Shamsuddin A. Shaikh CEO, Sindh Engro Coal Mining Co [email protected] +92-300-829-3039 27 th February 2014

Shamsuddin A. Shaikh February 2014 Coal.pdf · Shamsuddin A. Shaikh CEO, Sindh Engro Coal Mining Co ... Thar Coal Reserves Thar PAKISTAN 175 Billion Ton Total Thar Coal Reserve 50

Embed Size (px)

Citation preview

Page 1: Shamsuddin A. Shaikh February 2014 Coal.pdf · Shamsuddin A. Shaikh CEO, Sindh Engro Coal Mining Co ... Thar Coal Reserves Thar PAKISTAN 175 Billion Ton Total Thar Coal Reserve 50

Shamsuddin A. Shaikh CEO, Sindh Engro Coal Mining Co [email protected] +92-300-829-3039

27th February 2014

Page 2: Shamsuddin A. Shaikh February 2014 Coal.pdf · Shamsuddin A. Shaikh CEO, Sindh Engro Coal Mining Co ... Thar Coal Reserves Thar PAKISTAN 175 Billion Ton Total Thar Coal Reserve 50

Thar Desert contains the world’s 7th largest coal reserves:

Location of Thar Coal Field

Source:: GSP data/report – Energy equivalent is based on Shenhua report/RWE

• Thar Block II has been allocated to SECMC

• According to Competent Person Report (CPR) by RWE - Germany, Thar Block-II contains 2 Billion tons of Lignite reserves, out of which 1.57 Billion tons are exploitable. Thar Block-II alone can produce 5,000 MW for 50 years!

• Mine Lease for 30 years (extendable to 60 years) has been issued to SECMC for Block II

1% = 25% Pakistan’s Power

Generation Capacity in 2010 – 5000MW

Thar Coal Reserves

Thar

PAKISTAN

175 Billion

Ton Total Thar Coal

Reserve

50 Billion

TOE More than Saudi Arabia & Iranian

Oil Reserves

2000 TCF 68 Times higher than Pakistan’s

total gas reserves

Thar Lignite

2

Page 3: Shamsuddin A. Shaikh February 2014 Coal.pdf · Shamsuddin A. Shaikh CEO, Sindh Engro Coal Mining Co ... Thar Coal Reserves Thar PAKISTAN 175 Billion Ton Total Thar Coal Reserve 50

Thar Coal fields can be compared to many operating Open Pit Mines of the World - Thar has comparatively higher heating value, lower sulphur & lower ash contents than other operational mines in the world:

Stripping Ratio and Heating Value of Thar Block II is feasible for successful Mine Operation (e.g. Hambach Mine in Germany, producing ~40 Mt/a lignite whose specs are in fact inferior to Thar Lignite )

Thar Lignite can be utilized in Power Plants both at mine mouth as well as suitable locations like Jamshoro as lignite can be transported as being practised in places like India, China & Germany

By using properly designed de-sulfurizers and ash removal units, Thar coal can produce cheap electricity while meeting the most stringent international environmental standards

Thar Lignite – Comparison with World Lignite

Comparison of Thar Block II with Other International Mines

Deposit Heating Value

(Net) (KCal/kg) Sulfur (%) Ash Moisture

Stripping Ratio (m3/t)

Thar Block II 2770 1.07 7.8 47.46 6.12

Gujarat, India 2600-3000 3.4-5.9 9-12 38-40 9 – 14

Hambach, Germany 1911-2747 0.2–0.4 2-5 48-52 6.3

Maritza East - Bulgaria

1550 4.5 19-35 54 1.7

3

THAR COAL QUALITY AND ECONOMICS COMPARES FAVORABLY WITH OTHER LIGNITE MINES AROUND THE WORLD

Page 4: Shamsuddin A. Shaikh February 2014 Coal.pdf · Shamsuddin A. Shaikh CEO, Sindh Engro Coal Mining Co ... Thar Coal Reserves Thar PAKISTAN 175 Billion Ton Total Thar Coal Reserve 50

*Imported Indonesian Coal – 5200 kcal/kg based on CERA forecast (1st October 2013) **Comparison with Imported coal is based on HHV basis (all values in Real Terms)

Plants on Thar Coal will always have higher despatch & merit order versus those on Imported Coal

Scale Advantage of Thar Coal Mine

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

3.5

4.5

5.5

6.5

7.5

8.5

9.5

10.5

11.5

12.5

13.5

14.5

15.5

16.5

17.5

18.5

19.5

20.5

21.5

22.5

23.5

24.5

25.5

26.5

27.5

28.5

29.5

30.5

31.5

US

D/M

MB

TU

No. of Years from start of Physical Work

Thar Coal with Expansion Indonesian 5200 kcal - CERA forecast

3.8 Mt/a (660MW) Thar Power Company + Jamshoro ADB Plant 1.2Mt/a

7.3Mt/a (1320MW)

14.4 Mt/a (2640MW)

CERA Coal Price Forecast – (CIF Karachi)

USD/MMbtu has been used for comparison basis as it is the most accurate way of comparing coals of

different heating values and qualities

21.5 Mt/a (3960MW)

4

Page 5: Shamsuddin A. Shaikh February 2014 Coal.pdf · Shamsuddin A. Shaikh CEO, Sindh Engro Coal Mining Co ... Thar Coal Reserves Thar PAKISTAN 175 Billion Ton Total Thar Coal Reserve 50

5 3

4

5

6

7

8

9

10

3.5

4.5

5.5

6.5

7.5

8.5

9.5

10.5

11.5

12.5

13.5

14.5

15.5

16.5

17.5

18.5

19.5

20.5

21.5

22.5

23.5

24.5

25.5

26.5

27.5

28.5

29.5

30.5

31.5

32.5

US

c/k

Wh

No. of Years from Start of Physical Work

1320MW

2640MW

3960MW

*Price of Indonesian Sub bituminous coal CIF is based on CERA Forecast Graph shows Weighted Average Tariff at 85% Load Factor

All values in real terms

Promise of Thar for Pakistan

660MW - Thar Power Company + Jamshoro ADB Plant

Power Plants on Imported Sub-bituminous Coal

Power Plants on Thar Coal

Page 6: Shamsuddin A. Shaikh February 2014 Coal.pdf · Shamsuddin A. Shaikh CEO, Sindh Engro Coal Mining Co ... Thar Coal Reserves Thar PAKISTAN 175 Billion Ton Total Thar Coal Reserve 50

Thar Coal – Savior for Pakistan

Thar coal being an indigenous resource, will result in huge Forex savings (that will grow as the mine off-take increase)

Imported coal will only provide a short-term relief to the Pakistan’s Energy crisis; however, being linked with international prices, it carries the same risk of unaffordability in future like RFO

Furthermore, as the levelized tariff cost (USc/kWh) is much lower than other options and the National Average Tariff, Thar Coal will help reduce Circular Debt 6

Comparison of Different Options Available for 1200MW

Fuel Type Thar Coal Imported Coal LNG RFO

Levelized Tariff (USc/kWh) at 85% Load Factor*

7.8 8.8 12.3 18.9

Estimated Fuel Cost for Power Generation (PKR Bn/annum)

33 39 92 143

Estimated FX Outlay (USD Mn/annum)

93 362 850 1,324

*includes cost of infrastructure required apart from Transmission Line

Thar Coal – “Indigenous Strategic Energy Resource” that will guarantee

energy security to Pakistan in the decades to come

Page 7: Shamsuddin A. Shaikh February 2014 Coal.pdf · Shamsuddin A. Shaikh CEO, Sindh Engro Coal Mining Co ... Thar Coal Reserves Thar PAKISTAN 175 Billion Ton Total Thar Coal Reserve 50

Environmental Impact Assessment

Mining Project

Environment & Social Impact Assessment study for Mining Project has been

completed by SRK UK & Hagler Bailly Pakistan

Environmental studies fully complement requirements of the Feasibility Study and

indicate there are no significant or unmanageable environmental threats due to mining

in Thar Block-II

Public hearing was conducted in Nov 2012, subsequent to which NOC was issued by

SEPA for Mining Project

Power Project

THARCO has completed ESIA of Power Plant with Hagler Bailly Pakistan & RWE

Germany

Design meets all relevant NEQS and IFC guidelines for emissions and effluents

Approval from SEPA expected in April 2014

7

BOTH THE PROJECTS FULLY COMPLY WITH WORLD BANK STANDARDS AND NEQS!

Page 8: Shamsuddin A. Shaikh February 2014 Coal.pdf · Shamsuddin A. Shaikh CEO, Sindh Engro Coal Mining Co ... Thar Coal Reserves Thar PAKISTAN 175 Billion Ton Total Thar Coal Reserve 50

Mining Project Update

Detailed Feasibility Study for the Mining Project has been completed by internationally renowned German & Chinese consultants (RWE & Sinocoal)

Firm technical & commercial bids from Four Chinese EPC contractors have been received for development of 3.8Mt/a mine (660MW equivalent) and currently being evaluated – Announcement of EPC contractor expected by March 2014

Pakistan Environmental Authorities (SEPA) have given go-ahead for this project

Site team has been mobilized and 6,000 acres of land has been acquired for which no relocation is required

Coal Tariff Petition has been submitted to Coal Regularity Authority (TCEB) for determination – Decision is expected within next 90 days

8

MINING PROJECT IS READY FOR EXECUTION!