10
viewrail.com For more information or installation help, go to www.youtube.com/Viewrail Torque Wrench (Provided) 5/16 Hex Bit (Provided) Torque (Provided) Socket (Provided) Drill & 1/2” Drill Bit Tape Measure Level Items You’ll Need Ensure a clean flat surface is available to work on. DO NOT mount to any compressable material. (eg. carpet, drywall, etc.) Ensure all hardware & tools are present. Before You Begin Straight Stringer Installation Guide

Straight Stringer Installation Guide...Straight Stringer Installation Guide Match the beveled header plate holes to the stringer holes. Use torque wrench to tighten in Repeat sequence

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

  • 1211

    109

    Pull cable out and mark 3/4” be-yond in side face of post.

    Repeat Steps 9 & 10 to the rest of the posts.

    Tension following this sequence.

    Tension following this sequence.Tension following this sequence.

    8Repeat Steps 1-6 until all posts in run are filled.

    7

    viewrail.com

    For more information or installation help, go to www.youtube.com/Viewrail

    Torque Wrench (Provided)5/16 Hex Bit (Provided)Torque (Provided)Socket (Provided)Drill & 1/2” Drill BitTape MeasureLevel

    Items You’ll Need

    Ensure a clean flat surface is available to work on.DO NOT mount to any compressable material. (eg. carpet, drywall, etc.)Ensure all hardware & tools are present.

    Before You Begin

    Straight Stringer Installation Guide

  • Match the beveled header plate holes to the stringer holes.

    Repeat sequence to 65 lb-ft.Use torque wrench to tighten in sequence to 40 lb-ft.

    Match the beveled footplate holes to the stringer holes.

    Locate a sticker that tells you which end you are working with.

    65

    43

    21

  • 1211

    109

    Pull cable out and mark 3/4” be-yond in side face of post.

    Repeat Steps 9 & 10 to the rest of the posts.

    Tension following this sequence.

    Tension following this sequence.Tension following this sequence.

    8Repeat Steps 1-6 until all posts in run are filled.

    7

    Thread the bolts so they are finger tight.

    Insert locator pins to hold the tread bracket in place.

    Secure the header plate with a bolt to hold the stringer in place.

    Lift the stringer into place, lining up the holes.

    Predrill with a 1/2” Drill bit.Use the provided drawing to mark the header plate dimensions.

    1211

    109

    87

  • 65

    43

    2For an angled run, start at the bottom.

    For an angled run, start at the bottom.

    For an angled run, start at the bottom.

    For an angled run, start at the bottom.

    For an angled run, start at the bottom.

    1

    6For an angled run, start at the bottom.

    If not level, use the stringer shim to adjust until level, then cut. Pre- drill through the head plate holes.

    Ensure the tread is level on the tread bracket.

    Use one tread to test.

    Torque in sequence to 70 lb-ft.Torque in sequence to 50 lb-ft.

    1817

    1615

    1413

  • 1211

    109

    Pull cable out and mark 3/4” be-yond in side face of post.

    Repeat Steps 9 & 10 to the rest of the posts.

    Tension following this sequence.

    Tension following this sequence.Tension following this sequence.

    8Repeat Steps 1-6 until all posts in run are filled.

    7

    Populate the first tread holes with hanger bolts.

    Refer to steps 11-14 to install the remaining tread brackets.

    2423

    2221

    2019

  • 65

    43

    2For an angled run, start at the bottom.

    For an angled run, start at the bottom.

    For an angled run, start at the bottom.

    For an angled run, start at the bottom.

    For an angled run, start at the bottom.

    1

    6For an angled run, start at the bottom.Mark a center line on the nosing mounting block.

    Use the provided small screws to fasten the tread bracket cover.

    Ensure all treads are leveled. Adjust as needed.

    Populate the tread holes with tread screws.

    Using a nut and washer, tighten the tread to the tread bracket.

    3029

    2827

    2625

  • 1211

    109

    Pull cable out and mark 3/4” be-yond in side face of post.

    Repeat Steps 9 & 10 to the rest of the posts.

    Tension following this sequence.

    Tension following this sequence.Tension following this sequence.

    8Repeat Steps 1-6 until all posts in run are filled.

    7

    Mount using a 5/16” x 6” Wood Screw in a center hole.

    Align the mounting block center-line with the headboard centerline.

    Transfer the center line to the headboard.

    Position and level the nosing in the desired location.

    Mark a center line on the side of the nosing.

    Drill four evenly spaced holes along the center line.

    3635

    3433

    3231

  • Fasten the remaining screws.Adjust until leveled.

    41

    4039

    3837

  • 1211

    109

    Pull cable out and mark 3/4” be-yond in side face of post.

    Repeat Steps 9 & 10 to the rest of the posts.

    Tension following this sequence.

    Tension following this sequence.Tension following this sequence.

    8Repeat Steps 1-6 until all posts in run are filled.

    7

  • 65

    43

    2For an angled run, start at the bottom.

    For an angled run, start at the bottom.

    For an angled run, start at the bottom.

    For an angled run, start at the bottom.

    For an angled run, start at the bottom.

    1

    6For an angled run, start at the bottom.

    viewrail.comVersion 1.0 — 10-2019

    We’d love to see your work! Snap a few pics with your phone and send them to [email protected]. Thanks for choosing Viewrail. Enjoy your new installation!

    Congratulations! Your Install is Done