE DISPLAYED AND PRINTABLE. 3. TREND WINDOWS: SEVERAL CURVES CAN BE FULLY

CUSTOMISED BY THE OPERATOR.4. CONTROL WITH THE “SELECT-BEFORE OPERATE” SECURITY

COMMANDS.5. SAVING OF HISTORICAL FILES.6. SYSTEM CONFIGUARATION SCREEN.7. TIME SYNCHRONISATION8. MONITORING OF CIRCUIT BREAKER.9. MONITORING OF TRANSFORMER.10. MONITORING OF CTs, PTs, & CVTs.11. MONITORING OF RELAYS, ENERGY METERS & PANEL METERS.12. CONFIGUARATION OF RELAYS13. DISTURBANCE RECORD VIEW.14. MONITORING OF SWITCH YARD SURVELLIANCE SYSTEM.15. MONITORING OF NETWORK16. MONITORING OF PLCC / OLTE EQUIPMENT & COMMUNICATION.

Page 37: Substation Automation

UTILISATION OF SUBSTATION AUTOMATION

6. SECURITYA.LIVE CAMERAB.SURVELLIANCE SYSTEMC. ENTRY LOG

7. INFORMATION TECHA. Web Browser ViewB. Commissioning Via Web

ViewC. Advanced IT TechD. MessagesE. Notes

5. ENGINNERINGA.VOLTAGE CONTROLB.FREQUENCY CONTROLC. LOAD CONTROLD. VAR CONTROLE. GRID CONTROLF. POWER SYSTEM

ANALYSIS (LOAD FLOW)G. HARMONIC ANALYSISH. SYSTEM STABILITYI. ABT ANALYSISJ. GENERATION CONTROL

4. COMMUNICATIONSA.Analog PLCCB.Digital PLCCC. FIBRE OPTICD. DIGITAL MICROWAVEE. VSATF. DIDICATED

COMMUNICATIONG. MUX H. CHANNEL AIDED

PROTECTIONI. DATA TRANSMISSION

3. OPERATIONS:A. STATION DIAGRAMB. ALARMSC. SOE / ERD. METERING VALUESE. ICT/ EQUIP PARAMETERSF. HISTORYG. SOEH. DISTURABANCE REPORT

& ANALYSIS.

2. CONTROL&PROTECTIONA.CONTROL (BCU)B.METERING (BCU)C.PROTECTIONS (BPU)D. PROTECTION DIAGRAMSE. CONFIGUARATIONF. DISTURBANCE

RECORDERG. ENERY METERSH. ANALYSIS OF FAULTI. GPSJ. RTU

1. MAINTANENCEA. TRANSFORMERSB. BREAKERSC. CTsD. PTs &CVTsE. LAsF. ISOLATORS

Page 38: Substation Automation

MONITORING OF

SUBSTATION IN

SMS/SCS/SAPREPARED BY

GOPALA KRISHNA PALEPUADE/MRT(PROTECTION)

PREPARED BYGOPALA KRISHNA PALEPU

ADE/400KV/ VS/[email protected],

Mobile:9440336984

Page 39: Substation Automation

Advanced analysistools

Alarm Classes

GPS

Universal Timesynchronization

User friendlyvisualization

# Of trips

Sequence of Events

Automatic printingSummary report

CONCISE / FAST Distance to Fault

IED Parameter

CE

Mo 12. 11. 96 GMT 17:02.43.305

Ayer Rajah & Labrador Feeder One

Bay

CE

RF

IO

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

ABB Network Partner AG REL 316*4

C

E

MONITORING via IEDs for PROTECTION

Page 40: Substation Automation

Smart Screen “Wizards”• One Line Diagrams • Event Logger • IED Faceplate• IED Tabular Values• Annunciator Panel• Alarm List with Sorting Feature• Trending

Page 41: Substation Automation

Substation Level Supervision• Single line diagram

– U, I =>”fast”

– P, Q, E => “slow”

• Overview pictures

– P, Q, => “slow”

• Customised measurements

– P,Q, E

– Summation

– Minimum / maximum

– Average values

– Lists

– Bar charts

– etc. upon request

Page 42: Substation Automation

MAMIDIPALLY SS DISPLAY

Page 43: Substation Automation

SUBSTATION DISPLAY (400KV SIDE)

AKVMWMVAR

AKVMWMVAR

AKVMWMVAR

AKVMWMVAR

AKVMWMVAR

AKVMWMVAR

AKVMWMVAR

AKVMWMVAR

AKVMWMVAR

TAP TAP TAP

F1 F2 F3 F4 F5 F6

Page 44: Substation Automation

SUBSTATION DISPLAY (220KV SIDE)

AKVMWMVAR

TAP

AKVMWMVAR

TAP

AKVMWMVAR

TAP

AKVMWMVAR

F1 F2

AKVMWMVAR

AKVMWMVAR

F3 F4

AKVMWMVAR

Page 45: Substation Automation

SUBSTATION DISPLAY (220KV SIDE)AKVMWMVAR

TAP

AKVMWMVAR

TAP

AKVMWMVAR

TAP

AKVMWMVAR

AKVMWMVAR

AKVMWMVAR

AKVMWMVAR

AKVMWMVAR

AKVMWMVAR

F1 F2 F3 F4 F5 F6

Page 46: Substation Automation

SOE RECORDER EVENTS LIST

Page 47: Substation Automation

• Time stamped to nearest milli-second• Synchronizable to GPS via IRIG-B• Automatic retrieval from IED to Host• Storage on host disk• Automatically forward to operations PC• Data sort capability included

– Standard filters•Time•Device Type•Alarm Condition

– Custom filters per your needs

Monitors and Records all System Event Characteristics

Page 48: Substation Automation

ALARM PROCESSING

Persisting and fleeting alarms

Recording and time stamping of alarms

Page 49: Substation Automation

• Configurable Alarm Conditions– Any present value can drive an alarm– Set range of operation • Failure Alarms

– Equipment generated– System generated– Grouped per IED

Remote Communicationof Critical Alarms

Alarm Annunciation Panel

Page 50: Substation Automation

TREND CURVES

Page 51: Substation Automation

TREND PARAMETERS

Page 52: Substation Automation

Recording of Trends and Alarm Generation

Upper Alarm (A)hysteresis

Upper warning (W)

Lower warning

Lower alarm

A W

Page 53: Substation Automation

ABB DISTURBANCE RECORDER

Page 54: Substation Automation

ABB Diagnostic: Fault Recording and Evaluation

Automatic Fault Location Printout

Page 55: Substation Automation

ALSTOM DISTURBANCE RECORDER

Page 56: Substation Automation

ALSTOM DISTURBANCE RECORDER

Page 57: Substation Automation

DISTURBANCE RECORDER

Page 58: Substation Automation

GE Oscillography/Fault Reporting

Page 59: Substation Automation

SIEMENS Disturbance Recorder

Page 60: Substation Automation

SIEMENS Disturbance Recorder Analysis

Page 61: Substation Automation

BASLER – DISTURBANCE RECORDER

Page 62: Substation Automation

NXT-PHASE DISTURBANCE RECORDER

Page 63: Substation Automation

SUBSTATION AUTOMATION

Base System

ServiceModem

Network Partner SSLTA 88SRS485M SREDU/MSRS485M

RS232 RS485 RS485SERVICE

1MRSC600291MRSC600281MRSC600281MRSC600281MRSC600281MRSC600281MRSC60028

Rugged Com/Equivalent Ethernet Switches forming ‘Redundant Managed switched Ethernet LAN on fiber optic medium Interbay bus on IEC61850 Communication Gate way with hot standby for RCC and SLDC’ For Control and Protection Relays.

Network Partner SSLTA 88SRS485M SREDU/MSRS485M

RS232 RS485 RS485SERVICE

1MRSC600291MRSC600281MRSC600281MRSC600281MRSC600281MRSC600281MRSC60028

AlarmUnit

AlarmUnit

Ethernet (TCP/IP)

Printer Server

Alarm/EventLine Printer

Aux

iliar

yA

larm

Ann

unci

atio

nBase System

DM PrinterFor 15 Min Metering &

Trends

HardcopyPrinter +

MFD

POWER

V1

OVP

LOCKACQR SATELLITE CONTROLLED CLOCKGPS 166

NORMAL OPERATIONWED 11.12.1996MEZ 11.42.25SV 24 > SYN

MENUCLRACK NEXT INC

MEINBERG

GPSMeinberg

? LOCAL

REMOTE

SET

OPERATION

M

M

M

? LOCAL

REMOTE

SET

OPERATION

M

M

M

? LOCAL

REMOTE

SET

OPERATION

M

M

M

? LOCAL

REMOTE

SET

OPERATION

M

M

M

? LOCAL

REMOTE

SET

OPERATION

M

M

M

? LOCAL

REMOTE

SET

OPERATION

M

M

M

12345678

910111213141516

CE

12345678

910111213141516

CE

12345678

910111213141516

CE

12345678

910111213141516

CE

12345678

910111213141516

CE

12345678

910111213141516

CE

ABB Network Partner AG

CE

910111213141516

910111213141516

910111213141516

CE

ABB Network Partner AGREL511

CE

ABB Network Partner AG REL531

CE

ABB Network Partner AG REL531

910111213141516

910111213141516

910111213141516

910111213141516

910111213141516

910111213141516

RCC LDC

COMMUNICATION GATEWAY TORCC & ALDC

Engineering & DRwork Station

LAPTOP

OTH

AVR

HYDRANEM

EM

EM

EM

EM

EM

EM

EM

EM

DIGITALPLCC/OLTE

SYSTEM

CARRPROT

SYSTEM

CARRPROT

SYSTEM

CARRPROT

SYSTEM

CARRPROT

SYSTEM

CARRPROT

SYSTEM

CARRPROT

SYSTEM

2 Ports for RCC & 2 Ports for ALDC/SLDC

DIGITALPLCC/OLTE

SYSTEM

DIGITALPLCC/OLTE

SYSTEM

OTH

AVR

HYDRAN

OTH

AVR

HYDRAN

Page 64: Substation Automation

CONTROL & RELAY PANELS IN

CONVENTIONAL SYSTEM

PREPARED BYGOPALA KRISHNA PALEPU

ADE/MRT(PROTECTION)

PREPARED BYGOPALA KRISHNA PALEPU

ADE/400KV/ VS/[email protected],

Mobile:9440336984

Page 65: Substation Automation

400KV INTEGRATED CONTROL PANELS

Page 66: Substation Automation

79 + 25(AUTO RECLOSURE + CHECK SYNC RELAY)

50 Z(LBB / BFR)

4RLA

CB TROUBLE ALARAM AND TRIP RELAYS

TSRTC-1

TSRTC-1I

DCI & II

86 GR -A1-PH TRIPRELAYS -6FOR 21M1

86 GR -B1-PH TRIPRELAYS -6FOR 21M2

BREAKERMULTIPLICATION RELAY

UNDER VOLTAGE

RELAY

D/T CH-1 RECEIVERELAYS

D/T CH-2 RECEIVERELAYS

400KV LINE CB RELAY & PROTN PANEL

79 + 25(AUTO RECLOSURE + CHECK SYNC RELAY)

50 Z(LBB / BFR)

4RTB

CB TROUBLE ALARAM AND TRIP RELAYS

TSRTC-1

TSRTC-1I

DCI & II

86 GR -A1-PH TRIPRELAYS -6FOR 21M1

86 GR -B1-PH TRIPRELAYS -6FOR 21M2

BREAKERMULTIPLICATION RELAY

D/T CH-1 RECEIVERELAYS

D/T CH-2 RECEIVERELAYS

21 MAIN 1

21 MAIN 2

DC

-1

DC

-1I

4RLB

59 L1O/V STG-1

59 L2O/V STG-1i

87 LOWTEED-2

21 MAIN 1AUX RELYS

21 MAIN 1iAUX RELYS

87 HIGHTEED-1

Page 67: Substation Automation

79 + 25(AUTO RECLOSURE + CHECK SYNC RELAY)

50 Z(LBB / BFR)

4RLA

CB TROUBLE ALARAM AND TRIP RELAYS

TSRTC-1

TSRTC-1I

DCI & II

86 GR -A1-PH TRIPRELAYS -6FOR 21M1

86 GR -B1-PH TRIPRELAYS -6FOR 21M2

BREAKERMULTIPLIC

ATION RELAY

UNDER VOLTAGE

RELAY

D/T CH-1 RECEIVERELAYS

D/T CH-2 RECEIVERELAYS

400KV LINE + R CB RELAY & PROTN PANEL

79 + 25(AUTO RECLOSURE + CHECK SYNC RELAY)

50 Z(LBB / BFR)

4RTB

CB TROUBLE ALARAM AND TRIP RELAYS

TSRTC-1

TSRTC-1I

DCI & II

86 GR -A1-PH TRIPRELAYS -6FOR 21M1

86 GR -B1-PH TRIPRELAYS -6FOR 21M2

BREAKERMULTIPLICATION RELAY

D/T CH-1 RECEIVERELAYS

D/T CH-2 RECEIVERELAYS

21 MAIN 1

21 MAIN 2

DC

-1

DC

-1I

4RLC

59 L1O/V STG-1

59 L2O/V STG-1i

87 LOWTEED-2

21 MAIN 1AUX RELYS

21 MAIN 1iAUX RELYS

87 HIGHTEED-1

87 MAIN HIGH IMP

21 IMPDISTANCE

DC

-1

DC

-1I

4RLRB

75 A75 B75 L

64 REFHIGH SPEED

AUX TRIPRELAYS

Page 68: Substation Automation

400KV ICT HV + IV CB RELAY & PROTN PANEL

50 Z(LBB / BFR)

4RTRA

CB TROUBLE ALARAM AND TRIP RELAYS

TSRTC-1

TSRTC-1I

DCI & II

86 GR -A 86 GR -B

BREAKERMULTIPLICATION RELAY

INTER TRIP RECEIVERELAYS

INTER TRIP RECEIVERELAYS

87 MAIN 1LOW IMP

87 MAIN 2HIGH IMP

DC

-1

DC

-1I

4RTRB

87 HIGHTEED-1

87 LOWTEED-2

75 A75 B75 L

75 A75 B

67 HV 67 IV

99THV O/F

99TIV O/F

ICT / ATF TROUBLESALARAM & TRIP FLAG RELAYS

AUX RLYSFOR HV

AUX RLYSFOR IV

HIGH SPEED AUX TRIPRELAYS

50 Z(LBB / BFR)

4RTRC

CB TROUBLE ALARAM AND TRIP RELAYS

TSRTC-1

TSRTC-1I

DCI & II

86 GR -A 86 GR -B

BREAKERMULTIPLICATION RELAY

AUX RLYS INTER TRIP

RECEIVE

AUX RLYS INTERTRIP RECEIVE

Page 69: Substation Automation

400KV BUS REACTOR CB RELAY & PROTN PANEL

79 + 25(AUTO RECLOSURE + CHECK SYNC RELAY)

50 Z(LBB / BFR)

4RTB

CB TROUBLE ALARAM AND TRIP RELAYS

TSRTC-1

TSRTC-1I

DCI & II

86 GR -A1-PH TRIPRELAYS -6FOR 21M1

86 GR -B1-PH TRIPRELAYS -6FOR 21M2

BREAKERMULTIPLICATION RELAY

D/T CH-1 RECEIVERELAYS

D/T CH-2 RECEIVERELAYS

87 MAIN HIGH IMP

21 IMPDISTANCE

DC

-1

DC

-1I

4RBRB

75 A75 B

64 REFHIGH SPEED

AUX TRIPRELAYS

87 HIGHTEED-1

87 LOWTEED-2

50 Z(LBB / BFR)

4RBRA

CB TROUBLE ALARAM AND TRIP RELAYS

TSRTC-1

TSRTC-1I

DCI & II

86 GR -A 86 GR -B

BREAKERMULTIPLICATION RELAY

Page 70: Substation Automation

400KV BUSBAR PROTECTION & COMMON CONTROL PANEL4RBB2 BBM1 + 96 UNITS 4RBB3 BBM2 + 96 UNITS

Page 71: Substation Automation

CONTROL & RELAY PANELS IN

SUBSTATION AUTOMATION

SYSTEMPREPARED BY

GOPALA KRISHNA PALEPUADE/MRT(PROTECTION)

PREPARED BYGOPALA KRISHNA PALEPU

ADE/400KV/ VS/[email protected],

Mobile:9440336984

Page 72: Substation Automation

400KV & 220KV BUSBAR & COMMON CONTROL PANEL

BCU1 BCU2

BUSBARCENTRAL UNIT

4RBB

DC-1DC-289

BB

1A

E C

MR

89B

B2

AE

CM

R BusBarAux

relays

BCU3

BUSBARCENTRAL UNIT

2 RBB

DC-1

DC-2

BCU1 BCU2

89B

B1

AE

CM

R

89B

B2

AE

CM

R BusBarAux

relays

Page 73: Substation Automation

400KV LINE + REACTOR CB RELAY & PROTN PANEL

BAY1 BCU

4RLA

A/R+SC79+25

LBB/ BU50Z

CB TROUBLES& ALARMS

TRIP COIL1 & 2

HEALTHYLEDS

86 GR-A

186R1,Y1,B1R2,Y2,B2

DC

-1

86 GR-B

286R1,Y1,B1R2,Y2,B2 D

C-2

CB PB

9650Z

4RLB

21L1

21L2

59-1&2

D/T-1ReceiveRelays

D/T-2ReceiveRelays

BAY2 BCU

4RTB2

A/R+SC79+25

LBB/ BU50Z

CB TROUBLES& ALARMS

TRIP COIL1 & 2

HEALTHYLEDS

86 GR-A

186R1,Y1,B1R2,Y2,B2

DC

-1

86 GR-B

286R1,Y1,B1R2,Y2,B2 D

C-2

CB PB50 ZT

4RLRC1/RBR3

87R

64R

75A,B,L

Reactor TroubleAlarms & Trips

21R

99R

Page 74: Substation Automation

400KV ICT CB RELAY & PROTN PANEL

MFM

BAY3 BCU

4RTRA3

LBB/ BU50Z

CB TROUBLES& ALARMS

TRIP COIL1 & 2

HEALTHYLEDS

86 GR-A

DC

-1

86 GR-B D

C-2

CB PB

InterTrip

Relays

96/50Z

4RTRB3

87T1

87T2

75A,B,L 75A,B

Transformer TroubleAlarms & Trips

67HV 67IV

99HV 99IV

MFM

LV BAY BCU

4RTRC3

LBB/ BU50Z

CB TROUBLES& ALARMS

TRIP COIL1 & 2

HEALTHYLEDS

86 GR-A

DC

-1

86 GR-B D

C-2

CB PB

InterTrip

Relays

96/ 50Z

BAY2 BCU

4RTB2

A/R+SC79+25

LBB/ BU50Z

CB TROUBLES& ALARMS

TRIP COIL1 & 2

HEALTHYLEDS

86 GR-A

186R1,Y1,B1R2,Y2,B2

DC

-1

86 GR-B

286R1,Y1,B1R2,Y2,B2 D

C-2

CB PB50 ZT

Page 75: Substation Automation

220KV FEEDER CB RELAY & PROTN PANEL

MFM

BAY1 BCU

2RLA1

A/R+SC79+25

LBB/ BU50Z

CB TROUBLES& ALARMS

TRIP COIL1 & 2

HEALTHYLEDS

86 GR-A

186R1,Y1,B1R2,Y2,B2

DC

-1

86 GR-B

286R1,Y1,B1R2,Y2,B2 D

C-2

CB PBTTS

96 /50Z

2RLB1

21L1

21L2

D/T-1ReceiveRelays

D/T-2ReceiveRelays

75A75B

Page 76: Substation Automation

220KV BC, TBC & BS CB RELAY & PROTN PANELS

BC BCU

2RBC

LBB/ BU50Z

CB TROUBLES& ALARMS

TRIP COIL1 & 2

HEALTHYLEDS

86 GR-A

DC

-1

86 GR-B D

C-2

CB PB

LBB/ BU50Z

50/51 A,BC,N

96 50Z

TBC BCU

2RTBC

LBB/ BU50Z

CB TROUBLES& ALARMS

TRIP COIL1 & 2

HEALTHYLEDS

86 GR-A

186R1,Y1,B1R2,Y2,B2

DC

-1

86 GR-B

286R1,Y1,B1R2,Y2,B2 D

C-2

CB PB

96 50Z

A/R+SC79+25

BS BCU

2RBC

LBB/ BU50Z

CB TROUBLES& ALARMS

TRIP COIL1 & 2

HEALTHYLEDS

86 GR-A

DC

-1

86 GR-B D

C-2

CB PB

LBB/ BU50Z

50/51 A,BC,N

96 50Z

Page 77: Substation Automation

SUBSTATION AUXILIARIES & TERMINAL PANELS

AlarmUnit

Network PartnerSSLTA 88 SRS485M SREDU/MSRS485M

RS232 RS485 RS485SERVICE

1MRSC60029 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028

Ethernet Switch

Base System

ABB Network Partner AG

CE

COM581

CommunicationGateway

AlarmUnit

Network PartnerSSLTA 88 SRS485M SREDU/MSRS485M

RS232 RS485 RS485SERVICE

1MRSC60029 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028

Ethernet Switch

Hot Standby

Main Server Redunt Server

Line Printer forAlarm / Event Metering Values

DOT Matrix Printer

ABB Network Partner AG

CE

COM581

Router toALDC/SLDC

BCU1 BCU2

BCU3 BCU4

BCU5 BCU6

BCU7 BCU8

BCU9 BCU10

SSAUX

For AC 415V

System-1

For AC 415V

System-2

For DC220V

System-1

For DC220V

System-2

For DC48V

System-1

For DC48V

System-2

For AirconditionSystem

For FireFightingSystem

For DieselGenerator

System

For fire& SmokeDetector

ABB Network Partner AG

CE

COM581

Surveillancesystem

Page 78: Substation Automation

SUBSTATION AUTOMATION

Base SystemServiceModem

Network Partner SSLTA 88SRS485M SREDU/MSRS485M

RS232 RS485 RS485SERVICE

1MRSC600291MRSC600281MRSC600281MRSC600281MRSC600281MRSC600281MRSC60028

Rugged Com/Equivalent Ethernet Switches forming ‘Redundant Managed switched Ethernet LAN on fiber optic medium Interbay bus on IEC61850 Communication Gate way with hot standby for RCC and SLDC’ For Control and Protection Relays.

Network Partner SSLTA 88SRS485M SREDU/MSRS485M

RS232 RS485 RS485SERVICE

1MRSC600291MRSC600281MRSC600281MRSC600281MRSC600281MRSC600281MRSC60028

AlarmUnit

AlarmUnit

Ethernet (TCP/IP)

Printer Server

Alarm/EventLine Printer

Aux

iliar

yA

larm

Ann

unci

atio

nBase System

DM PrinterFor 15 Min Metering &

Trends

HardcopyPrinter +

MFD

POWER

V1

OVP

LOCKACQR SATELLITE CONTROLLED CLOCKGPS 166

NORMAL OPERATIONWED 11.12.1996MEZ 11.42.25SV 24 > SYN

MENUCLRACK NEXT INC

MEINBERG

GPSMeinberg

? LOCAL

REMOTE

SET

OPERATION

M

M

M

? LOCAL

REMOTE

SET

OPERATION

M

M

M

? LOCAL

REMOTE

SET

OPERATION

M

M

M

? LOCAL

REMOTE

SET

OPERATION

M

M

M

? LOCAL

REMOTE

SET

OPERATION

M

M

M

? LOCAL

REMOTE

SET

OPERATION

M

M

M

12345678

910111213141516

CE

12345678

910111213141516

CE

12345678

910111213141516

CE

12345678

910111213141516

CE

12345678

910111213141516

CE

12345678

910111213141516

CE

ABB Network Partner AG

CE

910111213141516

910111213141516

910111213141516

CE

ABB Network Partner AGREL511

CE

ABB Network Partner AG REL531

CE

ABB Network Partner AG REL531

910111213141516

910111213141516

910111213141516

910111213141516

910111213141516

910111213141516

RCC LDC

COMMUNICATION GATEWAY TORCC & ALDC

Engineering & DRwork Station

LAPTOP

OTH

AVR

HYDRANEM

EM

EM

EM

EM

EM

EM

EM

EM

DIGITALPLCC/OLTE

SYSTEM

CARRPROT

SYSTEM

CARRPROT

SYSTEM

CARRPROT

SYSTEM

CARRPROT

SYSTEM

CARRPROT

SYSTEM

CARRPROT

SYSTEM

2 Ports for RCC & 2 Ports for ALDC/SLDC

DIGITALPLCC/OLTE

SYSTEM

DIGITALPLCC/OLTE

SYSTEM

OTH

AVR

HYDRAN

OTH

AVR

HYDRAN

Page 79: Substation Automation

POWER GRID CHINA SAS

Page 80: Substation Automation

SAS in POWER GRID, INDIA – SEONI (WR)

Page 81: Substation Automation

IEC 61850 RELAY MODELS OF DIFFERENT MANUFACTURERS

B 90,T 60 L 60, L 90D 90, D 60F 60D 25,C90+, F650

GE MULTILIN

SIPROTEC 7 SS 52

SIPROTEC7UT 633/13/2

SIPROTEC7SD 522/61_

SIPROTEC7SA 522/6..

SIPROTEC7SJ 62/3/4

SIPROTEC6MD 66/3

SIEMENS ( SIPROTEC )

SEL 487B

SEL 487E

SEL 387L

SEL 421

SEL 451

SEL 451-4SEL

GRB 100/150GRT 100GRL

100 / 150GRZ 100GRD 140GRD 150TOSHIBA

MICOM P44 2/3/4

REL 670

DISTANCE21

MICOMP141

REX 521REF 615

FEEDER67

MICOM P543/547

RED 670

LINE DIFFERENTIAL

87 L

MICOM C264

REC 670

BAY CONTROL

UNIT

MICOM P633/P643

RET 670

DIFFERENTIAL87 T

MICOM P74 1/3/6AREVA

REB 670REB 500ABB

BUSBAR87 BBMANUFACTURERS

Page 82: Substation Automation

BAY LEVEL SUBSTATION AUTOMATIONDECENTRALIZED ARCHITECTURE -

DISTRIBUTED CONTROL ROOMS USING BAY KIOSKS CALLED PORTABLE RELAY ROOMS.

BAY-ORIENTED CONCEPT –EACH BAY PROVIDED WITH BAY KIOSKS/ PORTABLE RELAY ROOMS.

DISTRIBUTED INTELLIGENCE –EACH BAY PROVIDED WITH CONTROL IEDs (BCUs) FOR CONTROL & MONITORING FUNCTIONS. EACH BAY PROVIDED WITH PROTECTION IEDs (BPUs) FOR PROTECTION.

DECENTRALIZED FUNCTIONS.USING IEC 61850 (UNIVERSAL) SUBSTATION AUTOMATION PROTOCOL.IT IS CALLED BAY LEVEL SUBSTATION AUTOMATION.

Page 83: Substation Automation

PRESENT STATUS OF IMPLEMENTATION OF

SUBSTATION AUTOMATION SYSTEM

IN APTRANSCO IS

DISTRIBUTED CONTROL ROOMS USING BAY KIOSKS

CALLED PORTABLE RELAY ROOMS

USING IEC 61850 (UNIVERSAL)

SUBSTATION AUTOMATION PROTOCOL.

THIS IS CALLED BAY LEVEL

SUBSTATION AUTOMATION