30
STOPWATCH TIME STUDY ANALISA DAN PENGUKURAN KERJA Debrina Puspita Andriani e"Mail : [email protected] Blog : http://debrina.lecture.ub.ac.id/ 10

STOPWATCH TIME STUDY - debrina.lecture.ub.ac.iddebrina.lecture.ub.ac.id/files/2014/09/APK-10-Stopwatch-Time-Study.pdf · [WAKTU] KERJA PENGUKURAN ... stopwatch,&papan,&kalkulator,&form&pengukuran&kerja&!

  • Upload
    lydat

  • View
    239

  • Download
    0

Embed Size (px)

Citation preview

STOPWATCH TIME STUDY!ANALISA DAN PENGUKURAN KERJA

Debrina Puspita Andrianie"Mail':'[email protected]'

Blog':'http://debrina.lecture.ub.ac.id/'

10

METODE PENGUKURAN [WAKTU] KERJA

PENGUKURAN)[WAKTU])KERJA)

DIRECT' INDIRECT'

STOPWATCH'

WORK'SAMPLING'

STANDARD'DATA'

PMTS)

Regression'Analysis'

www.debrina.lecture.ub.ac.id)2) 12/11/14)

DIRECT VS INDIRECT TIME STUDY

DIRECT)TIME)STUDY)!  Kelebihan':'

!  PRAKTIS,'karena'hanya'mencatat'waktu'saja'tanpa'menganalisa'gerakan"gerakan'kerja.'

!  Biaya'lebih'murah'(pada'awalnya).'

!  Kekurangan):)!  Dibutuhkan'waktu'

pengamatan'yang'lebih'lama'agar'data'AKURAT'&'TELITI.'

!  Biaya'lebih'MAHAL'karena'harus'datang'langsung'ke'lokasi'pengamatan'(pada'akhirnya).'

INDIRECT)TIME)STUDY)!  Kelebihan):)

!  Waktu'pengamatan'relatif'SINGKAT'karena'cukup'merekam'aktivitas'kerja.'

!  Biaya'relatif'lebih'MURAH'karena'tidak'perlu'berulang'kali'datang'ke'lokasi'pengamatan.'

!  Jumlah'pengukuran'tidak'harus'sebanyak'penghukuran'langsung'

!  Kekurangan):)!  Terkadang'tabel'gerakan'kerja'orang'

EROPA'tidak'cocok'dengan'INDONESIA.'

!  Dibutuhkan'KETELITIAN'yang'tinggi'dalam'membreakdown'gerakan"gerakan'kerja.'

!  Data'waktu'gerakan'kerja'harus'disesuaikan'dengan'JENIS'PEKERJAAN.'

www.debrina.lecture.ub.ac.id)3)12/11/14)

•  Element'is'a'component'of'job'or'task'that'are'logical'divisions'with'easily'identifiable'starting'and'end'points,'and'are'repeated'on'a'regular'basis.'

•  Cycle'is'the'completion'of'the'activities'(elements)'required'to'perform'the'job'under'study.''

'www.debrina.lecture.ub.ac.id)4)12/11/14)

12/11/14) www.debrina.lecture.ub.ac.id)5

Types)of)elements)

A'repetitive'element''is'an'element'which'occurs'in'every'

work'cycle'of'the'job.''

An'occasional'element'does'not'occur'in'each'work'cycle'of'the'job,'but'which'may'occur'at'regular'or'irregular'intervals.'e.g.'

machine'setting.'

For'a'constant'element'the'basic'time'remains'constant'whenever'it'is'performed.'e.g.'

switch'the'machine'on.'

A'variable'element''is'an'element'for'which'the'basic'time'varies'in'relation'to'some'characteristics'of'the'product,'equipment'or'process,'e.g.'

dimensions,'weight,'quality'etc.'e.g.'push'trolley'of'parts'to'next'

shop.'

A)manual)element)is'an'element'performed'by'a'

worker.'

A)machine)element)'is'automatically'performed'by'a'

power"driven'machine'(or'process).'

A)governing)element)'occupies'a'longer'time'than'any'of'the'other'elements'which'are'being'performed'concurrently.'e.g.'boil'kettle'of'water,'while'setting'out'teapot'and'cups.'

A)foreign)element))is'observed'during'a'study'which,'after'analysis,'is'not'found'to'be'necessary'part'of'the'job.'e.g.'

degreasing'a'part'that'has'still'to'be'machined'further.'

www.debrina.lecture.ub.ac.id)6)12/11/14)

Direct Time Study

Stopwatch T-­me Study :! Elemen&kerja&berlangsung&dalam&waktu&SINGKAT&

! Waktu&siklus&kerja&PENDEK&

! Siklus&kerja&terjadi&BERULANGAULANG&! Waktu&elemen&kerja&diukur&dengan&STOPWATCH)

Wor. Sampl-­ng :! Elemen&kerja&berlangsung&dalam&waktu&LAMA&

! Waktu&siklus&kerja&PANJANG&

! Siklus&kerja&TIDAK&BERULANG&! Mencari&%&kerja&dan&%&delay&(PROBABILITAS)&

www.debrina.lecture.ub.ac.id)7)12/11/14)

LANGKAH – LANGKAH !PENGUKURAN [WAKTU] KERJA

www.debrina.lecture.ub.ac.id)8)12/11/14)

1. Mengumpulkan informasi dan peralatan

! Tentukan&TUJUAN&dari&pengukuran&kerja!&

! Melakukan&pengamatan&pendahuluan&

&(layout,&lingkungan&kerja,&mesin&yang&&

&digunakan,&dll).&

! Menyiapkan&peralatan&:&

!  stopwatch,&papan,&kalkulator,&form&pengukuran&kerja&

! Memilih&operator&yang&akan&diamaR&dan&

mengkomunikasikan&dengan&supervisor&(operator&harus&

memiliki&kemampuan&NORMAL,&bisa&BEKERJA&SAMA,&dan&

WAJAR).)www.debrina.lecture.ub.ac.id)9)12/11/14)

Stopwatch)

Electronic)Stopwatch) Mechanical)Stopwatch)

Calibrated in decimal minutes LED read-out www.debrina.lecture.ub.ac.id)10)12/11/14)

Learning Curve

www.debrina.lecture.ub.ac.id)11)12/11/14)

2. Membagi operasi dalam elemen-elemen

! Purpose&:&easy&to&measure&&&line&balancing&

! Separate&handling&Rme&(nonAproducRve&Rme)&with&&

operaRon&Rme&(producRve&Rme)&

! Separate&constant&element&with&variable&element.&

! Every&element&must&have&an&easily&idenRfiable&

starRng&and&ending&point&(breakpoints)&

! ConRnuiRes&between&elements&

! Elements&Rmes:&0.04min&(short),&0.25min&

(reasonable)&

! RelaRve&frequency&must&be&included&&

www.debrina.lecture.ub.ac.id)12)12/11/14)

12/11/14) www.debrina.lecture.ub.ac.id)13)

3. Metode Stopwatch Time Study !  CONTINUOUS)TIMING))

!  Tombol'stopwatch'ditekan'pada'saat'awal'elemen'kerja'dan'terus'dibiarkan'berjalan'selama'periode'studi.''Pengamat'terus'melihat'jalannya'jarum'stopwatch'dan'setiap'awal/akhir'dari'sebuah'elemen'kerja'yang'ada'mencatat'dan'menuliskannya'di'lembar'pengamatan.''Waktu' setiap' elemen' kerja' akan' diperoleh' dengan' cara' “pengurangan”' dan'dilakukan' setelah' studi' pengukuran' kerja' selesai' dilaksanakan.' APA)KEKURANGANNYA?)

!  REPETITIVE)(SNAP[BACK)METHOD)))

'Jarum'penunjuk'stopwatch'selalu'dikembalikan'ke'posisi'nol'setiap'kali'satu'elemen'kegiatan'selesai'dilaksanakan.''Waktu'yang'diamati'dan'dicatat'akan'merupakan'waktu'yang'sebenarnya.''Time2 study2analyst2akan'bisa'mendeteksi'dengan'mudah'adanya'variasi'perbedaan'waktu'dari'setiap'elemen'kegiatan.'APA)KEKURANGANNYA?)

!  ACCUMULATIVE)TIMING))

'Merupakan' kombinasi' cara' pengukuran' dengan'metoda' continuous2 dan2 snap6back2(pengukuran' dilaksanakan' dengan' menggunakan' dua' atau' lebih' stopwatch' yang'bekerja'secara'bergantian).'

Continuous Method

Snapback Method

www.debrina.lecture.ub.ac.id)14) 12/11/14)

THE RULES ! "  Don’t'comment'to'the'worker'during'

the'task'

"  Stand'(don’t'sit)'beside'the'worker'

"  Write'every'event'(even'though'it'may'seems'not'important)'

"  Have'a'good'position'to'observe'

"  Stop'the'study'if'the'worker'seems'to'be'under'pressure'and'it'affects'his/her'work'

www.debrina.lecture.ub.ac.id)15)12/11/14)

PENGAMATAN

www.deb

rina

.lecture.ub

.ac

.id)

12/11/14

)

Performing a Time Study

Time Study Observation Sheet

Identification of operation Sandwich Assembly Date 5/17

Operator Approval Observer Smith Jones Russell

Cycles Summary 1 2 3 4 5 6 7 8 9 10 Σ t Nt RF t

Place ham, cheese, and lettuce on bread

1

2

3

4

Grasp and lay out bread slices

Spread mayonnaise on both slices

Place top on sandwich, Slice, and stack

t

t

t

t

R

R

R

R

.11 .44 .79 1.13 1.47 1.83 2.21 2.60 2.98 3.37

.04 .05 .05 .04 .06 .05 .06 .06 .07 .05 .53 .053 1.05 .056

.04 .38 .72 1.05 1.40 1.76 2.13 2.50 2.89 3.29

.07 .06 .07 .08 .08 .08 .07 .07 .10 .09 .77 .077 .077 1.00

.11 .12 .14 .12 .12 .13 .13 .13 .14 .14 1.28 1.28 1.10 .141

.93 .23 .55 1.25 1.60 1.96 2.34 2.72 3.12 3.51

.12 .10 .08 .09 .12 .10 .11 .11 .10 .10 1.03 1.03 1.10 .113

.33 .67 1.01 1.34 1.71 2.07 2.44 2.82 3.24 3.61

www.debrina.lecture.ub.ac.id)17)12/11/14)

4.  Tes Kenormalan, Tes Keseragaman,!Tes Kecukupan Data

"  TES) KENORMALAN) #) data' pengamatan' seharusnya'berjumlah'cukup'besar'(banyak)'dan'berdistribusi'normal.''

"  TES)KESERAGAMAN)#'data'harus'homogen'dan'diperoleh'dari'populasi'yang'sama.''

"  TES) KECUKUPAN)#' data' yang' dikumpulkan' telah' cukup'secara' obyektif,' dengan' konsep' statistik' (derajat' ketelitian'dan'tingkat'keyakinan/kepercayaan'yang'diinginkan).'

www.debrina.lecture.ub.ac.id)18)12/11/14)

Determining Number of Cycles

Time'measurement'•  Measuring'time'of'each'

element'•  The'number'of'

observation'of'each'element'depends'on'the)significance)level)and'required)level)of)accuracy)

'

www.debrina.lecture.ub.ac.id)19) 12/11/14)

Number of Cycles (1)

To)determine))sample)size:)

n = zs eT

2

where'

'z'=''number'of'standard'deviations'from'the'mean'in'a'normal'distribution'reflecting'a'level'of'statistical'confidence'

'T'=''average'job'cycle'time'from'the'sample'time'study''e'=''degree'of'error'from''true'mean'of''distribution'

s = = sample'standard'deviation'from''sample'time'study'

Σ(xi - x)2 n - 1

www.debrina.lecture.ub.ac.id)20)12/11/14)

Number of Cycles (2)

Example):)

• Average'cycle'time'='0.361'•  Computed'standard'deviation'='0.03'•  Company'wants'to'be'95%'confident'that'computed'time'is'within'5%'of'true'average'time'

n = = = 10.61 or 11 zs eT

2 (1.96)(0.03) (0.05)(0.361)

2

www.debrina.lecture.ub.ac.id)21)12/11/14)

Recom

mended)num

ber)of)cycles/observations'

www.debrina.lecture.ub.ac.id)22)12/11/14)

5.  Performance Rating & Waktu Normal

Normal)time):))Tn)=)Tobs'(PR))

1)'Waktu'Pengamatan'(Tobs)'

2)'TN'<'TObs'untuk'p'<'1'(100%)'

3)'TN'='TObs'untuk'p'='1'(100%)'

4)'TN'>'TObs'untuk'p'>'1'(100%)'

www.debrina.lecture.ub.ac.id)23)12/11/14)

WESTINGHOUSE RATING SYSTEM

www.debrina.lecture.ub.ac.id)24)12/11/14)

6.  Menentukan Allowance

Allowance)

Constant)

Personal)Needs) Fatigue))

Special)

Avoidable)Delays)

Unavoidable)Delays)

More)details)in):)Handbook)of)IE)(Salvendy)):)pp.)1409)www.debrina.lecture.ub.ac.id)25)12/11/14)

7.  Waktu Standar dan Output Standar

TS'=)TN'(1)+)Apfd)) OS)=)1)/)TS)

Waktu)Normal)(TN)' Allowance'

Waktu)Baku/Standard))(TS)'

www.debrina.lecture.ub.ac.id)26)12/11/14)

Let’s Try!'

www.deb

rina

.lecture.ub

.ac

.id)

12/11/14

)

TUGAS 1 !  Given:'A'direct'time'study'was'taken'on'a'manual'work'

element'using'the)snapback)method.''!  The'regular'cycle'consisted'of'three'elements':'a,)b,)and)

c.' Element) d) is' an' irregular' element' performed' every'five'cycles.''

'''

''!  Determine''

'(a)'normal'time'''(b)'standard'time'for'the'cycle'using)Apfd'='0.15'

Work)element) a) b) c) d)

Observed'time'(min)' 0.56' 0.25' 0.50' 1.10'

Performance'rating' 100%' 80%' 110%' 100%'

www.debrina.lecture.ub.ac.id)28)12/11/14)

Solution (a) Normal time:

'TN 2='0.56(1.00)'+'0.25(0.80)'+'0.50(1.10)'+'1.10(1.0)/5''

' '='1.53'min'

'

(b) Standard time:

'TS'='1.53(1'+'0.15)'='1.76'min'

www.debrina.lecture.ub.ac.id)29)12/11/14)

“Knowing exactly what you want to do, and then seeing that they do it the best and cheapest way.”

Freder-­c. W. Taylor