Social Housing Foundation [PMG note: photo’s have been removed]. Presentation to Portfolio Committee on Housing 14 May 2008. “Building Communities, Building Social Housing”. Contents. Mandate Company Structure and Strategic Objectives Key Performance Areas - PowerPoint PPT Presentation

Citation preview

Page 1: Social Housing Foundation [PMG note: photo’s have been removed]

Social Housing Social Housing

FoundationFoundation[PMG note: photo’s have been removed][PMG note: photo’s have been removed]

“Building Communities,

Building Social Housing”

Presentation to Portfolio Presentation to Portfolio

Committee on Housing 14 Committee on Housing 14

May 2008May 2008

Page 2: Social Housing Foundation [PMG note: photo’s have been removed]

Contents

1. Mandate2. Company Structure and Strategic

Objectives3. Key Performance Areas4. Provincial Operations & Priorities for

MTEF5. Financial Implications6. Corporate Governance

Page 3: Social Housing Foundation [PMG note: photo’s have been removed]

1. Mandate[PMG note: photo’s have been removed][PMG note: photo’s have been removed]

Page 4: Social Housing Foundation [PMG note: photo’s have been removed]

1. Mandate (1)

1.1 Legal StatusThe Social Housing Foundation was established as a section 21 company in 1997 under the Companies Act (Act 61 of 1973). The Social Housing Foundation (SHF) is a Schedule 3A Public Entity as indicated in the PFMA and Treasury Regulations

1.2 MissionThe mission of the SHF is to provide strategic services towards creating and developing a sustainable and vibrant social housing sector in South Africa

Page 5: Social Housing Foundation [PMG note: photo’s have been removed]

1. Mandate (2)

1.3 Mandate• The organisation was established as a national institution and is

formally mandated by the National Department of Housing to develop and build capacity for social housing institutions and to develop a policy framework for the social housing sector through the Housing Amendment Act 20 of 1999.

• SHF has also been mandated by NDoH to be the Implementing Agent for the Interim Social Housing Programme (in the absence of SHRA)

• SHF has championed the new National Rental Housing Strategy.• SHF is the entity that has been tasked to manage the

VROM/NDoH MOU.• SHF is working with the SIU at NDoH on the Turnaround of

distressed projects.

Page 6: Social Housing Foundation [PMG note: photo’s have been removed]

1.4 Mandate (contd)•Central to this goal, SHF creates credible social housing institutions (SHIs) and simultaneously develops housing capacity.

•We deliver expertise, products and services in response to the challenges impacting the South African social housing environment.

1. Mandate (3)

Page 7: Social Housing Foundation [PMG note: photo’s have been removed]

1. Mandate (4)1.4 Mandate (contd)Expertise - project development

- project packing

- project modeling

- property management

Services - advise

- facilitation

- information research

- training

Products - tools

- methodologies

- best practise (models)

Page 8: Social Housing Foundation [PMG note: photo’s have been removed]

2. Company Structure[PMG note: photo’s have been removed][PMG note: photo’s have been removed]

Page 9: Social Housing Foundation [PMG note: photo’s have been removed]

2. Company Structure (1)

2.3 Structure

Executive Management

Strategic Management Stakeholder Management Organisational Development Organisational Performance

Implementation of programmes

Delivery arm Support Research Financial Planning & Management

Systems Development, budgeting, cost control, procurement & reporting

Management Information

Page 10: Social Housing Foundation [PMG note: photo’s have been removed]

2.4 Alignment

ISHP

Long Term Funding

• Grants/Subsidies

• Bridging/Equity

(TUHF)

• Loans (P/Sector)

PROJECTPROGRAM:

OUTCOMES:

PSSP

Increase Number of Units Delivered

SHI SUPPORT (Technical)

R & D TURNAROUND(Dept. Lead)

• Regulator Skills Developed• Base Information for SHRA• Social Housing Act

Funding & MonitoringYear 2006/2007

• Prov S/Com• LGSHF• Tools & Product

• Project Planning & Packaging

• Project Development

• Property Management

Monitoring & Evaluation

• KWTHA• AHA• EHI• FREE STATE

• Consultants• Contract Staff• Permanent Staff

• Contract Staff• Permanent Staff

SALGA/VNG

• Contract Staff• Permanent Staff• TA’s (Rooftops

Support)

• Permanent Staff• Contract Staff

• Permanent Staff• Consultants• Contract Staff• NDoH• Provinces• (NHFC)

PURPOSE:

HUMAN RESOURCES:

FUNDING RESOURCES:

NDoH NDoH/VROM/SALGA/VNG NDoH/VROM NDoH/NHFC & Provinces

Capacity (increase) to grow in Sector

Page 11: Social Housing Foundation [PMG note: photo’s have been removed]

2. Strategic Objectives[PMG note: photo’s have been removed][PMG note: photo’s have been removed]

Page 12: Social Housing Foundation [PMG note: photo’s have been removed]

2. Strategic Objectives (1)

2.1 Strategic Objectives (SO’s)

• SO 1: Policy Support• SO 2: Monitoring & Evaluation• SO 3: Delivery Agent’s support• SO 4: Sector Communication, professionalisation

and knowledge management• SO 5: Government Support• SO 6: Operational Management

Page 13: Social Housing Foundation [PMG note: photo’s have been removed]

2.2 Strategic

Objectives (SO’s) vs

Workstreams

Page 14: Social Housing Foundation [PMG note: photo’s have been removed]

3. Key Performance Areas[PMG note: photo’s have been removed][PMG note: photo’s have been removed]

Page 15: Social Housing Foundation [PMG note: photo’s have been removed]

3. Key Performance Areas (1)

3.1 Past Performance

Current

2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11

No. SHIs receiving funds 19 12 17 4 2 3 4

No. projects funded 13 33 28 4 4 4 5

No. units financed 1698 1440 1751 2000

No. SHIs receiving capacity development support 10 17 21 7 10 20 30

Number of workshops held with SHI personnel 8 19 25 24 24 24 24

Number of times where Technical Assistance were provided to SHI's 8 8 3 8 10 15 20

Number of SHI's using the tools created by SHF 13 18 24 24 24 30 30

IndicatorsProjectedPast

Performance

Page 16: Social Housing Foundation [PMG note: photo’s have been removed]

3. Key Performance Areas (2)

3.2 Current Performance

Current

2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11

No. SHIs receiving funds 19 12 17 4 2 3 4

No. projects funded 13 33 28 4 4 4 5

No. units financed 1698 1440 1751 2000

No. SHIs receiving capacity development support 10 17 21 7 10 20 30

Number of workshops held with SHI personnel 8 19 25 24 24 24 24

Number of times where Technical Assistance were provided to SHI's 8 8 3 8 10 15 20

Number of SHI's using the tools created by SHF 13 18 24 24 24 30 30

IndicatorsProjectedPast

Performance

Page 17: Social Housing Foundation [PMG note: photo’s have been removed]

3. Key Performance Areas (3)

3.3 ISHP : 2006/07Province Municipality SHI Project Units Value

Western Cape City of Cape Town Thubelisha N2 Gateway: Joe Slovo

705 42 582000

KZN uNgungundlovu Msunduzi Signal Hill 487 21 985 600

KZN eThekwini SOHCO Hillary Umkumbaan

364 29 414 828

KZN eThekwini SOHCO Lindar House 142 8 576 800

Sub-Total 102 559 228

Operations 4 690 402

Total 1 698 107 249 630

Page 18: Social Housing Foundation [PMG note: photo’s have been removed]

3.4 Turnaround InterventionsProvince Municipality Project No.Units Length of

Engagement

Eastern Cape Buffalo City KWTHA 759 9 months

Eastern Cape NMMM Abahlali 328 9 months

Western Cape City of Cape Town N2 Gateway: Joe Slovo

705 6 months

Mpumalanga Witbank EHI/Emahlaleni 676 12 months

3. Key Performance Areas (4)

Page 19: Social Housing Foundation [PMG note: photo’s have been removed]

3. Key Performance Areas (5)

3.5 Future Projections

Current

2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11

No. SHIs receiving funds 19 12 17 4 2 3 4

No. projects funded 13 33 28 4 4 4 5

No. units financed 1698 1440 1751 2000

No. SHIs receiving capacity development support 10 17 21 7 10 20 30

Number of workshops held with SHI personnel 8 19 25 24 24 24 24

Number of times where Technical Assistance were provided to SHI's 8 8 3 8 10 15 20

Number of SHI's using the tools created by SHF 13 18 24 24 24 30 30

IndicatorsProjectedPast

Performance

Page 20: Social Housing Foundation [PMG note: photo’s have been removed]

4. Provincial Operations (coverage)

[PMG note: photo’s have been removed][PMG note: photo’s have been removed]

Page 21: Social Housing Foundation [PMG note: photo’s have been removed]

4. Provincial Operations (coverage)(1)

4.1 Previous Output

PROVINCE SHI’S UNITS

Eastern Cape 7 13 522

Free-State 3 905

KwaZulu-Natal 6 4 454

Limpopo 1 500 in progress

Mpumalanga 3 1 966

North West 1 150

Western Cape 2 3 835

Gauteng 32 27 433

Northern Cape 1 511

TOTAL 56 52 776

Page 22: Social Housing Foundation [PMG note: photo’s have been removed]

4.2 Geographical Spread

Page 23: Social Housing Foundation [PMG note: photo’s have been removed]

PROVINCE LOCAL AUTHORITY NO OF PROJECTS NO OF UNITS

Gauteng City of Joburg 16 6073Ekurhuleni 5 3000City of Tshwane 5 1208

Sub-Total 26 10281

Eastern Cape Buffalo City 3 1182Sub-Total 3 1182

KZN Msunduzi 6 2820Ethekwini 11 3245

Sub-Total 17 6065

North West Rustenburg 2 9583Potchefstroom 2

Sub-Total 4 9583

Western Cape City of Cape Town 7 1199Sub-Total 7 1199

CRU PROJECTSFree State CRU

Dihlabeng 3 470Maluti 1 120Mangaung 3 80Masilonyana 1 75Mathjhabeng 3 158Metsimaholo 5 871Moqhaka 4 382

Sub-Total 20 2156

SH & RDPDihlabeng 1 50Kopanong (15 of 215 is RDP) 2 215

Sub-Total 3 265Free State Total 23 2421

Total 57 30731

PROVINCIAL PROJECT PIPELINE OVERVIEW

PROJECT DETAILS

SOCIAL HOUSING PROJECTS 4.3 Current

Pipeline

Page 24: Social Housing Foundation [PMG note: photo’s have been removed]

4. Provincial Operations (coverage)(4)

4.4 PSSP• PSC’s : set up in 6 provinces (Gauteng, KZN, W Cape, NW

Province, Free State, Eastern Cape• Eastern Cape requires technical support, Mpumalanga

lagging• PRZ’s : of the 13 as per Phase 1 in policy, 10 have council

resolutions.• CoJ, Tshwane, Ekurhuleni, eThekwini, CCT, Msunduzi, Buffalo

City, NMMM, Rustenburg/Potch, Mangaung on track• Nelspruit, Sol Plaatjie, Polokwane lagging.• Pipeline: process (both SH + CRU) – commitment from

province, municipality, SHI’s. Tools provided – capacitation. Strategy which goes to sub-committees of NSHTT – outlines an approach, engagement, scan, unblocking, workshops

Page 25: Social Housing Foundation [PMG note: photo’s have been removed]

4. Provincial Operations (coverage)(5)

4.5 Turnaround Interventions• Finalise Abahlali – complete sales and transfers• Support KWTHA legal process• Complete N2 Gateway: Joe Slovo interventions• Fast-track EHI interventions• Welkom projects to come on board• Gauteng projects to come on board.• Other projects as per official list

Page 26: Social Housing Foundation [PMG note: photo’s have been removed]

4. Provincial Operations (coverage)(6)

4.6 ISHP 2007/08 + 2008/09 • 10 projects shortlisted with 4000 units• Will be able to fund 3 projects with approximately 1300 units

with R180m budget.• 2008/09 : Calls for proposals has begun using the existing

pipeline.• Will be able to build approximately 1500 units with R196m

budget• Unit works closely with both TSSP and PSSP

Page 27: Social Housing Foundation [PMG note: photo’s have been removed]

4. Provincial Operations (coverage)(7)

4.7 R&D + M&E• Multi-Disciplinary Task Teams appointment (with PSSP &

TSSP)• Working with City of Johannesburg – conducting a socio-

economic survey for San Jose/Zinn building (Constitutional Court ruling)

• Also working with Gauteng Department of Housing on Assessment of TRG intervention.

Page 28: Social Housing Foundation [PMG note: photo’s have been removed]

4. Provincial Operations (coverage)(8)

4.8 National Rental Strategy

Page 29: Social Housing Foundation [PMG note: photo’s have been removed]

4.9 Operational Burning Issues

Page 30: Social Housing Foundation [PMG note: photo’s have been removed]

5. Financial Implications[PMG note: photo’s have been removed][PMG note: photo’s have been removed]

Page 31: Social Housing Foundation [PMG note: photo’s have been removed]

Financial ImplicationsIncome and Expenditure 2007-2008 (Unaudited)

Page 32: Social Housing Foundation [PMG note: photo’s have been removed]

Financial ImplicationsBalance Sheet 31 March 2008 (unaudited)

Page 33: Social Housing Foundation [PMG note: photo’s have been removed]

Financial ImplicationsInternal Costs Breakdown (Unaudited)

Page 34: Social Housing Foundation [PMG note: photo’s have been removed]

Financial Implications Schematic Breakdown of Operational Costs

2007-2008

Page 35: Social Housing Foundation [PMG note: photo’s have been removed]

Financial ImplicationsISHP expenditure 2007-2008 (Unaudited)

Page 36: Social Housing Foundation [PMG note: photo’s have been removed]

Financial Implications Income & Expenditure Projections 2008-2009: Income

2008-2009 2009-2010 2010-2011 2011-2012

INCOME - DoHInterest received 922 503 750 000 750 000 750 000 Transfer funding - DoH 21 738 000 23 129 000 24 478 030 26 191 492

Other income 0 0 0 0

TOTAL INCOME - DoH 22 660 503 23 879 000 25 228 030 26 941 492

STRATEGIC OBJECTIVESSO 1 = Policy Support 205 600 230 000 240 000 250 000 SO 2 = Monitoring and Evaluation 1 707 000 1 420 000 1 530 000 1 600 000

SO 3 = Delivery Agent Support 4 302 000 4 170 000 4 440 000 4 440 000 SO 4 = Communication,Professionalisation, 1 933 600 1 967 000 2 199 000 2 358 000

SO 5 = Public Sector Support 829 200 740 000 770 000 800 000

INTERNAL COSTS 13 683 103 15 282 040 15 974 872 17 414 144

TOTAL COSTS 22 660 503 23 879 000 25 228 030 26 941 492

NET SURPLUS / (DEFICIT) 0 0 0 0

Page 37: Social Housing Foundation [PMG note: photo’s have been removed]

Financial Implications Income & Expenditure Projections 2008-2009 : Expenditure

INTERNAL COSTS Total 2009-2010 2010-2011 2011-2012

Annual report 140 000 160 000 160 000 170 000 Audit Fees 650 000 580 000 600 000 620 000 Consulting 597 000 600 000 636 000 680 520 Computer running costs 647 480 686 329 727 509 778 434 Depreciation 495 560 483 604 370 000 670 000 Legal Fees 213 500 200 000 200 000 302 029 Management Fee 276 000 270 000 270 000 270 000 Office running costs 1 555 952 1 686 089 2 065 847 1 927 938 Rent 1 431 737 1 560 592 1 692 079 1 844 366 Salaries - Gross 6 109 874 7 366 467 7 548 942 8 355 046 Staff recruitment costs 200 000 200 000 200 000 200 000 Staff training 360 000 381 600 404 496 432 811 Travel and accommodation- international 150 000 200 000 200 000 200 000 Travel and accommodation-domestic 856 000 907 360 900 000 963 000

TOTAL 13 683 103 15 282 040 15 974 872 17 414 144

Page 38: Social Housing Foundation [PMG note: photo’s have been removed]

Financial Implications Income & Expenditure: Breakdown of Operational Portion

Annual report

Audit Fees

Consulting

Computer running costs

Depreciation

Legal Fees

Management Fee

Office running costs

Rent

Salaries - Gross

Staff recruitment costs

Staff training

Travel and accommodation- international

Travel and accommodation-domestic

Annual report 140 000 Audit Fees 650 000 Consulting 597 000 Computer running costs 647 480 Depreciation 495 560 Legal Fees 213 500 Management Fee 276 000 Office running costs 1 555 952 Rent 1 431 737 Salaries - Gross 6 109 874 Staff recruitment costs 200 000 Staff training 360 000 Travel and accommodation- international 150 000 Travel and accommodation-domestic 856 000

Page 39: Social Housing Foundation [PMG note: photo’s have been removed]

Financial Implications Income & Expenditure Projections : ISHP

Page 40: Social Housing Foundation [PMG note: photo’s have been removed]

5. Financial ImplicationsBalance Sheets

31-Mar-08 31-Mar-09 31-Mar-10 31-Mar-11 31-Mar-12Capital Employed

Accumulated Funds 17 825 290 17 825 290 17 825 290 17 825 290 17 825 290

17 825 290 17 825 290 17 825 290 17 825 290 17 825 290

Employment of Capital

Fixed Assets 579 290 521 730 600 000 550 000 550 000

Current Assets 198 031 000 132 623 559 74 095 290 39 075 290 18 905 290 Cash on Hand - SHF 18 000 000 18 092 559 18 745 290 18 505 290 18 305 290 Cash on Hand - ISHP 1 18 500 000 4 000 000 0 0 0 Cash on Hand - ISHP 2 161 000 000 40 000 000 0 0 0 Cash on Hand - ISHP 3 0 70 000 000 54 800 000 20 000 000 0 Accounts receivable & Deposits 531 000 531 000 550 000 570 000 600 000

Current Liabilities 180 785 000 115 320 000 56 870 000 21 800 000 1 630 000

Donor Funds - deferred income - ISHP 1 18 500 000 4 000 000 0 0 0 Donor Funds - deferred income - ISHP 2 161 000 000 40 000 000 0 0 0 Donor Funds - deferred income - ISHP 3 0 70 000 000 54 800 000 20 000 000 0 NHFC 493 000 528 000 570 000 600 000 630 000 Accounts payable 792 000 792 000 1 500 000 1 200 000 1 000 000

Net Current Assets 17 246 000 17 303 559 17 225 290 17 275 290 17 275 290

17 825 290 17 825 290 17 825 290 17 825 290 17 825 290

Page 41: Social Housing Foundation [PMG note: photo’s have been removed]

Financial Implications

MATERIALITY FRAMEWORK

Materiality Basis Guideline % % used Rand Value Materiality Value

Gross Income 0.25% to 1% 0.50% 22 660 503 113 303

Gross expenses 0.25% to 1% 0.50% 22 660 503 113 303

Total Assets 0.5% to 2% 1% 132 623 559 1 326 236

Net Income/loss 2.5% to 10% 3% 0 0

Fraud 100% of actual cost

Materiality is calculated for the company as a whole and not for each component. All componentsare indicators of performance. However, the gross expenses component would be selected as a basis for materiality calculation, as it is a reflection of the level of acvtivity of the company as awholeManagement would be requested to adjust all material misstatements detected accordingly.It should be noted that 100% of the cost of any fraud would be reported and adjusted for

Page 42: Social Housing Foundation [PMG note: photo’s have been removed]

6. Corporate Governance6.1 Governance• Executive Officer – Minister of Housing• Executive Authority – 7 members

– Requires 2 new members = NDOH advised• Accounting Authority – Board of Directors

– Requires 2 additional directors = NDOH advised• Accounting Officer – Managing Director• Board Committees – Audit (including fraud and risk); Human Resources, Ethics and

Remuneration = Charters in place• Board Technical Sub Committee for ISHP approvals in place• PFMA – Treasury Guidelines, King Code II and Protocol of Corporate Governance

compliant• Shareholders Compact = currently being reviewed by BOD• External audit – 10 years unqualified audit reports• Internal audit – in place, perform annual risk assessment and three targeted evaluations

annually = no major problems found• Fraud plan, Risk plan, Business Interruption plan, HR strategy plan in place• Employment Equity plan in place• NPO registration applied for and waiting confirmation