Stephen P. Shoemaker PO Box 1025 Waynesboro, Georgia 30830 772-285-0959 [email protected] RESPONSIBILITIES Manages/directs the installation of: civil, structural, mechanical, electrical, and instrumentation components/systems necessary to complete/operate power plants; as well as; creates/commands systems to control construction related: time, expenditures, documentation, safety, and quality. EXPERIENCE More than thirty years of construction experience on both fossil and nuclear power plants. Is a general superintendent and has been a: project manager, construction manager, construction area manager, construction/fabrication manager, welding/PWHT manager, commissioning lead, welding/PWHT supervisor, construction supervisor, journeyman pipefitter instructor, welding instructor, welding subject matter expert, certified welder, and a construction/maintenance planner on combined cycle, oil, gas, coal, and nuclear power plants. Fluor Vogtle Unit 4 Nuclear Island Auxiliary Building General Superintendent Directs all civil, structural, mechanical, electrical, and instrumentation activities required to construct and operate the Unit 4 Auxiliary Building. (November 2016 – Present) MTI Power Project Manager/Business Development Manager Directed all estimation, requisition, cost tracking, scheduling, and labor activities required to construct the Saint Lucie Nuclear Power Station FLEX (i.e., the diverse and flexible coping capability to implement the lessons learned from the Fukushima Daiichi incident) Building. Listed by Saint Lucie Nuclear Power Station during the January 05, 2015, Station Stand-down as one of only five … “examples of successful behaviors and activities from 2014 that went well”. 1

Stephen Shoemaker Resume Dated 02-05-2017

Embed Size (px)

Citation preview

Page 1: Stephen Shoemaker Resume Dated 02-05-2017

Stephen P. ShoemakerPO Box 1025Waynesboro, Georgia [email protected]

RESPONSIBILITIES

Manages/directs the installation of: civil, structural, mechanical, electrical, and instrumentation components/systems necessary to complete/operate power plants; as well as; creates/commands systems to control construction related: time, expenditures, documentation, safety, and quality.

EXPERIENCE

More than thirty years of construction experience on both fossil and nuclear power plants. Is a general superintendent and has been a: project manager, construction manager, construction area manager, construction/fabrication manager, welding/PWHT manager, commissioning lead, welding/PWHT supervisor, construction supervisor, journeyman pipefitter instructor, welding instructor, welding subject matter expert, certified welder, and a construction/maintenance planner on combined cycle, oil, gas, coal, and nuclear power plants.

FluorVogtle Unit 4 Nuclear Island Auxiliary BuildingGeneral Superintendent Directs all civil, structural, mechanical, electrical, and instrumentation activities required to

construct and operate the Unit 4 Auxiliary Building.(November 2016 – Present)

MTI PowerProject Manager/Business Development Manager Directed all estimation, requisition, cost tracking, scheduling, and labor activities required to

construct the Saint Lucie Nuclear Power Station FLEX (i.e., the diverse and flexible coping capability to implement the lessons learned from the Fukushima Daiichi incident) Building.

Listed by Saint Lucie Nuclear Power Station during the January 05, 2015, Station Stand-down as one of only five … “examples of successful behaviors and activities from 2014 that went well”.

Created a worldwide sales network to supply purchased/rented welding/machining equipment and provide on-site skilled welders/machinists.

Fashion and conduct sales/technical presentations to various potential clients. Determined existing safety manual to be inaccurate/insufficient and, consequently, replaced

existing safety manual. Reviewed the cost versus benefit and recommended that MTI obtain/maintain a NR Stamp. Managed and assembled the proposal to fabricate, deliver, and test the “Nine Mile Point

Nuclear Station Unit 1 Liquid Nitrogen Storage Tank Number 12 and Appurtenances” (example: vaporizer).

Managed the fabrication, delivery, and testing of the “Nine Mile Point Nuclear Station Unit 1 Liquid Nitrogen Storage Tank Number 12 and Appurtenances”.

Managed and assembled the proposal to fabricate, deliver, and install the “Quad Cities Station and Dresden Station Hardened Containment Vents”.

Managed and assembled the proposal to provide “Maintenance and Modification Support Services” to Cooper Nuclear Station.

(2014 – 2016)

1

Page 2: Stephen Shoemaker Resume Dated 02-05-2017

Stephen P. ShoemakerPO Box 1025Waynesboro, Georgia [email protected]

CB&IShandong Haiyang China Nuclear Power Station Unit 1 and Unit 2Auxiliary Buildings Area ManagerNuclear Islands: Civil, Structural, and Coatings Discipline LeadShield Building Milestone ManagerNuclear Islands: QC Welding LeadMain Control Room Available Milestone Manager Directed all civil, structural, mechanical, electrical, and instrumentation activities required to

construct and operate the Unit 1 and Unit 2 Auxiliary Buildings. Provided counsel and/or otherwise facilitated installation of all Nuclear Island: civil,

structural, and coating work. Interfaced between the Architect Engineer, Westinghouse, and the Site Project

Management Organization to resolve all obstacles impeding schedule adherence. Ensured compliance with all Nuclear Island welding: codes, standards, and specifications. Mobilized and motivated all available resources to ensure proper and timely operation of

MCR.(2010 – 2014)

NextEra EnergyPoint Beach Nuclear Power Plant, Unit 1 and Unit 2Senior Construction Supervisor Directed the 2P-2A charging pump replacement and the installation of the associated

variable frequency drive. Managed the GSI-191: removal/replacement of asbestos insulation/non-asbestos insulation

from/on the Unit 1 steam generators, reactor coolant pumps, and the pressurizer; as well as; the removal of the debris interceptors and installation of a 16 inch core bore to Unit 1 Sump A.

Supervised the security upgrades connected to the Unit 1 and Unit 2 discharges.(January 2010 – April 2010)

Ameren Energy GeneratingCoffeen Power Station, Unit 1 and Unit 2 (i.e., Coal-fired plant) Construction Manager Oversaw the installation of all civil work (excluding the chimney erection), all structural steel

systems, the majority of the coating work, and most mechanical components/systems comprising the Unit 1 and Unit 2 Wet Scrubbers (i.e., a 500 million dollar plus project).

Oversaw the installation of all civil work, all structural steel systems, all coating work, and all mechanical components/systems comprising the Unit 1 and Unit 2 SCRs (i.e., a 30 million dollar plus project and a 50 million dollar plus project respectively).

Managed numerous plant betterment projects (examples: coal feeder installations, fire protection system installation, and main steam repairs).

Conducted numerous vendor surveillance reviews/audits (example: Babcock & Wilcox) to determine/ensure compliance with applicable: design drawings, codes, and standards.

General duties included: review and acceptance/rejection of contractor quality and welding control manuals/programs.

Created process control systems to ensure prime contractors adherence to client direction/expectation. Verified site practice was consistent with contract provisions or

2

Page 3: Stephen Shoemaker Resume Dated 02-05-2017

Stephen P. ShoemakerPO Box 1025Waynesboro, Georgia [email protected]

amended contract to match site practice. Reviewed invoice submittals to guarantee numeric accuracy and compliance with contract terms. Interfaced between prime contractor and design engineering to effect resolution of site installation problems.

Reviewed job progress and man-hours to verify schedule adherence. Monitored and enforced compliance to OSHA regulations and site policies. Inspected and enforced installation conformance to the governing specifications, standards, and/or codes.

(2001 – 2009)

Florida Power & LightTurkey Point Fossil Unit 1; Cutler Unit 6; Port Everglades Units 1, 2, 3, and 4; Lauderdale Units 5 and 6; Manatee Unit 1; Riviera Unit 3; Martin Units 1, 3, and 4; Cape Canaveral Units 1 and 2; and Sanford Unit 3.Maintenance PlannerWelding Subject Matter Expert Planned both mechanical and civil construction projects at various combined cycles and

conventional oil/gas fired units. Many required system/component design and all provided chronological installation details, raw materials selection, finished products requisition, as well as, the type and timing of NDE.

Developed welding “position papers” that directed the selection/installation of filler material, governed preheat/post heat of weld joints, and explained the root cause of weld failures.

(2000 – 2001)

Florida Power & LightFabrication & Outage ServicesConstruction/Fabrication Manager Directed an in-house, for profit, construction, fabrication, and maintenance facility.

Responsibilities included - overseeing the manufacturing activities; accounting processes; examining/determining the potential risks, revenues, and expenses associated with entry into new internal/external markets; and, developing/implementing a strategy to deal successfully with competition.

(1995 – 2000)

Florida Power & LightTurkey Point Fossil Unit 2, Cutler Unit 5, Lauderdale Unit 5, Manatee Unit 1,Riviera Unit 3, Fort Myers Unit 2, and Sanford Unit 3.Civil/Mechanical Construction Supervisor Responsible for and directed the day-to-day activities of the primary, civil/mechanical

contractors at various combined cycles and conventional oil/gas fired units. Verified that the quality/quantity of services was consistent with the - governing contract, design drawings, and codes/standards, as well as, monitored schedule/cost compliance and resolved field installation problems.

(1991 – 1995)

Florida Power & Light3

Page 4: Stephen Shoemaker Resume Dated 02-05-2017

Stephen P. ShoemakerPO Box 1025Waynesboro, Georgia [email protected]

Corporate HeadquartersWelding Manager Mr. Shoemaker was the fossil plant welding, subject matter expert and, subsequently,

discovered a continuous-for-forty-years, welding fabrication error that potentially affected all General Electric previously installed and scheduled to be purchased generators. He also investigated/determined the possible/probable causes of catastrophic/non-catastrophic weld failures at all fossil power generating facilities. His duties included: reviewing contractor welding control manuals/programs, authoring numerous “position papers” that directed the selection/installation of filler material and/or governed preheat/post heat of weld joints, originating/overseeing welding development projects (examples: GTAW/GMAW joining of aluminum electrical bus conductors and an Electrode Flux Fume Study), creating Procedure Qualifications Records/Welding Procedure Specifications, training/testing welders, and authoring a welding and pipefitting manual. This was done as part of a basic welding course and basic pipefitting course Mr. Shoemaker taught to select plant operators at all Florida Power & Light power generating facilities. Additionally, he conducted the welding/post heat portion of the due diligence supporting Florida Power & Light's decision to purchase Georgia Power Company's Scherer Unit 4 power generating facility (i.e., a coal fired power plant).

(1988 – 1991)

United Engineers and ConstructorsSt. Lucie Nuclear PlantWelding Supervisor Mr. Shoemaker’s duties included supervising welder testing, as well as, determining the

required quantities/requisitioning all welding related supplies/equipment necessary to support both welder training and plant outage/daily maintenance activities.

GTAW/SMAW certified welder. (1986 – 1988)

Tennessee Valley AuthorityBellefonte Nuclear PlantSteamfitter Foreman, Steamfitter Sketchman, and Steamfitter Instructor Supervised all underground piping installation in the switch yard, all embedded piping in the

closed cooling water pumping station and diesel auxiliary building; as well as; the majority of the piping/hanger systems in the Unit 1 reactor building. A representative samplings of the Unit 1 reactor building systems installed at the direction of Mr. Shoemaker include - core flood, reactor building spray, decay heat removal, and emergency raw cooling water.

Created detailed, fabrication drawings for the: Steamfitter Hanger Shop, the Steamfitter Handrail Shop, and the Steamfitter Pipe Shop.

Taught journeymen steamfitters: basic trigonometry, print reading, template development, and basic drafting.

(1977 – 1986)

DravoBridgeport Foundry

4

Page 5: Stephen Shoemaker Resume Dated 02-05-2017

Stephen P. ShoemakerPO Box 1025Waynesboro, Georgia [email protected]

Steamfitter Welder Installed various above and below ground piping systems.(1976 – 1977)

EDUCATION

- Florida International UniversityBachelor of Science Degree in Construction Management (anticipated 2018 graduation)

- Plumbers and Steamfitters Local Union 498 Apprenticeship

PROFICIENCIES

- Construction Management- Construction Planning- Construction Safety- Construction Accounting- Construction Finance- Welding Management- Heat Treatment- Due Diligence- Technical Writing- Mechanical Drafting- Sales- ASME Sections - I, II, III, VIII, and IX- ASME B31.1- ASME B36.19- AWS D1.1- AWS D1.4- AWS D1.6- AWS D9.1- AWS D14.6- API 650- NFPA 13- National Electrical Code- National Board Inspection Code- American Concrete Institute Manual of Concrete Practice- Concrete Reinforcing Steel Institute Placing Reinforcing Bars- AISC Code of Standard Practice for Steel Buildings and Bridges- RCSC Specification for Structural Joints Using ASTM A325 or A490 Bolts- Steel Structures Painting Council Standards

5