14
Smart Grids for Future City May 2015

Smart Grids for Future City May 2015. 61 Mln Clients 45 Mln Smart Meters 30 Countries 96 GW Installed Capacity 2

Embed Size (px)

Citation preview

Smart Grids for Future City

May 2015

61 Mln Clients45 Mln Smart Meters

30 Countries

96 GW Installed Capacity

2

Enel Smart MeteringBenefits for Utilities and Customers

3

• Remote readings• Remote activation• Lower switching costs • Lower meter

maintenance

Expenses for field operations decrease

- 38%

• Better accuracy/ reliability billing• Lower claims management• Optimization of back-office /

lower customer service costs• New flexible tariffs/ better pricing

methodology

Customer Service

- 26%

• Loss detection• Energy balance• Stimulates bills and payment

culture

Revenue Protection & Cash collection

- 28%

Enel Smart Grids The Value of an Integrated Solution

SMART METERING

SMARTGRIDS STORAGE

ENERGYMANAGEMENT

LED LIGHTING

ELECTRICMOBILITY

From Smart Grids to Smart CityEnergy, Networks, Home and Urban Services

Renewables IntegrationDispatchingNetwork AutomationForecastStorage

Secondary Substation as Data HubSensors networkBig DataUrban, environmental, energy data

Electric MobilityVehicle-to-GridFast-ChargeLoad ShapingDistributed Storage

Active DemandServices for the MarketSmart-InfoEnergy-BoxLoad balancing

Smart MetersElectricityGasWaterHeat

Broad BandUltra-broad Band

Big Data

Cloud Computing

EXPO 2015 MilanoThe first greenfield Smart City in the World

6

147 participants

20 mlnvisitors

1 mlnsm area

Food Cultures and Sustainabilitythe theme

184 days

7

Enel is EXPO 2015 Smart Energy Partner, bringing to the exhibition state-of-the-art Smart Grids technologies:

Innovative automatic grid control and fault detection systems for electricity distribution network management (50MW are required)

80 MV delivery substations for pavilions, with MV close ring, 10 MV feeders, 10 MV delivery substations

Storage System and integration of RES

EMS for Pavilions and Palazzo Italia

Over 8.000 LED lighting fixtures

50 recharging stations for EV

Operation Centre to monitor and control all the electrical infrastructures: interactive multimedia contents will be available both at Enel Pavilion and Milano Rubattino Enel Showroom

EXPO 2015 MilanoThe first greenfield Smart City in the World

10

Smart City Metropolitana Bari

The project costs app. 41.5 million euros and consists of two sub-projects:

• Tension unification at 20kV – app. 25.5 million euros:• 1 new Primary Station and refurbishment of 3 Satellite Centres• replacement of 200 km of medium voltage cables• adapt app. 250 Secondary Stations

•Smart Grid – 16 million euros• development of telecontrol• charging infrastructure• Smart Info

To do:• Install state-of-the-art technology in Primary Stations, Secondary Stations and Satellite Centres• Optical Fibre• Automatization of the medium voltage electrical network• Electrical charging infrastructure – 240 quick/slow chargers, 35 fast chargers• 30.000 Smart Info

Project financing – 60% Grant + 40% Loan BEI

11

Romania - Heavy investments turned into results in service quality

*source – ANRE report, SAIDI for 2013

Muntenia

569

240

20102013

-58%

Between period 2009-2014 at Enel Distributie Muntenia 74% of Primary Stations were telecontrolled 39% of Secondary Stations were telecontrolled

Best urban service continuity performance in Enel Distributie Banat and Enel Distributie Dobrogea – 107 min/year vs 205 min/year national average*

Obsolete control panel in a secondary station Modernized control panel in a secondary station

Network modernization (MV)

Residential consumer, old

connection point

Modernized connection point for residential consumer

Smart meter

Past Present Near Future

Network modernization (LV)

Thank you!