Click here to load reader

Sheet Metal Forming

Embed Size (px)

DESCRIPTION

Sheet Metal Forming Analysis Using FEA techniques

Citation preview

PROJECT GROUP #12 BATCH 2006-07 KASHIF ASHHAR ARSALAN ZAHEER M. FAYZAN SYED WAQAS ALI (031) (032) (059) (060)

1

PROJECT GROUP #12

OBJECTIVEAPPLICATION OF NUMERICAL MODELING AND SIMULATION IN DESIGNING OF SHEET METAL DIES

2

PROJECT GROUP #12

INTRODUCTION

Flow chart of process planning and die design in traditional CAD environment

Workflow in simulation based process planning and die design

3

PROJECT GROUP #12

PARTMATERIALSACE 120 CR-DDQ-AL (JISG3314) (ASTM A 463)

Protector, Fuel tank (Corolla -242L)

THICKNESS0.5 mm

4

PROJECT GROUP #12

PHASE IIIMODELING & SIMULATIONOne step AnalysisTo conclude simply whether a product as designed is formable with ease, & if not, to identify areas on the geometry that lead to formability issues

Starting Final product geometry only with: Sheet Thickness Material Specifications Setting Parameters Die Tip Lubrication Edge Restraint Conditions5 PROJECT GROUP #12

ONE STEP ANALYSIS RESULT(Geometry 1)

6

PROJECT GROUP #12

Forming Limit Diagrams (Geometry 1)

7

PROJECT GROUP #12

8

PROJECT GROUP #12

Forming Limit Diagrams (Geometry 2)

9

PROJECT GROUP #12

INCREMENTAL ANALYSISA Full process model that simulates the forming stages as accurately as possible in logical order from blank holder closing to final flanging. With Capabilities to Analyze: Initial Deflection of Sheet due to gravity Blank holder Closing First Draws and Restrikes Cutting Operations Sheet Repositioning Flanging and Springback Hydro-Mechanical processes for Sheets and Tubes

10

PROJECT GROUP #12

FIRST CONCEPT

CAD Surface geometry Of Fuel tank protector

Boundary Fill(brown),Binder(reddish brown) and Addendum ( green) created with Autoform Die Designer

PROJECT GROUP #12 11

12

PROJECT GROUP #12

13

PROJECT GROUP #12

PRESS TONNAGECALCULATIONS:

PUNCH :DIE

From graph: Punch force = 300kN By rule of thumb: (300kN)(2.5) = 750kN = 75tonn(approx) BLANK HOLDER: From graph: blank holding force = 120kN By rule of thumb: (120kN)(2.5) = 300kN = 30tonn(approx) PRESS TONNAGE; Press tonnage = punch force + blank holding force = 75tonn + 30tonn = 105tonnPUNCH BLANK HOLDER

14

PROJECT GROUP #12

INCREMENTAL ANALYSIS

SECOND CONCEPT

15

PROJECT GROUP #12

16

PROJECT GROUP #12

Location of Wrinkles Planar/Flat areas Curved areas Areas under binder

Threshold value0.001 0.02 0.05

17

PROJECT GROUP #12

FIRST MODIFICATION IN PROCESS PARAMETERSModify Coefficient of friction from 0.15 to 0.12 and blank holder force from 120KN to 450KN.

DIE

BLANK HOLDER

PUNCH

18

PROJECT GROUP #12

SECOND MODIFICATION IN PROCESS PARAMETERSModify Coefficient of friction from 0.12 to 0.10 and blank holder force remains same.

19

PROJECT GROUP #12

CAD MODELING

20

PROJECT GROUP #12

MATERIAL /COST OPTIMIZATION Initial blank calculation based on part boundary Blank calculation based on the geometry of the drawing tool Embedding/Nesting

21

PROJECT GROUP #12

INITIAL BLANK CALCULATION BASED ON PART BOUNDARY

22

PROJECT GROUP #12

BLANK CALCULATION BASED ON THE GEOMETRY OF THE DRAWING TOOL

Punch opening line expanded 20mmPROJECT GROUP #12

23

EMBEDDING/NESTING

24

PROJECT GROUP #12

AREAS COVERED Project Scheduling. Study the Sheet Metal Forming Processes and its

25

characteristics. Study Forming and Drawing Dies. Learn CAD/CAM/CAE programs (PRO-E, AUTOFORM). Designing of Draw die using AUTOFORM and PRO/E. Process Simulation using AUTOFORM. Optimize process parameters using software. Material/Cost optimization (Blank calculation and Embedding/Nesting). Manufacturing of Designed die(Scaled) using CAM techniques. PROJECT GROUP #12 Report writing.

THANK YOU

26

PROJECT GROUP #12