Status på Dvalin-prosjektet
Roy Padget, Topside Host Manager
Kristiansund, 31. mai 2018
DEA Norge AS
A brief history of DEA in Norway…
1980ies
Amongst the
first
companies to
enter the
Norwegian
Sea and the
Barents Sea.
1990
First income
when
Veslefrikk
came on
stream.
1979
The Snorre
field was
discovered,
and three
years later the
Veslefrikk
field. Snorre is
still one of our
main sources
of income.
2015
Sold by RWE
to
LetterOne.
RWE Dea
Norge
becomes DEA
Norge.
Purchase of
E.ON E&P
Norge.
1991
Became
operator. First
operatorship
was PL166.
1991
Deminex was
split among
the
shareholders –
Deminex
Norge became
RWE Dea
Norge
.
1973
Company
established
as Deminex
Norge AS.
First licences
acquired
shortly
thereafter
45 YEARS
2010
Zidane and
Titan were
discovered.
2016
Merger with
E.ON E&P
Norge.
Move head
office to
Stavanger
Dvalin PDO
Submitted
2017
Dvalin PDO
Approved
Oslo office
closed
Possible
merger with
Wintershall
announced
2018
Possible
merger with
Wintershall
progressing
with due
diligence &
negotiations
DEA Norge AS
› Development (operated)
› Dvalin
› Production (non-operated)
› Key fields: Skarv, Snorre,
Njord, Hyme, Gjøa,
Snøhvit and Knarr
› Exploration
› Active in all NCS areas
› Good mixture of different
types of prospects and
leads
DEA’s portfolio
Page 3
DEA Norge AS
DEA Norge AS
PL435 – Dvalin Development
PL435
DEA Norge (O) 55%
Petoro 35%
Edison 10 %
Licence awardDrill or Drop BOK
3D Reproc . P. Eval .Drill Zidane westSite survey
3D Reproc . P. Eval ..
2008 2009 2010 2011 20122007
.
BOVPDO
2013 2016
Drill Zidane east
StartFeasibility Concept FEED Execution
Licence history
2020
PAGE 5
› PDO approved March 2017
› Development ongoing
› First gas planned end 2020
› 18.2 GSm3 recoverable gas
(P50)
› ~10 BNOK investments
DEA Norge AS
Dvalin reservoir
› Two proved structures
with hydrocarbons in Dvalin East
and West
› Reservoir in the Garn and Ile
formation
› High pressure and temperature
› Top reservoir 4100m TVD MSL
Dvalin
East
Dvalin
West
Zidane East Zidane West
Reservoir pressure 635 bar @4242 mTVD MSL 722.2 bar @4242 mTVD MSL
Reservoir temperature 158.8 °C @4242 mTVD MSL 158.8 °C @4242 mTVD MSL
CGR 22 Sm³/MSm³ 15 Sm³/MSm³
CO2 content 5.4% 7.1%
DEA Norge AS
Subsea tie-back and processing on Heidrun
Page 7
DEA Norge AS
Aibel - Haugesund
Fabrication yard
M40 and H25 module
Technip - Lysaker
SURF engineering
Aibel – Asker
Topside engineering
Aker - Egersund
SPS fabrication/assembly yard
Technip - Orkanger
Spool base /pipeline fabrication
Aker Solutions – Fornebu
SPS engineering
Aker Solutions - Moss
Umbilical Fabrication yard
Main Contractors
Kristiansund
68 % Norwegian content
DEA Norge AS
Contractor interfaces
Page 9
StatoilDEA
SURF
Riser
EPC
SPS Heavy
Lift
Riser
Install
Topside
EPCI
Company’s interface management system
Drilling &
Completion SAS
upgrade
Polarled
operator
DEA Norge AS
Heidrun platform
Unit parties Unit interests
Statoil Petroleum AS (operator) 13,11821 %
Petoro AS 57,68845 %
ENI Norge AS 5,19170 %
ConocoPhillips Skandinavia AS 24,00164 %
› Tension leg platform (TLP) with concrete substructure
› Water depth approx 350 m
› 56 dry wellhead slots
› Production start-up: 1995
DEA Norge AS
Two modules of 4,000t and 435t to be manufactured and installed
Page 11Page 11
Heidrun modifications
M40 module:
Main dimensions:
72m x 16m x 18m
Dry weight:
4,000 tonnes
H25 module:
Dry weight:
435 tonnes
H25
M40
DEA Norge AS Page 12
Integration scope
Integration building blocks
| 02/09/2016 | Zidane project
DEA Norge AS Page 13
Subsea Production System
Integrated template
structure (typical) ,
Typically: 34m x 22m x TBN
m / <280 ton
Manifold (typical)
Typically: 20m x 9m x 6m / 206 ton
XT – front (typical)
DEA Norge AS Page 14
Pipeline, flowline and installation activites
Polarled tie-in – inline tee as laid
Dvalin overall field layout
DEA Norge AS
Project Status and Schedule
DEA Norge AS
Topside - status
› Fabrication of topside modules ongoing at
Aibel yard in Haugesund
› H25 module – installed May 2018
› M40 module – installation August 2019
› Offshore modification work at Heidrun
› Started October 2017 and is progressing
well
› POB average 60 in April
› Revision stop at Heidrun May 2018
DEA Norge AS
M40 Fabrication
Ongoing Yard Work
DEA Norge AS
M40 Module fabrication
DEA Norge AS
Ongoing Offshore Work
DEA Norge AS
H25 Module – on the move
DEA Norge AS
H25 Module – lifting
DEA Norge AS
H25 Module – placed at Heidrun
DEA Norge AS
Good overall progress
Status SPS
Fit test of manifold in template at Aker Egersund
Manifold assembly at Aker Egersund
DEA Norge AS
Ongoing SPS Work
Manifold Fabrication (Egersund)
Subsea Control Module
Factory Acceptance Test
(Aberdeen)
Hydraulic Control Unit
DEA Norge AS
Gas Export
Pipeline
Double Jointing
(Orkanger)
SURF Minor
Structure
Check Valve
(From Italy)
Ongoing SURF Work
Temporary
Pig Launcher
Receiver
(PLR)
fabrication
at ERMS in
France
Pipeline End
Termination
(PLET)
fabrication at
Westcon
DEA Norge AS
Flowline, pipeline and marine installations
› Good overall progress
› Gas Export pipeline stalk fabrication
completed in Orkanger
› Mainline stalk fabrication ongoing for
13%Cr inner pipe
› ITS successfully installed
› Rock- installation commencing mid May
› Gas Export pipeline installation
commence end May / early June
ITS installation from Deep Explorer
DEA Norge AS
Dvalin Pre-lay Rock Installation
DEA Norge AS
Offshore Installation CampaignJune July AugustMay
14.04Template installation and prep. work for Gas Export line, Production line & Umbilical
(Deep Explorer)27.04
14,5
d31.05 14.06 (offshore 11 – 13.06)
Gas Export line installation
(Deep Energy) includes Heidrun
07.06 10,5 d 18.06
April
GE line as-laid survey and FCG
(Far Superior)
Pre-rock installation (Nordnes)Mob. window 09 - 15.05 Demob. window 21 – 27.0512 d
13 d
H25 Module lift and installation (Saipem S7000)13.05 15.053 d
06.0623.05
Topsides SD 2018
DEA Norge AS
Offshore Installation Campaign
DEA Norge AS
Drilling & WellsTransocean Arctic contracted to drill Dvalin Wells
DEA Norge AS
Project Schedule