48
No. Item Pembiayaan Biaya I PEMBIAYAAN Biaya awal proyek 1 Perencanaan (Pembuatan DED) (61,342,147,380.95) 2 Pekerjaan Sipil (839,088,466,666.66) 3 (582,426,000,000.00) 4 Rolling Stock (728,571,428,571.43) 5 Pembebasan lahan seluas 30,36 Ha (303,600,000,000.00) TOTAL (2,515,028,042,619.04) Biaya operasional dan maintenance (24,536,858,952.38) 6 Biaya operasional, umum dan administrasi (12,268,429,476.19) 7 Biaya Pemeliharaan Stasiun (4,907,371,790.48) 8 (7,361,057,685.71) Biaya lainnya 9 10 Pengembalian pinjaman (Pokok dan Bunga) 11 Life Cycle Cost 12 Depresiasi TOTAL PEMBIAYAAN II PENDAPATAN 1 Tarif 2 Pemasangan iklan 3 4 Ekuitas 20% 503,005,608,523.81 5 2,012,022,434,095.23 TOTAL PENDAPATAN PENDAPATAN SEBELUM PAJAK Pajak NET PROFIT Dividen Pajak penghasilan untuk dividen TOTAL CASH FLOW Total Debt Service DSCR NPV Err:509 KESIMPULAN Err:509 IRR #VALUE! Stasiun, Depot, Traffic Management, Utilitas Pengalihan, Sistem E&M, Jalur dll Biaya Pemeliharaan Rolling Stock Track Access Charge (TAC) ke pemerintah Jakarta dan Tangerang Fasilitas check-in Pinjaman dari sindikasi bank dalam negeri (BCA, BNI, BRI dan Mandiri) 80%

Spreadsheet LRT-BaseCase 13102015 (-20%)

Embed Size (px)

DESCRIPTION

sadadsad

Citation preview

Page 1: Spreadsheet LRT-BaseCase 13102015 (-20%)

No. Item Pembiayaan Biaya

I PEMBIAYAANBiaya awal proyek

1 Perencanaan (Pembuatan DED) (61,342,147,380.95)2 Pekerjaan Sipil (839,088,466,666.66)3 (582,426,000,000.00)

4 Rolling Stock (728,571,428,571.43)5 Pembebasan lahan seluas 30,36 Ha (303,600,000,000.00)

TOTAL (2,515,028,042,619.04)

Biaya operasional dan maintenance (24,536,858,952.38)6 Biaya operasional, umum dan administrasi (12,268,429,476.19)7 Biaya Pemeliharaan Stasiun (4,907,371,790.48)8 (7,361,057,685.71)

Biaya lainnya9

10 Pengembalian pinjaman (Pokok dan Bunga)

11 Life Cycle Cost12 Depresiasi

TOTAL PEMBIAYAAN

II PENDAPATAN1 Tarif2 Pemasangan iklan34 Ekuitas 20% 503,005,608,523.81 5 2,012,022,434,095.23

TOTAL PENDAPATAN

PENDAPATAN SEBELUM PAJAKPajakNET PROFITDividenPajak penghasilan untuk dividenTOTAL CASH FLOWTotal Debt ServiceDSCR

NPV Err:509KESIMPULAN Err:509IRR #VALUE!

Stasiun, Depot, Traffic Management, Utilitas Pengalihan, Sistem E&M, Jalur dll

Biaya Pemeliharaan Rolling Stock

Track Access Charge (TAC) ke pemerintah Jakarta dan Tangerang

Fasilitas check-in

Pinjaman dari sindikasi bank dalam negeri (BCA, BNI, BRI dan Mandiri) 80%

Page 2: Spreadsheet LRT-BaseCase 13102015 (-20%)

KESIMPULAN #VALUE!

Page 3: Spreadsheet LRT-BaseCase 13102015 (-20%)

Tahun2014 2015 2016

(61,342,147,380.95)0.00 (587,361,926,666.66) (251,726,540,000.00)0.00 (407,698,200,000.00) (174,727,800,000.00)

0.00 (510,000,000,000.00) (218,571,428,571.43)(303,600,000,000.00) 0.00 0.00

0.00 0.00 0.000.00 0.00 0.000.00 0.00 0.00

Err:509 (405,863,011,769.48)

### Err:509 ###

2,014.00 2,015.00 2,016.000.00 0.00 0.000.00 0.00 0.00

364,942,147,380.95 138,063,461,142.86 0.000.00 2,012,022,434,095.23 0.00

364,942,149,394.95 2,150,085,897,253.09 2,016.00

2,014.00 Err:509 ###

2,014.00 Err:509 ###

2,014.00 Err:509 ###Err:509 (405,863,011,769.48)

Page 4: Spreadsheet LRT-BaseCase 13102015 (-20%)
Page 5: Spreadsheet LRT-BaseCase 13102015 (-20%)

Tahun2017 2018 2019

0.00 0.00 0.000.00 0.00 0.00

0.00 0.00 0.000.00 0.00 0.00

(12,268,429,476.19) (13,803,816,402.36) (15,531,356,123.44)(4,907,371,790.48) (5,521,526,560.94) (6,212,542,449.38)(7,361,057,685.71) (8,282,289,841.41) (9,318,813,674.06)

(4,410,624,960.00) (4,410,624,960.00) (4,851,687,456.00)

(405,863,011,769.48) (811,726,023,538.95) (771,139,722,362.01)

(385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15)(819,924,449,528.01) ### ###

2,017.00 2,018.00 2,019.00674,277,227,520.00 701,248,316,620.80 645,470,864,310.27

25,776,000,000.00 25,776,000,000.00 25,776,000,000.000.00 0.00 0.000.00 0.00 0.00

700,053,229,537.00 727,024,318,638.80 671,246,866,329.27

(119,871,219,991.01) (501,833,916,511.02) (520,921,209,581.77)Err:509 Err:509 Err:509

Err:509 Err:509 Err:509Err:509 Err:509 0.00 Err:509 Err:509 0.00

Err:509 Err:509 Err:509(405,863,011,769.48) (811,726,023,538.95) (771,139,722,362.01)

Err:509 Err:509 Err:509

Page 6: Spreadsheet LRT-BaseCase 13102015 (-20%)
Page 7: Spreadsheet LRT-BaseCase 13102015 (-20%)

Tahun2020 2021 2022

0.00 0.00 0.000.00 0.00 0.00

0.00 0.00 0.000.00 0.00 0.00

(17,475,096,451.72) (19,662,094,769.44) (22,122,794,674.73)(6,990,038,580.69) (7,864,837,907.78) (8,849,117,869.89)

(10,485,057,871.03) (11,797,256,861.67) (13,273,676,804.84)

(4,851,687,456.00) (5,336,856,201.60) (5,336,856,201.60)

(730,553,421,185.06) (689,967,120,008.11) (649,380,818,831.16)

(3,495,019,290.34)(385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15)

### ### ###

2,020.00 2,021.00 2,022.00671,289,698,882.68 767,955,415,521.79 798,673,632,142.66

25,776,000,000.00 28,353,600,000.00 28,353,600,000.000.00 0.00 0.000.00 0.00 0.00

697,065,700,902.68 796,309,017,542.79 827,027,234,164.66

(461,898,573,778.32) (323,433,102,051.96) (257,049,984,063.72)Err:509 Err:509 Err:509

Err:509 Err:509 Err:509Err:509 Err:509 Err:509Err:509 Err:509 Err:509

Err:509 Err:509 Err:509(730,553,421,185.06) (689,967,120,008.11) (649,380,818,831.16)

Err:509 Err:509 Err:509

Page 8: Spreadsheet LRT-BaseCase 13102015 (-20%)
Page 9: Spreadsheet LRT-BaseCase 13102015 (-20%)

Tahun2023 2024 2025

0.00 0.00 0.000.00 0.00 0.00

0.00 0.00 0.000.00 0.00 0.00

(24,891,449,764.59) (28,006,600,454.10) (31,511,610,469.20)(9,956,579,905.84) (11,202,640,181.64) (12,604,644,187.68)

(14,934,869,858.76) (16,803,960,272.46) (18,906,966,281.52)

(5,870,541,821.76) (5,870,541,821.76) (6,457,596,003.94)

(608,794,517,654.21) (568,208,216,477.27) (527,621,915,300.32)

(5,601,320,090.82)(385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15)

### ### (982,216,686,088.82)

2,023.00 2,024.00 2,025.00830,620,577,428.37 863,845,400,525.50 988,239,138,201.18

28,353,600,000.00 28,353,600,000.00 31,188,960,000.000.00 0.00 0.000.00 0.00 0.00

858,974,179,451.37 892,199,002,549.50 1,019,428,100,226.17

(190,587,733,399.95) (128,608,230,594.70) 37,211,414,137.36 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509Err:509 Err:509 Err:509Err:509 Err:509 Err:509

Err:509 Err:509 Err:509(608,794,517,654.21) (568,208,216,477.27) (527,621,915,300.32)

Err:509 Err:509 Err:509

Page 10: Spreadsheet LRT-BaseCase 13102015 (-20%)
Page 11: Spreadsheet LRT-BaseCase 13102015 (-20%)

Tahun2026 2027 2028

0.00 0.00 0.000.00 0.00 0.00

0.00 0.00 0.000.00 0.00 0.00

(35,455,270,481.33) (39,892,477,286.53) (44,884,997,983.41)(14,182,108,192.53) (15,956,990,914.61) (17,953,999,193.37)(21,273,162,288.80) (23,935,486,371.92) (26,930,998,790.05)

(6,457,596,003.94) (7,103,355,604.33) (7,103,355,604.33)

(487,035,614,123.37) (446,449,312,946.42) 0.00

(8,976,999,596.68)(385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15)

(949,517,704,936.13) (918,451,576,969.96) (490,964,305,014.00)

2,026.00 2,027.00 2,028.001,027,768,703,729.22 1,068,879,451,878.39 1,111,634,629,953.53

31,188,960,000.00 31,188,960,000.00 31,188,960,000.000.00 0.00 0.000.00 0.00 0.00

1,058,957,665,755.22 1,100,068,413,905.39 1,142,823,591,981.53

109,439,960,819.09 181,616,836,935.43 651,859,286,967.53 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509Err:509 Err:509 Err:509Err:509 Err:509 Err:509

Err:509 Err:509 Err:509(487,035,614,123.37) (446,449,312,946.42) 0.00

Err:509 Err:509 Err:509

Page 12: Spreadsheet LRT-BaseCase 13102015 (-20%)
Page 13: Spreadsheet LRT-BaseCase 13102015 (-20%)

No. Item Pembiayaan Biaya

I PEMBIAYAANBiaya awal proyek

1 Perencanaan (Pembuatan DED) (61,342,147,380.95)2 Pekerjaan Sipil (839,088,466,666.66)3 (582,426,000,000.00)

4 Rolling Stock (728,571,428,571.43)5 Pembebasan lahan seluas 30,36 Ha (303,600,000,000.00)

TOTAL (2,515,028,042,619.04)

Biaya operasional dan maintenance (24,536,858,952.38)6 Biaya operasional, umum dan administrasi (12,268,429,476.19)7 Biaya Pemeliharaan Stasiun (4,907,371,790.48)8 (7,361,057,685.71)

Biaya lainnya9

10 Pengembalian pinjaman (Pokok dan Bunga)

11 Life Cycle Cost12 Depresiasi

TOTAL PEMBIAYAAN

II PENDAPATAN1 Tarif2 Pemasangan iklan34 Ekuitas 20% 503,005,608,523.81 5 2,012,022,434,095.23

TOTAL PENDAPATAN

PENDAPATAN SEBELUM PAJAKPajakNET PROFITDividenPajak penghasilan untuk dividenTOTAL CASH FLOWTotal Debt ServiceDSCR

NPV Err:509KESIMPULAN Err:509IRR #VALUE!

Stasiun, Depot, Traffic Management, Utilitas Pengalihan, Sistem E&M, Jalur dll

Biaya Pemeliharaan Rolling Stock

Track Access Charge (TAC) ke pemerintah Jakarta dan Tangerang

Fasilitas check-in

Pinjaman dari sindikasi bank dalam negeri (BCA, BNI, BRI dan Mandiri) 80%

Page 14: Spreadsheet LRT-BaseCase 13102015 (-20%)

KESIMPULAN #VALUE!

Page 15: Spreadsheet LRT-BaseCase 13102015 (-20%)

Tahun2014 2015 2016

(61,342,147,380.95)0.00 (587,361,926,666.66) (251,726,540,000.00)0.00 (407,698,200,000.00) (174,727,800,000.00)

0.00 (510,000,000,000.00) (218,571,428,571.43)(303,600,000,000.00) 0.00 0.00

0.00 0.00 0.000.00 0.00 0.000.00 0.00 0.00

Err:509 (405,863,011,769.48)

### Err:509 ###

2,014.00 2,015.00 2,016.000.00 0.00 0.000.00 0.00 0.00

364,942,147,380.95 138,063,461,142.86 0.000.00 2,012,022,434,095.23 0.00

364,942,149,394.95 2,150,085,897,253.09 2,016.00

2,014.00 Err:509 ###

2,014.00 Err:509 ###

2,014.00 Err:509 ###Err:509 (405,863,011,769.48)

Page 16: Spreadsheet LRT-BaseCase 13102015 (-20%)
Page 17: Spreadsheet LRT-BaseCase 13102015 (-20%)

Tahun2017 2018 2019

0.00 0.00 0.000.00 0.00 0.00

0.00 0.00 0.000.00 0.00 0.00

(12,268,429,476.19) (13,803,816,402.36) (15,531,356,123.44)(4,907,371,790.48) (5,521,526,560.94) (6,212,542,449.38)(7,361,057,685.71) (8,282,289,841.41) (9,318,813,674.06)

(4,410,624,960.00) (4,410,624,960.00) (4,851,687,456.00)

(405,863,011,769.48) (811,726,023,538.95) (771,139,722,362.01)

(385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15)(819,924,449,528.01) ### ###

2,017.00 2,018.00 2,019.00674,277,227,520.00 701,248,316,620.80 645,470,864,310.27

25,776,000,000.00 25,776,000,000.00 25,776,000,000.000.00 0.00 0.000.00 0.00 0.00

700,053,229,537.00 727,024,318,638.80 671,246,866,329.27

(119,871,219,991.01) (501,833,916,511.02) (520,921,209,581.77)Err:509 Err:509 Err:509

Err:509 Err:509 Err:509Err:509 Err:509 0.00 Err:509 Err:509 0.00

Err:509 Err:509 Err:509(405,863,011,769.48) (811,726,023,538.95) (771,139,722,362.01)

Err:509 Err:509 Err:509

Page 18: Spreadsheet LRT-BaseCase 13102015 (-20%)
Page 19: Spreadsheet LRT-BaseCase 13102015 (-20%)

Tahun2020 2021 2022

0.00 0.00 0.000.00 0.00 0.00

0.00 0.00 0.000.00 0.00 0.00

(17,475,096,451.72) (19,662,094,769.44) (22,122,794,674.73)(6,990,038,580.69) (7,864,837,907.78) (8,849,117,869.89)

(10,485,057,871.03) (11,797,256,861.67) (13,273,676,804.84)

(4,851,687,456.00) (5,336,856,201.60) (5,336,856,201.60)

(730,553,421,185.06) (689,967,120,008.11) (649,380,818,831.16)

(3,495,019,290.34)(385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15)

### ### ###

2,020.00 2,021.00 2,022.00671,289,698,882.68 767,955,415,521.79 798,673,632,142.66

25,776,000,000.00 28,353,600,000.00 28,353,600,000.000.00 0.00 0.000.00 0.00 0.00

697,065,700,902.68 796,309,017,542.79 827,027,234,164.66

(461,898,573,778.32) (323,433,102,051.96) (257,049,984,063.72)Err:509 Err:509 Err:509

Err:509 Err:509 Err:509Err:509 Err:509 Err:509Err:509 Err:509 Err:509

Err:509 Err:509 Err:509(730,553,421,185.06) (689,967,120,008.11) (649,380,818,831.16)

Err:509 Err:509 Err:509

Page 20: Spreadsheet LRT-BaseCase 13102015 (-20%)
Page 21: Spreadsheet LRT-BaseCase 13102015 (-20%)

Tahun2023 2024 2025

0.00 0.00 0.000.00 0.00 0.00

0.00 0.00 0.000.00 0.00 0.00

(24,891,449,764.59) (28,006,600,454.10) (31,511,610,469.20)(9,956,579,905.84) (11,202,640,181.64) (12,604,644,187.68)

(14,934,869,858.76) (16,803,960,272.46) (18,906,966,281.52)

(5,870,541,821.76) (5,870,541,821.76) (6,457,596,003.94)

(608,794,517,654.21) (568,208,216,477.27) (527,621,915,300.32)

(5,601,320,090.82)(385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15)

### ### (982,216,686,088.82)

2,023.00 2,024.00 2,025.00830,620,577,428.37 863,845,400,525.50 988,239,138,201.18

28,353,600,000.00 28,353,600,000.00 31,188,960,000.000.00 0.00 0.000.00 0.00 0.00

858,974,179,451.37 892,199,002,549.50 1,019,428,100,226.17

(190,587,733,399.95) (128,608,230,594.70) 37,211,414,137.36 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509Err:509 Err:509 Err:509Err:509 Err:509 Err:509

Err:509 Err:509 Err:509(608,794,517,654.21) (568,208,216,477.27) (527,621,915,300.32)

Err:509 Err:509 Err:509

Page 22: Spreadsheet LRT-BaseCase 13102015 (-20%)
Page 23: Spreadsheet LRT-BaseCase 13102015 (-20%)

Tahun2026 2027 2028

0.00 0.00 0.000.00 0.00 0.00

0.00 0.00 0.000.00 0.00 0.00

(35,455,270,481.33) (39,892,477,286.53) (44,884,997,983.41)(14,182,108,192.53) (15,956,990,914.61) (17,953,999,193.37)(21,273,162,288.80) (23,935,486,371.92) (26,930,998,790.05)

(6,457,596,003.94) (7,103,355,604.33) (7,103,355,604.33)

(487,035,614,123.37) (446,449,312,946.42) 0.00

(8,976,999,596.68)(385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15)

(949,517,704,936.13) (918,451,576,969.96) (490,964,305,014.00)

2,026.00 2,027.00 2,028.001,027,768,703,729.22 1,068,879,451,878.39 1,111,634,629,953.53

31,188,960,000.00 31,188,960,000.00 31,188,960,000.000.00 0.00 0.000.00 0.00 0.00

1,058,957,665,755.22 1,100,068,413,905.39 1,142,823,591,981.53

109,439,960,819.09 181,616,836,935.43 651,859,286,967.53 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509Err:509 Err:509 Err:509Err:509 Err:509 Err:509

Err:509 Err:509 Err:509(487,035,614,123.37) (446,449,312,946.42) 0.00

Err:509 Err:509 Err:509

Page 24: Spreadsheet LRT-BaseCase 13102015 (-20%)
Page 25: Spreadsheet LRT-BaseCase 13102015 (-20%)

a Menurut UU No.36 tahun 2008 Pasal 17 ayat 1b, Wajib pajak badan dalam negeri dan badan usaha tetap sebesar 28% dari pendapatan sebelum pajak

b

c Maka, besaran penghasilan kena pajak =d Besar pajak =

Untuk penghasilan sebelum pajak Rp 4,8 M - Rp 50 M, menggunakan rumus :(0,25 -(0,6 Miliar/Penghasilan sebelum pajak)) x Penghasilan kena pajak

Untuk penghasilan sebelum pajak > Rp 50 M, menggunakan rumus :25% x Penghasilan kena pajak

No. Tahun Pendapatan sebelum pajak Penghasilan kena pajak

3 2017 (405,863,011,769.48) (56,820,821,647.73)4 2018 (405,863,011,769.48) (56,820,821,647.73)5 2019 (79,192,754,665.11) (11,086,985,653.11)6 2020 (14,105,033,648.16) (1,974,704,710.74)7 2021 50,986,187,368.79 7,138,066,231.63 8 2022 153,031,039,137.74 21,424,345,479.28 9 2023 147,947,651,513.66 20,712,671,211.91

10 2024 (72,772,007,364.58) (10,188,081,031.04)11 2025 134,108,738,496.85 18,775,223,389.56 12 2026 114,511,282,247.36 16,031,579,514.63 13 2027 90,857,122,857.39 12,719,997,200.04 14 2028 244,178,235,288.87 34,184,952,940.44

JUMLAH

Menurut Pasal 31E ayat 1, bagi wajib pajak badan usaha yang peredaran brutonya sampai dengan Rp 50 M, dapat mendapatkan fasilitas berupa pengurangan tarif sampai dengan 50% dari yang telah ditetapkan pada pasal 17 ayat 1b

Page 26: Spreadsheet LRT-BaseCase 13102015 (-20%)

Menurut UU No.36 tahun 2008 Pasal 17 ayat 1b, Wajib pajak badan dalam negeri dan badan usaha tetap sebesar 28% dari pendapatan sebelum pajak

Maka, besaran penghasilan kena pajak = 28% x 50% x Penghasilan sebelum pajakBesar pajak =Untuk penghasilan sebelum pajak Rp 4,8 M - Rp 50 M, menggunakan rumus :(0,25 -(0,6 Miliar/Penghasilan sebelum pajak)) x Penghasilan kena pajak

Besar pajak

(14,205,205,411.93) 3.50 (14,205,205,411.93) 3.50

(2,855,746,413.28) 3.61 (577,676,177.69) 4.10

1,784,516,557.91 3.50 5,356,086,369.82 3.50 5,178,167,802.98 3.50

(2,547,020,257.76) 3.50 4,693,805,847.39 3.50 4,007,894,878.66 3.50 3,179,999,300.01 3.50 8,546,238,235.11 3.50

(1,644,144,680.72)

Menurut Pasal 31E ayat 1, bagi wajib pajak badan usaha yang peredaran brutonya sampai dengan Rp 50 M, dapat mendapatkan fasilitas berupa pengurangan tarif sampai dengan 50% dari yang telah ditetapkan pada pasal 17 ayat 1b

Page 27: Spreadsheet LRT-BaseCase 13102015 (-20%)

28% x 50% x Penghasilan sebelum pajak

Page 28: Spreadsheet LRT-BaseCase 13102015 (-20%)

Kondisi Base Case

Cost of Debt (CoD)Tingkat suku bunga 10.00%Pajak yang berlaku 7.50%CoD = Tingkat suku bunga x (1-pajak yang berlaku)

CoD = 9.25%

Cost of Equity (CoE)Berdasarkan Surat Utang Negara 2010 diasumsikan :Risk free rate 7.92%Beta 1.38%Equity risk premium 7.50%Country risk premium 0.00%Spesific risk 2.00%

CoE = 10.02%

WACCWACC debtCoD = 9.25%Weight debt = 30%WACC debt = CoD x Weight debt

WACC debt = 2.78%

WACC equityCoE = 10.02%Weight equity = 70%WACC equity = CoE x Weight equity

WACC equity = 7.01%

TOTAL WACC = WACC debt + WACC equityTOTAL WACC = 9.79%

WACC LRT

premium) + Country risk premium + Spesific risk

Page 29: Spreadsheet LRT-BaseCase 13102015 (-20%)

Pendanaan LRTKondisi Base Case

No. Item Pembiayaan Biaya2015 2016 2017 2018

I PEMBIAYAANBiaya awal proyek

1 Perencanaan (Pembuatan DED) (191,808,000,000.00) (191,808,000,000.00) 0.00 0.00 0.002 Pekerjaan Sipil (7,197,843,000,000.00) 0.00 0.00 (5,038,490,100,000.00) (2,159,352,900,000.00)3 (1,732,144,500,000.00) 0.00 0.00 (1,212,501,150,000.00) (519,643,350,000.00)

4 Rolling Stock (3,586,216,000,000.00) 0.00 0.00 (2,510,351,200,000.00) (1,075,864,800,000.00)5 Pembebasan lahan seluas 4 Ha (80,000,000,000.00) 0.00 (80,000,000,000.00) 0.00 0.00

TOTAL (12,788,011,500,000.00)

Biaya operasional dan maintenance (127,880,115,000.00)6 Biaya operasional, umum dan administrasi (63,940,057,500.00) 0.00 0.00 0.00 0.00 7 Biaya Pemeliharaan Stasiun (25,576,023,000.00) 0.00 0.00 0.00 0.00 8 (38,364,034,500.00) 0.00 0.00 0.00 0.00

Biaya lainnya9 Pengembalian pinjaman (Pokok dan Bunga) 0.00 0.00 (405,863,011,769.48) (405,863,011,769.48)

10 Life Cycle Cost 0.00 0.00 0.00 0.00 11 Depresiasi 0.00 0.00 0.00 0.00

TOTAL PEMBIAYAAN (191,808,000,000.00) (80,000,000,000.00) (9,167,205,461,769.48) (4,160,724,061,769.48)

II PENDAPATAN1 APBN (Untuk pembebasan tanah) 80,000,000,000.00 80,000,000,000.00

Kebutuhan Pendapatan 13,528,767,058,982.50 2 Ekuitas 70% 9,470,136,941,287.77

PT. Pembangunan Jaya (62%) 5,883,920,941,287.77 191,808,000,000.00 0.00 4,871,357,382,305.24 0.00Mitsubishi Electric Co (38%) 3,586,216,000,000.00 0.00 0.00 2,510,351,200,000.00 1,075,864,800,000.00

3 Pinjaman 30% 4,058,630,117,694.76 0.00 0.00 1,379,633,867,694.76 2,678,996,250,000.00

Pendapatan Rutin 4,735,068,470,643.894 Tarif 0.00 0.00 0.00 0.005 Pemasangan iklan 0.00 0.00 0.00 0.006 Sewa properti 0.00 0.00 0.00 0.007 Parkir 0.00 0.00 0.00 0.00

TOTAL PENDAPATAN 191,808,000,000.00 80,000,000,000.00 8,761,342,450,000.00 3,754,861,050,000.00

Sistem persignalan, traffic management, Sistem M&E

Biaya Pemeliharaan Rolling Stock

Page 30: Spreadsheet LRT-BaseCase 13102015 (-20%)

No. Item Pembiayaan Biaya2015 2016 2017 2018

PENDAPATAN SEBELUM PAJAK 0.00 0.00 (405,863,011,769.48) (405,863,011,769.48)Biaya konsesi dengan Pemerintah 0.00 0.00 0.00 0.00Pajak 0.00 0.00 0.00 0.00NET PROFIT 0.00 0.00 (405,863,011,769.48) (405,863,011,769.48)Dividen 0.00 0.00 0.00 0.00Pajak penghasilan untuk dividen 0.00 0.00 0.00 0.00TOTAL CASH FLOW 0.00 0.00 (405,863,011,769.48) (405,863,011,769.48)Total Debt Service 0.00 0.00 (405,863,011,769.48) (405,863,011,769.48)DSCR

NPV Rp172,078,160,780.55 KESIMPULAN Investasi layak dilakukanIRR 11.90%KESIMPULAN Investasi layak dilakukan

Page 31: Spreadsheet LRT-BaseCase 13102015 (-20%)

Pendanaan LRTKondisi Base Case

2019 2020 2021 2022 2023 2024 2025

0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00

(63,940,057,500.00) (71,942,119,095.12) (80,945,634,118.28) (91,075,933,892.74) (102,474,034,885.12) (115,298,601,692.11) (129,728,155,693.87)(25,576,023,000.00) (28,776,847,638.05) (32,378,253,647.31) (36,430,373,557.10) (40,989,613,954.05) (46,119,440,676.84) (51,891,262,277.55)(38,364,034,500.00) (43,165,271,457.07) (48,567,380,470.97) (54,645,560,335.64) (61,484,420,931.07) (69,179,161,015.26) (77,836,893,416.32)

(811,726,023,538.95) (771,139,722,362.01) (730,553,421,185.06) (689,967,120,008.11) (649,380,818,831.16) (608,794,517,654.21) (568,208,216,477.27)0.00 0.00 0.00 0.00 (20,494,806,977.02) 0.00 0.00

(385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15)### ### ### ### ### ### ###

127,880,115,000.00 143,884,238,190.25 161,891,268,236.57 182,151,867,785.48 204,948,069,770.23 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00

1,076,558,202,720.00 1,100,218,822,560.00 1,123,879,442,400.00 1,184,214,022,992.00 1,158,187,341,168.00 1,106,133,977,520.00 1,300,151,060,208.0038,540,000,000.00 39,310,800,000.00 40,081,600,000.00 40,852,400,000.00 41,623,200,000.00 42,394,000,000.00 43,164,800,000.00

1,400,000,000.00 1,470,000,000.00 1,543,500,000.00 1,620,000,000.00 1,701,000,000.00 1,780,000,000.00 1,869,000,000.001,149,020,000.00 1,149,020,000.00 1,149,020,000.00 1,425,690,000.00 1,425,690,000.00 1,425,690,000.00 1,702,360,000.00

1,245,527,337,720.00 1,286,032,880,750.25 1,328,544,830,636.57 1,410,263,980,777.48 1,407,885,300,938.23 1,151,733,667,520.00 1,346,887,220,208.00

Page 32: Spreadsheet LRT-BaseCase 13102015 (-20%)

2019 2020 2021 2022 2023 2024 2025

(79,192,754,665.11) (14,105,033,648.16) 50,986,187,368.79 153,031,039,137.74 147,947,651,513.66 (72,772,007,364.58) 134,108,738,496.85 0.00 352,625,841.20 (1,274,654,684.22) (3,825,775,978.44) (3,698,691,287.84) 1,819,300,184.11 (3,352,718,462.42)0.00 1,057,877,523.61 (3,823,964,052.66) (11,477,327,935.33) (11,096,073,863.52) 5,457,900,552.34 (10,058,155,387.26)

(79,192,754,665.11) (12,694,530,283.34) 45,887,568,631.91 137,727,935,223.96 133,152,886,362.30 (65,494,806,628.12) 120,697,864,647.16 0.00 3,173,632,570.84 (11,471,892,157.98) (34,431,983,805.99) (33,288,221,590.57) 16,373,701,657.03 (30,174,466,161.79)0.00 476,044,885.63 (1,720,783,823.70) (5,164,797,570.90) (4,993,233,238.59) 2,456,055,248.55 (4,526,169,924.27)

(79,192,754,665.11) (9,044,852,826.88) 32,694,892,650.24 98,131,153,847.07 94,871,431,533.14 (46,665,049,722.54) 85,997,228,561.10 (811,726,023,538.95) (771,139,722,362.01) (730,553,421,185.06) (689,967,120,008.11) (649,380,818,831.16) (608,794,517,654.21) (568,208,216,477.27)

0.10 0.01 0.04 0.14 0.15 0.08 0.15

Page 33: Spreadsheet LRT-BaseCase 13102015 (-20%)

Pendanaan LRTKondisi Base Case

2026 2027 2028 2029 2030 2031 2032

0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00

(145,963,560,119.09) (164,230,816,114.54) (184,784,208,741.16) (207,909,846,689.69) (233,929,644,989.74) (263,205,806,152.62) (296,145,862,126.57)(58,385,424,047.63) (65,692,326,445.82) (73,913,683,496.46) (83,163,938,675.88) (93,571,857,995.90) (105,282,322,461.05) (118,458,344,850.63)(87,578,136,071.45) (98,538,489,668.72) (110,870,525,244.70) (124,745,908,013.81) (140,357,786,993.85) (157,923,483,691.57) (177,687,517,275.94)

(527,621,915,300.32) (487,035,614,123.37) (446,449,312,946.42) 0.00 0.00 0.00 0.00 0.00 0.00 (36,956,841,748.23) 0.00 0.00 0.00 0.00

(385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15)### ### (1,238,088,526,023.13) (800,933,647,225.53) (852,973,243,825.64) (911,525,566,151.39) (977,405,678,099.30)

0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00

1,271,576,311,632.00 1,243,001,563,056.00 1,432,650,531,312.00 1,464,137,356,176.00 1,401,163,706,448.00 1,504,269,407,520.00 1,469,688,501,600.0043,935,600,000.00 44,706,400,000.00 45,477,200,000.00 46,248,000,000.00 47,018,800,000.00 47,789,600,000.00 48,560,400,000.00

1,960,000,000.00 2,058,000,000.00 2,160,000,000.00 2,268,000,000.00 2,381,400,000.00 2,500,000,000.00 2,625,000,000.001,702,360,000.00 1,702,360,000.00 1,979,030,000.00 1,979,030,000.00 1,979,030,000.00 2,255,700,000.00 2,255,700,000.00

1,319,174,271,632.00 1,291,468,323,056.00 1,482,266,761,312.00 1,514,632,386,176.00 1,452,542,936,448.00 1,556,814,707,520.00 1,523,129,601,600.00

Page 34: Spreadsheet LRT-BaseCase 13102015 (-20%)

2026 2027 2028 2029 2030 2031 2032

114,511,282,247.36 90,857,122,857.39 244,178,235,288.87 713,698,738,950.47 599,569,692,622.36 645,289,141,368.61 545,723,923,500.71 (2,862,782,056.18) (2,271,428,071.43) (6,104,455,882.22) (17,842,468,473.76) (14,989,242,315.56) (16,132,228,534.22) (13,643,098,087.52)(8,588,346,168.55) (6,814,284,214.30) (18,313,367,646.67) (53,527,405,421.29) (44,967,726,946.68) (48,396,685,602.65) (40,929,294,262.55)

103,060,154,022.62 81,771,410,571.65 219,760,411,759.98 642,328,865,055.42 539,612,723,360.12 580,760,227,231.75 491,151,531,150.64 (25,765,038,505.65) (20,442,852,642.91) (54,940,102,940.00) (160,582,216,263.86) (134,903,180,840.03) (145,190,056,807.94) (122,787,882,787.66)

(3,864,755,775.85) (3,066,427,896.44) (8,241,015,441.00) (24,087,332,439.58) (20,235,477,126.00) (21,778,508,521.19) (18,418,182,418.15)73,430,359,741.12 58,262,130,032.30 156,579,293,378.99 457,659,316,351.99 384,474,065,394.09 413,791,661,902.62 349,945,465,944.83 (527,621,915,300.32) (487,035,614,123.37) (446,449,312,946.42) 0.00 0.00 0.00 0.00

0.14 0.12 0.35 0.00 0.00 0.00 0.00

Page 35: Spreadsheet LRT-BaseCase 13102015 (-20%)

Pendanaan LRTKondisi Base Case

2033 2034 2035 2036

0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00

0.00 0.00 0.00 0.000.00 0.00 0.00 0.00

(333,208,347,249.89) (374,909,181,170.84) (421,828,850,586.32) (474,620,489,771.07)(133,283,338,899.96) (149,963,672,468.34) (168,731,540,234.53) (189,848,195,908.43)(199,925,008,349.94) (224,945,508,702.50) (253,097,310,351.79) (284,772,293,862.64)

0.00 0.00 0.00 0.00 (66,641,669,449.98) 0.00 0.00 0.00

(385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15)(1,118,172,317,795.92) (1,134,932,316,187.83) (1,228,771,655,018.79) (1,334,354,933,388.30)

0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00

1,538,850,313,440.00 1,730,774,341,296.00 1,692,735,344,784.00 1,730,774,341,296.0049,331,200,000.00 50,102,000,000.00 50,872,800,000.00 51,643,600,000.00

2,756,000,000.00 28,940,000,000.00 30,387,000,000.00 31,900,000,000.002,255,700,000.00 2,532,370,000.00 2,532,370,000.00 2,532,370,000.00

1,593,193,213,440.00 1,812,348,711,296.00 1,776,527,514,784.00 1,816,850,311,296.00

Page 36: Spreadsheet LRT-BaseCase 13102015 (-20%)

2033 2034 2035 2036

475,020,895,644.08 677,416,395,108.17 547,755,859,765.21 482,495,377,907.70 (11,875,522,391.10) (16,935,409,877.70) (13,693,896,494.13) (12,062,384,447.69)(35,626,567,173.31) (50,806,229,633.11) (41,081,689,482.39) (36,187,153,343.08)

427,518,806,079.68 609,674,755,597.35 492,980,273,788.69 434,245,840,116.93 (106,879,701,519.92) (152,418,688,899.34) (123,245,068,447.17) (108,561,460,029.23)

(16,031,955,227.99) (22,862,803,334.90) (18,486,760,267.08) (16,284,219,004.39)304,607,149,331.77 434,393,263,363.11 351,248,445,074.44 309,400,161,083.31

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 37: Spreadsheet LRT-BaseCase 13102015 (-20%)

Pendanaan LRTKondisi Base Case

2037 2038 2039 2040 2041 2042 2043

0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00

(534,018,972,380.45) (600,851,141,087.11) (676,047,317,450.89) (760,654,252,242.28) (855,849,696,491.55) (962,958,796,096.19) (1,083,472,538,204.24)(213,607,588,952.18) (240,340,456,434.84) (270,418,926,980.35) (304,261,700,896.91) (342,339,878,596.62) (385,183,518,438.48) (433,389,015,281.70)(320,411,383,428.27) (360,510,684,652.27) (405,628,390,470.53) (456,392,551,345.37) (513,509,817,894.93) (577,775,277,657.72) (650,083,522,922.55)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 (120,170,228,217.42) 0.00 0.00 0.00 0.00 (216,694,507,640.85)

(385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15) (385,113,953,846.15)(1,453,151,898,607.05) (1,706,986,464,237.79) (1,737,208,588,747.92) (1,906,422,458,330.72) (2,096,813,346,829.25) (2,311,031,546,038.54) (2,768,753,537,895.48)

0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00

1,946,540,993,760.00 1,904,679,897,120.00 1,862,818,800,480.00 2,003,053,474,224.00 2,095,147,886,832.00 2,049,100,680,528.00 2,302,178,310,432.0052,414,400,000.00 53,185,200,000.00 53,956,000,000.00 54,726,800,000.00 55,497,600,000.00 56,268,400,000.00 57,039,200,000.0033,495,000,000.00 35,160,000,000.00 36,918,000,000.00 38,763,900,000.00 40,700,000,000.00 42,735,000,000.00 44,860,000,000.00

2,809,040,000.00 2,809,040,000.00 2,809,040,000.00 3,085,710,000.00 3,085,710,000.00 3,085,710,000.00 3,362,380,000.002,035,259,433,760.00 1,995,834,137,120.00 1,956,501,840,480.00 2,099,629,884,224.00 2,194,431,196,832.00 2,151,189,790,528.00 2,407,439,890,432.00

Page 38: Spreadsheet LRT-BaseCase 13102015 (-20%)

2037 2038 2039 2040 2041 2042 2043

582,107,535,152.95 288,847,672,882.21 219,293,251,732.08 193,207,425,893.28 97,617,850,002.75 (159,841,755,510.54) (361,313,647,463.48)(14,552,688,378.82) (7,221,191,822.06) (5,482,331,293.30) (4,830,185,647.33) (2,440,446,250.07) 3,996,043,887.76 9,032,841,186.59 (43,658,065,136.47) (21,663,575,466.17) (16,446,993,879.91) (14,490,556,942.00) (7,321,338,750.21) 11,988,131,663.29 27,098,523,559.76

523,896,781,637.65 259,962,905,593.99 197,363,926,558.87 173,886,683,303.95 87,856,065,002.47 (143,857,579,959.49) (325,182,282,717.14)(130,974,195,409.41) (64,990,726,398.50) (49,340,981,639.72) (43,471,670,825.99) (21,964,016,250.62) 35,964,394,989.87 81,295,570,679.28

(19,646,129,311.41) (9,748,608,959.77) (7,401,147,245.96) (6,520,750,623.90) (3,294,602,437.59) 5,394,659,248.48 12,194,335,601.89 373,276,456,916.83 185,223,570,235.72 140,621,797,673.20 123,894,261,854.07 62,597,446,314.26 (102,498,525,721.13) (231,692,376,435.96)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 39: Spreadsheet LRT-BaseCase 13102015 (-20%)

Pendanaan LRTKondisi Base Case

2044

0.000.000.00

0.000.00

(1,219,068,506,151.82)(487,627,402,460.73)(731,441,103,691.09)

0.00 0.00

(385,113,953,846.15)(2,823,250,966,149.79)

0.000.000.00

2,352,775,635,936.0057,810,000,000.0047,103,000,000.00

3,362,380,000.002,461,051,015,936.00

Page 40: Spreadsheet LRT-BaseCase 13102015 (-20%)

2044

(362,199,950,213.79)9,054,998,755.34

27,164,996,266.03 (325,979,955,192.41)

81,494,988,798.10 12,224,248,319.72

(232,260,718,074.60)0.00 0.00

Page 41: Spreadsheet LRT-BaseCase 13102015 (-20%)

Pengembalian Pinjaman LRTKondisi Base Case

Lender : Sindikasi Bank Dalam Negeri (Bank DKI, Bank BNI dan Bank Mandiri)Pinjaman : 4,058,630,117,694.76 Bunga : 10.00%Tenor : 10Grace Period : 2 TahunPokok/thn : 405,863,011,769.48

No. Tahun Hutang Pembayaran

Pokok1 2017 (4,058,630,117,694.76) 0.00 2 2018 (4,058,630,117,694.76) 0.00 3 2019 (4,058,630,117,694.76) (405,863,011,769.48)4 2020 (3,652,767,105,925.28) (405,863,011,769.48)5 2021 (3,246,904,094,155.81) (405,863,011,769.48)6 2022 (2,841,041,082,386.33) (405,863,011,769.48)7 2023 (2,435,178,070,616.85) (405,863,011,769.48)8 2024 (2,029,315,058,847.38) (405,863,011,769.48)9 2025 (1,623,452,047,077.90) (405,863,011,769.48)

10 2026 (1,217,589,035,308.43) (405,863,011,769.48)11 2027 (811,726,023,538.95) (405,863,011,769.48)12 2028 (405,863,011,769.48) (405,863,011,769.48)13 2029 0.00 14 2030 0.00 15 2031 0.00 16 2032 0.00 17 2033 0.00 18 2034 0.00 19 2035 0.00 20 2036 0.00 21 2037 0.00 22 2038 0.00 23 2039 0.00 24 2040 0.00 25 2041 0.00 26 2042 0.00 27 2043 0.00 28 2044 0.00

JUMLAH (4,058,630,117,694.76)

Page 42: Spreadsheet LRT-BaseCase 13102015 (-20%)

Pengembalian Pinjaman LRTKondisi Base Case

Sindikasi Bank Dalam Negeri (Bank DKI, Bank BNI dan Bank Mandiri)

PembayaranJumlah Pokok + Bunga

Bunga10.00% (405,863,011,769.48) (405,863,011,769.48)10.00% (405,863,011,769.48) (405,863,011,769.48)10.00% (405,863,011,769.48) (811,726,023,538.95)10.00% (365,276,710,592.53) (771,139,722,362.01)10.00% (324,690,409,415.58) (730,553,421,185.06)10.00% (284,104,108,238.63) (689,967,120,008.11)10.00% (243,517,807,061.69) (649,380,818,831.16)10.00% (202,931,505,884.74) (608,794,517,654.21)10.00% (162,345,204,707.79) (568,208,216,477.27)10.00% (121,758,903,530.84) (527,621,915,300.32)10.00% (81,172,602,353.90) (487,035,614,123.37)10.00% (40,586,301,176.95) (446,449,312,946.42)10.00% 0.00 0.00 10.00% 0.00 0.00 10.00% 0.00 0.00 10.00% 0.00 0.00 10.00% 0.00 0.00 10.00% 0.00 0.00 10.00% 0.00 0.00 10.00% 0.00 0.00 10.00% 0.00 0.00 10.00% 0.00 0.00 10.00% 0.00 0.00 10.00% 0.00 0.00 10.00% 0.00 0.00 10.00% 0.00 0.00 10.00% 0.00 0.00 10.00% 0.00 0.00

(3,043,972,588,271.07) (7,102,602,705,965.83)

Page 43: Spreadsheet LRT-BaseCase 13102015 (-20%)

Depresiasi LRTKondisi Base Case

Item yang terdepresiasi :1 Pekerjaan Sipil2

3 Rolling StockTOTAL

Salvage Value :Waktu :Depresiasi/thn :

No. Tahun Capex

1 2019 (12,516,203,500,000.00)2 2020 (12,131,089,546,153.80)3 2021 (11,745,975,592,307.70)4 2022 (11,360,861,638,461.50)5 2023 (10,975,747,684,615.40)6 2024 (10,590,633,730,769.20)7 2025 (10,205,519,776,923.10)8 2026 (9,820,405,823,076.92)9 2027 (9,435,291,869,230.77)

10 2028 (9,050,177,915,384.61)11 2029 (8,665,063,961,538.46)12 2030 (8,279,950,007,692.30)13 2031 (7,894,836,053,846.15)14 2032 (7,509,722,099,999.99)15 2033 (7,124,608,146,153.84)16 2034 (6,739,494,192,307.69)17 2035 (6,354,380,238,461.53)18 2036 (5,969,266,284,615.38)19 2037 (5,584,152,330,769.22)20 2038 (5,199,038,376,923.07)21 2039 (4,813,924,423,076.91)22 2040 (4,428,810,469,230.76)23 2041 (4,043,696,515,384.61)24 2042 (3,658,582,561,538.45)25 2043 (3,273,468,607,692.30)26 2044 (2,888,354,653,846.14)

2045 (2,503,240,699,999.99)

Stasiun, Depot, Traffic Management, Utilitas Pengalihan, Sistem E&M, Jalur dll

Page 44: Spreadsheet LRT-BaseCase 13102015 (-20%)

Depresiasi LRTKondisi Base Case

(7,197,843,000,000.00)(1,732,144,500,000.00)

(3,586,216,000,000.00)###

2,503,240,700,000.00 26 tahun

(385,113,953,846.15)

Depresiasi Akumulasi Depresiasi

(385,113,953,846.15) (385,113,953,846.15)(385,113,953,846.15) (770,227,907,692.31)(385,113,953,846.15) (1,155,341,861,538.46)(385,113,953,846.15) (1,540,455,815,384.62)(385,113,953,846.15) (1,925,569,769,230.77)(385,113,953,846.15) (2,310,683,723,076.92)(385,113,953,846.15) (2,695,797,676,923.08)(385,113,953,846.15) (3,080,911,630,769.23)(385,113,953,846.15) (3,466,025,584,615.38)(385,113,953,846.15) (3,851,139,538,461.54)(385,113,953,846.15) (4,236,253,492,307.69)(385,113,953,846.15) (4,621,367,446,153.85)(385,113,953,846.15) (5,006,481,400,000.00)(385,113,953,846.15) (5,391,595,353,846.16)(385,113,953,846.15) (5,776,709,307,692.31)(385,113,953,846.15) (6,161,823,261,538.46)(385,113,953,846.15) (6,546,937,215,384.62)(385,113,953,846.15) (6,932,051,169,230.77)(385,113,953,846.15) (7,317,165,123,076.93)(385,113,953,846.15) (7,702,279,076,923.08)(385,113,953,846.15) (8,087,393,030,769.24)(385,113,953,846.15) (8,472,506,984,615.39)(385,113,953,846.15) (8,857,620,938,461.54)(385,113,953,846.15) (9,242,734,892,307.70)(385,113,953,846.15) (9,627,848,846,153.85)(385,113,953,846.15) (10,012,962,800,000.00)SALVAGE VALUE

Page 45: Spreadsheet LRT-BaseCase 13102015 (-20%)

Kondisi Base Case

a Asumsi besaran penghasilan kena pajak (pkp) = 30% x Pendapatan sebelum pajakb Besar pajak =

Untuk penghasilan sebelum pajak Rp 4,8 M - Rp 50 M, menggunakan rumus :(25% -(0,6 Miliar/Pendapatan sebelum pajak)) x Penghasilan kena pajak

Untuk penghasilan sebelum pajak > Rp 50 M, menggunakan rumus :25% x Penghasilan kena pajak

No. Tahun Pendapatan sebelum pajak Penghasilan kena pajak

1 2019 (79,192,754,665.11) 0.00 2 2020 (14,105,033,648.16) (4,231,510,094.45)3 2021 50,986,187,368.79 15,295,856,210.64 4 2022 153,031,039,137.74 45,909,311,741.32 5 2023 147,947,651,513.66 44,384,295,454.10 6 2024 (72,772,007,364.58) (21,831,602,209.37)7 2025 134,108,738,496.85 40,232,621,549.05 8 2026 114,511,282,247.36 34,353,384,674.21 9 2027 90,857,122,857.39 27,257,136,857.22 10 2028 244,178,235,288.87 73,253,470,586.66 11 2029 713,698,738,950.47 214,109,621,685.14 12 2030 599,569,692,622.36 179,870,907,786.71 13 2031 645,289,141,368.61 193,586,742,410.58 14 2032 545,723,923,500.71 163,717,177,050.21 15 2033 475,020,895,644.08 142,506,268,693.23 16 2034 677,416,395,108.17 203,224,918,532.45 17 2035 547,755,859,765.21 164,326,757,929.56 18 2036 482,495,377,907.70 144,748,613,372.31 19 2037 582,107,535,152.95 174,632,260,545.88 20 2038 288,847,672,882.21 86,654,301,864.66 21 2039 219,293,251,732.08 65,787,975,519.62 22 2040 193,207,425,893.28 57,962,227,767.98 23 2041 97,617,850,002.75 29,285,355,000.82 24 2042 (159,841,755,510.54) (47,952,526,653.16)25 2043 (361,313,647,463.48) (108,394,094,239.05)26 2044 (362,199,950,213.79) (108,659,985,064.14)

JUMLAH

Corporate Tax LRT

Page 46: Spreadsheet LRT-BaseCase 13102015 (-20%)

Kondisi Base Case

Asumsi besaran penghasilan kena pajak (pkp) = 30% x Pendapatan sebelum pajakBesar pajak =Untuk penghasilan sebelum pajak Rp 4,8 M - Rp 50 M, menggunakan rumus :(25% -(0,6 Miliar/Pendapatan sebelum pajak)) x Penghasilan kena pajak

Besar pajak

0.00 (1,057,877,523.61)3,823,964,052.66

11,477,327,935.33 11,096,073,863.52 (5,457,900,552.34)10,058,155,387.26

8,588,346,168.55 6,814,284,214.30

18,313,367,646.67 53,527,405,421.29 44,967,726,946.68 48,396,685,602.65 40,929,294,262.55 35,626,567,173.31 50,806,229,633.11 41,081,689,482.39 36,187,153,343.08 43,658,065,136.47 21,663,575,466.17 16,446,993,879.91 14,490,556,942.00

7,321,338,750.21 (11,988,131,663.29)(27,098,523,559.76)(27,164,996,266.03)

452,507,371,743.05

Corporate Tax LRT

Page 47: Spreadsheet LRT-BaseCase 13102015 (-20%)

Kondisi Base Case

Hutang = (4,058,630,117,694.76)

No. Tahun Hutang

1 2017 (4,058,630,117,694.76) (405,863,011,769.48)2 2018 (405,863,011,769.48)3 2019 (79,192,754,665.11)4 2020 (9,044,852,826.88)5 2021 32,694,892,650.24 6 2022 98,131,153,847.07 7 2023 94,871,431,533.14 8 2024 (46,665,049,722.54)9 2025 85,997,228,561.10

10 2026 73,430,359,741.12 11 2027 58,262,130,032.30 12 2028 156,579,293,378.99 13 2029 457,659,316,351.99 14 2030 384,474,065,394.09 15 2031 413,791,661,902.62 16 2032 349,945,465,944.83 17 2033 304,607,149,331.77 18 2034 434,393,263,363.11 19 2035 351,248,445,074.44 20 2036 309,400,161,083.31 21 2037 373,276,456,916.83 22 2038 185,223,570,235.72 23 2039 140,621,797,673.20 24 2040 123,894,261,854.07 25 2041 62,597,446,314.26 26 2042 (102,498,525,721.13)27 2043 (231,692,376,435.96)28 2044 (232,260,718,074.60)

Payback Periode LRT

Total cash flow

Page 48: Spreadsheet LRT-BaseCase 13102015 (-20%)

Kondisi Base Case

Jumlah sisa hutang Keterangan

(4,464,493,129,464.24)(4,870,356,141,233.71)(4,949,548,895,898.82)(4,958,593,748,725.70)(4,925,898,856,075.46)(4,827,767,702,228.39)(4,732,896,270,695.25)(4,779,561,320,417.79)(4,693,564,091,856.69)(4,620,133,732,115.57)(4,561,871,602,083.27)(4,405,292,308,704.28)(3,947,632,992,352.29)(3,563,158,926,958.20)(3,149,367,265,055.58)(2,799,421,799,110.76)(2,494,814,649,778.99)(2,060,421,386,415.88)(1,709,172,941,341.44)(1,399,772,780,258.13)(1,026,496,323,341.30)

(841,272,753,105.58)(700,650,955,432.39)(576,756,693,578.32)(514,159,247,264.06)(616,657,772,985.20)(848,350,149,421.15)

(1,080,610,867,495.75)

Payback Periode LRT