21
Mine Services Head Office : Recapital Building, 9th Floor Jln Adityawarman 55, Kebayoran Baru Jakarta 12160 Indonesia Tlp. (021) 72787338, Fax. (021) 72787339 Executive Summary Site Visit PT. Selabara & PT. Nusabara Kutai Barat, Kalimantan Timur

Sela & Nusa

Embed Size (px)

DESCRIPTION

Geologi selabara dan nusabara melak, kalimantan timur.

Citation preview

Mine Services

Head Office :Recapital Building, 9th FloorJln Adityawarman 55, Kebayoran BaruJakarta 12160IndonesiaTlp. (021) 72787338, Fax. (021) 72787339

Executive SummarySite Visit

PT. Selabara & PT. NusabaraKutai Barat, Kalimantan Timur

Overview IUP PT. Selabara & Nusabara

1. PT. Selabara : 5000 ha (IUP Eksplorasi)Saat ini IUP PT. Selabara sudah ditingkatkan ke IUP OP

2. PT. Nusabara : 4000 ha (IUP Eksplorasi)IUP Operasi Produksi sedang dalam proses

PT. Selabara & PT. Nusabara berada di wilayah Desa Kelian Dalam dan Kelian Luar, Kecamatan Tering, Longiram dan Linggang Bigung, Kabupaten Kutai Barat, Provinsi Kalimantan Timur

Overview IUP PT. Selabara & Nusabara

Overview IUP PT. Selabara & NusabaraBerdasarkan rekonsiliasi IUP PP 23/2010 dan No.03/E/31/DJB/2009 yang diterbitkan oleh pemerintah, IUP PT. Selabara dan PT. Nusabara terdaftar CnC (Clean & Clear)

Tata Guna Lahan

PT. Selabara & PT. Nusabara masuk ke dalam Hutan Produksi (Harus ada ijin pinjam pakai kehutanan di Kementrian Kehutanan)

Tata Guna Lahan (Indikatif Moratorium Kehutanan)

Instruksi Presiden RI No. 10 Tahun 2011 & Keputusan Menteri Kehutanan No. SK.323/Menhut-II/2011PT. Selabara & Nusabara bebas dari Penundaan Pemberian Ijin Baru (PIPIB)

Tambang daerah sekitarBerdasarkan informasi sekunder terdapat setidaknya 4 perusahaan batubara yang telah menambang pada daerah sekitar IUP PT. Selabara dan PT. Nusabara, perusahaan tersebut diantaranya :

a. PT. United Coal Indonesia (UCI) : 2,328 ha (IUP Operasi Produksi)b. PT. Agro City Kaltim (ACK) : luas perkiraan ± 1,000 hac. PT. Bumi Enggang Khatulistiwa (BEK) : 4,570 ha (IUP Operasi Produksi)d. PT. Harindo Wahana (HW) : 5,110 ha (IUP Operasi Produksi)

Kondisi keadaan tambang di Kecamatan Tering saat ini mengalami kelesuan, sebab terkait dengan harga batubara yang terus merosot yang tidak dapat diimbangi dengan ongkos produksi batubara dan transportasi. Info dari masyarakat bahwa terdapat tambang yang menghentikan proses coal getting, sehingga ada beberapa karyawan yang dirumahkan, namun ada beberapa yang masih tetap jalan.

Eksplorasi Batubara PT. Selabara & PT. NusabaraDistribusi singkapan dan lubang bor pada masing-masing daerah prospek berdasarkan laporan eksplorasi PT. Selabara & PT. Nusabara :

Prospect Area Outcrop/ singkapan Drill hole/ lubang bor

PT. Selabara 62 40

PT. Nusabara 12 15

Total 74 outcrops 55 drill holes

Waktu site visit yang pendek & kondisi lapangan yang tidak memungkinkan (hujanderas dan mobil tidak bisa masuk ke lokasi), maka banyak singkapan/ data boryang sebenarnya sangat penting untuk dibuktikan di lapangan sesuai denganlaporan eksplorasi tidak bisa dijangkau.

Singkapan dan data bor tersebut sangat penting karena sangat mempengaruhiperhitungan cadangan batubara untuk areal IUP.

Eksplorasi Batubara PT. Selabara & PT. Nusabara

Coal Outcrops yang ditunjukan saat site visit dilapangan PT. Selabara

Eksplorasi Batubara PT. Selabara & PT. Nusabara

Coal croplines/ subcrops PT. Selabara & PT. Nusabara

Batubara PT. Selabara & PT. Nusabara

A. Coal reserves berdasarkan laporan eksplorasi PT. Selabara & PT. Nusabara

Company RemarksOverburden Coal Striping

RatioVolume (Bcm) Coal Reserves (Ton) Recovery 95% (Ton)

PT. Selabaraa. Berdasarkan laporan Kelayakan Teknis (2009) 37,130,076.28 3,698,442.57 3,513,520.44 10.57b. Berdasarkan laporan Studi Kelayakan (2009) 15,772,419.38 1,277,497.00 1,213,622.15 13.00

PT. Nusabara a. Berdasarkan laporan Kelayakan Teknis (2009) 14,650,878.01 1,178,932.83 1,119,986.19 13.08

B. Coal reserves berdasarkan team PT. Bukit Mandiri Utama (BMU)

No Nama PIT OB (BCM) Coal (Tonnes) SR1 Pit 1 Nusabara 11,434,531.17 724,581.73 15.782 Pit 2 Selabara 4,934,109.71 288,423.73 17.11

Grand Total 16,368,640.88 1,013,005.46 16.16

NB : model batubara berdasarkan data laporan eksplorasi (drilling dan outcrop yang dibuat oleh PT. Selabara dan PT. Nusabara

Pit design PT. Selabara & PT. Nusabara

Section Model 2DPT. Nusabara

Section Model 2DPT. Selabara

Batubara PT. Selabara & PT. Nusabara

Coal Analysis berdasarkan laporan eksplorasi PT. Selabara & PT. Nusabara

Sampel Location

Mass asProximate Analysis

TM IM Ash VM FC TS CV

Received % % % % % % Cal/g Cal/g Cal/g

(kg) ar ad ad ad ad ad ad ar daf

OC1-SB-T1 Selabara 1.15 5.70 3.00 6.70 43.00 47.30 1.16 7224 7023 8000

OC1-SB-T2 Selabara 1.85 36.10 24.20 4.80 36.70 34.30 0.14 4808 4053 6772

OC2-SB-T2 Selabara 1.50 5.30 3.10 2.70 43.90 50.30 2.39 7475 7305 7935

DH-24C Selabara 0.53 4.50 3.60 7.60 42.00 46.80 2.33 7072 7006 7964

DH-26C Selabara 0.925 7.20 3.50 5.50 42.70 48.30 1.99 7303 7023 8025

OC1-NB-BGL Nusabara 0.88 18.20 14.10 0.90 42.00 43.00 0.19 6090 5799 7165

OC1-NB-SP Nusabara 0.98 18.40 14.30 0.70 41.20 43.80 0.17 6042 5753 7108

Sum product 7.82 15.92 10.80 4.00 41.24 43.96 1.10 6423 6076 7491

Akses Output PT. Selabara & PT. Nusabara

Akses Output PT. Selabara & PT. Nusabara

Financial Model Cost

(USD/ton) Remarks

1 2 3 4coal 250,000 250,000 250,000 250,000

Luas 9000 Ha investment (13,000,000) Mining 16.16 SR 35.22 Pada jarak 2 km (5,000,000) - Overburden 2.00 revenue 71.82 17,955,000 17,955,000 17,955,000 17,955,000 - Coal 1.30 mining 35.22 (8,805,000) (8,805,000) (8,805,000) (8,805,000) - Fuel 1.60 processsing 1.55 (387,500) (387,500) (387,500) (387,500) Processing 1.55 hauling 4.00 (1,000,000) (1,000,000) (1,000,000) (1,000,000) - Crushing 0.35 barging 18.50 (4,625,000) (4,625,000) (4,625,000) (4,625,000) - Stockpile & loading 0.40 transshipment 4.11 (1,026,600) (1,026,600) (1,026,600) (1,026,600) - Double handling 0.80 Env provision 0.20 (50,000) (50,000) (50,000) (50,000) Hauling 25 km 4.00 Comdev 0.25 (62,500) (62,500) (62,500) (62,500) - Hauling cost per ton/km 0.12 overhead 10% (1,595,660) (1,595,660) (1,595,660) (1,595,660) - Japre 1.00 royalti 7.00% (1,256,850) (1,256,850) (1,256,850) (1,256,850) Barging 500 km 18.50 ebitda (854,110) (854,110) (854,110) (854,110) - Barging cost per km 0.037 USD 3.7 per 100 km interest - - - - Transhipment 4.11 depreciation (833,333) (833,333) (833,333) (833,333) - Stevedoring 1.70 ammortization (3,250,000) (3,250,000) (3,250,000) (3,250,000) - Surveyor 0.07 ebt (4,937,443) (4,937,443) (4,937,443) (4,937,443) - Demmurage 0.30 tax 25% 1,234,361 1,234,361 1,234,361 1,234,361 - Komisi 1.44 2% dari harga eat (3,703,083) (3,703,083) (3,703,083) (3,703,083) - Equipment hire 0.60 non-cash 4,083,333 4,083,333 4,083,333 4,083,333 Env provision 0.20 cashflow (18,000,000) 380,251 380,251 380,251 380,251 Comdev 0.25 cumm cash flow (18,000,000) (17,619,749) (17,239,498) (16,859,248) (16,478,997)

Sub total 64 npv 13% (16,868,955) Overhead 10% 6 irr #NUM!

Total 70 Kualitas Calori- CV 6076 arb 72

Net sale 72 EBITDA/Margin 2

InvestasiPembelian KP

Eksplorasi 2,000,000 Cost 1,000 USD/ha (2000 ha) -> high quality exploration activity

Permit & licence 1,000,000 Land compensation 10,000,000 Cost 10,000 USD/ha (1000 ha) -> data sekunderJalan - Cost - per km - - Crusher- Jetty- Intermediate Stockpile

Sub total 18,000,000

Prediksi Cost

5,000,000

Rekomendasi

Company : PT. Selabara & Nusabara

Brand new (harga maksimal 2 jt USD)

HBA CV ar 6322 cal/gr USD 81.44 (recent), irr dan npv positif apabila harga USD100/MT

Financial Model Optional Cost

(USD/ton) Remarks

1 2 3 4coal 250,000 250,000 250,000 250,000

Luas 9000 Ha investment (12,000,000) Mining 16.16 SR 35.22 Pada jarak 2 km (2,000,000) - Overburden 2.00 revenue 100.00 25,000,000 25,000,000 25,000,000 25,000,000 - Coal 1.30 mining 35.22 (8,805,000) (8,805,000) (8,805,000) (8,805,000) - Fuel 1.60 processsing 1.55 (387,500) (387,500) (387,500) (387,500) Processing 1.55 hauling 4.00 (1,000,000) (1,000,000) (1,000,000) (1,000,000) - Crushing 0.35 barging 18.50 (4,625,000) (4,625,000) (4,625,000) (4,625,000) - Stockpile & loading 0.40 transshipment 4.67 (1,167,500) (1,167,500) (1,167,500) (1,167,500) - Double handling 0.80 Env provision 0.20 (50,000) (50,000) (50,000) (50,000) Hauling 25 km 4.00 Comdev 0.25 (62,500) (62,500) (62,500) (62,500) - Hauling cost per ton/km 0.12 overhead 10% (1,609,750) (1,609,750) (1,609,750) (1,609,750) - Japre 1.00 royalti 7.00% (1,750,000) (1,750,000) (1,750,000) (1,750,000) Barging 500 km 18.50 ebitda 5,542,750 5,542,750 5,542,750 5,542,750 - Barging cost per km 0.037 USD 3.7 per 100 km interest - - - - Transhipment 4.67 depreciation (333,333) (333,333) (333,333) (333,333) - Stevedoring 1.70 ammortization (3,000,000) (3,000,000) (3,000,000) (3,000,000) - Surveyor 0.07 ebt 2,209,417 2,209,417 2,209,417 2,209,417 - Demmurage 0.30 tax 25% (552,354) (552,354) (552,354) (552,354) - Komisi 2.00 2% dari harga eat 1,657,063 1,657,063 1,657,063 1,657,063 - Equipment hire 0.60 non-cash 3,333,333 3,333,333 3,333,333 3,333,333 Env provision 0.20 cashflow (14,000,000) 4,990,396 4,990,396 4,990,396 4,990,396 Comdev 0.25 cumm cash flow (14,000,000) (9,009,604) (4,019,208) 971,188 5,961,583

Sub total 64 npv 13% 843,789 Overhead 10% 6 irr 16%

Total 71 Kualitas Calori- CV 6076 arb 100

Net sale 100 EBITDA/Margin 29

InvestasiPembelian KP

Eksplorasi 1,000,000 Cost 1,000 USD/ha (2000 ha) -> high quality exploration activity

Permit & licence 1,000,000 Land compensation 10,000,000 Cost 10,000 USD/ha (1000 ha) -> data sekunderJalan - Cost - per km - - Crusher- Jetty- Intermediate Stockpile

Sub total 14,000,000

Prediksi Cost

2,000,000

Rekomendasi

Company : PT. Selabara & Nusabara

Brand new (harga maksimal 2 jt USD)

HBA CV ar 6322 cal/gr USD 81.44 (recent), irr dan npv positif apabila harga USD100/MT

Rekomendasi

1. Perlu dilakukan eksplorasi (mapping dan drilling) yang lebih detail untuk meningkatkan tingkat akurasi.

2. Perlu dilakukan studi mengenai nilai keekonomisan terutama untuk jalur transportasi batubara dari pit-jetty-transhipment point (Note:FS & AMDAL yang telah dilakukan tidak detail).

3. Untuk kedua IUP patut dipertimbangkan untuk diambil alih mengingat potensi cadangan & kualitas.

Terima Kasih