Structure 3a Rail Bridge - Built off line
Worcester Birmingham
Canal diversion
Temporary towpath installed
BAG1 – Birmingham to Gloucester Railway
Structure 3a Rail Bridge - Built off line Structure 3b
Canal Aqueduct –
Built insitu
Selly Oak New Road Phase 2
Aerial photo October 2010
Worcester Birmingham
Canal diversion
Temporary towpath installed
BAG1 – Birmingham to Gloucester Railway
Selly Oak New Road Phase 2
Aerial photo March 2011
Structure 3a
Rail BridgeStructure 3b -
Ariel Aqueduct
BAG1 Birmingham to Gloucester Railway
Worcester Birmingham
Canal
Construction of Aston Webb Boulevard – Relief Road off A38 Bristol Road
New towpath
Selly Oak New Road Phase 2 Rail Bridge
Selly Oak witnesses Europe's heaviest bridge drive involving modular transports
4026 tonne 75metres
The New Queen Elizabeth Hospital
The University of Birmingham main campus – Grange Road pedestrian route and Southgate
Tesco Express
Ariel Aqueduct
New SONR 2 Rail Bridge
Bournbrook Road
A38 Bristol Road
Edgbaston Park Road
Aston Webb Boulevard junction (start of SONR 2)
New road starts to form – further surfacing works completed since aerial photo.
Structure 3a
Rail Bridge
Worcester Birmingham
Canal
Construction of Aston Webb Boulevard – Relief Road off A38 Bristol Road
New towpath
Structure 3a
Rail Bridge
Worcester Birmingham
Canal
Construction of Aston Webb Boulevard – Relief Road off A38 Bristol Road
New towpath