Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1 Tim Hayler

Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

  • View
    219

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

Tim Hayler 1

Step IV Infrastructure update

STFCTim Hayler

Eddie HoltomNorbert CollombGraham Stokes

14th December 2011MICO170 meeting

Page 2: Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

Tim Hayler 2

MICE major Infrastructure milestonesTask Baseline Status

Downstream spectrometer solenoid base plate installation complete

31/12/11 Complete

He window manufacture complete

30/6/12 Detail drawings complete, currently out for Quotation.

TOF cage and Virostek plate bracket design complete

31/12/11 Detail drawings complete,currently out for Quotation

AFC rolling platforms tested 31/12/11 Complete

Radiation shield manufacture and testing complete

30/3/12 Design review held at the Technical board meeting 21st November, some open issues.

Ready for AFC & SS installation

30/3/12 Depends on the MICE hall schedule of events

Page 3: Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

Tim Hayler 3

Downstream spectrometer solenoid base plate installation complete

All step IV base plates installed:Upstream spectrometer base plate (in beam and out of beam)AFC base plate (in beam and out of beam)Downstream spectrometer base plate (in beam only, there will be no possibility of moving the downstream spectrometer out of beam)

Page 4: Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

Tim Hayler 4

He window manufacture, currently out for quotation

Page 5: Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

Tim Hayler 5

TOF cage and Virostek plate bracket design completeDetail drawings of the bracket design are complete.

We have worked closely with the Spectrometer team to make sure all the necessary compliance is in the design e.g. The way the brackets fasten to the Spectrometer and positioning of the TOF cage.

Currently going through the tendering process.

Expect delivery in march 2012

Page 6: Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

Tim Hayler 6

TOF cage and Virostek plate test support standSupport frame to test:

• The bracket assembly to the TOF cage and Virostek plate.

• TOF detector assembly, movement of the detector on the sliding mechanism.

• The mechanical arm for removing the split ring

•Expect the need to do some re-work on the Virostek plates, split rings, drill and tap holes, some machining

Expect to start the build in March 2012

Page 7: Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

Tim Hayler 7

AFC rolling platform tests completeTesting specification for the MICE Moving Platform:

• Ensure the platform raises and lowers and moves horizontally

• Leak check/pressure drop check (Hydraulic system)

• Ensure the platform raises sufficiently to permit moving the unit without interference

• Visual inspection of components under load regarding deformation

• There are no unforeseen failures of components

• The moving of the platform along its intended path

Page 8: Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

Tim Hayler 8

AFC rolling platform tests complete

4 tonne load test done at Daresbury Lab

Hydraulic jacks raise the platform.

Roller stakes move the platform in and out of the beam.

Final testing needs to be done in the MICE hall early 2012

Page 9: Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

Tim Hayler 9

The Radiation ShieldThe review presentation is on the technical board website, meeting minutes 21st November 2011. http://mice.iit.edu/tb/Meetings/2011-11-21/

Page 10: Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

Tim Hayler 10

Actions from the radiation shield review

Action Date Responsible Status

A test plan devised for all operating scenarios (in vacuum)

02/Jan/2012 Norbert Collomb

WIP

Manual method to open and close the shutter doors

02/Jan/2012 Norbert Collomb

WIP

Add radiation monitor to the design

01/Feb/2012 Tim Hayler and Norbert Collomb

Need specification from the collaboration

Page 11: Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

Tim Hayler 11

Spectrometer Solenoid stand

Support frame design is being worked on at RAL with close collaboration with the Spectrometer team

Page 12: Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

Tim Hayler 12

Spectrometer Solenoid stand

The frame will be built in the UK and installed in the MICE hall as part of the Step IV build

The Spectrometer team will now provide the SS with just the four support feet shown. This helps with shipping issues.

Page 13: Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

Tim Hayler 13

Local magnetic shielding for the MICE hall compressors and beyond

Prototype being made in mild steel for a fit check

Page 14: Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler

Tim Hayler 14

Ready for AFC and SS installation30/03/2011

• The readiness date for the AFC and SS installation is very much dependant on the MICE hall schedule of events.

• We want to install all the moving platforms for step IV• Can we move the KL detector downstream to progress the

Engineering build in the first SS position? First raised at the TB, 21st Nov meeting, slides by Ken Long http://mice.iit.edu/tb/Meetings/2011-11-21/

• Are we taking beam in the first quarter of 2012?• What is the Hydrogen project doing?• What other work is scheduled for the first quarter 2012? • In building up the Infrastructure we would expect unknowns,

items lost and unforeseen events. It would be very useful to start the work in January.