15
SKN N0331R4 1 Solar Keymark Network 23 rd Solar Keymark Network meeting Revised final draft agenda (R4) 2017-10-11, JEN/JF/PD Meeting time: Tuesday, October 17 th , 2017, 13:00 - 19:00 Wednesday, October 18 th , 2017, 09:00 - 14:00 Meeting location: Lordos Beach Hotel Dhekelia Rd, Larnaca 7081, Cyprus Phone: +357 24 647444 Web conference login - see last part of this document Related meetings same place – see last part of this document All voting at the meeting is done by e-voting, be sure you have access to internet. Registration LAST CHANCE 20 th September Registration is done using form in separate spreadsheet file SKN_N0332R0 . Please fill in and send this form to:

SKN Agenda M14 · Web viewSolar Keymark Network SKN N0331R4 SKN N0331R4 SKN N0331R0 Solar Keymark Network SKN N0331R0 SKN N0331R0 1 1 1 1 1 1 2 2 2 12 12 12 23rd Solar Keymark Network

Embed Size (px)

Citation preview

Page 1: SKN Agenda M14 · Web viewSolar Keymark Network SKN N0331R4 SKN N0331R4 SKN N0331R0 Solar Keymark Network SKN N0331R0 SKN N0331R0 1 1 1 1 1 1 2 2 2 12 12 12 23rd Solar Keymark Network

SKN N0331R4Solar Keymark Network

23rd Solar Keymark Network meetingRevised final draft agenda (R4)2017-10-11, JEN/JF/PD

Meeting time:Tuesday, October 17th, 2017, 13:00 - 19:00Wednesday, October 18th, 2017, 09:00 - 14:00

Meeting location:Lordos Beach HotelDhekelia Rd, Larnaca 7081, CyprusPhone: +357 24 647444

Web conference login - see last part of this document

Related meetings same place – see last part of this document

All voting at the meeting is done by e-voting, be sure you haveaccess to internet.Registration LAST CHANCE 20 th September Registration is done using form inseparate spreadsheet file SKN_N0332R0. Please fill in and send this form to:Irene Manti: [email protected] Jan Erik Nielsen: [email protected]

Hotel booking should be done before end of May – see end ofThe meeting is kindly hosted by TÜV NORD CYPRUS

1

Page 2: SKN Agenda M14 · Web viewSolar Keymark Network SKN N0331R4 SKN N0331R4 SKN N0331R0 Solar Keymark Network SKN N0331R0 SKN N0331R0 1 1 1 1 1 1 2 2 2 12 12 12 23rd Solar Keymark Network

Tuesday, 13:00

Item

Deci

sion/

-res

oluti

onre

ques

ted

Rela

ted

to d

ecis

ion

of la

st m

eetin

gTi

me

(min

)Topic/content/responsible Related documents /comments/details

60 Arriving & lunch 13:00 – 14:0014:00 Meeting starts - welcome by host

1 5Opening of the meeting /HDThis meeting will be chaired by Harald Drück acting as deputy chairman.Short welcome from deputy chairman - and some practical information

2 10

Introduction of participants /AllExcuses from:

Cai Zhao TÜV Rheinland (Shanghai) Co., Ltd. China Attending via web:

Jean-Baptiste BEYSSAC CESP-University of Perpignan France

Markus Barek sunlumo Germany

Maria del Val Varas Garcia AENOR Spain

Fabienne Sallaberry CENER Spain

Patrik Ollas RISE Research Institutes of Sweden Sweden

Hanspeter Weiss Ernst Schweizer AG Switzerland

3 x 5 Approval of the agenda /All

4 x 5 Comments to the minutes of the SKN meeting 21A (web) /All SKN_N0330R0_ Minutes22_SKNmeeting_Draft.pdf

5 (x) 5 Review of Decision list and follow up of action list /JENAction list

N0100R20_DecisionList pdfSKN_N0286.R9_ActionListFor23SKNmeeting2017-05-16.xlsx

2

Page 3: SKN Agenda M14 · Web viewSolar Keymark Network SKN N0331R4 SKN N0331R4 SKN N0331R0 Solar Keymark Network SKN N0331R0 SKN N0331R0 1 1 1 1 1 1 2 2 2 12 12 12 23rd Solar Keymark Network

6 x 20

Structure/organisation of SKN meetings /PD, JENStarting in 2018, the structure of SKN meetings changes into one physical meeting to be held in spring time and one WEB meeting to be held in autumn. A proposal for the structure of the meetings will be presented.A web tool for online meetings (and voting) will be used as a final practice. EVERYBODY AT THE MEETING SHALL USE THIS TOOL FOR VOTING AT THE MEETING

Proposal for resolution on procedure for e-voting / K Meyer "Participation Rules WG"?

SKN_N0352R0_Proposal for new Structure of SKN meetings.pptx

SKN_N0355R0-H ow to join SKN online meeting and use the voting tool.docx

7 x 15

Election of new Solar Keymark Network Chairman / JENDue to Jaime Fernandez sudden stepdown as chair, we need to elect a new chairman. A call for candidates was announced 2017-09-28. It could be convenient to elect him at this meeting, so we don’t have a chairman-less period until next meeting.Proposal for decision:Due to the special situation, the election of new SKN chairman will take place at the 23rd SKN meeting 17-18 October 2017.

So far we have the following candidates: Andreas Bohren, short presentation attached …

Election of Chairman …

Note: This meeting will still be chaired by deputy chair Harald Drück

SKN_N0338R0_Application Andreas Bohren.pdf

8 x 10

Date and place of next meeting(s) /JEN- 24th SKN meeting: March 6th 13:00 to March 7th 14:00, 2018 - Madrid, AENOR,- 25th SKN meeting: October 2018. Web meeting- 26th SKN meeting: March 2019 …

Note: The item “Next meeting” is put first in the agenda, as it is kind of decision item.9 (x) 10 Report from "10% Rule WG" / HD Document/presentation? / H Drück

10 x 15

Updates and proposal for Resolution on systems data sheet / M. Carvalho

Proposal for resolution - New SK data sheets for system tests according to EN 12976 A new version of the data sheets for systems tested according to EN 12976 was prepared (SKN_N0106_AnnexB2_R4.4-system.xlsx) and includes the system performance model parameters determined according to ISO 9459-2 and ISO 9459-5 used for the system performance prediction. The Data sheet also includes the possibility to report results based on the new version of EN 12976-2:2017 and EU regulation CDR 811,812,813. This new data sheet is approved as new Annex B2 of the Solar Keymark Scheme Rules.

SKN_N0106_AnnexB2_R4.4-system.xlsx

3

Page 4: SKN Agenda M14 · Web viewSolar Keymark Network SKN N0331R4 SKN N0331R4 SKN N0331R0 Solar Keymark Network SKN N0331R0 SKN N0331R0 1 1 1 1 1 1 2 2 2 12 12 12 23rd Solar Keymark Network

11 (x) 25

Transition process for new version of EN 12976-1+2/ (Part 1 K. Meyer) (Part 2 U.Fritzche)1. Presentation of changes in Product standard EN 12976-1. Any proposals for Resolution in Scheme Rules?2. Presentation of changes in Testing standard EN 12976-2. Any proposals for Resolution in Scheme Rules? 3. Resolution for adapted data sheet to EN 12976-2

4. Proposal for Decision on transition period for new EN 12976-1 and EN 12976-2IntroductionThe European Standards EN 12976-1:2017 and EN 12976-2:2017 came into effect on 2017-07-31. Proposalfor decisonAll factory made thermal solar heating systems (according EN 12976-1) shall be tested according to the new EN 12976-2:2017 from 2018-05-01. After 2018-11-01 all certificates for factory made thermal solar heating systems (according EN 12976-1) shall be issued according to the new standard EN 12976-1:2017.

SKN_N0341R0_2017-07-31 Changes in EN 12976-1.pptx

12 (x) 25

Transition process for new EN/ISO 9806 /A. BohrenDiscuss/decide:

a) How long will it take for laboratories to update their accreditation to the new standard?b) How long will it take to prepare a new version of the data sheet?c) Should there be a transition period in which certificates are granted different with versions of the standard?

(because not all labs will update their accreditation simultaneously?)d) Are any CBs making reference to the ISO 9806 in their accreditation and certificates, if so, how long to update?e) The Com&Mkt WG should inform about the change in standard and transition process

SKN_N0334R0-ISO9806 Tranistion.pdf / A Bohren

13 x 5

Proposal for resolution: Remove “13.2 Negative pressure test of the collector” from SK scheme rules /A. Bohren13.2 Negative pressure test of the collector“Negative pressure test of the collector” according to 5.9.2 EN 12975-2:2006 does not have to be performed on tubular collectors due to the following reason: The negative pressure test is intended to assess the extent to which the fixings between the collector cover and collector box are able to resist uplift forces caused by the wind. This is not relevant for tubular collectors. There shall be a remark on the Solar Keymark certificate in case the negative pressure test was not performed as long as the pressure test is still mandatory according to the standard. SKN decision D6.M3.

Reason to delete: - It is against the ISO9806:2017- There is no reason to exclude ETCs in general and we have the methods to do the test

4

Page 5: SKN Agenda M14 · Web viewSolar Keymark Network SKN N0331R4 SKN N0331R4 SKN N0331R0 Solar Keymark Network SKN N0331R0 SKN N0331R0 1 1 1 1 1 1 2 2 2 12 12 12 23rd Solar Keymark Network

14 x 5

Proposal for resolution: Remove “13.5 Pre-agening” from SK scheme rules /A. BohrenBefore performing a rain penetration test the solar thermal product should be pre-aged to at least the following extent by using either possibility 1 or possibility 2:….(SKN Decision D8.M10)

Reason to delete: - It is included in the ISO9806:2017

15 15

Energy labelling: review of Lot1 & Lot2 / PD- Presentation from Martijn van Elburg - Review process: challenges and timings (PD)- Implications of review process on standardization & certification (GvA)

Presentation (available at meeting)

16 10Labelpack A+: the package label, SKN and energy labelling /PDThe future Labelpack A+ activities, namely the online tool and resources, considering also synergies with SK and the new energy labelling framework.

Presentation (available at meeting)

17 0 Updates on collector data sheet? - need for allocation of funding? / P. OllasNo updates proposed before the meeting

18 (x) 5 Report and Decision/Resolution from Air "Collectors WG" / K. Kramer?Proposal for decision/resolution? Document/presentation? / K. Kramer

19 (x) 0 Report and Decision/Resolution proposals from PVT WG - presentation of "show cases" / U. Fritzsche?Proposal for decision on funding of WG work – see below “Priorities for SCF 9th call”

20 (x) 0 New Equivalent absorber coatings? Document/presentation? / ?21 (x) 0 New Equivalent glazing? Document/presentation? / ?

22 (x) 10

New Equivalent insulation /A. BohrenRegistration of insulation materials (Annex K)

We have 8 materials that should be registered in the new Insulation database as defined in Annex K. Attached a presentation for this including the database, and the required test reports/datasheets.

SKN_N0335R0-Registration of insulation materials.pdfSKN_N0335R0-ZipAnnex-Registration Insulation Materials.zip

23 (x) 10

Update (decisions?) regarding new EN 12975? /A BohrenReport from CEN TC 312 WG1 meeting in the morning.Present version (2016-10) of draft EN 12975 attachedIs there need for an SCF Project to pay an expert in CPR standards? Transition period for EN 12975?

SKN_N0348R0_Cyprus EN12975.docx

24 x 10Proposal for decision on ‘thermodynamic’ solar collectors/J R Hernández, AENORThe AENOR Certification Committee has found a problem with certifying ‘thermodynamic’ collectors. A proposal for decision that explains why they fall under scope of standard is needed.

SKN_N0351R0_Solar Keymark for Thermodynamic Collectors.pdf

5

Page 6: SKN Agenda M14 · Web viewSolar Keymark Network SKN N0331R4 SKN N0331R4 SKN N0331R0 Solar Keymark Network SKN N0331R0 SKN N0331R0 1 1 1 1 1 1 2 2 2 12 12 12 23rd Solar Keymark Network

25 15Update on “AP2 Marketing and Communication WG and Presentation and approval of SKN marketing plan /PDProposal for decisionThe SKN marketing plan as presented in SKN_N0342R0 and SKN_N0343R0 is approved

SKN_N0342R0_Marketing Plan- Complete 2017-10-02 R.0 - final version.docx

SKN_N0343R0_Marketing-Plan_SKN_Overview_4.1.pdf

26 x 10SKN fees and budget for 2018 and other financial issues / JEN, PDProposal for decision on budgets: Approve attached budgetsProposal for decision on fees:: Keep the fees unchanged

SKN_N0345R0-SKNbudget2018.pdf

SKN_N0346R0-SKN_income_expenses.pdf

SKN_N0347R0_SK-ESTIF_SKN services_2018-f.pdf

27 15 SCF project: 8C04.1 SK-Scope-Products_vAC. Presentation of the results. /G.v.Amerongen SKN_N0349R0_Final report 8C04_1 SK Scope_Products 29 09 2917.pdf

28 x 15

SCF project: 6C14_1_Other_model. Presentation of results. /G.v.Amerongen

Proposal for a decision / U. Fritzsche:The Solar Keymark Network decide to accept SolTherm as a preliminary method for energy yield prediction for the EN 12977 Solar Keymark data sheet, if an appropriate validation of SolTherm for the used system design is available. The used simulation tool as well as the preliminary acceptance will be mentioned on the data sheet.

BackgroundAs the only System certification according to EN 12977(-2) is still waiting for a fully harmonized method for energy yield prediction, we suggest to use the new Simulation Tool SolTherm based on the current EPBD standards for an at least preliminary energy yield simulation. In this special case of the first issued EN 12977 certificate, it will be possible to perform an energy yield validation in comparison with performed DST-Test results and their Long Term Prediction results. In this first step, the validation will be limited to water heating and solar only systems. We are quite sure, that this procedure will improve the SolTherm tool and bridge the gap for the time being, until a final method for the long term prediction is confirmed by the SKN.

SKN_N0350R0_Final report Other_Model 25 09 2017.pdf

29 5 Update on voting of new SCF Chairman /HD

6

Page 7: SKN Agenda M14 · Web viewSolar Keymark Network SKN N0331R4 SKN N0331R4 SKN N0331R0 Solar Keymark Network SKN N0331R0 SKN N0331R0 1 1 1 1 1 1 2 2 2 12 12 12 23rd Solar Keymark Network

30 x 30

Proposal for decision: Priorities for SCF 9th call / JENProposals for priorities:

Title: Follow-up feasibility ‘Broadening the scope’ SK / Budget: € 10 000,-Remarks: Revision of scheme rules Custom built systems, requirements for companies issuing declaration, outline

(draft) certification scheme for calculation tool.

Title: Feasibility DST testing with SolTherm model / Budget: € 12 000,-Remarks: Selection of relevant parameter set, adoption of SolTherm for DST datasets, link to parameter

identification software, validation with existing datasets.

Title: Support to liaison CEN/TC312 officers / Budget: € 3 000,- to 5 000,- per liaisonRemarks: Monitoring developments at CEN TC’s, inform those TC’s about developments in TC312 and report back

to TC312

Title: Establishment of software management group / Budget: € 7 000,-Remarks: Define the tasks, working procedures and recruiting of members. Start with the management for

ScenoCalc and SolTherm and be prepared to add future software tools linked to Solar Keymark. Revise when appropriate.

Title: Desk study: state of the art methods for quality and durability / Budget: € 4 000,-Remarks: Aim at recent developments that can bring quality and durability issues such as expected product life

time, drinking water quality, construction issues, emission issues, energy costs issues and life cycle assessment issues to the level of a Solar Keymark certification scheme.

Titel: Online tool package label / PD

Titel: Quality & durability: extending SK to additional aspects /HD Remarks: Should this be in 12976/7 first? – related to Liaison – additional clarification by GvA

Titel: Harmonization of the testing, inspection and certification procedures of SHAMCI and Solar Keymark /AKRemarks: See links to related documents N0353 & N0354 (Ashraf Kraidy)

Priorities related to WGs /PDo Legal requirements / Scopeo Communication

Proposal for decision:The SKN decided, that the chair of the PVT working group including the revision of Annex J as deliverable will be one priority call within the SCF 8th call.

SKN_N0353R0-20170814_Appendices_v3_Comparison bet SHAMCI and SKM annexes.pdf

SKN_N0354R0-Comp_SHAMCI_SKN for SCF WG.pdf

31 5 Report by CB WG on web inspection - report from pilot project? / A. Bohren & U. Fritzche…

Document/presentation? / A. Bohren, U Fritzsche

7

Page 8: SKN Agenda M14 · Web viewSolar Keymark Network SKN N0331R4 SKN N0331R4 SKN N0331R0 Solar Keymark Network SKN N0331R0 SKN N0331R0 1 1 1 1 1 1 2 2 2 12 12 12 23rd Solar Keymark Network

32 5 Report or Update on “Inter-laboratory Comparison - ILC on Data Analysis”, SCF7 Project / A. Bohren… Document/presentation? / A. Bohren

33 10

Presentation of Project SCF7-FlowScheme – how to give code for the hydraulic type and layout of a collector / A. BohrenAttached a long comprehensive presentation to be distributed to the participants. A ultrashort presentation is given in Larnaca to get feedback.

SKN_N0333R0-SCF7 FlowScheme Proposal.pdf / A. Bohren

34 10 Update on “Thermosiphon Task-Force”, SCF7 Project / PD [7C02 Label-ThermoSiphon]Presentation / PD

35 15 Information from CEN Keymark Management / K Meyer… Document/presentation? / ?

36 20

Update on complaints / S. ScholzReport from complaint committeeHow to prevent further tedious SK complaints / A. BohrenA proposal for discussion is attached: The “nothing-to-hide initiative”.

SKN_N0344R0_FinalReportSKNComplaintCommittee.pdf /S. ScholzSKN_N0336R0-Nothing to hide initiative.pdf / A. Bohren

37 15

Update on Action Plan working groups: AP1 Strategy WG (?)AP3 Installers WG (K. Meyer)AP6 Legal Requirements (G. v Amerongen)

Document/presentation? / ?

38 15 Solar Certification Fund Projects – General Status Reports / PD… Document/presentation? / PD?

39 10 Update on Global Solar Certification Network / JEN… Document/presentation? / JEN?

40 5 Update on detailed SK database / JEN… Document/presentation? / JEN?

41 20

Updates from liaison officer:1. S.Fischer (IEC/TC117)2. K.Kramer(IEC/TC128)3. J-M. Suter (TC164)4. G.v.Amerongen(TC 228 and TC371)

Documents/presentations? / ?

3: SKN_N0340R0_Liaison TC164-WG2 - Update Oct.2017 - Suter.pptx

42 20

Important updates / other important information:1. Standing WGs / CB S.Scholz and IB JF2. CEN Standardisation / V. Drosou (TC 312) 3. Update on solar heating and cooling market /PD4. Clean Energy Package / PD5. Update on the weekly SK database check/report /A. Bohren Any misuse of Solar Keymark ?

5: SKN_N0339R0_SCF8 Argus.pptx

8

Page 9: SKN Agenda M14 · Web viewSolar Keymark Network SKN N0331R4 SKN N0331R4 SKN N0331R0 Solar Keymark Network SKN N0331R0 SKN N0331R0 1 1 1 1 1 1 2 2 2 12 12 12 23rd Solar Keymark Network

43 5 Any other business / JEN44 5 End of meeting /HD45 Meeting ends 14:00Meeting durationJF: Jaime Fernandez, AENOR, Leaving Chairman of Solar Keymark Network HD: Harald Drück, ITW, Temporary Deputy Chairman of Solar Keymark Network, [email protected] JEN: Jan Erik Nielsen, Solarkey Int., ESTIF Technical Consultant, Manager of Solar Keymark Network, [email protected] PD: Pedro Dias, ESTIF Secretary General, Administrative Secretary of Solar Keymark Network, [email protected]

9

Page 10: SKN Agenda M14 · Web viewSolar Keymark Network SKN N0331R4 SKN N0331R4 SKN N0331R0 Solar Keymark Network SKN N0331R0 SKN N0331R0 1 1 1 1 1 1 2 2 2 12 12 12 23rd Solar Keymark Network

Meeting plan CyprusOctober

2017

Tuesday 17th October Wednesday 18th October Thursday 19th MarchEstimated no. people

9 - 13

Lunch

13-14 14 - 19 9 - 14 15 - 19 9 - 18Location

Solar Keymark Network x x x 40 Lordos Beach HotelCEN/TC312 x Lordos Beach HotelCEN/TC312 WG1 x Lordos Beach HotelCEN/TC312 WG2/3 x Lordos Beach Hotel

WEB meeting login: October 17: https://global.gotomeeting.com/join/484755957   October 18: https://global.gotomeeting.com/join/475363829  

How to vote etc.:SKN_N0355R0-How to join SKN online meeting and use the voting tool.docx

Recommended hotels:

Lordos Beach HotelBook before end of May to have special price:Standard side sea view room, single occupancy : €80.00 per nightStandard side sea view, double room : €110.00 per nightSuperior side sea view room, single occupancy : €90.00 per nightSuperior side sea view, double room : €130.00 per night

10