SEWERAGE INFRASTRUCTURE UNDER
GREATER KUALA LUMPUR/KLANG VALLEY
INITIATIVES River of Life & Sewerage Non River
Contents
Background1
Scopes of Project2
Outcomes of Project3
12 National Key Economic Areas (NKEAs)
20-20 by 2020
Greater KL/KV Aspiration
To be the only metropolis in Asia that simultaneously achieves top-20 economic
growth and be among the global top-20 most livable cities by 2020
September 21, 2010
EPP#1 – MNC Attraction
EPP#2 – Talent Attraction
EPP#3 – High Speed Rail
EPP#4 – Mass Rapid Transit
EPP#5 – River of Life
EPP#6 – Greener KL
EPP#7 – Global Attractions
EPP#8 – Pedestrian Network
EPP#9 – Solid Waste Management
BO#1 – Vitalizing Putrajaya
BO#3 – Sewerage Non-River
TIMELINE : 2011 – 2020
AGENCY : SSD
CAPITALCOST : RM 5.6 BIL
TOTALPROJECT : 21
- ROL – 9 - SNR - 12
10 EPPs & 2 BOs
EPP#10 – Property
GREATER KL/KV REGIONAL CATCHMENT
RIVER OF LIFE
SEWERAGE NON RIVER
6
SEWERAGE ISSUES WITHIN GREATER KL/KV CATCHMENT
Old plants which are unable to achieve DOE gazetted standards.
Defective sewerlines.
Undersized sewerlines unable to cater for rampant growth.
Illegal discharge Issues.
Buffer issues.
Property Connection Issues
Risks beyond control-Flooding, structure failures, landslide/erosion
High number of private plants
Septic Tank
7
Refurbishment problematic plants.
Upgrading of non complying plants to meet
Category 1 standard for nutrient removal.
Rationalization & Regionalization programmes.
Property connection works for premises where
ISTs are still being used.
Sewer investigation works to identify condition
of existing aged sewers.
Sewer rehabilitation works for sewers in deteriorating
condition which prior investigation works been carried
out.
Sewer upsizing works for sewers which are undersized
and overloaded in the city centre due to rampant growth.
PROPOSED SOLUTIONSBefore
After
1. RATIONALISATION OF 17 STPs AT SETAPAK, KERAMAT, WANGSA MELAWATI (PAKEJ 1 & PAKEJ 2)
2. RATIONALISATION & UPGRADING OF STPs AT BUKIT ANTARABANGSA
3. CONNECTION WORKS TO PREMISES AT AMPANG HILIR , SEPUTEH & TITWANGSA (D39 – D42)
4. JINJANG KEPONG STP & NETWORK
5. BUNUS STP & NETWORK
6. UPGRADING OF 16 STPs AT SELAYANG ( B19 – B22 )
7. SEWER PIPE REHABILITAITON WORKS (G06 – G07)
8. RATIONALISATION OF 19 STPs AT DAMANSARA
River of Life
9. STUDIES ON ABANDON STPs AT AMPANG, SELAYANG & KUALA LUMPUR
Sewerage Non River
1. SEWER NETWORK CONSTRUCITON AT JALAN KLANG LAMA, PETALING JAYA & SEPUTEH (D47 & D48)
2. CHERAS BATU 11 STP & NETWORK
3. CHERAS JAYA STP & NETWORK
4. KAJANG 2 STP & NETWORK
6. SEWER REHABILITATION WORKS AT KELANG, SHAH ALAM, SUBANG JAYA AND PETALING JAYA (F16 & F17, G10 & G11)
7. RATIONALISATION OF 27 STPs AT JLN KLANG LAMA
8. RATIONALISATION OF 33 STPs AT PUCHONG
9. SEWER REHABILITATION WORKS IN SELANGOR (G08)
10. LOT 130 STP & NETWORK
12. STUDIES ON GREEN TECHNOLOGY APPLICATION TO EXISTING STPs
11 A) UPGRADING OF STPs (B23 – B37) B) UPPER KERAYONG STP & NETWORK
5. KAJANG 1 & 3 STP & NETWORK
OUTPUT
2
6
3
4
1
CONNECTED PE2,060,000 PE
NEW SEWER PIPE – 380.5 KM
PIPE RAHABILITATION
– 87.3 KM
Premis Connection (IST) – 3,500 unit of
houses
STPs RATIONALISATION
– 710 nos.Public STP – 678 nos.Private STP – 32 nos.
UPGRADING & REFURBISHMENT STP
– 87 nos.
** PE = Population Equivalent** PE = Population Equivalent
5
Outcome of Project
Will be able to reduce number of small plants
Reduce the risk on non compliance to DOE standards.
Reduce the pollution loading on the receiving water courses. All
upgraded & regionalized plants will meet DOE Standard A Category
1
Eliminate the risk of receiving complaints due to odour, buffer,
noise & aesthetics
Unlock land for potential redevelopment on rationalised STP sites
PROGRESS STATUS PROJECT RIVER OF LIFE
Project CategoryImplementation
statusActivities
No. Packages
Remarks
Physical Projects (8 projects, 18 packages)
Construction stage 6 package
Rasionalisation 17 STPs in Setapak, Keramat and Wangsa Melati (Pakej 1)
G06 G07 B19 B21 B22
Pre- Construction Stage (Conventional)
Tender / Evaluation
Preparation of design / tender document
8 package
Rasionalisation 17 STPs in Setapak, Keramat and Wangsa Melati (Pakej 2)
Rasionalisation in Bukit Antarabangsa
Property connection in Taman Seputeh (D40)
Property connection (3 packages)** Jinjang Kepong STP** Bunus STP**
Pre- Construction Stage (D&B)
Pre-Qualification Tender / Evaluation
1 package Rasionalisation Damansara
Tender / Evaluation 1 package B20
Preparation of need statement / pre-bid document
2 package Jinjang Kepong Network Bunus Network
Non-physical Project (1 Project, 1 package)
Research Research on-going 1 packageResearch on abandoned STPs in KL, Selayang dan Ampang
PROGRESS STATUS PROJECT SEWERAGE NON RIVER
Project CategoryImplementation
statusActivities
No. Packages
Remarks
Physical Projects(11 projects; 36 packages) Construction stage 5 packages
Rasionalisasi 27 Loji di Jalan Klang Lama
Kajang 2 STP Kajang 2 Network Lot 130 STP G08
Pre- Construction Stage (Conventional)
Preparation of design / tender document and to be tendered in2013
6 packages
G10 & G11* Kajang 1&3 STP* Cheras Jaya STP* Cheras Batu 11 STP* Upper KerayongSTP*
Pre- Construction Stage (D&B)
Pre-Qualification Tender / Evaluation
4 packages 3 Pakej B28- B30 Puchong Network
Tender / Evaluation 10
packages
Seputeh & PJ Network (D47 & D48)
4 pakej B24 – B27 Lot 130 Network B23 F16 & F17
Preparation of need statement / pre-bid document
11 packages
Cheras Jaya Network Cheras Batu 11 Network Kajang 1&3 Network* 7 Pakej B31-B37* Upper Kerayong Network*
Non-physical Project (1 Project, 1 package)
Planning TOR Approval 1 packagesResearch on Green Technology Application