    Semi-detached Residential Project Laval, Quebec

    PROJECT DETAILS:

    Type: Residential / Semi-detached Location: 1505 Rue Louis-Durocher, Laval Client: Sebastien Brunelle Areas:

    Total site area: 2161.4 square meters (23261.8 square feet) Lot A: Lot B:

    Ground floor area (without parking): 232.7 square meters (2504.7 square feet)

    Ground floor area (without parking): 200.5 square meters (2158 square feet)

    Basement area: 282 square meters (3035.42 square feet)

    Basement area: 243 square meters (2615.6 square feet)

    Parking area: 51.3 square meters (552.25 square feet)

    Parking area: 55.5 square meters (597.5 square feet)

    Height: 1 level above ground level Height: 1 level above ground level Total area: 566 square meters (6092.37 square feet)

    Total area: 499 square meters (5371.1 square feet)

    Program:

    Lot A: Lot B: Ground floor: Main entrance, Master bedroom, Middle bedroom, Small bedroom, Kitchen, 3 Bathrooms, Walking closets, Living room, Dining area, Laundry, Parking

    Ground floor: Main entrance, Master bedroom, Middle bedroom, Small bedroom, Kitchen, 3 Bathrooms, Walking closets, Living room, Dining area, Laundry, Parking

    Basement area: Master bedroom, Kitchen, Bathroom, Walking closets, Living room, Dining area, Laundry, Gym area, Storage

    Basement area: Master bedroom, Kitchen, Bathroom, Walking closets, Living room, Dining area, Laundry, Gym area, Storage

    Lot A: Lot B: Design/Build start: September 2015 Design/Build start: September 2015 Construction start: Planned to be on December 2015

    Construction start: Planned to be on December 2015

    Estimated cost: 425000$ Estimated cost: 400000$ Inauguration start: Planned to be on June 2015

    Inauguration start: Planned to be on June 2015

    Cost at completion: N/A Cost at completion: N/A

  • 8

    Estimated schedule: 7 months Estimated schedule: 7 months Time at completion: N/A Time at completion: N/A

    PROJECT CREDITS: Designers:

    Project Architect: Babak Manouchehri, Ar. Structural Engineer: Alireza Sharifzadeh, Eng.,

  • 9

    Site plan

    Ground floor plan Basement plan

    Section A-A Section B-B

  • 10

    Northen Elevation

    Southern elevation

    Eastern elevation

    Western elevation

  • 11

    Ground floor measurement plan

    Basement measurement plan