APIRG/18 - WP-17 Appendix A Appendix A to WP/17 on Agenda Item 3.5 APPENDIX-3.5G Insert Logo Here Insert Logo Here Insert Logo Here Organisation 1 Organisation 2 Organisation 3 Edition : Edition Date : Status : Service Level Agreement Template

Service Level Agreement TemplateService Level Agreement Template . APIRGG/18 - WP-17 Appendix A Appendix A to WP-17 on Agenda Item 3.5 Edition: 0.5 Proposed Issue Page 2 DOCUMENT APPROVAL

  • Upload
    others

  • View
    32

  • Download
    0

Embed Size (px)

Citation preview

APIRG/18 - WP-17 Appendix A

Appendix A to WP/17 on Agenda Item 3.5

APPENDIX-3.5G

Insert Logo Here Insert Logo Here Insert Logo Here Organisation 1 Organisation 2 Organisation 3

Edition : Edition Date : Status :

Service Level Agreement Template

APIRGG/18 - WP-17 Appendix A

Appendix A to WP-17 on Agenda Item 3.5

Edi t ion : 0 .5 Proposed Issue Page 2

DOCUMENT APPROVAL

The following table identifies all management authorities that have successively approved the present issue of this document.

In witness whereof, the undersigned have executed this Agreement as of the date previously mentioned in this Agreement.

[Insert authority names below as appropriate]

AUTHORITY NAME AND SIGNATURE DATE

Aeronautical Information Services

Data Originator

Regulator

APIRG/18 - WP-17 Appendix A

Appendix A to WP/17 on Agenda Item 3.5

Edi t ion : 0 .5 Proposed Issue Page 3

DOCUMENT CHANGE RECORD

The following table records the complete history of the successive editions of the present document.

EDITION DATE REASON FOR CHANGE SECTIONS

PAGES AFFECTED

APIRG/18 - WP-17 Appendix A

Appendix A to WP/17 on Agenda Item 3.5

Edi t ion : 0 .5 Proposed Issue Page 4

TABLE OF CONTENTS

1. INTRODUCTION ................................................................................................................

1.1 Scope ........................................................................................................................ 1.2 Parties to the Agreement .......................................................................................

1.3 Perspective – Regulative Environment ............................................................... 1.4 Term .......................................................................................................................... 1.5 Conventions ............................................................................................................

1.5.1 Time .......................................................................................................................

1.5.2 Quality Attributes ..................................................................................................

1.5.3 Data Categories ....................................................................................................

2. SERVICES AND SERVICE LEVELS ................................................................................ 2.1 Service Description .................................................................................................

2.1.1 Regulation ............................................................................................................ 2.2 Optional Services ....................................................................................................

2.3 Exclusions ...............................................................................................................

2.4 Limitations ............................................................................................................... 2.5 Entities Involved ......................................................................................................

2.6 Service Levels .........................................................................................................

2.6.1 Data Originator .....................................................................................................

2.6.2 AISP ......................................................................................................................

2.7 Service Level Indications ......................................................................................

3. MANAGEMENT ELEMENTS .............................................................................................

3.1 Rewards and Remedies ..........................................................................................

3.2 Escalation Procedures ..........................................................................................

3.3 SLA Lifecycle ........................................................................................................... 3.3.1 Reporting ..............................................................................................................

3.3.2 Reviews ................................................................................................................

3.3.3 Change Process ....................................................................................................

3.4 Points of Contact ....................................................................................................

4. REFERENCES ....................................................................................................................

4.1 Refer to docs and add a short description ...........................................................

TABLE 1: PARTIES TO AGREEMENT ....................................................................................... 2 TABLE 2: DATA TO BE PROVIDED .......................................................................................... 5 TABLE 3: DATA ATTRIBUTES – ENTITY X ............................................................................. 6 TABLE 4: SERVICE LEVEL INDICATIONS .............................................................................. 7

APIRG/18 - WP-17 Appendix A

Appendix A to WP/17 on Agenda Item 3.5

Edi t ion : 0 .5 Proposed Issue Page 5

TABLE 5: POINTS OF CONTACT .............................................................................................. 8

APIRG/18/WP-17 to Agenda Item 3.5

3.5G-6 Appendix 3.5G to WP-17 on Agenda Item 3.5

S LA/1

Ed i t ion : 0 .5 Proposed Issue Page 6

1. INTRODUCTION

1.1 Scope

This Service Level Agreement (SLA) documents the agreed provision of service for the supply of aeronautical information (Data) by [organisation name] (The Data Originator) to [organisation name] (The AISP) and the agreed standards to which the said information shall be published by the AISP. This SLA is overseen and managed by the [organisation name] (The Regulator).

1.2 Benefits Gained from an SLA

An SLA is a contract between parties that defines the services provided, the indicators associated with these services, acceptable and unacceptable service levels, liabilities on the part of the service provider and the customer, and actions to be taken in specific circumstances.

In the scope of this SLA only modes of operation are discussed and formalised and financial components are not considered.

The basic objectives of an SLA are as follows:

• Better communication. It facilitates two-way communication between the parties. This communication starts at the beginning of the process to establish an SLA and continues throughout the life of the arrangement. The parties involved come together in order to understand each other’s needs, priorities and concerns, and to gain an insight into the problems which may be faced by each party through the failure of each party to fulfil their obligations.

• Guards against expectation creep. It is not uncommon for one party’s expectations of another to be higher than that which may be considered reasonable. Discussing these expectations and the resource commitments necessary to meet them is one activity undertaken in the establishment of an SLA. The process facilitates the identification and discussion of expectations. As a result, it helps identify service levels that are considered acceptable by each party and which are attainable and achievable.

• Mutually agreed standard. It sets an agreed standard against which performance may be measured. It identifies customer expectations, defines the boundaries of the service provision and clarifies responsibilities. In the absence of a shared understanding about needs and priorities, it is easy for conflicts to arise between parties. An SLA and the communication process involved in establishing it help to minimise the conflicts between the parties and provides a means for conflict resolution should a problem arise.

• A process for gauging service effectiveness. As the SLA defines standards against which the service may be measured and evaluated, it provides the basis for performing an assessment of the effectiveness of the service.

1.3 Parties to the Agreement

The following table describes and names the legal entities and their representatives who have reviewed and approved this SLA.

7 Appendix 3.5G to WP-17 on Agenda Item 3.5

S LA/1

Page 7 Proposed Issue Ed i t ion : 0 .5

Entity [Insert Regulator details here]

Address Re presentative

[Insert AISP details here]

[Insert Data Originator details here]

Table 1: Parties to Agreement

1.4 Perspective – Regulative Environment

A number of documents specify the regulatory requirements for the provision of information by Data Originators and its subsequent processing by AIS. These include:

• ICAO Annex 4 “Aeronautical Charts”;

• ICAO Annex 5 “Units of Measurement to be Used in Air and Ground Operations”;

• ICAO Annex 11 “Air Traffic Services”;

• ICAO Annex 14 “Aerodromes”;

• ICAO Annex 15 “Aeronautical Information Services”. These documents are further supported by guidance material, including:

• ICAO Doc 8126 “AIS Manual”;

• ICAO Doc 8697 “Aeronautical Chart Manual”;

• ICAO Doc 9674 “WGS-84 Manual”;

• Operating Procedures for AIS Dynamic Data (OPADD). [Add any State applicable regulation here]

1.5 Term

The term of this SLA shall be as follows: Start Date: [Insert start date here] End Date: [Insert end date here] Duration: [Insert duration here] Once agreed The AISP and The Data Originator cannot withdraw from all or part of this agreement within the above dates. [Add any other agreed constraints of / specification for the scope here.]

1.6 Conventions

Within this SLA, the following conventions are used:

APIRG/18/WP-17 to Agenda Item 3.5 3.5G-8

Appendix 3.5G to WP-17 on Agenda Item 3.5

S LA/1

Ed i t ion : 0 .5 Proposed Issue Page 8

1.6.1 Time

1.6.2 Presentation of Date and Time in All-numeric Form

This SLA uses Co-ordinated Universal Time (UTC) as described in Attachment D of Annex 5.

This SLA uses the procedures for writing the date and time in all-numeric form as described in Attachment E of Annex 5.

Times expressed as a number of “Office hours” include the hours from 8:00 to 16:00 Dutch local time (Monday to Friday).

Times expressed as a number of “Office hours” include business hours, Monday through Friday, excluding designated holidays.

Unless specifically mentioned otherwise, all durations specified are in working days.

1.6.3 Quality Attributes / Definitions

Accuracy: A degree of conformance between the estimated or measured value and the true value.

AIRAC System: A system aimed at advance notification based on common effective dates, of circumstances that necessitate significant changes in operating practices.

NOTAM System: A system of distributing notices by means of telecommunication, that contain information concerning the establishment, condition or change in any aeronautical facility, service, procedure or hazard, the timely knowledge of which is essential to personnel concerned with flight operations.

Resolution: A number of units or digits to which a measured or calculated value is expressed and used.

Integrity: A degree of assurance that an aeronautical data item and its value have not been lost or altered since its origination or authorised amendment.

Timeliness: A characteristic by which either data is provided or actions performed, with sufficient time remaining so as not to impact later actions and possibly jeopardise the achievement of the required result within due time.

1.6.4 Data Categories

The following data classifications are used within this document:

Routine: There is a very low probability when using corrupted routine data that the continued safe flight and landing of an aircraft would be severely at risk with the potential for catastrophe.

The permitted maximum error rate is 1 in 1000, providing an integrity level of 1 x 10-3.

APIRG/18/WP-17 to the Agenda I

S LA/1

Ed i t ion : 0 .5 Proposed Issue Page 9

Essential: There is a low probability when using corrupted essential data that the continued safe flight and landing of an aircraft would be severely at risk with the potential for catastrophe.

The permitted maximum error rate is 1 in 100,000, providing an integrity level of 1 x 10-5.

Critical: There is a high probability when using corrupted critical data that the continued safe flight and landing of an aircraft would be severely at risk with the potential for catastrophe.

The permitted maximum error rate is 1 in 100,000,000, providing an integrity level of 1 x 10-8.

1.7 Entities Involved for Data Provision

The following entities categories involved are used within this document:

1. Civil Aviation Authority (CAA)

The national body responsible for the overall supervision of aviation-related activities.

2. [Insert Organisation Name Here]

The organisation responsible for the provision of Air Navigation Services for the State.

3. Aeronautical Information Management/Services (AIM/AIS) The unit of the ANSP responsible for the provision of Aeronautical Information Services (AIS) for the State.

4. Data Originator Describe the data originator body here.

5. National Supervisory Authority (NSA)

APIRG/18/WP-17 Appendix 3.5G to WP-17 on Agenda Item 3.5

S LA/1

Ed i t ion : 0 .5 Proposed Issue Page 10

2. SERVICES AND SERVICE LEVELS

2.1 Service Description

The Data Originator will provide the AISP with the Data for which it is responsible as listed in Table 2, below.

Table 2: Data to be Provided

The AISP will, in turn, publish the information within the National Publication and in accordance with ICAO and National regulations.

2.1.1 Regulation

[Detail here the regulation that applies to this SLA]

2.2 Optional Services

[Detail any further services required here]

2.3 Exclusions

[Detail any further services required here]

2.4 Limitations

[Detail any further services required here]

2.5 Entities Involved

[Detail any the entities involved here]

2.6 Service Levels

2.6.1 Data Originator

All Data shall be provided in accordance with the following criteria:

1. The Data shall include its effective date.

2. The Data shall include its period of validity.

3. The Data shall be provided with the requested publication.

4. The Data shall be prepared in accordance with the following standards:

a. [List standards here]

Additionally, the Data Originator shall provide each of the identified Data items in Table 2, in accordance with the following specific criteria:

APIRG/18/WP17 3.5G-11

Appendix 3.5G to WP-17on Agenda Item 3.5

S LA/1

Ed i t ion : 0 .5 Proposed Issue Page 11

2.6.1.1 Data Item x – Repeat for each data item.

The Data shall be provided at least [insert timeliness requirement] days prior to the effective date.

The Data shall be provided by [insert delivery requirement] means.

The Data shall be provided in [insert required format of delivery].

The Data shall be provided with the following quality attributes:

Attribute Accuracy Resolution Inte grity Level Note

X’1 20 m 1 second Critical

X’2 1 ft 0.1 ft Essential

X’3 n/a n/a Routine Textual data Table 3: Data Attributes – Entity X

The Data shall be provided by with the following mete-data:

1. [insert meta-data requirement].

[Add more requirements for the provision of information]

2.6.2 AISP

The AISP shall process the Data upon receipt.

The AISP shall present a draft publication including the Data for approval by [insert approver] at least [insert timeliness requirement] days prior to the effective date.

The AISP shall publish the Data within the requested publication unless otherwise agreed, in writing, with the Data Originator.

[Add more requirements for the publication of information]

2.7 Service Level Indications

The following measures will be used to assess the performance of the service:

APIRG/18/WP17 3.5G-12

Appendix 3.5G to WP-17on Agenda Item 3.5

S LA/1

Ed i t ion : 0 .5 Proposed Issue Page 12

Measure Description Target date1.

Late provision must be alerted to the AIM as soon as known. The publication of this information will then be the subject of negotiation.

Format The Data is provided by the Data Originator to the AIM, without errors in presentation or content, in the format detailed within this SLA.

95%

Draft Publication The AIM will present a draft publication to the Data Originator for approval within the specified timeframe.

95% by required due date2.

100% within one day following due date2.

Publication The AIM will publish the Data within the required period (e.g. in compliance with

the AIRAC cycle).

95% by required due date.

Quality of Publication The IAIP product prepared will be

provided in accordance with the applicable standards.

95%

Add and amend indications as required.

Due date is used to mean the number of days in advance of the effective date that the information is to be provided to the AIS. This period is defined in section 2.6.1.

Measure Description Target

The Data is delivered by the Data 100% Originator to the AIM with the required quality levels.

Quality of Data

The Data is delivered by the Data Originator to the AIM within the specified timeframe.

95% by required due date1.

100% within three days

following due

Timeliness

APIRG/18/WP-17 3.5G-13

Appendix 3.5G to WP-17 on Agenda Item 3.5

S LA/1

Ed i t ion : 0 .5 Proposed Issue Page 13

Table 4: Service Level Indications 2 Due date is used to mean the number of days in advance of the

effective date that the draft publication is to be provided to the Data Originator.

3. MANAGEMENT ELEMENTS 3.1 Rewards and Remedies

[Detail rewards and remedies here] 3.2 Escalation Procedures [Detail any escalation procedures here] 3.3 SLA Lifecycle 3.3.1 Reporting [Detail any reporting here] 3.3.2 Reviews [Detail any reviews here] 3.3.3 Change Process [Detail the change process here] 3.4 Points of Contact The following points of contact for execution of the SLA are:

Organisation Primary Contact Secondary Contact [Insert Regulator details here] [Insert Primary Contact

details here, including name, role/job title, address, telephone, fax and email]

[Insert Secondary Contact details here, including name, role/job title, address, telephone, fax and email]

[Insert AISP details here] [Insert Primary Contact

details here, including name, role/job title, address, telephone, fax and email]

[Insert Secondary Contact details here, including name, role/job title, address, telephone, fax and email]

[Insert Data Originator details here]

[Insert Primary Contact details here, including name, role/job title, address, telephone, fax and email]

[Insert Secondary Contact details here, including name, role/job title, address, telephone, fax and email]

Table 5: Points of Contact

APIRG/18/WP-17 3.5G-14

Appendix 3.5G to WP-17 on Agenda Item 3.5

S LA/1

Ed i t ion : 0 .5 Proposed Issue Page 14

4. FUTURE INTENTIONS

4.1 General

Although outside the scope of this SLA, AIM and the [Data Originator] have a number of intentions for improvement which may have a consequential impact on this SLA.

The following sections outline these and should be considered during the review of the SLA, once it is in operation.

4.2 Describe future intentions here

5. REFERENCES

5.1 Refer to docs and add a short description.

End of Document

APIRG/18 – WP/17 Appendix B

a) Proposal for Amendment to the AFI Basic ANP (Doc 7474 Vol. II) for the introduction of

a new Section related to e-TOD

World Geodetic System – 1984 (WGS-84)

67. In order to ensure that quality (accuracy, resolution and integrity) and traceability requirements for the WGS-84 related geographical coordinate data are met, States must take measures to develop and introduce a quality system programme. This programme containing procedures, processes and resources should be in conformity with the International Organization for Standardization (ISO) 9000 series of quality assurance standards.

(Insert the following new Text) Electronic Terrain and Obstacle Data (eTOD) Requirements (FASID Table AIS 9)

68. Recognizing that significant safety benefits for international civil aviation will be provided by in-flight and ground-based applications that rely on quality electronic Terrain and Obstacle Data (eTOD), States should make every effort to implement the eTOD provisions in accordance with Chapter 10 of Annex 15 and Doc 9881. 69. FASID Table AIS-X sets out the requirements for the provision of Electronic Terrain and Obstacle Data (e-TOD) to be provided by States. 70. The implementation of e-TOD should involve different Administrations within and outside the Civil Aviation Authority i.e.: AIS, Aerodromes, Military, National Geographic and Topographic Administrations/Agencies, procedure designers, etc. 71. States, while maintaining the responsibility for data quality and availability, should consider to which extent the provision of electronic terrain and obstacle data could be delegated to national geodetic Institutes/Agencies, based on Service Level Agreement reflecting such delegation. 72. States should consider carefully the required level of details of collected terrain and obstacle data with particular emphasis on obstacle data and associated cost. 73. States should take into consideration the requirements for update/maintenance of data, especially related to obstacles. 74. States should work co-operatively with regard to the cross-border issue, for the sake of harmonization and more efficient implementation of e-TOD. (Renumber the following paragraphs)

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

FASID TABLE AIS-X — e-TOD REQUIREMENTS

EXPLANATION OF THE TABLE

1 Name of the State, territory or aerodrome for which electronic Terrain and Obstacle Data (e-TOD) are required with the designation of the aerodrome use:

RS — international scheduled air transport, regular use RNS — international non-scheduled air transport, regular use RG — international general aviation, regular use AS — international scheduled air transport, alternate use

2 Runway designation numbers

3 Type of each of the runways to be provided. The types of runways, as defined in Annex 14, Volume 1, Chapter I,

are:

NINST — non-instrument runway; NPA — non-precision approach runway PA1 — precision approach runway, Category I; PA2 — precision approach runway, Category II; PA3 — precision approach runway, Category III.

4 Requirement for the provision of Terrain data for Area 1, shown by an ‘‘X’’ against the State or territory to be

covered.

5 Requirement for the provision of Terrain data for Area 2 (TMA), shown by an ‘‘X’’ against the aerodrome to be covered.

6 Requirement for the provision of Terrain data for Area 2 (45 Km radius from the ARP), shown by an

‘‘X’’ against the aerodrome to be covered.

7 Requirement for the provision of Terrain data for Area 3, shown by an ‘‘X’’ against the aerodrome to be covered.

8 Requirement for the provision of Terrain data for Area 4, shown by an ‘‘X’’ against the runway threshold to be covered.

9 Requirement for the provision of Obstacle data for Area 1, shown by an ‘‘X’’ against the State or territory to be

covered.

10 Requirement for the provision of Obstacle data for Area 2 (TMA), shown by an ‘‘X’’ against the aerodrome to be covered.

11 Requirement for the provision of Obstacle data for Area 2 (45 Km radius from the ARP), shown by an

‘‘X’’ against the aerodrome to be covered.

12 Requirement for the provision of Obstacle data for Area 3, shown by an ‘‘X’’ against the aerodrome to be covered.

13 Remarks (timetable for implementation)

Note: For Columns 4 to 12 use the following symbols:

X- Required but not implemented XI- Required and implemented

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

1 2 3 4 5 6 7 8 9 10 11 12 13

ALGERIA

DAUA ADRAR/Touat RS

04 22

NPA

DAAG ALGER/Houari Boumediene RS

05 23

09 27

NPA PA2

PA1 NPA

DABB ANNABA/El Mellah RS

01 19

05 23

NPA PA1 NPA

NINST

DABC CONSTANTINE/Mohamed Boudiaf RS

14 32 16 34

NPA PA1 NPA PA1

DAUG GHARDAIA/Noumérate RS

12 30

NPA PA1

NINST

DAUH HASSI-MESSAOUD/Oued Irara RS

18 361

01 19

PA1 NPA

DAUI IN-SALAH/ AS

05 23

NPA NPA

DAOO ORAN/Es Sénia RS

07 25

NPA PA2

DAAT TAMANRASSET/Aguennar AS

02 20 08 26

NPA PA1 NPA

DABS TEBESSA/Tébessa RS

11 29 12

NPA NPA NPA

NINST

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

30

DAON TLEMCEN/Zénata RS

09 27

NPA NPA

DAUZ ZARZAITINE/In Amenas RS

05 23 15 33

NPA NPA

ANGOLA

FNHU HUAMBO/Albano Machado RS

11 29

NPA NPA

FNLU LUANDA/4 de Fevereiro RS

05 23 07 25

NPA PA1

BENIN

DBBB COTONOU/Cadjehoun RS

06 24

NPA PA1

BOTSWANA

FBFT FRANCISTOWN/ Francistown RS

11 29

NINST NINST

FBSK GABORONE/Sir Seretse Khama Intl RS

08 26

PA1 NPA

FBKE KASANE/Kasane RS

08 26

NPA NINST

FBMN MAUN/Maun RS

08 26

NINST NINST

FBSP SELEBI-PHIKWE/Selebi-Phikwe

12 30

NINST PA1

NINST

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

RS

BURKINA FASO

DFOO BOBO-DIOULASSO/Bobo-Dioulasso RS

06 24

PA1 NPA

DFFD OUAGADOUGOU/Ouagadougou RS

04L 22R

PA1 NPA

BURUNDI

HBBA BUJUMBURA/Bujumbura RS

18 36

PA1 NPA

CAMEROON

FKKD DOUALA/Douala RS

12 30

NPA PA2

FKKR GAROUA/Garoua RS

09 27

PA1 NPA

FKKL MAROUA/Salak RS

13 31

NPA NINST

FKKN N'GAOUNDERE/N’Gaoundere AS

03 21

NPA NINST

FKYS YAOUNDE/Nsimalen RS

01 19

NINST PA2

CAPE VERDE

GVFM PRAIA/Francisco Mendes RS

04 22

NPA NINST

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

GVAC SAL I./Amilcar Cabral RS

01 19 07 25

PA1 NPA

CENTRAL AFRICAN REPUBLIC

FEFF BANGUI/M'Poko RS

17 35

NPA PA1

FEFT BERBERATI/Berberati RS

17 35

NPA NINST

CHAD

FTTJ N'DJAMENA/N'Djamena RS

05 23

PA1 NPA

COMOROS

FMCV ANJOUAN/Ouani RS

10 28

NPA NPA

FMCZ DZAOUDZI/Pamanzi, Mayotte I. RS

16 34

NINST NPA

FMCH MORONI/Prince Said IbrahimHahaia RS

02 20

PA1 NPA

CONGO

FCBB BRAZZAVILLE/Maya-Maya RS

06 24

PA1 NPA

FCPP POINTE NOIRE/Agostino Neto RS

17 35

NPA NPA

COTE D'IVOIRE

DIAP ABIDJAN/Felix Houphouet Boigny Intl RS

03 21

NPA PA2

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

DIBK BOUAKE/Bouake RS

03 21

NPA PA1

DEMOCRATIC REPUBLIC

OF THE CONGO

FZNA GOMA/Goma RS

18 36

NINST NPA

FZAA KINSHASA/N'Djili RS

06 24

NPA PA1

FZIC KISANGANI/Bangoka AS

13 31

NPA NPA

FZQA LUBUMBASHI/Luano AS

07 25

PA1 NPA

FZWA MBUJI MAYI/Mbuji Mahi AS

17 35

NPA NINT

DJIBOUTI

HDAM DJIBOUTI/Ambouli RS

09 27

NPA PA1

EGYPT

HEBL ABU-SIMBEL/Abu-Simbel RS

15L 33R 15L 33R

NPA NPA NPA NPA

HEAX ALEXANDRIA/Alexandria RS

04 22 18 36

NPA NPA NPA NPA

HESN ASWAN/Aswan RS

17 35

NPA PA1

HECA CAIRO/Cairo Intl RS

05L 23R 05R 23L 16 34

PA2 PA2 PA2 PA2 NPA NPA

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

HEGN HURGHADA/Hurghada RS

16 34

NPA PA1

HELX LUXOR/Luxor RS

02 20

NPA PA1

HEMM MERSA-MATRUH/Mersa-Matruh RS

15 33

NPA NPA

HESH SHARM EL SHEIKH/Sharm El Sheikh RS

04L 22R 04R 22L

PA1 NINST

HESC ST. CATHERINE/St. Catherine RS

17 35

NPA NINST

HETB TABA/Taba RS

04 22 14 32

NINST NPA

EQUATORIAL GUINEA

FGSL MALABO/Malabo RS

05 23

PA1 NPA

ERITREA

HHAS ASMARA/Asmara Intl RS

07 25 12 30

PA1 NPA

HHSB ASSAB/Assab RS

12 30

NPA NINST

ETHIOPIA

HAAB ADDIS ABABA/Bole Intl RS

07 25

NPA PA1

HADR DIRE DAWA/Dire Dawa Intl RS

15 33

NINST NPA

FRANCE (ILE DE LA REUNION)

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

FMME SAINT-DENIS/Gilot La Reunion RS

12 30 14 32

NINST NPA PA1

NINST

GABON

FOON FRANCEVILLE/M'Vengue RS

15 33

PA1 NPA

FOOL LIBREVILLE/Leon M'Ba RS

16 34

PA1 NPA

FOOG PORT GENTIL/Port Gentil RS

03 21

NPA PA1

GAMBIA

GBYD BANJUL/Banjul Intl RS

14 32

NPA PA1

GHANA

DGAA ACCRA/Kotoka Intl RS

03 21

NPA PA1

DGSI KUMASI/Kumasi RS

02 20

NPA NPA

DGLE TAMALE/Tamale RS

05 23

NPA NPA

GUINEA

GUCY CONAKRY/Gbessia RS

06 24

PA1 NPA

GUXN KANKAN/Diankana RS

10 28

NPA NINST

GULB LABE/Tata RS

06 24

NINST NINST

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

GUNZ N'ZEREKORE/Konia RS

18 36

NPA NINST

GUINEA-BISSAU

GGOV BISSAU/Osvaldo Vieira Intl RS

03 21

NPA PA1

KENYA

HKEL ELDORET/Eldoret Intl RS

08 26

PA2 NPA

HKMO MOMBASA/Moi Intl RS

03 21 15 33

NPA PA1

HKJK NAIROBI/Jomo Kenyatta Intl RS

06 24

PA2 NPA

LESOTHO

FXMM MASERU/Moshoeshoe I. Intl RS

04 22

NINST PA1

LIBERIA

GLRB MONROVIA/Roberts Intl RS

04 22

PA2 NPA

LIBYAN ARAB JAMAHIRIYA

HLLB BENGHAZI/Benina RS

15L 33R 15R 33L

PA1 NPA NPA PA1

HLLS SEBHA/Sebha RS

13 31

PA1 NPA

HLLT TRIPOLI/Tripoli Intl RS

06 24 09

PA1 PA2

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

27 18 36

MADAGASCAR

FMMI ANTANANARIVO/Ivato RS

11 29

PA1 NPA

FMNA ANTSIRANANA/Arrachart RS

13 31

NPA NINST

FMNM MAHAJANGA/Amborovy RS

14 32

NPA NINST

FMNN NOSY-BE/Fascene RS

05 23

NPA PA1

FMMS SAINTE-MARIE/Sainte-Marie RS

01 19

NPA NPA

FMMT TOAMASINA/Toamasina RS

01 19

NPA PA1

FMSD TOLAGNARO/Tolagnaro RS

07 25

NPA NPA

MALAWI

FWCL BLANTYRE/Chileka RS

10 28

PA1NPA

NPA

FWLI LILONGWE/Lilongwe Intl RS

14 32

PA1 NPA

MALI

GABS BAMAKO/Senou RS

06 24

PA1 NPA

GAGO GAO/Gao RS

07 25

NPA NINST

GAKY KAYES/Kayes RS

08 26

NPA NINST

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

GAKL KIDAL/Kidal RS

10 28

NPA NINST

GAMB MOPTI-BARBE/Mopti-Barbe RS

05 23

NPA NINST

GANR NIORO/Nioro RS

08 26

NPA NINST

GATB TOMBOUCTOU/ Tombouctou RS

07 25

PA1 NPA

MAURITANIA

GQPA ATAR/Atar RS

04 22

NPA NINST

GQNI NEMA/Nema RS

10 28

NINST NPA

GQPP NOUADHIBOU/Nouadhibou RS

03 21

PA1 NPA

GQNN NOUAKCHOTT/Nouakchott RS

05 23

PA1 NPA

GQPZ ZOUERATE/Zouerate RS

28 10

NPA NPA

MAURITIUS

FIMP MAURITIUS/Sir Seewoosagur Ramgoolam Intl RS

14 32

PA1 NPA

MOROCCO

GMAD AGADIR/Al Massira RS

10 28

NPA PA1

GMTA AL HOCEIMA/Cherif Al Idrissi RS

18 36

PA1 NINST

GMMN CASABLANCA/Mohammed V RS

17 35

NPA PA2

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

GMFK ERRACHIDIA/Moulay Ali Cherif AS

13 31

NPA PA1

GMFF FES/Saïss RS

10 28

NPA PA1

GMMX MARRAKECH/Ménara RS

10 28

PA1 NPA

GMMZ OUARZAZATE/Ouarzazate RS

12 30

NPA PA1

GMFO OUJDA/Angads RS

06 24

PA1 NINST

GMME RABAT/Salé RS

04 22

PA1 NPA

GMTT TANGER/Ibnou-Batouta RS

10 28

NPA PA1

GMAT TAN-TAN/Plage Blanche RS

14 22

NPA NINST

GMTN TETOUAN/Saniat-Rimel RS

06 24

NPA NINST

MOZAMBIQUE

FQBR BEIRA/Beira RS

12 30 06 24

PA1 NPA

FQMA MAPUTO/Maputo Intl RS

05 23

NPA PA1

NAMIBIA

FYKT KEETMANSHOOP/Keetmanshop RS

04 22 18 36

NPA NPA

FYWB WALVIS BAY/Walvis Bay RS

09 27 12 30

NPA NPA

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

FYWH WINDHOEK/Hosea KutakoWindhoek RS

08 26 16 34

PA1 NPA

NIGER

DRZA AGADES/Sud RS

07 25

NPA NINST

DRRN NIAMEY/Diori Hamani Intl RS

09R 27L 09L 27R

PA1 NPA

DRZR ZINDER/Zinder AS

06 24

NPA NINST

NIGERIA

DNAA ABUJA/Nnamdi Azikiwe RS

04 22

NPA PA1

DNCA CALABAR/Calabar RS

03 21

NPA PA1

DNIL ILORIN/Ilorin AS

05 23

PA1 NPA

DNKA KADUNA/Kaduna RS

05 23

PA1 NPA

DNKN KANO/Mallam Aminu Kano Intl RS

06 24 05 23

PA2 PA2

DNMM LAGOS/Murtala Muhammed RS

01L 19R 01R 19L

PA2 PA2 NPA PA2

DNMA MAIDUGURI/Maiduguri RS

05 23

PA2 NPA

DNPO PORT HARCOURT/Port Harcourt Intl RS

03 21

NPA PA1

DNSO SOKOTO/Abubakar Saddiq III Intl RS

08 26

PA1 NPA

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

RWANDA

HRYR KIGALI/Gregoire Kayibanda RS

10 28

NPA PA1

SAO TOME AND PRINCIPE

FPST SAO TOME/Sao Tomé RS

11 29

PA1 NPA

SENEGAL

GOGS CAP SKIRING/Cap Skiring RS

15 33

NINST NPA

GOOY DAKAR/Leopold Sedar Senghor Intl RS

18 36 03 21

PA2 NPA

GOSS SAINT LOUIS/Saint Louis RS

18 36

NPA NINST

GOTT TAMBACOUNDA/Tambacounda RS

06 24

NPA NPA

GOGG ZIGUINCHOR/Ziguinchor RS

10 28

NINST NPA

SEYCHELLES

FSIA MAHE/Seychelles Intl RS

13 31

NPA PA1

SIERRA LEONE

GFLL FREETOWN/Lungi RS

12 30

NPA PA1

SOMALIA

HCMI BERBERA/Berbera AS

05 23

NINST NINST

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

HCMV BURAO/Burao RS

13 31

NINST NINST

HCMH HARGEISA/Hargeisa RS

06 24

NPA NPA

HCMK KISIMAYU/Kisimayu AS

05 23

NPA PA1

HCMM MOGADISHU/Mogadishu RS

05 23

NPA PA1

SOUTH AFRICA

FAAB ALEXANDER BAY/Alexander Bay RS

01 19 07 25 11 29

NPA NINST

FABL BLOEMFONTEIN/Bloemfontein AS

02 20 12 30

PA1 NPA

NINST NINST

FACT CAPE TOWN/Cape Town RS

01 19 16 34

PA1 NPA

FADN DURBAN/Durban RS

05 23

NPA PA1

FAJS JOHANNESBURG/Johannesburg RS

03L 21R 03R 21L 15 33

PA2 MINST

PA2 PA2

NINST NINST

FAGM JOHANNESBURG/Rand RS

18 36

NPA NPA

FALA LANSERIA/Lanseria RS

06L 24R 06R 24L 17 35

NPA NINST

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

FAUP UPINGTON/Upington RS

01 19 08 26

NPA NPA

SPAIN

GCLP GRAN CANARIA/Gran Canaria, Canary I. RS

03L 21R 03R 21L

PA1 NPA

NINST NINST

GCHI HIERRO/Hierro, Canary I. RS

16 34

NPA NINST

GCLA LA PALMA/La Palma, Canary I. RS

01 19

NPA NINST

CGRR LANZAROTE/Lanzarote, Canary I. RS

04 22

NPA NPA

GEML MELILLA/Melilla RS

15 33

NPA NINST

GCFV FUERTEVENTURA/ Fuerteventura, Canary I. RS

01 19

PA1 NPA

GCXO TENERIFE NORTE/Los Rodeos, Canary I. RS

12 30

NPA NPA

GCTS TENERIFE SUR/Reina Sofia, Canary I. RS

08 26

PA1 NPA

SUDAN

HSSJ JUBA/Juba RS

13 31

PA1 NINST

HSKA KASSALA/Kassala AS

02 20

NINST NINST

HSSS KHARTOUM/Khartoum RS

18 36

PA1 NPA

HSPN PORT SUDAN/Port Sudan Intl RS

18 36

NPA PA1

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

SWAZILAND

FDMS MANZINI/Matsapha RS

07 25

NPA

NINST

TOGO

DXXX LOME/Tokoin RS

05 23

NPA PA1

DXNG NIAMTOUGOU/Niamtougou RS

03 21

PA1 NPA

TUNISIA

DTTJ DJERBA/Zarzis RS

09 27

PA1 NPA

DTMB MONASTIR/Habib Bourguiba RS

08 26

PA1 NPA

DTTX SFAX/Thyna RS

15 33

NPA NPA

DTKA TABARKA/7 NOVEMBRE RS

09 27

NPA PA1

DTTZ TOZEUR/Nefta RS

09 27

PA1 NPA

DTTF GAFSA/Ksar RS

05 23

PA1 NPA

DTTA TUNIS/Carthage RS 01

19 11 29

NPA PA1

NPAINST

PA1NPA

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

UGANDA

HUEN ENTEBBE/Entebbe Intl RS

17 35

PA1 NPA

UNITED REPUBLIC OF TANZANIA

HTDA DAR-ES-SALAAM/Dar-Es-Salaam RS

05 23

PA1 NPA

HTKJ KILIMANJARO/Kilimanjaro Intl RS

09 27

PA1 NPA

HTZA ZANZIBAR/Zanzibar RS 18

36 NINST

NPA

WESTERN SAHARA

GSAI EL AAIUN/El Aaiun RS

04 22

NPA PA1

GSMA SMARA/Smara RS 17

35 NINST NINST

GSVO VILLA CISNEROS/Villa Cisneros RS

04 22

NINST NPA

ZAMBIA

FLLI LIVINGSTONE/Livingstone Intl RS

10 28 15 33

NPA PA1 NPA

FLLS LUSAKA/Lusaka Intl RS 10

28 PA1 NPA

FLMF MFUWE/Mfuwe RS 08

26 NPA NPA

FLND NDOLA/Ndola RS

10L 28R 10R 28L

NPA PA1 NPA

ZIMBABWE

APIRG/18 - WP/17 Appendix C

Appendix C to WP/17 on Agenda Item 3.5

STATE, TERRITORY OR AERODROME FOR WHICH eTOD IS REQUIRED TERRAIN DATA REQUIRED

OBSTACLE DATA REQUIRED REMARKS

CITY/AERODROME

RWY No

RWY TYPE

Area 1

Area 2

Area 3 Area

4 Area 1

Area 2

Area 3

TMA 45Km

TMA 45Km

FVBU BULAWAYO/Bulawayo RS

13 31

NPA NPA

FVHA HARARE/Harare RS

06 24

PA1 PA1

FVFA VICTORIA FALLS/Victoria Falls RS

12 30

PA1 NINST

APIRG/18 - WP/17 Appendix D

Appendix D to WP/17 on Agenda Item 3.5

AFI Region E-TOD IMPLEMENTATION PLAN

Updated Timelines

Timelines: GLOBAL REGIONAL NATIONAL

APIRG/18 - WP/17 Appendix D

Appendix D to WP/17 on Agenda Item 3.5

AFI REGION - E-TOD Implementation Timelines 2000 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 Global Provision of Terrain Data

for Area 1

States Angola Benin Botswana Burkina Faso Burundi Cape Verde Central African Republic Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia Madagascar Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania Zambia Zimbabwe

APIRG/18 - WP/17 Appendix D

Appendix D to WP/17 on Agenda Item 3.5

AFI REGION - E-TOD Implementation Timelines 2000 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 Global Provision of Obstacle Data

for Area 1

States Angola Benin Botswana Burkina Faso Burundi Cape Verde Central African Republic Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia Madagascar Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania Zambia Zimbabwe

APIRG/18 - WP/17 Appendix D

Appendix D to WP/17 on Agenda Item 3.5

AFI REGION - E-TOD Implementation Timelines 2000 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 Global Provision of Terrain Data

for Area 2

States Angola Benin Botswana Burkina Faso Burundi Cape Verde Central African Republic Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia Madagascar Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania Zambia Zimbabwe

APIRG/18 - WP/17 Appendix D

Appendix D to WP/17 on Agenda Item 3.5

AFI REGION - E-TOD Implementation Timelines 2000 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 Global Provision of Obstacle Data

for Area 2

States Angola Benin Botswana Burkina Faso Burundi Cape Verde Central African Republic Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia Madagascar Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania Zambia Zimbabwe

APIRG/18 - WP/17 Appendix D

Appendix D to WP/17 on Agenda Item 3.5

AFI REGION - E-TOD Implementation Timelines 2000 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 Global Provision of Terrain Data

for Area 3

States Angola Benin Botswana Burkina Faso Burundi Cape Verde Central African Republic Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia Madagascar Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania Zambia Zimbabwe

APIRG/18 - WP/17 Appendix D

Appendix D to WP/17 on Agenda Item 3.5

AFI REGION - E-TOD Implementation Timelines 2000 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 Global Provision of Obstacle Data

for Area 3

States Angola Benin Botswana Burkina Faso Burundi Cape Verde Central African Republic Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia Madagascar Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania Zambia Zimbabwe

APIRG/18 - WP/17 Appendix D

Appendix D to WP/17 on Agenda Item 3.5

AFI REGION - E-TOD Implementation Timelines 2000 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 Global Provision of Terrain Data

for Area 4

States Angola Benin Burkina Faso Botswana Burundi Cape Verde Central African Republic Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia Madagascar Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania Zambia Zimbabwe

APIRG/18 - WP/17 Appendix D

Appendix D to WP/17 on Agenda Item 3.5

X = Implemented N = Non Implemented

AFI REGION - E-TOD Implementation Timelines 2000 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 Global Provision of Obstacle Data

for Area 4

States Angola Benin Botswana Burkina Faso Burundi Cape Verde Central African Republic Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia Madagascar Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania Zambia Zimbabwe

APIRG/18 - WP/17 Appendix D

Appendix D to WP/17 on Agenda Item 3.5

P = Plan Implementation

APIRG/18 – WP/17 Appendix E1

Appendix E1 to WP/17 on Agenda Item 3.5

AIM PERFORMANCE OBJECTIVES (AIS-AIM Transition)

REGIONAL PERFORMANCE OBJECTIVES / NATIONAL PERFORMANCE OBJECTIVES

TRANSITION FROM AIS TO AIM

Benefits Environment . reductions in fuel consumption; Efficiency . improved planning and management of flights; . efficient use of airspace; Safety . improved safety

KPI Status of implementation of the AIRAC system in the AFI Region Status of implementation of QMS in the AFI Region Status of implementation of AIS Automation in the AFI Region

Number of States complying with the AIRAC procedures Proposed Number of Posting of AIS information on the ICAO AFI Forum Metrics Number of States having developed and signed service Level Agreements between AIS and data Originators Number of States having organized QMS awareness campaigns and training programmes Number of States having implemented QMS Number of States having developed eAIP Number of States having developed a National Plan for the transition from AIS to AIM

Strategy Short term (2010-2011)

Medium term (2011 – 2015)

ATM OC COMPONENTS TASKS

TIMEFRAME START-END RESPONSIBILITY STATUS

AUO, ATM SDM • Improve the

compliance with the AIRAC system

Ongoing States &

AFI AIMTF Valid

• Use of the internet, including the ICAO AFI Forum, for the advance posting of the aeronautical information considered of importance to users;

2009 – 2011

States & ICAO Valid

• Signature of service Level Agreements between AIS and data originators;

2009 – 2011

States Valid

• Foster the implementation of AFI QMS based on the AFI Region Methodology for the implementation of QMS ;

2009 – 2011 ICAO &

AFI AIMTF & States Valid

• Monitor the implementation of QMS until complete

2008 - 2013 ICAO &

AFI AIMTF Valid

APIRG/18 – WP/17 Appendix E1

Appendix E1 to WP/17 on Agenda Item 3.5

implementation of the requirements by all AFI States;

• Foster the development of eAIPs by AFI States;

2009 - 2013 States &

AFI AIMTF Valid

• Monitor the implementation of AIS automation in the AFI Region in order to ensure availability, sharing and management of electronic aeronautical information;

2008 -2013

ICAO & AFI AIMTF

Valid

• Foster the development of National/regional AIS databases;

2010 – 2015 ICAO &

AFI AIMTF & States Valid

Linkage to GPIs GPI-5: performance-based navigation; GPI-11: RNP and RNAV SIDs and STARs; GPI-18: Aeronautical Information

Abbreviations used in the Global ATM Operational Concept: AO Aerodrome Operations AOM Airspace Organization and Management ATM SDM ATM Service Delivery Management AUO Air User Operations CM Conflict Management DCB Demand and Capacity Balancing TS Traffic Synchronization

------------

APIRG/18 - WP/17 Appendix E2

Appendix E2 to WP/17 on Agenda Item 3.5

AIM PERFORMANCE OBJECTIVES

NATIONAL PERFORMANCE OBJECTIVE - IMPLEMENTATION OF WGS-84 AND e-TOD

Benefits Environment • Supporting benefits described in performance objectives for PBN Efficiency • WG8 -84 is a prerequisite for performance-based navigation, benefits described in performance

objectives for PBN. • support approach and departure procedure design and implementation • improve aircraft operating limitations analysis • support aeronautical chart production and on-board databases Safety • improve situational awareness • support determination of emergency contingency procedures • support technologies such as ground proximity and minimum safe altitude warning systems • see benefits described in performance objectives for PBN KPI • status of implementation of WGS-84 in the AFI Region

• status of implementation of e-TOD in the AFI Region (for Areas 1 & 4) Proposed Metrics

• number of States having fully implemented WGS-84 • number of States having organized e-TOD awareness campaigns and training programmes • number of States having implemented e-TOD for Areas 1 & 4.

Strategy Short term (2010-2012) Medium term (2012 - 2016)

ATM OC COMPONENTS

TASKS TIMEFRAME START-END

RESPONSIBILITY STATUS

ATM CM

Electronic terrain and obstacle data (e-TOD)

• share experience and resources in the implementation of e-TOD through the establishment of an e-TOD working group

2008-2011

APIRG States

e-TOD WG has been established

• report requirements and monitor implementation status of e-TOD using a new AIS Table of the AFI FASID (Ref. Appendix B)

2008-ongoing APIRG States

APIRG/18 for amendment of FASID APIRG/18 for endorsement of e-TOD WG proposals

• develop a high level policy for the management of a national e-TOD programme

2008-20092012

States

ATM OC Electronic terrain and obstacle data (e-TOD)

• Provide Terrain and Obstacle data for area 1

2008-2012 States

AFI AIM TF to review

• Provide Terrain and Obstacle data for area 4 2008-2012 States

AFI AIM TF to review

• assessment of Annex 15 requirements related to the provision of e-TOD for area 2 and 3

2010-2012 States

AFI AIM TF to review

APIRG/18 - WP/17 Appendix E2

Appendix E2 to WP/17 on Agenda Item 3.5

• development of an action plan

for the provision of e-TOD for area 2 and 3

2013 States

AFI AIM TF to review

• provide necessary Terrain and Obstacle data for area 2 2015 States AFI AIM TF

to review • provide necessary Terrain and

Obstacle data for area 3 2015 States AFI AIM TF to review

ATM AUO

WGS-84 • establish WGS-84 implementation

goals in coordination with the national PBN implementation plan

2008-20092012 States

APIRG/18 AFI AIM-TF

• report requirements and monitor implementation status of WGS-84 using the new AIM-5 Table of the AFI FASID and take remedial action if required

• completeWGS-84 implementation

2011- 2013

2013

APIRG States

States Linkage to GPIs

GPI-5: Performance-based navigation; GPI-9: Situational awareness; GPI-ll: RNP and RNAV SIDs and STARs; GPI-18: Aeronautical Information; GPI-20: WGS-84; GPI-2l: Navigation systems

APIRG/18 – WP/17 Appendix E3

Appendix E3 to WP17 on Agenda Item 3.5

AIS/MAP PERFORMANCE OBJECTIVES

ELIMINATION OF IDENTIFIED AIS/MAP DEFICIENCIES

(implementation of WGS-84 coordinates, publication of aeronautical charts and timely publication and updating of AIS/MAP documents, i.e. NOTAMs, AIPs, AICs, etc.)

Benefits Efficiency • improved collaborative decision-making through sharing aeronautical data information Safety • enhance safety by timely exchange air safety data, i.e. electronically and wider distribution of such

data Strategy

Short term (2010) Medium term (2011 - 2015)

ATM OC COMPONENTS

TASKS TIMEFRAME START-END

RESPONSIBILITY STATUS

AIS/MAP • publication of relevant aeronautical charts.

2008 - 20092011

States/ANSPs Survey for APIRG

• publication of WGS-84 coordinates for en-route waypoints and use for GNSS coordinates for terminal approaches and departure procedures

2008 - 20092011

States/ANSPs Survey for APIRG

• publication of AIPs, NOTAMs and AICs using standards formats.

States/ANSPs

• States concerned to develop action plan to eliminate the deficiencies

2008 -20092011 States/ANSPs Survey for APIRG

Linkage to GPIs

GPI/18: Aeronautical information; GPI/20: WGS-84

APIRG/18 - WP/17

Appendix F1

Table AIM-1 Responsibility for the provision of AIM Services EXPLANATION OF THE TABLE

Column: 1 Name of the State or territory 2 Designated international NOTAM Office (NOF) 3 Designated State for AIP production 4 Designated State for aeronautical charts (MAP) production 5 Designated State for the provision of the authoritative Integrated Aeronautical

Information Database (IAID) 6 Designated State for the provision of the Pre-flight information services 7 Remarks — additional information, as appropriate.

FASID TABLE AIM-1

Responsibility for the provision of AIM Services

State NOF AIP MAP IAID Pre-Flight

Briefing Remarks

1 2 3 4 5 6 7 Angola Benin Burkina Faso Botswana Burundi Cape Verde Central African Republic

Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo

Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia Madagascar Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe

Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania

Zambia Zimbabwe

APIRG/18 - WP/17 Appendix F2

Table AIM-2 Provision of AIM products and services based on the Integrated Aeronautical Information Database (IAID) EXPLANATION OF THE TABLE

Column: 1 Name of the State or territory for which the provision of AIM products and services based

on the IAID is required. 2 Requirement for the implementation and designation of the authoritative IAID, shown by:

FI – Fully Implemented PI – Partially Implemented NI – Not Implemented

Note 1 — The IAID of a State is a single access point for one or more databases (AIS, Terrain, Obstacles, AMDB, etc). The minimum set of databases which should be integrated is defined in Annex 15.

Note 2 — Information providing detail of “PI” should be given in the Remarks column (the implemented components of the IAID).

Note 3 — The information related to the designation of the authoritative IAID should be published in the AIP (GEN 3.1)

3 Requirement for an IAID driven AIP production, shown by: FC – Fully compliant (eAIP: Text, Tables and Charts) PC – Partially compliant NC – Not compliant

Note 4 — AIP production includes, production of AIP, AIP Amendments and AIP Supplements

4 Requirement for an IAID driven NOTAM production, shown by: FC – Fully Compliant NC – Not compliant

5 Requirement for an IAID driven SNOWTAM production, shown by: FC – Fully Compliant NC – Not compliant

6 Requirement for an IAID driven PIB production, shown by: FC – Fully compliant NC – Not compliant

7 Requirement for Charting systems to be interoperable with the IAID, shown by: FC – Fully compliant PC – Partially compliant NC – Not compliant

8 Requirement for Procedure design systems to be interoperable with the IAID, shown by: FI – Fully Implemented PI – Partially Implemented NI – Not Implemented

APIRG/18 - WP/17 Appendix F2

9 Requirement for ATS systems to be interoperable with the IAID, shown by:

FI – Fully Implemented PI – Partially Implemented NI – Not Implemented

10 Action Plan — short description of the State’s Action Plan with regard to the provision of AIM products and services based on the IAID, including planned date(s) of full compliance, as appropriate.

11 Remarks — additional information, including detail of “PC”, “NC”, “PI” and “NI”, as appropriate.

APIRG/18 - WP/17 Appendix F2

FASID TABLE AIM-2

Integrated Aeronautical Information Database (IAID)

State IAID AIP NOTAM SNOWTAM PIB Charting Procedure

design ATS Action Plan

Remarks

1 2 3 4 5 6 7 8 9 10 11 Angola Benin Burkina Faso Botswana Burundi Cape Verde Central African Republic

Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo

Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia Madagascar

APIRG/18 - WP/17 Appendix F2

State IAID AIP NOTAM SNOWTAM PIB Charting Procedure

design ATS Action Plan

Remarks

1 2 3 4 5 6 7 8 9 10 11 Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe

Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania

Zambia Zimbabwe

APIRG18 - WP/17 Appendix F3

Table AIM-3 Terrain and Obstacles datasets and Airport Mapping Databases (AMDB) EXPLANATION OF THE TABLE

Column

1 Name of the State or territory for which Terrain and Obstacles datasets and AMDB are required.

2 Compliance with requirement for the provision of Terrain datasets, shown by: FC – Fully compliant PC – Partially compliant NC – Not compliant

3 Compliance with requirement for the provision of Obstacle datasets, shown by: FC – Fully compliant PC – Partially compliant NC – Not compliant

4 Implementation of AMDB, shown by: FI – Fully Implemented PI – Partially Implemented NI – Not implemented

5 Action plan — short description of the State’s Action Plan with regard to compliance with the requirements for provision of Terrain and Obstacles datasets and implementation of AMDB.

6 Remarks— additional information, including detail of “PC” and “NC”, as appropriate.

FASID TABLE AIM-3

Terrain and Obstacle datasets and Airport Mapping Database (AMDB)

State

Terrain Datasets

Obstacle datasets

AMDB Action Plan Remarks

1 2 3 4 5 6 Angola Benin Burkina Faso Botswana Burundi Cape Verde Central African Republic

Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo

Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia Madagascar Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe

Senegal Seychelles Sierra Leone Somalia

AIS

State

Terrain Datasets

Obstacle datasets

AMDB Action Plan Remarks

1 2 3 4 5 6 South Africa Swaziland Togo Uganda United Republic of Tanzania

Zambia Zimbabwe

APIRG18 - WP/17 Appendix F4

Table AIM-4 Aeronautical Data Quality EXPLANATION OF THE TABLE

Column: 1 Name of the State or territory. 2 Compliance with the requirement for implementation of QMS for Aeronautical

Information Services including safety and security objectives, shown by: FC – Fully compliant PC – Partially compliant NC – Not compliant

3 Compliance with the requirement for the establishment of formal arrangements with approved data originators concerning aeronautical data quality, shown by:

FC – Fully compliant PC – Partially compliant NC – Not compliant

4 Implementation of digital data exchange with originators, shown by: FI – Implemented PI – Partially Implemented NI – Not implemented

Note 1 — Information providing detail of “PI” and “NI” should be given in the Remarks column (percentage of implementation).

5 Compliance with the requirement for metadata, shown by: FC – Fully compliant PC – Partially compliant NC – Not compliant

6 Compliance with the requirements related to aeronautical data quality monitoring (accuracy, resolution, timeliness, completeness), shown by:

FC – Fully compliant PC – Partially compliant NC – Not compliant

7 Compliance with the requirements related to aeronautical data integrity monitoring, shown by:

FC – Fully compliant PC – Partially compliant NC – Not compliant

8 Compliance with the requirements related to the AIRAC adherence, shown by: FC – Fully compliant PC – Partially compliant NC – Not compliant

9 Action Plan — short description of the State’s Action Plan with regard to aeronautical data quality requirements implementation, including planned date(s) of full compliance, as appropriate.

10 Remarks — additional information, including detail of “PC”, “NC”, “PI” and “NI”, as appropriate.

APIRG18 - WP/17 Appendix F4

FASID TABLE AIM-4 Aeronautical Data Quality

State

QMS Establishment of formal

agreements

Digital data exchange

with originators

Metadata Data quality

monitoring

Data integrity

monitoring

AIRAC adherence

Action Plan Remarks

1 2 3 4 5 6 7 8 9 10 Angola Benin Burkina Faso Botswana Burundi Cape Verde Central African Republic

Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo

Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia

APIRG18 - WP/17 Appendix F4

State

QMS Establishment of formal

agreements

Digital data exchange

with originators

Metadata Data quality

monitoring

Data integrity

monitoring

AIRAC adherence

Action Plan Remarks

1 2 3 4 5 6 7 8 9 10

Madagascar Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe

Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania

Zambia Zimbabwe

APIRG/18 - WP/17 Appendix F5

Table AIM-5 World Geodetic System-1984 (WGS-84) EXPLANATION OF THE TABLE

Column: 1 Name of the State or territory for which implementation of WGS-84 is required. 2 Compliance with the requirements for implementation of WGS-84 for FIR and Enroute

points, shown by: FC – Fully compliant PC – Partially compliant NC – Not compliant

3 Compliance with the requirements for implementation of WGS-84 for Terminal Areas (arrival, departure and instrument approach procedures), shown by:

FC – Fully compliant PC – Partially compliant NC – Not compliant

4 Compliance with the requirements for implementation of WGS-84 for Aerodrome, shown by:

FC – Fully compliant PC – Partially compliant NC – Not compliant

5 Compliance with the requirements for implementation of Geoid Undulation, shown by: FC – Fully compliant PC – Partially compliant NC – Not compliant

6 Action Plan — short description of the State’s Action Plan with regard to WGS-84 implementation, including planned date(s) of full compliance, as appropriate.

7 Remarks — additional information, including detail of “PC” and “NC”, as appropriate.

APIRG/18 - WP/17 Appendix F5

FASID TABLE AIM-5 World Geodetic System-1984 (WGS-84)

State FIR/ENR Terminal AD GUND Action Plan

Remarks

1 2 3 4 5 6 7

Angola Benin Burkina Faso Botswana Burundi Cape Verde Central African Republic

Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia Madagascar

APIRG/18 - WP/17 Appendix F5

State FIR/ENR Terminal AD GUND Action Plan

Remarks

1 2 3 4 5 6 7

Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe

Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania

Zambia Zimbabwe

APIRG18- WP/17 Appendix F6

Table AIM-6 AERONAUTICAL CHARTS EXPLANATION OF THE TABLE

Column

1 Name of the State or territory for which aeronautical charts are required.

2 Compliance with the requirements for the Enroute Chart — ICAO (ENRC) and the ATC Surveillance Minimum Altitude Chart — ICAO (ATCSMAC), shown by:

FC – Fully compliant PC – Partially compliant NC – Not compliant

3 Compliance with requirements for charts related to terminal areas (IAC, ARC, SID, STAR, VAC) shown by:

FC – Fully compliant PC – Partially compliant NC – Not compliant

4 Compliance with the requirement for Aerodrome charts (ADC, ADGMC and APDC), shown by:

FC – Fully compliant PC – Partially compliant NC – Not compliant

5

Compliance with the requirements for Obstacle Charts (AOC-A, PATC, AOC-E) shown by:

FC – Fully compliant) PC – Partially compliant NC – Not compliant

6 Compliance with the requirement for WAC, shown by: FC – Fully compliant PC – Partially compliant NC – Not compliant

7 Action plan — short description of the State’s Action Plan with regard to aeronautical charts implementation, including planned date(s) of full compliance, as appropriate.

8 Remarks— additional information, including detail of “PC” and “NC”, as appropriate.

VII-AIM X-2

FASID TABLE AIM-6 Aeronautical Charts

State

ENR & ATCSMAC

Charts related to Terminal

Areas

AD Charts

Obstacle Charts

WAC Action Plan Remarks

1 2 3 4 5 6 7 8 Angola Benin Burkina Faso Botswana Burundi Cape Verde Central African Republic

Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo

Djibouti Equatorial Guinea

Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia Madagascar Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe

Senegal

AIS

State

ENR & ATCSMAC

Charts related to Terminal

Areas

AD Charts

Obstacle Charts

WAC Action Plan Remarks

1 2 3 4 5 6 7 8 Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania

Zambia Zimbabwe

APIRG/18 - WP/17 Appendix F7

FASID Table AIM-7 PRODUCTION RESPONSIBILITY FOR SHEETS OF THE WORLD AERONAUTICAL CHART - ICAO 1:1 000 000

EXPLANATION OF THE TABLE

Column: 1 Name of the State accepting production responsibility. 2 World Aeronautical Chart — ICAO 1:1 000 000 sheet number(s) for which

production responsibility is accepted. 3 Remarks.

Note 1— When Aeronautical Charts — ICAO 1:500 000 or Aeronautical Navigation

Charts — ICAO Small Scale, are made available instead of the 1:1 000 000 chart, this is to be indicated in the Remarks column.

Note 2— In those instances where the production responsibility for certain sheets has been accepted by more than one State, these States by mutual agreement should define limits of responsibility for those sheets.

FASID Table AIM-7 Production responsibility for sheets of the

World Aeronautical Chart - ICAO 1:1 000 000 (WAC)

1 2 3 State Sheet number(s) Remarks Angola

Benin

Burkina Faso

Botswana

Burundi

Cape Verde Central African Republic Chad Comoros Congo Cote d’Ivoire

Democratic Republic of Congo

Djibouti

Equatorial Guinea

Eritrea

Ethiopia

Gabon

Gambia

Ghana

Guinea

Guinea Bissau

Kenya

Lesotho

Liberia

Madagascar

Malawi

Mali

Mauritanie

Mauritius

Mozambique

Namibia

Niger

Nigeria

Rwanda

Sao Tome and Principe

Senegal

Seychelles

Sierra Leone

Somalia

APIRG/18 - WP/17 Appendix F7

---------------

South Africa

Swaziland

Togo

Uganda

United Republic of Tanzania

Zambia

Zimbabwe

APIRG/18 - WP/17 Appendix F8

Table AIM-8 Pre-Flight Information Services EXPLANATION OF THE TABLE

Column: 1 Name of the State or territory. 2 Compliance with the requirements for the provision of Pre-Flight Information

Bulletins (PIB), shown by: FC – Fully compliant, against each type of PIB PC – Partially compliant, against each type of PIB NC – Not compliant, against each type of PIB

Note 1 — AD: Aerodrome type bulletins Area: Area type bulletins (FIR or group of FIRs or States) FIR route: FIR route specific bulletin Narrow route: Narrow path route specific bulletin

3 Compliance with the requirements for the availability of the elements of the Integrated Aeronautical Information Publications (IAIP), maps and charts to the flight operations personnel, shown by:

FC – Fully compliant PC – Partially compliant NC – Not compliant

4 Requirement for a common point of access to aeronautical information and meteorological information briefings, shown by:

FI – Fully Implemented PI – Partially Implemented NI – Not implemented

5 Action Plan — short description of the State’s Action Plan with regard to Pre-Flight Information Services, including planned date(s) of full compliance, as appropriate.

6 Remarks — additional information, including detail of “PC”, “NC”, “PI” and “NI”, as appropriate.

APIRG/18 - WP/17 Appendix F8

FASID TABLE AIM-8

Pre-Flight Information Services

State

PIB IAIP

Aeronautical Information and Meteorological

information Integrated Briefing

Action Plan Remarks AD Area FIR route

Narrow route

1 2 3 4 5 6

Angola Benin Burkina Faso Botswana Burundi Cape Verde Central African Republic Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya

APIRG/18 - WP/17 Appendix F8

State

PIB IAIP

Aeronautical Information and Meteorological

information Integrated Briefing

Action Plan Remarks AD Area FIR route

Narrow route

1 2 3 4 5 6

Lesotho Liberia Madagascar Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania

Zambia Zimbabwe

APIRG/18 - WP/17 Appendix F9

Table AIM-9

AIM Certification EXPLANATION OF THE TABLE

Column: 1 Name of the State or territory for which implementation of AIM Certification is required. 2 Availability of AIM Regulations, shown by:

FC – Fully compliant PC – Partially compliant NC – Not compliant

Note.— Please provide in the Remarks column detail of “PC” and “NC”. 3 Compliance with the requirements for the establishment of a Safety Oversight System for

ensuring the effective implementation of safety-related policy and procedures in the area of AIM, shown by:

FC – Fully compliant PC – Partially compliant NC – Not compliant

Note 1.— Please provide in the Remarks column detail of “PC” and “NC”. Note 2.— A Safety Oversight System is based on the eight (8) Critical Elements (CEs) as defined in the ICAO Safety Oversight Manual (Doc 9734, Part A). Note 3.— As part of the Safety Oversight System, States should, in particular: a) establish an entity responsible for the safety oversight of the AIS/AIM service

provider(s)(not necessarily limited to the safety oversight of AIM) with clearly defined functions and responsibilities, or delegate this function to a Regional/Sub-Regional Organization;

b) ensure the availability of sufficient number of qualified AIM inspectors; c) establish minimum qualifications and experience for the AIM inspectorate staff ; d) establish detailed job descriptions reflecting all the regulatory and safety oversight tasks

for the AIM inspectorate staff; e) establish the necessary procedures for the AIM inspectorate staff; f) establish and implement a formal surveillance programme for the continuing supervision

of the AIS/AIM service provider(s) and ensure that safety oversight is effectively conducted; and

g) establish and implement a mechanism/system for the elimination of deficiencies identified by the AIM inspectorate staff.

4 Compliance with the requirements for implementation of AIM certification, shown by: FC – Fully compliant PC – Partially compliant NC – Not compliant

Note 4.— AIM Certification may be performed within the framework of ANS Certification

APIRG/18 - WP/17 Appendix F9

5 Action Plan — short description of the State’s Action Plan with regard to the implementation

of the different requirements of AIM certification, including planned date(s) of full compliance, as appropriate.

6 Remarks — additional information, including detail of “PC” and “NC”, as appropriate.

APIRG/18 - WP/17 Appendix F9

FASID TABLE AIM-9 AIM Certification

State AIM

Regulations AIM Safety Oversight

AIM Certification

Action Plan

Remarks

1 2 3 4 5 6

Angola Benin Burkina Faso Botswana Burundi Cape Verde Central African Republic Chad Comoros Congo Cote d’Ivoire Democratic Republic of Congo Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia Madagascar Malawi

APIRG/18 - WP/17 Appendix F9

State AIM

Regulations AIM Safety Oversight

AIM Certification

Action Plan

Remarks

1 2 3 4 5 6

Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania

Zambia Zimbabwe

APIRG/18 - WP/17 Appendix G

Appendix G to WP/17 on Agenda Item 3.5 __________________________________________________________________________

Proposal for Amendment to the AFI Basic FASID (Doc 7474 Vol.II) for the inclusion of materials related to transition from AIS to AIM Amendment of the AIS Parts of the AFI Basic ANP and FASID in order to introduce/develop Planning material related to the transition from AIS to AIM consisting of new AIM Tables. This amendment proposal to Doc. 7474 (Vol. I and II) relates to the requirement for an overview of the Air Navigation Plan and the requirements for FASID tables, along with amendments to text which will be relevant to operations within the AFI Region of responsibility.

AFI ANP, VOLUME II, FASID PART x - AERONAUTICAL INFORMATION MANAGEMENT (AIM) (Insert the following new Text)

1. INTRODUCTION 1.1 The material in this part complements that contained in Part x — AIM of the AFI Basic ANP and should be taken into consideration in the overall planning processes for the AFI region. 1.2. This part contains the details of the facilities and services to be provided to fulfill the basic requirements of the plan as agreed between the provider and user States concerned. Such agreement indicates a commitment on the part of the State(s) concerned to implement the requirement(s) specified. It provides a structured framework for States to plan and to monitor their progress and supports regional and national plans to implement the transition to AIM. This element of the FASID, in conjunction with the AFI Basic ANP, is kept under constant review by APIRG in accordance with its schedule of management, in consultation with user and provider States and with the assistance of the ICAO AFI Regional Office. 1.3. To satisfy new requirements arising from the Global Air Traffic Management Operational Concept, aeronautical information services must transition to a broader concept of aeronautical information management, with a different method of information provision and management given its data-centric nature as opposed to the product-centric nature of AIS. AIM is the dynamic, integrated management of aeronautical information services – safely, economically and efficiently – through the provision and exchange of quality assured digital aeronautical data in collaboration with all parties. 2. ORGANISATION AND PROVISION OF AIM FACILITIES AND SERVICES 2.1. AIM requires all aeronautical information to be stored as data sets that can be accessed by user applications. The establishment and maintenance of an Integrated Aeronautical

APIRG/18 - WP/17 Appendix G

Appendix G to WP/17 on Agenda Item 3.5 __________________________________________________________________________

Information Database where data sets are integrated and used to produce current and future AIM products and services is a fundamental step in the transition to AIM. The following AIM FASID tables contain planning criteria and provisions requiring implementation and compliance by States: • Responsibility for the provision of AIM Services • Provision of AIM products and services based on the Integrated Aeronautical Information Database (IAID) • Terrain and Obstacle data sets and Airport Mapping Databases (AMDB) • Aeronautical Data Quality • World Geodetic System – 1984 (WGS84) • Aeronautical Charts • Production Responsibility for sheets of the World Aeronautical Chart – ICAO 1:1 000 000 • Pre-Flight Information Services • AIM Certification 2.2. FASID Table AIM-1 sets out the responsibilities for the provision of AIM services in the AFI Region. It takes into account the current situation and new developments specific to the AFI Region where States delegate certain AIS/AIM services to a Regional Agency (e.g. with the establishment of Functional Airspace Blocs (FAB). The responsibilities for the provision of aeronautical data, products and services in such cases need to be clearly assigned. 2.3. FASID Table AIM-2 sets out the requirements for the Provision of AIM products and services based on the Integrated Aeronautical Information Database (IAID). It reflects the transition from the current product centric AIS to data centric AIM. For the future digital environment it is important that the -2 authoritative databases are clearly designated and such designation must be published for the users. This is achieved with the concept of the Integrated Aeronautical Information Database (IAID), a single access point for one or more authoritative databases (AIS, Terrain, Obstacles, AMDB, etc) for which the State is responsible. 2.4. FASID Table AIM-3 sets out the requirements for the provision of Terrain and Obstacles datasets and Aerodrome Mapping Data Bases (AMDB). The AFI e-TOD implementation Checklist at Attachment A1 and the AFI e-TOD implementation strategy at Attachment A2 to Part x - AIM of the AFI FASID is developed to assist States in the process of e-TOD implementation. 2.5. FASID Table AIM-4 sets out the requirements for aeronautical data quality. Attachment B to Part x - AIM of the AFI FASID describes the safety and security objectives to be included in the Quality Management System of AIM. Attachment C to Part x - AIM of the AFI FASID lists the data originators and the type of aeronautical data/information required to be exchanged by direct electronic connection. 2.6. FASID Table AIM-5 sets out the requirements for the implementation of the World Geodetic System – 1984 (WGS-84).The requirement to use a common geodetic system remains essential to facilitate the exchange of data between different systems. The expression of all coordinates in the AIP and charts using WGS-84 is an important first step for the transition to AIM.

APIRG/18 - WP/17 Appendix G

Appendix G to WP/17 on Agenda Item 3.5 __________________________________________________________________________

2.7. FASID Table AIM-6 sets out the requirements for the production of aeronautical charts. The provision of digital mapping data bases e.g. AMDB, allows for the provision and use of electronic aeronautical charts. Annex 4 SARPs include the requirement for an Electronic Aerodrome Terrain and Obstacle Chart. 2.8. FASID Table AIM-7 sets out the responsibilities for the production of the sheets of the World Aeronautical Chart 1: 1 000 000 (WAC). The assignment of the WAC sheets is determined by regional agreement, based on the delineation of areas specified in Appendix 5 to Annex 4 and taking into consideration the cross-border issues. Note.- The World Aeronautical Chart 1: 1 000 000 provides information to satisfy the requirements of visual air navigation. 2.9. FASID Table AIM-8 sets out the requirements for the provision of pre-flight information services. 2.10. FASID Table AIM-9 sets out the requirements for AIM Certification.

APIRG/18 - WP/17 Appendix H

Appendix H J-1

AFI REGION QESTIONNAIRE FOR STATE’S TRANSITION FROM AIS TO AIM National Plan for the transition from AIS to AIM

a) Have you developed a National Plan for the transition from AIS to AIM? If Yes, is it based on the ICAO Roadmap (Phases 1, 2 and 3) ? YES NO

Sample No formal plan has been developed for the whole transition but a set of initiatives for several steps of the Roadmap. Phase 1 is fully covered by our initiatives / Phases 2 and 3 are partly covered by our initiatives.

X

STATE

1. Phase 1 – Consolidation (2009)

a) What do you consider a realistic timeframe for the implementation of Phase 1? Sample 2013 – due to the implementation of QMS by the raw data originators

Quality measures will be reinforced to ensure the required level of quality of the aeronautical information. Before end of June 2013.

Incremental improvements in data quality will be achieved through the implementation of the revised QMS. Data quality is expected to be fully compliant before the end of June 2017.

a) What do you consider a realistic timeframe for the implementation of Phase 1? STATE

b) What is the status of implementation of the following steps of Phase 1 in your State? P-03 — AIRAC adherence monitoring

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample There seems currently no effective means available to monitor the process steps after “publication”, (which is beyond our influence and control (mailing).

Implemented up to the process step “publication” in the frame of the Quality Management System.

STATE

APIRG/18 - WP/17 Appendix H

Appendix H J-2 b) What is the status of implementation of the following steps of Phase 1 in your State?

P-03 — AIRAC adherence monitoring

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

STATE

b) What is the status of implementation of the following steps of Phase 1 in your State?

P-04 — Monitoring of States’ differences to Annex 4 and Annex 15

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample During preparations for ICAO USOAP all differences to Annex 4 and Annex 15 have been identified and recorded, using standard checklists supplied from ICAO. Since then, some of those differences are removed and some standards are changed, checklists were updated. Differences are published in the AIP.

Dialogs are conducted concerning differences between CAA and service provider about measures and time frame.

STATE

b) What is the status of implementation of the following steps of Phase 1 in your State? P-05 — WGS-84 implementation

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample Implemented – since 1998 Geoid Undulation not yet

implemented STATE

AppendixH J-3

b) What is the status of implementation of the following steps of Phase 1 in your State? P-17 — Quality

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample Partially achieved. Not in place for all data throughout the data management chain. Partly implemented concerning integrity.

Data exchange tool will improve data integrity.

STATE

2. Phase 2 – Going Digital (2009 – 2011)

a) What do you consider a realistic timeframe for the implementation of Phase 2? Sample Many steps of Phase 2 are already implemented; however the entire scope of data will be covered by 2015.

STATE

b) What is the status of implementation of the following steps of Phase 2 in your State?

P-01 — Data quality monitoring

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample A structured monitoring system is not implemented. Quality management in the chain is fractured.

State policy under development

STATE

APIRG/18 – WP/17 Appendix H

Appendix H J-4

a) What is the status of implementation of the following steps of Phase 2 in your State?

P-06 — Integrated aeronautical information database

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample AISP operates a database of static aeronautical data based on AICM/AIXM 4.5 and a separate database for dynamic aeronautical data. The database was converted to the current AIXM 4.5 version with the effective date of 4th of June 2010. Obstacle data database with only one way exchange from (originator) to AISP under test operation.

With the introduction of a system based on AIXM 5.1 an integration of the static and dynamic database is expected. The deadline for the transition to AIXM 5.1 is not specified yet.

STATE

a) What is the status of implementation of the following steps of Phase 2 in your State?

P-07 — Unique identifiers

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample AISP uses a model of unique feature identification based on natural keys in compliance with AIXM 4.5.

With the introduction of a system based on AIXM 5.1 the universally unique identifier (UUID) model will be implemented. We expect possible difficulties in the transition process to the new unique identifiers.

STATE b) What is the status of implementation of the following steps of Phase 2 in your State?

P-07 — Unique identifiers Implemented

(specify how) Planned

(specify when/how) Additional

comments/clarification required STATE . a) What is the status of implementation of the following steps of Phase 2 in your State?

P-08 — Aeronautical information conceptual model

a) What is the status of implementation of the following steps of Phase 2 in your State? P-02 — Data integrity monitoring

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

STATE

APIRG/18 – WP/17 Appendix H

Appendix H J-5

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample The data model which is used by AIXM 4.5 is implemented. With the introduction of a system based on AIXM 5.1 the appropriate data model will be implemented.

b) What is the status of implementation of the following steps of Phase 2 in your State?

P-08 — Aeronautical information conceptual model

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

STATE

b) What is the status of implementation of the following steps of Phase 2 in your State? P-11 — Electronic AIP

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample No Initial eAIP produced May 11. Operational version planned for Sep 11.

AIP available in digital format (PDF) on CD and on the web

STATE

a) What is the status of implementation of the following steps of Phase 2 in your State? P-13 — Terrain

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample

Terrain datasets are available, but unfit to cover all eTOD requirements. Implementation is planned until mid 2013

Implementation Project is ongoing, charging mechanism under discussion. State policy under development.

STATE

a) What is the status of implementation of the following steps of Phase 2 in your State?

P-11 — Electronic AIP

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

STATE

APIRG/18 – WP/17 Appendix H

Appendix H J-6 b) What is the status of implementation of the following steps of Phase 2 in your State?

P-13 — Terrain

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification

STATE

a) What is the status of implementation of the following steps of Phase 2 in your State? P-14 — Obstacles

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification

required Sample Partially provided but not compliant with chapter 10 of

ICAO Annex 15 Data collected for Area 1

Area 1 planned for 2012 Area 2 and Area 3 planned 2015

State policy under development.

STATE

b) What is the status of implementation of the following steps of Phase 2 in your State? P-14 — Obstacles

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required STATE

a) What is the status of implementation of the following steps of Phase 2 in your State?

P-15 — Aerodrome mapping

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification

required Sample No No concrete planning available yet, still under

review.

STATE

APIRG/18 – WP/17 Appendix H

Appendix H J-7

3. Phase 3 – Information Management (2011 – 2016)

a) What do you consider a realistic timeframe for the implementation of Phase 3? Sample We believe that the foreseen implementation time frame of Phase 3 is too ambitious and think that 2013-2018 would be a more realistic time frame.

STATE a) What is the status of implementation of the following steps of Phase 3 in your State?

P-09 — Aeronautical data exchange

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample An AIXM interface from/to the central aeronautical database (refer to P-06) is available.

It is planned to implement the exchange model and mechanisms together with AICM 5.1. This starts in 2013

Not implemented between data providers and AIS

STATE

b) What is the status of implementation of the following steps of Phase 3 in your State? P-09 — Aeronautical data exchange

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

STATE

a) What is the status of implementation of the following steps of Phase 3 in your State? P-10 — Communication networks

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample AISP has been using the Internet for static and dynamic data exchange for some time already. AFTN is also being used, currently in the role of a backup network for dynamic data exchange. Starting August 2010 the AISP is using PENS for dynamic data exchange.

Migration to AMHS completed. For some specific services Internet is being used.

In some specific cases the ANSP is delivering aeronautical data to customers (airlines) through business-to-business (B2B) web services (industry standard). Briefing services (self- and home briefing) are provided by making use of the Internet in line with the ICAO Doc 9855 (requires update in line with latest developments).

APIRG/18 – WP/17 Appendix H

Appendix H J-8 STATE

a) What is the status of implementation of the following steps of Phase 3 in your State? P-12 — Aeronautical information briefing

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample For many years the ANSP is applying enhanced NOTAM selection criteria for the delivery of NOTAMs to airlines going beyond the ICAO provisions (enhancing the operational relevance for the airline). This procedure is applied in agreement with the Regulator.

Despite the constraints with the current NOTAM selection criteria, the presentation of all required pre-flight information (AIS, FPL and MET) has been improved in an integrated system allowing for custom tailored information.

b) What is the status of implementation of the following steps of Phase 3 in your State?

P-12 — Aeronautical information briefing

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

STATE

a) What is the status of implementation of the following steps of Phase 3 in your State?

P-16 — Training

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample

Currently it is not clear what is expected under the training header. ICAO training manual has to be developed to reflect the new competencies required by the transition to AIM, before national requirements can be developed.

APIRG/18 – WP/17 Appendix H

Appendix H J-9

a) What is the status of implementation of the following steps of Phase 3 in your State?

P-18 — Agreements with data originators

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample Under Development. See P-01. Partially achieved, some requirements in current CAA publications.

By July 2013 – Implementation of CAA Policy for Agreements with Data Originators.

STATE

a) What is the status of implementation of the following steps of Phase 3 in your State?

P-19 — Interoperability with meteorological products

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample Partially implemented, pre-flight information briefing is provided in harmonized way (one stop shop) in accordance with current ICAO Annex 3 and ICAO Annex 15 requirements.

Next step (fully integrated briefing) will be implemented after the design and implementation of the appropriate data exchange technology is finished (WXXM – Weather Exchange Model).

STATE

STATE

Appendix H J-10

P-20 — Electronic aeronautical charts

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample

More detailed specification are required; Annex 4, Chapter 20 Electronic Aeronautical Chart Display is too general.

a) What is the status of implementation of the following steps of Phase 3 in your State? P-20 — Electronic aeronautical charts

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

STATE

a) What is the status of implementation of the following steps of Phase 3 in your State?

P-21 — Digital NOTAM

Implemented (specify how)

Planned (specify when/how)

Additional comments/clarification required

Sample Plan to provide digital NOTAM by Jul 2017. AIXM 5.1 will be the enabler to digital NOTAM.

STATE

4. Do you expect any specific difficulty which could impede the transition from AIS to AIM?

YES NO

Appendix H J-11 Sample x Potential for the non-participation of key stakeholders providing e-TOD data.

x Continuation of downturn in aviation industry causing financial constraints on the State AIS provider and other key stakeholders supplying aeronautical data. x Non-agreement by airports to establishment of SLA with State AIS for provision of data. x Justification to aerodromes for additional costs related to the provision of survey data for digital mapping. x Funding, decision making on all levels, manpower capacity, availability of knowledge, technical infrastructure, acceptance by all stakeholders, timescales unrealistic.

X

STATE

5. What kind of assistance/support do you expect from ICAO to expedite the transition from AIS to AIM?

Sample x Specific guidance material for implementation of each subject. Development of more detailed guidance materials, manuals, best practices examples and other supporting documents. x Expeditious revisions to Annex 15 and 4 when appropriate. x Regional workshops and seminars to ensure consistency in the transition to AIM.

STATE

6. Do you have any suggestion to update/improve the ICAO Roadmap for the Transition from AIS to AIM? Sample x In the first version of the Roadmap document the description of the steps is quite basic and insufficient. Those definitions should be

expanded and/or reference to specific standards, manuals and other documents should be provided within it. x Timelines should be permanently monitored and adapted accordingly.

STATE

7. Any other suggestion on the subject?

Sample x ICAO Doc 9881 is only a draft, but the content is paramount for the transition to AIM - e.g. the attributes of terrain and obstacle data need clear definitions and explanations – including examples of obstacles together with attributes.

STATE

Appendix H J-12

APIRG/18 - WP/17 Appendix I

Appendix I to WP/17 on Agenda Item 3.5

Status report against the 21 steps of the ICAO Roadmap for the transition from AIS to AIM

State AIS AIM Transition Table Phase 1 P~03 —AIRAC adherence monitoring P~04 —Monitoring of States’differences to Annex 4 and Annex 15 P~05 —WGS~84 implementation P~17 —Quality Phase 2 P~01 —Data quality monitoring P~02 —Data integrity monitoring P~06 —Integrated aeronautical information database P~07 —Unique identifiers P~08 —Aeronautical information conceptual model P~11—Electronic AIP P~13 —Terrain P~14 —Obstacles P~15—Aerodrome mapping Phase 3 P~09 —Aeronautical data exchange P~10—Communication networks P~12 —Aeronautical information briefing P~16 —Training P~18 —Agreements with data originators P~19 —Interoperability with meteorological products P~20 —Electronic aeronautical charts P~21 —Digital NOTAM

APIRG/18 – WP/17 Appendix I

Appendix I to WP/17 on Agenda Item 3.5

Appendix -H

Date Last Amended:

Phase 1 Consolidation Phase 2 Going Digital Phase 3 Information Management P~03 P~04 P~05 P~17 P~01 P~02 P~06 P~07 P~08 P~11 P~13 P~14 P~15 P~09 P~10 P~12 P~16 P~18 P~19 P~20 P~21

Angola Benin Burkina Faso Burundi Cape Verde Central African Republic Chad Comoros Congo Cote d’Ivoire Democratic Republic of C

Djibouti Equatorial Guinea Eritrea Ethiopia Gabon Gambia Ghana Guinea Guinea Bissau Kenya Lesotho Liberia

APIRG/18 – WP/17 Appendix I

Appendix I to WP/17 on Agenda Item 3.5

Madagascar Malawi Mali Mauritanie Mauritius Mozambique Namibia Niger Nigeria Rwanda Sao Tome and Principe Senegal Seychelles Sierra Leone Somalia South Africa Swaziland Togo Uganda United Republic of Tanzania

Zambia Zimbabwe X= Implemented N= Non Implemented P= Plan Implementation

APIRG/18 – WP/17 Appendix I

Appendix I to WP/17 on Agenda Item 3.5

APIRG/18 - WP/17 Appendix J

Appendix J to WP/17 on Agenda Item 3.5

NOTAM Templates related to the operational impact and limited access of airspace and

routes affected by volcanic ash

NOTAM Templates

General Structure of NOTAM content For each operational area, a short description is given for in which situations the examples can be used. It follows by a description of the structure of the NOTAM text, providing the sequence of the free text information to be inserted in item E). The structure of the information is in accordance with a dedicated digital NOTAM event scenario. Filling instructions and NOTAM codes The NOTAM examples include some instructions in completion of the qualifier line, the recommended NOTAM code and instruction in how to describe a published airspace in item E).

Navigation warnings Type of operational impact/event These templates apply for the issuance of navigation warnings for potential volcanic activity: a) pre-eruption notification and outbreak of a volcano including detailed information regarding the activity, b) volcano ash contamination areas forecast spread and movement, for which an area restriction has not been established Structure of information The examples follow the structure of the digital NOTAM event scenario Ad-hoc special activity area: airspace type – activity/reason – location note (ex. name of volcano) – geometry (horizontal/vertical) – note(s); The structure of the information is illustrated by color coding in the NOTAM example 2.2.3.1 with the following meaning: Red = airspace type Blue =activity/reason for the area establishment Green =location note of the activity Purple = Geometry Orange = airspace activity note #1(there may be as many Notes as necessary) Brown = airspace activity note #2 (there may be as many Notes as necessary) NOTAM examples Pre-eruptive volcanic alert (A0777/10 NOTAMN Q) BIRD/QWWLW*/IV/NBO/W/000/999/6337N01901Wxxx** A) BIRD B) 1002260830 C) 1002261100

APIRG/18 - WP/17 Appendix J

Appendix J to WP/17 on Agenda Item 3.5

E) PRE-ERUPTIVE ACTIVITY ALERT FOR VOLCANIC ACTIVITY, POSSIBLY INDICATING IMMINENT ERUPTION (VOLCANO KATLA 1702-03 ICELAND-S) AS FOLLOWS: CIRCLE WITH CENTRE 6337.5N 01901.5W AND RADIUS OF XXXNM***. VOLCANIC ASH CLOUD IS EXPECTED TO REACH 50.000 FEET AMSL FEW MINUTES FROM START OF ERUPTION. AIRCRAFT ARE REQUIRED TO FLIGHT PLAN TO REMAIN AT LEAST XXXM CLEAR OF VOLCANO AND MAINTAIN WATCH FOR NOTAM/SIGMET FOR AREA F) GND G) UNL *) Recommended NOTAM code: QWWLW “Significant volcanic activity will take place…(specify)”. **) A radius shall be included in the qualifier line in a way that encompasses the total area of influence of the NOTAM. ***) XXX is a distance established by the Provider State and shall correspond to the radius in the qualifier line. Reporting on outbreak of volcanic eruption (A0778/10 NOTAMR A0777/10 Q) BIRD/QWWLW/IV/NBO/W/000/999/6337N01901Wxxx A) BIRD B) 1002261000 C) 1002261300 E) VOLCANIC ERUPTION CONFIRMED IN VOLCANO KATLA 17-2-03 ICELAND-S. CIRCLE WITH CENTRE 6337.5N 01901.5W AND RADIUS OF XXXNM. VOLCANO ASH CLOUD IS EXPECTED TO REACH 50 000 FEET AMSL. AIRCRAFT ARE REQUIRED TO REMAIN AT LEAST XXXNM CLEAR OF VOLCANO AND MAINTAIN WATCH FOR NOTAM/SIGMET FOR BIRD AREA. F) GND G) UNL Reporting on forecasted volcanic ash area [of Medium or High, High/Medium or High/Medium/Low contamination] (A0207/10 NOTAMN Q) EIAA/QWWLW/IV/NBO/W /000/200/xxxxNxxxxxE (orW)/xxx*) A)EIAA B) 1005190700 C) 1005191300 E) VOLCANIC ASH AREA OF MEDIUM CONTAMINATION FORECAST AS FOLLOWS: 5243N 00853W - 5330N 00618W - 5150N 00829W - 5243N 00853W**) F)SFC G) FL200 *) The geographical reference (coordinates lat/long) shall represent the approximate centre of a circle whose radius encompasses the whole area of influence. A radius shall be included in a way that encompasses the total area of influence of the NOTAM. **) Definition of the area should be done by radius/circle or coordinates only. Definition of airspace by the use of geographical or administrative features such as State borders, rivers, sea shores etc) is not supported by the digital NOTAM event scenario and is therefore not recommended. If operational necessary, this can be defined by providing a simplified polygon larger than the area and excluding a neighbouring FIR, for example.

APIRG/18 - WP/17 Appendix J

Appendix J to WP/17 on Agenda Item 3.5

Coordinates defining the lateral limits of the area (polygon) should be enumerated in clockwise order, each point separated by space-hyphen-space. The last and the first points of the list shall be the same.

Airspace restrictions Type of operational impact/event These templates apply for established temporary airspace restrictions for areas affected by volcanic activity: a) temporary airspace restriction due to outbreak of volcanic eruption, b) temporary airspace restrictions based on forecast ash contamination areas spread and movement Structure of information The examples follow the structure of the digital NOTAM event scenario Ad-hoc special activity area: airspace type – activity/reason – location note (ex. name of volcano) – geometry (horizontal/vertical) – note(s); The structure of the information is illustrated by color coding in the NOTAM example 2.3.3.1 with the following meaning: Red = airspace type Blue =activity/reason for the area establishment Green =location note of the activity Purple = Geometry Orange = airspace activity note #1(there may be as many Notes as necessary) Brown = airspace activity note #2 (there may be as many Notes as necessary) NOTAM examples Established temporary airspace restriction for confirmed volcanic eruption (A0255/11 NOTAMN Q) BIRD/QRDCA*/IV/NBO/W/000/500/6337N01901Wxxx** A) BIRD B) 1103260800 C) 1103261200 E) TEMPORARY DANGER AREA ESTABLISHED FOR CONFIRMED VOLCANIC ERUPTION VOLCANO KATLA 1702-03 ICELAND-S AS FOLLOWS: CIRCLE WITH CENTRE 6337.5N 01901.5W AND RADIUS OF XXXNM*** VOLCANIC ASH CLOUD REPORTED REACHING FL500. AIRCRAFT ARE REQUIRED TO REMAIN CLEAR OF AREA AND MAINTAIN WATCH FOR NOTAM/SIGMET FOR BIRD AREA. F) SFC G) FL500 *) Recommended NOTAM code: QRTCA “Temporary restricted area activated”, QRDCA “Danger area activated” and QRPCA “ Prohibited area activated”, based on States decision on established restriction. **) A radius shall be included in the qualifier line in a way that encompasses the total area of influence of the NOTAM. ***) XXX is a distance established by the Provider State and shall correspond to the radius in the qualifier line

APIRG/18 - WP/17 Appendix J

Appendix J to WP/17 on Agenda Item 3.5

Established airspace restriction including volcanic ash area of High [or High/Medium or High/Medium/Low] contamination (A0503/10 NOTAMN Q) EGGN/QRTCA/IV/NBO/W/000/350/xxxxNxxxxxW (or E)xxx* A)EGPX B)1005182300 C)1005190500 E)TEMPORARY RESTRICTED AREA ESTABLISHED FOR VOLCANIC ASH AREA OF HIGH CONTAMINATION AS FOLLOWS: 5812N 00611W - 5718N 00216W - 5552N 00426W - 5629N 00652W - 5812N 00611W**) F)SFC G) FL350 (A0886/10 NOTAMR A0884/10 Q) BIRD/QRDCA/IV/NBO/W/000/250/xxxxNxxxxxW(orE)xxx* A) BIRD B) 1011301214 C) 1011301814 E) TEMPORARY DANGER AREA ESTABLISHED FOR VOLCANIC ASH AREA OF MEDIUM AND HIGH CONTAMINATION AS FOLLOWS: 7134N 00843W - 7134N 00801W - 6931N 00508W - 6606N 00732W - 6208N 01334W - 6254N 01419W - 6823N 00925W - 7134N 00843W**) F)SFC G)FL250 *) The geographical reference (coordinates lat/long) shall represent the approximate centre of a circle whose radius encompasses the whole area of influence. A radius shall be included in a way that encompasses the total area of influence of the NOTAM. **) Definition of the area should be done by radius/circle or coordinates only. Definition of airspace by the use of geographical or administrative features such as State borders, rivers, sea shores etc) is not supported by the digital NOTAM event scenario and is therefore not recommended. If operational necessary, this can be defined by providing a simplified polygon larger than the area and excluding a neighboring FIR, for example. Coordinates defining the lateral limits of the area (polygon) should be enumerated in clockwise order, each point separated by space-hyphen-space. The last and the first points of the list shall be the same.

Aerodrome/heliport closure Type of operational impact/event These templates cover the event of a temporary closure of an airport/heliport. The closure can be total (any traffic is forbidden) or partial (with the exception of particular operations, flight or aircraft categories). Structure of information The proposed structure of data items in the examples follow the digital NOTAM event scenario Airport/Heliport closure: designator - operational status - forbidden operation - permitted operation – reason - start closure - end closure – note(s)

APIRG/18 - WP/17 Appendix J

Appendix J to WP/17 on Agenda Item 3.5

The structure of the information is illustrated by color coding in the NOTAM example 2.3.3.1, with the following meaning: Red = designator Blue =operational status (closure/limitation) Green = forbidden operation (flight/aircraft) Purple = permitted operation (flight/aircraft) and PPR details Orange = reason for aerodrome/heliport closed Indigo = start closure Pink = end closure, schedule Brown = further instructions concerning the airport closure Note (there may be as many Notes as necessary) NOTAM examples Aerodrome/Heliport closed for all traffic (A1340/10 NOTAMN Q)EFIN/QFALC/IV/NBO/A/000/999/6455N01252E/010 A)EFOU B) 1012151600 C) 1012151900EST E) AD*) EFOU CLOSED FOR ALLTRAFFIC DUE TO VOLCANIC ASH AREA OF HIGH CONTAMINATION FORECAST FOR INFO CALL + 35885207700 *) If the designator concerns a heliport, the word “HELIPORT” shall be included. Aerodrome/Heliport closed for IFR traffic (A0468/10 NOTAMN Q)EFIN/QFALT/I/NBO/A/000/999/6455N012521E/010 A)EFOU B) 1003211000 C) 1003211300EST E) AD EFOU CLOSED FOR IFR TRAFFIC DUE TO VOLCANIC ASH AREA OF MEDIUM CONTAMINATION FOR INFO CALL + 35885207700

Restrictions on route portions/flight levels Type of operational impact/event These templates cover the event of a temporary closure of one or more route portions (could be on different routes) due to a common cause, such as the activation of a temporary restricted area. If more than one route portion is concerned, the eventual vertical layers and schedules specified by the data originator are assumed to apply identically to all route portions (routes); if one route portion has different layers or schedules, it shall be considered a separate event and a separate NOTAM shall be issued. Structure of information The proposed structure of data items in the examples follow the digital NOTAM event scenario Route portion closure: route availability - route designator - start point - end point - direction - lower level - upper level - start time - end time - schedule - reason - note(s)

APIRG/18 - WP/17 Appendix J

Appendix J to WP/17 on Agenda Item 3.5

The structure of the information is illustrated by color coding in the NOTAM example 2.5.3.1 with the following meaning: Red = route availability Blue =route designator Green = start point (designator of the significant point, and the type in case of a navaid) Purple = end point (designator of the significant point and the type in case of a navaid) Indigo = lower level/upper level Orange = start time/end time/schedule Pink = reason (explanation of the situation that triggered the closure of the route) Brown = further instructions concerning the route portion closure Note (there may be as many Notes as necessary) : NOTAM examples Area Navigation (RNAV) routes portion closure with vertical layer (A0515/10 NOTAMN Q) ENOR/QANLC/I/NBO/E/285/400/6230N00300E/085 A)ENOR B) 1004151200 C) 1004151400EST E) RNAV ROUTE SEGMENTS CLSD UM 996 ISVIG – VIGRA DVOR/DME (VIG) UL727 ISVIG – FLORO DVOR/DME (FLO) UP607 INGAL – FLORO DVOR/DME (FLO) FROM FL285 TO FL400 DUE TO VOLCANIC ASH AREA OF HIGH CONTAMINATION FORECAST ATS route *) portion closure with vertical layer A0515/10 NOTAMN Q) LFFF/QARLC/IV/NBO/E/200/400/4920N0015E/060 A)LFFF B) 1011030800 C) 1011031000EST E) ATS ROUTE SEGMENTS CLSD UL612 XAMAB – RESMI FROM FL 200 TO FL 400 03 NOV 2010 08:00 TO 03 NOV 2010 10:00EST DUE TO TEMPORARY ESTABLISHED DANGER AREA FOR VOLCANIC ASH AREA OF MEDIUM AND HIGH CONTAMINATION. *)The second and third NOTAM code letters AR apply for conventional ATS routes, TACAN routes and routes other than Area Navigation routes.