17
SELF-FUNDING ENERGY PERFORMANCE CONTRACT HALF HOLLOW HILLS CENTRAL SCHOOL DISTRICT

Self -Funding Energey Performance Contract

Embed Size (px)

DESCRIPTION

Self -Funding Energey Performance Contract

Citation preview

Page 1: Self -Funding Energey Performance Contract

SELF-FUNDING ENERGY

PERFORMANCE CONTRACT

HALF HOLLOW HILLS CENTRAL SCHOOL DISTRICT

Page 2: Self -Funding Energey Performance Contract

AGENDA

� Overview

� Project Updates with NYSSED Approval

� Facility Improvement Measures (FIM)

� Cost and Savings Summary

� Construction Begins……..

Page 3: Self -Funding Energey Performance Contract

SUMMARY

�$894k in Total Savings – a 29% reduction

� Project Size - $16,400,000+ cash flows

� 20 Energy Conservation Measures

� LIPA Rebate - $170,000

� Includes $45k in Operational Savings

� JCI Coordinates with HHH securing $1,000,000 ARRA

Grant

Page 4: Self -Funding Energey Performance Contract

HIGHLIGHTS

�District-wide Lighting Retrofit.

�District-wide DDC Controls Upgrade.

�One 85-kW Cogeneration Unit at Natatorium.

�District-wide Computer Energy Management System.

�Two 5 kW Photovoltaic Systems

Page 5: Self -Funding Energey Performance Contract

HOW DOES IT CASHFLOW

Page 6: Self -Funding Energey Performance Contract

LIGHTING UPGRADE

� Super T8s – Philips/Advance Ballasts

� 100k s.f. Ceiling Tile Replacement

� New Fixtures – 6,950

� Relamp & Reballast – 10,918

� Retrofit – 1,177

Page 7: Self -Funding Energey Performance Contract

LIGHTING CONTROLS

� Occupancy Sensors – 527

� Bi Level Controllers – 331

� DHC/ Timers/ Photocells - 123

Page 8: Self -Funding Energey Performance Contract

BUILDING MANAGEMENT SYSTEM UPGRADE

Non-Proprietary, Web-Enabled, Expandable System

Benefits – 1,000+

• Temperature Setback• Exhaust Fan Control• Optimal Start• Individual Zone Control• Test/Calibrate/Replace Thermostats

Page 9: Self -Funding Energey Performance Contract

CHILLER REPLACEMENT

West Hollow Middle School

•Install a new 510 Ton chiller

Page 10: Self -Funding Energey Performance Contract

RENEWABLE ENERGY

`

HS EAST & WEST Install a 5-kW Photovoltaic System

Page 11: Self -Funding Energey Performance Contract

BUILDING ENVELOPE IMPROVEMENTS

REDUCE INFILTRATION

� Seal Roof-Top Ventilators – 500+

� Seal Roof-Wall Joints – 7,500+

� Weather-strip Doors - 425+

Signal HillManasquan

Page 12: Self -Funding Energey Performance Contract

COMPUTER MANAGEMENT SYSTEM

� 500 PC’s & 1,600 Mac Computers

� Ability to turn off remotely

� Different user groups

Page 13: Self -Funding Energey Performance Contract

OTHER MEASURES

� Boiler Controllers

� Window Replacements – HS East Gym, West Hollow, Otsego & Trans.

� Window Film

� Premium Efficiency Motors

� HS West Air Handler Replacement

� New Wireless Clocks

Page 14: Self -Funding Energey Performance Contract

JCI - QUALIFICATIONS

� Fortune 100 – $34 Billion Company

� Largest Performance Contracting Company in the US

� Thousands of K-12 Partnerships Nationwide

Local Presence – Syosset, Hawthorne NY, Hasbrouck Hts NJ, NYC

Page 15: Self -Funding Energey Performance Contract

JCI PROJECTS IN LONG ISLAND

Page 16: Self -Funding Energey Performance Contract

Environmental Impact

Page 17: Self -Funding Energey Performance Contract

NEXT STEPS

� Approve Contract – Complete

� Complete Design – Complete

� Submit to SED – Complete

� NYSSED Approval - Complete

� Begin Construction – January 2011

� Complete Construction – 2012