Seine-Scheldt project Flemish view

Seine-Scheldt project

Embed Size (px)

DESCRIPTION

Seine-Scheldt project. Flemish view. Decision 93/630/CEE. Realisation missing links and elimination bottlenecks CEMT class of 1992 for international connections minimum class IV (1350 tons) for modernisation: minimum class Va (2000 tons) for new construction: class Vb (3000 to 6000 tons). - PowerPoint PPT Presentation

Citation preview

Page 1: Seine-Scheldt project

Seine-Scheldt project

Flemish view

Page 2: Seine-Scheldt project

Decision 93/630/CEE

Realisation missing links and elimination bottlenecks

CEMT class of 1992 for international connections– minimum class IV (1350 tons)– for modernisation: minimum class Va

(2000 tons)– for new construction: class Vb (3000 to

6000 tons)

Page 3: Seine-Scheldt project

Decision 884/2004/EC

priority sections:– navigability improvements Deûlémont - Ghent– new canal Compiègne - Cambrai

Page 4: Seine-Scheldt project

Improvements: 54 km river Lys + 26 km canals

Page 5: Seine-Scheldt project

01.000.0002.000.0003.000.0004.000.0005.000.0006.000.000

Menen

Lock Menenupstream

dow nstream

01.000.0002.000.0003.000.0004.000.0005.000.0006.000.000

St Baafs Vijve

Lock St.Baafs-Vijveupstream

dow nstream

02.000.0004.000.0006.000.0008.000.000

10.000.000

Evergem

Lock Evergemupstream

dow nstream

01.000.0002.000.0003.000.0004.000.0005.000.0006.000.000

Ooigem

Lock Ooigem

upstreamdow nstream

01.000.0002.000.0003.000.0004.000.0005.000.0006.000.000

Harelbeke

Lock Harelbekeupstreamdow nstream

Page 6: Seine-Scheldt project

Dimensions existing locks

Length Width Depth

Evergem 136 m 16,0 m 4,25 m

St-B-Vijve 136 m 16,0 m 3,50 m

Harelbeke 115 m 12,5 m 3,50 m

Menen 195 m 12,5 m 4,50 m

Comines 185 m 12,5 m 4,50 m

Page 7: Seine-Scheldt project

Construction of new locks

Reason:– Dimensions class Vb

Length: 210 m (230 m)Width: 12,5 m (25 m)Depth: 4,7 m (5 m)

– Comfort capacity existing locks (“operation regime B”, 24 hours a weekday)Harelbeke: 5,2 M tons/yearSint-Baafs-Vijve: 10 M tons/year(Evergem: 7,7 to 12,3 M tons/year, depending

on measures of equal arrival)

Page 8: Seine-Scheldt project

Lock Evergem: under construction

Page 9: Seine-Scheldt project

4,00

4,50

5,00

5,50

6,00

6,50

7,00

7,50

8,00

8,50

9,00

9,50

10,00

Brug te

St.

Eloois

-Vijv

e N77

2

Brug v

an S

t. Elo

ois-V

ijve

Sluis

te S

t. Baa

fs-V

ijve

Zultebru

g

Olsen

ebru

g

Mac

helen

brug

Spoorweg

brug te

Mac

helen

Vaartb

rug

Krom

meb

rug

Voetgan

gersb

rug te

Nev

ele

Nevel

ebru

g

Brug in

E 4

0

Landeg

embru

g

Spoorbru

g te L

andeg

em

Mer

endre

ebru

g

Schip

donkbru

g

Durmen

brug

Lovendeg

embru

g

Biers

talb

rug

Nieuwe

Kaleb

rug (W

16)

Sluis

te E

verg

em

Heinak

kerb

rug (S

6)

Waa

lbru

g (W 1

7)

Brug in

R4

Spoorweg

brug (S

7)

Evers

tein

brug (W

18)

Free heightGhent-Terneuzen Canal to Roeselare-Lys Canal

Hoogte 1B Hoogte 2B

3 layerscontainers

Page 10: Seine-Scheldt project

4,00

4,50

5,00

5,50

6,00

6,50

7,00

7,50

8,00

8,50

9,00

9,50

10,00

Brug te

War

neton

Brug te

Com

ines

Balokk

enbru

g te W

ervi

k

Brug v

an W

ervi

k in

RW

304

Pont d'H

allu

in

Brug v

an M

enen

Brug te

Men

en in

N 3

2

Brug v

an W

evel

gem-L

auwe

Viadukt

te W

evel

gem in

A 1

7

Brug te

Bis

segem

in R

8

Brug te

Bis

segem

-Mar

ke

Spoorweg

brug 3

Duik

ers

Brug te

Kortr

ijk in

R8

Kuurneb

rug te

Har

elbek

e

Sluis

te H

arel

beke

Hogebru

g te H

arel

beke

Brug te

Har

elbek

e N36

Brug v

an O

oigem

-Des

selg

em

Free heightRoeselare - Lys Canal

to Deûlémont

Hoogte 1B Hoogte 2B

3 layers containers

Page 11: Seine-Scheldt project

Improvements of the Lys river

Leie

Profile– deepening

with 1 m– 7 mooring

places for one way traffic

Page 12: Seine-Scheldt project

Lys and Diversion Canal of the Lys

Two way traffic– class Va or Vb (3,5 m) – class IV (3,0 m)– class Va (≤3,0 m) – class Va (≤3,0 m)

One way traffic– class Va (>3,0 m) – class Va (>3,0 m)– class Vb – class Vb

Page 13: Seine-Scheldt project
Page 14: Seine-Scheldt project

Improvements of the Northern Section of the Circular

Canal around Ghent

Industrial area– rectangular

profile– quay walls at

both banks

Ring Canal

Page 15: Seine-Scheldt project

Ghent – Ostend Canal and Northern Section of the Circular Canal Ghent

Two way traffic– class V (3,5 m) – class V (3,5 m)– mooring places on both sides (only on the

Circular Canal of Ghent)

Page 16: Seine-Scheldt project

Planning

Spring 2009

– Finish lock Evergem

– Start rest of the works

First Circular Canal of Ghent

Project completed in 2016