11
SMART CITY AHMEDABAD Rakesh Shankar , I.A.S (CEO, SCADL)

SMART CITY AHMEDABAD - Smart Cities Missionsmartcities.gov.in/upload/uploadfiles/files/3_Smart city Ahmedabad... · SMART CITY AHMEDABAD Rakesh Shankar , I.A.S (CEO, SCADL) Ahmedabad

  • Upload
    others

  • View
    57

  • Download
    1

Embed Size (px)

Citation preview

SMART CITY AHMEDABADRakesh Shankar , I.A.S

(CEO, SCADL)

Ahmedabad ITMS- AFCS & CCPS in World Economic Forum Report for Data Driven Cities

3

Scope of Common Card Payment System and ITMSComponent Details Vendor/OEMs

Optical fibre network

182 KMs Connects all 158 BRTS stations with Command and Control Center.

Sterlite Technologies. Commissioned in March 2017.

ITMS AFCS

Cameras

Integration of 158 Stations & 230 Buses of BRTS along with 837 buses & 2900 Stations of AMTS.

Electronic Ticketing Machines

Validators and Turnstiles

Passenger Information Systems

GPS

Softwares (AFCS, AVLS, VPSD, DMS, IMS)

Janmitra Open loop Smart card system for transit and non-transit services.

ICICI BankMajor OEMs:1. Paycraft – Mumbai 2. Verifone – Bangalore 3. NEC-Japan 4. Amco – Greece.

(n)Code-NEC-Japan

4

Challenges and mitigation measures.S.No. Challenges Mitigation measures

1Complex architecture involving 15 sub-systems and 5000 points.

Adherence to Open Loop Standards

215 OEMS located across different geographies.

War room for integrating designing and testing.

3 Brownfield implementation.Implementation in night (11 PM to 5 AM) without hampering existing operations.

4Regulatory certifications without many references points.

NPCI 2000 test cases compliance and RBI PCI DSS Audit.

5Financial reconciliation:Transit – Bank host and AFCS.Non-transit – Bank and NPCI.

More than 10,000 tests for Electronic Ticketing Machines, 25,000 tests for Fare gates and stress testing with 100,000 transactions.

Ticketing in new ITMS-CCPS system

Parameter On 04- Dec Consolidated

No. ETMs Operational 231

No. of POS operational(Stations)

141

No. of POS based Tickets 1.04 L 11.64 L

Collection from POS 13.03 L 1.54 Cr

No. of ETM based tickets (Cash)

15968 17.62 L

Total Amount (Cash) 3.08 L 2.58 Cr

No. of Card based tickets.

3514 72016

Total Amount (Card) 0.54 L 7.78 L

Total Revenue 16.65 L 4.19 Cr

1.19

1.26

1.35

1.41

1.05

1.1

1.15

1.2

1.25

1.3

1.35

1.4

1.45

2014-2015 2015-2016 2016-2017 2017-2018 (E)

Avg. daily ridership (in lakhs)

Janmitra Card & Its Offers

Parameter 04- Dec Consolidated

Total cards issued (Instant + Personalized)

134 10,583

Total Top-up transactions

96 5,392

Total Top-up transactions

19,400 6,12,604

Total ticketing transactions

3,938 90,653

Total amount of ticketing transactions

58,919 13,49,197

Total retail transactions21 687

Total amount of retail transactions 4313 1,76,428

AMC ITMS & AFCS 7

In station– Field elements deployment for BRTS & AMTS

Fare Gate-542 PIS - 329 Station Camera-303

Midblock Camera-303ETM - 189 POS- 158

Fare Gate-542 PIS - 329 Station Camera-303

In bus – elements deployment

CCTV - 460 GPS Module - 842

ETM - 1346Front PIS - 719 Side PIS - 719

In Bus PIS - 719

9

ITMS command and control center

ImpactBusiness Intelligence

AVLS

Components Outcome

Automatic Fare Collection System (AFCS)

• Reduction in ticket issuance time (25 card transactions and 15 cash transactions per minute on validators.)

• Automatic and effective reconciliation (Below 1% reconciliation difference)

• Real time passenger data• Origin – Destination Data Analysis to change bus schedule

Automatic Vehicle Locating System (AVLS) &Vehicle planning and scheduling (VPSD)

• Schedule Adherence at real time • Analysis of Driver behaviour and Bus Speed monitoring• Avoiding bus bunching and Idle timing• Real time communication between Driver & Control Room• Saving of ~45 Lakhs per month through optimized

scheduling.

CCTV Surveillance • Passenger Safety at Station and in bus.• Station Supervision • Monitoring of Traffic at Junctions

Passenger InformationSystem

• Bus Information Display for the ease of Passenger• Advertisement revenue• Emergency Announcement

Projects In-Progress

1.SASA- Safe and secure Ahmedabad (Integrated Command and control center)

2.E-mobility3.Bike Sharing- Ride by the river4.Multi-Modal Transit Hub5.Incubation center6.PPP based housing for 7000 slum

dwellers