10
Southern Engineering Consulting Services “SECS” Plan for Project Management Services

SECS White Paper For Folders

Embed Size (px)

Citation preview

Page 1: SECS White Paper For Folders

Southern Engineering Consulting Services

“SECS”

Plan for Project Management Services

Page 2: SECS White Paper For Folders

About SECS and Project Services SECS LLC, is the leading independent provider of comprehensive services, infrastructure upgrades, project management solutions, energy efficiency, and renewable energy solutions for facilities throughout North America and internationally.

“SECS” begins every engagement with an initial “Kickoff Meeting” to establish a working relationship with the client, discuss and agree on the scope of the engagement including project control processes and requirements (status reporting, issues management, etc.), and address project logistics and communication issues.

In addition to the kickoff meeting, program reviews are scheduled on a regular basis. These point meetings are designed to ensure client satisfaction of overall engagement quality. They allow us the opportunity to provide our clients with a status on accomplishments during the previous period, planned activities, budget and spend rate, issues, recommendations, advice, and insight.

Our consultants are skilled at rapidly analyzing your situation, determining the right mix of high-value, high-impact solutions, and quickly executing the best solutions to deliver measurable and sustainable results.

As a professional project management firm, “SECS” is committed to quality. Our offerings are continually being refined and improved as a result of our experience on all of our client engagements.

We leverage our research to consistently integrate industry best practice quality standards and trends. Our consultants come equipped with the knowledge, experience, vertical industry depth, and tools associated with the specific offering being delivered.

“SECS” has completed projects from simple process equipment installations to complete facility builds.

A lot of our work has been based off of EEP services and audits. However, we are fully capable of process equipment installations and building improvements. We believe any good CAPEX project should be based off of good data and an ROI (return on investment) projection. With that simple philosophy we have successfully completed several compressed air system upgrades, Boiler system upgrades and process improvements, lighting based strictly on data and validating that data.

We are also firm believers in the 5 PMI Steps: Project Initiation Project Planning Project Execution Project Monitoring and Controls Project Closure and Lessons Learned

Page 3: SECS White Paper For Folders

A few “SECS” Project Completions to date include: Bimbo Bakeries (George Weston Foods)- new Thomas’s English Muffin Facility 1

million square feet

SPF- Diana 2 new warehouses and research facility, boiler house

SPF Diana- new plant Guyman, Oklahoma with process equipment

Schwan Foods- multiple plants new air compressor rooms, energy alignments, boiler rooms, plant surveys for process improvements

Schwan Foods- product spiral and freezer rebuilds and evaluations

Schwan Foods – complete packaging lines

Northeast Foods- Spiral rebuilding management

Industrial Thermal Infrared Analysis

Vibration Analysis

Demand Management Analysis

Oven profiles and evaluations, installations

Silo installations, liquid and dry ingredient

Ingredient transfer systems

Lighting upgrades with Capex and rebates

Refrigeration control systems with full automation services via wonderware overlays

Numerous process equipment installations from mixers to cooling conveyors and packaging equipment

Site Contract Administration

Project Development Management

Solar Support Capabilities

Plant Construction and Buildings with Designs

Process and ancillary equipment installations and audits

Maintenance and downtime improvements CMMS systems

Process and production improvements (CAPEX Support)

Real Time Monitoring of Critical Assets

Executive to Turnkey Project Management

Page 4: SECS White Paper For Folders

Project examples completed over past several years:

Manufacturing Plants and Industrial Building Projects:

SPF North America- 50,000 sq. ft. Pet Food facility and process equipment, Guyman, Oklahoma 5.8 million dollars

SPF North America- 10,000 sq. ft. warehouse and equipment Hodges, Sc. SPF North America- 2,000 sq. ft. storage warehouse and equipment Hodges, Sc. SPF North America- 800 sq. ft. Cattery Building and equipment Hodges, Sc., 1.4

million SPF North America- 2 – 200’ liquid silo’s installation George Weston Bakeries- 10,000 production facility addition Orlando, Fla.,

addition and equipment George Weston Bakeries- 600,00 Sq. Ft. Thomas’s English muffin plant Elkhart,

Indiana-67million dollar project, plant and equipment purchased purveyed and installed

George Weston Bakeries- 8 bread and roll cooler installations George Weston Bakeries- 6 bread and roll oven rebuilds George Weston Bakeries- 2- muffin oven rebuilds 20 plus years of Building and equipment installations through career

Energy Savings Projects:

SPF North America – Lighting upgrades through entire warehouse 40,000 Sq. ft. storage facility- mercury vapor lighting technology switched and replaced with T5HO lighting upgrades. Cost $57,000.00 payback was figured for 3 yrs.

SPF North America- Office area lighting upgrades T-12 standards to T8 replacements

SPF North America- Installed two York Shipley boilers with software that regulates the boilers to run at 75% capacity and alternate every three days from master to slave

SPF North America- Dedert evaporator equipment installation- decreased drying time and shortened gas dryer run time. $1,800,000.00 purchase price with ancillary equipment payback was figured for 5 yrs.

SPF North America- switched plant over to time of use Duke Power rate to save power costs. 7/24 operation with savings of $23,000.00 in first year

George Weston Bakeries- Hydraulic fluid driven conveyors and spiral bread and roll coolers converted to VFD driven. Immediate payback in energy and dependability.

George Weston Bakeries- VFD conversions on all motors in entire Easton, pa. facility

George Weston Bakeries- cooling towers converted to VFD drives George Weston Bakeries – sub metering installed to track energy usage and

curve high demand

Page 5: SECS White Paper For Folders

George Weston Bakeries- infrared and vibration analysis throughout facility, electrical panels and equipment

Holsum ButterKrust- HVAC upgrades mandated by CFR’s R-12 to 417a entire facility and leaks repaired

Schwan Foods- Lighting upgrades Compressed air sequencing and optimization Flour and ingredient systems installations

"SECS" Approach to Predictive Maintenance We now offer full service Industrial Thermal Infrared Analysis to our customers

for electrical and HVAC inspections. Get those 480 Volt panels inspected regularly and reduce your reactive maintenance downtime.  Thermal imaging is the next wave of new technology that we can offer our customer base.

Vibration analysis is another full service offering to our customers. Reactive maintenance to proactive maintenance lower that downtime. Appointments are being scheduled now!

“SECS” Approach To PMOThe design and implementation services consist of three distinct tasks, including:

Engineering & Design:

SECS’ design team will take the accepted project selected by your company for implementation and create a final design. This will include design sketches as may be required to convey the scope of the project, equipment selections, and scopes of work sufficient to provide investment-grade cost estimates. All design documents will be submitted to your company for review and approval prior to ordering of equipment and beginning construction.

Construction Management & On-site Supervision:

Following the results created through the design and engineering effort, SECS will competitively price all equipment; competitively solicit and hire local, qualified subcontractors; and construct and commission the project. A minimum of three bids for equipment and installation will be solicited where possible. SECS will assure successful project implementation by maintaining an open and regular line of communications with the plant, providing careful coordination, and through on-site construction supervision. An SECS project manager will be assigned to each

Page 6: SECS White Paper For Folders

individual project and be the prime point of contact with your company for all local construction activities. The site-specific project manager’s role is to coordinate and communicate all implementation efforts from design, through procurement and construction, to commissioning and final turnover to your company at a project level, while the program manager will have overall responsibility for delivering a timely and uniform product to your company across all plants and communicating and reporting to your company on a corporate or programmatic level on a regular basis.

Commissioning/M&V/Training/Closeout:

To assure that the installed measures meet the intent of the customer and design documents, all installed equipment and or buildings will be fully commissioned by SECS’ engineers, with support as necessary by the installing subcontractors and equipment vendors. Depending on the measures, this might also entail pre- and post- retrofit measurement of performance parameters (e.g. motor wattage, boiler efficiency) above and beyond the validation services provided by data collection services to confirm any projected energy savings. SECS will also train local facility operations staff as necessary in the proper use and maintenance of the installed equipment to assure a seamless turnover to your company and project closeout.

The cost for the design and installation services will be structured on an hourly or package cost-plus basis, and shall include all project direct costs, namely, materials, subcontracted labor, and bonding, if required; SECS’ professional services, including, but not limited to, engineering, project management, commissioning, measurement and verification, energy management and training, priced at the labor rates negotiated, plus travel expenses, per diem and other reimbursable expenses. The labor rates negotiated are straight rates and we can provide services on a per project basis as needed. Travel expenses are billed outside labor rates Net 30 days where as possible and or agreed. Project reimbursable expenses will be charged only as agreed by your company.

“SECS” Approach To EnergySECS integrated products and services are delivered using an innovative process that maximizes energy and carbon reductions through financially compelling solutions. Whether SECS is designing a refrigeration controls system for a dairy processing facility, constructing a solar system thru its partnerships for a medical products manufacturer, or implementing an enterprise-wide industrial energy management program for a Fortune 500 company, SECS delivers the right information – at the right time – to enable decisions that improve energy efficiency, reduce cost, and achieve

Page 7: SECS White Paper For Folders

sustainability goals.

Contact Information

Roger Rearick

Owner

Email address: [email protected]

Phone Number(s):

Cell: 1-570-898-5615

Office: 1-864-229-2956

Page 8: SECS White Paper For Folders

Jessica Rearick

VP Project Development and Sales

Email address: [email protected]

Phone Number(s):

Cell: 1-570-259-4556

Office: 864-229-2956