Simulation Of BioprocessERT 315

Page 2: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Batch/Bioprocess Modeling,Scheduling & Optimization

Page 3: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Subject covered Modeling and optimization of batch and

continuous processes

Batch Process Scheduling

Resources and inventory tracking

Cost analysis & project economic evaluation

Throughput Analysis & Debottlenecking

Page 4: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

What is “Process Simulation”?

Q: What does the word “simulate” mean?

Building a process model Predicting how a process would actually behave Performing an experiment (on computer)

Incentives: Highly cost effective Reasonably accurate Proactive approach

Page 5: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

IDEA GENERATIONProject Screening, Strategic Planning

PROCESS DEVELOPMENTEvaluation of Alternatives

Common Language of Communication

FACILITY DESIGNEquipment & Utility Sizing and Design

MANUFACTURINGOn-Going Optimization, Debottlenecking

Production Scheduling, Capacity Analysis

Development Groups

Development GroupsProcess EngineeringCorporate EnvironmentalTech Transfer

Manufacturing

The Role of Process Simulation and Scheduling Tools inProduct Development and Commercialization

Page 6: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Sequential modular approachSequential modular approach Individual equipment blocks may require

iterative solution algorithms

Overall process solution is sequential & not iterative

(Turton et al., 1998)

Page 7: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Sequential modular approachSequential modular approach

Page 8: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Objectives of simulationObjectives of simulation

ProcessThroughput

BatchSize / Batch

Cycle Time

• Raw Materials• Labor• Utilities• Capital Expenses

Product(s)

Waste

Page 9: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Commercial process simulatorsCommercial process simulators

Oil, Gas &Petrochemicals

Oleo Chemicals

Specialty Chemicals

Aspen Plus

HYSYS

Provision

Design II

SuperPro

SS Simulation

Dynamic Simulation

Batch

Solids

Pinch

Phys Prop

Sizing & Costing

Economics

Rating

Sensitivity Analysis

Optimization

Page 10: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

SuperPro Designer (SPD)SuperPro Designer (SPD)

Water PurificationWastewater TreatmentAir Pollution Control

BioPro Designer

SuperPro Designer

BatchPro Designer

EnviroPro Designer

BiotechnologyBio-Fuels

Fine ChemicalsPharmaceuticalsFood ProcessingMineral Processing

SchedulePro Scheduling and Debottlenecking of Multi-Product Facilities

Page 11: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Available toolsAvailable tools

•Intuitive user interface

•Wide variety of unit operation models

•Databases for components and mixtures

•M&E Balances of Integrated Processes

• Equipment Sizing and Costing

• Project Economic Evaluation

• Process Scheduling & Cycle Time Analysis

• Throughput Analysis & Debottlenecking

• Environmental Impact

• Detailed Reports and Charts for the Above

Page 12: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

User Interface of SuperPro Designer

Page 13: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Double-Click

Detailed Modeling using Unit Procedures and OperationsDetailed Modeling using Unit Procedures and Operations

Page 14: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Operations Gantt ChartOperations Gantt Chart

Page 15: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Equipment Occupancy ChartEquipment Occupancy Chart

Page 16: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

• How can I schedule production during the next 6-18 months?

• How can I schedule operations in an R&D facility?

• How to adjust scheduling if priorities change?

• Can I fit a new product into my facility?

Scheduling Questions Scheduling Questions

Page 17: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Resource Demand ChartResource Demand Chart

Page 18: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Labor Demand ChartLabor Demand Chart

Page 19: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Raw Materials

Equipment

Labor

Consumables

Lab/QC/QA

Waste Trtm/Disp

Utilities

Cost Breakdown

Raw materials$0.88/g39.6%

Facility$0.54/g24.4%

Consumables$0.65/g29.1%

Page 20: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

• What is the required capital investment for a new plant?

• How much would it cost to make a kilo of product?

• Which process is better for making this product? A or

B?

• How can I reduce the operating cost of a process?

Cost Analysis QuestionsCost Analysis Questions

Page 21: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Stream Dialog – Env. Properties Tab

INTELLIGEN, INC.

Environmental Impact ReportEnvironmental Impact Report

Page 22: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

Bottleneck identificationBottleneck identification

Page 23: Simulation Of Bioprocess ERT 315. Batch/Bioprocess Modeling, Scheduling & Optimization

• How much product can I make in this plant?

• What limits the current production level?

• What is the capital investment for increasing production?

Debottlenecking QuestionsDebottlenecking Questions