33
SHORELINE SCHOOL DISTRICT Shorewood High School Alternative Sites Analysis September 15, 2008 Shorewood High School Shoreline Center

SHORELINE SCHOOL DISTRICT

  • Upload
    yaron

  • View
    25

  • Download
    0

Embed Size (px)

DESCRIPTION

SHORELINE SCHOOL DISTRICT. Shorewood High School Alternative Sites Analysis. September 15, 2008. Shorewood High School. Shoreline Center. Site Analysis Team: NAC|Architecture AHBL Engineers – Wet Utilities/SEPA/Zoning - PowerPoint PPT Presentation

Citation preview

Page 1: SHORELINE SCHOOL DISTRICT

SHORELINE SCHOOL DISTRICT Shorewood High School

Alternative Sites Analysis September 15, 2008

Shorewood High School Shoreline Center

Page 2: SHORELINE SCHOOL DISTRICT

Site Analysis Team:

• NAC|Architecture

• AHBL Engineers – Wet Utilities/SEPA/Zoning

• Associated Earth Sciences - Geotechnical Report/Level One Study

• Roduin Consulting Group – Dry Utilities

• Transpo Group – Traffic

Page 3: SHORELINE SCHOOL DISTRICT

Presentation Overview:

• Description of Existing Sites Survey and Geotechnical Report

• Existing Utility Infrastructure   Dry Utilities and Wet Utilities             

• Existing Building Condition/Adaptive Reuse

• Traffic Report

• Zoning /Shoreline Comprehensive Plan

• Regulatory Compliance

• Educational Specifications

• Shoreline Center Use

• Student Demographics

Page 4: SHORELINE SCHOOL DISTRICT
Page 5: SHORELINE SCHOOL DISTRICT
Page 6: SHORELINE SCHOOL DISTRICT

BOUNDARY SURVEY- Shorewood

Page 7: SHORELINE SCHOOL DISTRICT

BOUNDARY SURVEY – Shoreline Center

Page 8: SHORELINE SCHOOL DISTRICT

BORINGS OVERLAY - Shorewood

Page 9: SHORELINE SCHOOL DISTRICT

BORINGS OVERLAY - Shoreline Center

Page 10: SHORELINE SCHOOL DISTRICT

SHOREWOOD DRY UTILITIES:

• ELECTRIC POWER - provided by Seattle City Light (SCL)

• TELEPHONE- provided by Verizon

• CABLE TELEVISION - provided by Comcast

• NATURAL GAS – provided by Puget Sound Energy Natural Gas (PSE)

Page 11: SHORELINE SCHOOL DISTRICT

SHORELINE CENTER DRY UTILITIES:

• ELECTRIC POWER - provided by Seattle City Light (SCL)

• TELEPHONE- provided by Qwest

• CABLE TELEVISION - provided by Comcast

• NATURAL GAS – provided by Puget Sound Energy Natural Gas (PSE)

• OTHER TELECOMMUNICATIONS SYSTEMS – I-NET and/or WAN

Page 12: SHORELINE SCHOOL DISTRICT

DISTRICT DATA AND COMMUNICATIONS HUBS - Shoreline Center

Page 13: SHORELINE SCHOOL DISTRICT

SHOREWOOD HS AND SHORELINE CENTER WET UTILITIES:

• WATER - served by Seattle Public Utilities “SPU”

• STORMWATER DRAINAGE - governed by City of Shoreline

• SEWER - served by Ronald Wastewater

Page 14: SHORELINE SCHOOL DISTRICT

WET UTILITY OVERLAY – Shorewood Storm and Water

Page 15: SHORELINE SCHOOL DISTRICT

UTILITY OVERLAY – Shoreline Center Storm and Water

Page 16: SHORELINE SCHOOL DISTRICT

EXISTING BUILDINGS -Shorewood

Page 17: SHORELINE SCHOOL DISTRICT

EXISTING BUILDINGS - Shoreline Center

Page 18: SHORELINE SCHOOL DISTRICT

EXISTING BUILDINGS – Shoreline Center

Page 19: SHORELINE SCHOOL DISTRICT

EXISTING BUILDINGS – Shoreline Center

Page 20: SHORELINE SCHOOL DISTRICT

Shoreline Center and Shorewood High School

Page 21: SHORELINE SCHOOL DISTRICT

TRAFFIC - Shorewood

Page 22: SHORELINE SCHOOL DISTRICT

TRAFFIC – Shoreline Center

Page 23: SHORELINE SCHOOL DISTRICT

ZONING – Shoreline Civic Plans and Codes

• Shoreline Comprehensive Plan

• Shoreline Parks, Recreation, and Open Space Plan

• Shoreline Surface Water and Environmental Master Plan

• Shoreline Transportation Master Plan

• Shoreline Municipal Code Title 20 – Development Code

Page 24: SHORELINE SCHOOL DISTRICT

Shoreline Planning - INTERURBAN PROJECT

Page 25: SHORELINE SCHOOL DISTRICT

Shoreline Planning - AURORA CORRIDOR PROJECT

Page 26: SHORELINE SCHOOL DISTRICT

Shoreline Planning - TOWN CENTER PROJECT

Page 27: SHORELINE SCHOOL DISTRICT

ZONING – Shoreline General Process

• Administrative Conditional Use Permit

• Administrative Rezoning of Parcels

• Administrative Variances

• All can run Concurrently

• City Lead Agency for SEPA

• MDNS (mitigated determination of non-significance)

Page 28: SHORELINE SCHOOL DISTRICT

ZONING – Requirements Shorewood High School

• Multi-Parcel Lot: R-6, R-12, and I (rezone)

• Split Parcel Lot: R-6 and I (rezone)

• Parking Required 260 spaces

• Maximum Height 30’ in R-6 (variance for higher)

• Maximum Building Coverage in R-6: 35%

• Maximum Impermeable Surface in R-6: 50%

Page 29: SHORELINE SCHOOL DISTRICT

ZONING – Requirements Shoreline Center

• Multi-Parcel Lot: R-6

• Parking Required 733 spaces

• Maximum Height 30’ (variance for higher)

• Maximum Building Coverage 35%

• Maximum Impermeable Surface 50%

Page 30: SHORELINE SCHOOL DISTRICT

REGULATORY COMPLIANCE - Agencies

• Shoreline Building Department – IBC 2006 or 2009

• Seattle/King County Health Department

• Office of the Superintendent of Public Instruction

• Construction Funding Assistance

• Washington Sustainable Schools Protocol (WSSP)

Page 31: SHORELINE SCHOOL DISTRICT

EDUCATIONAL SPECIFICATIONS – Adopted Board Goals

• A safe and secure environment• Spaces that support a Comprehensive Educational

experience• A flexible environment focused on learning and teaching now

and for the future.• An environment that honors community values and promotes

community access.• Materials allowing for efficient and cost effective campus

maintenance.• An environmentally responsible campus.• A specialized design that honors the identity and history of

the School and District.

Page 32: SHORELINE SCHOOL DISTRICT

COMBINED DISTRICT USE -Shoreline Center

Page 33: SHORELINE SCHOOL DISTRICT

TENANTS -Shoreline Center

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.