1 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
SECOND CARRIER IMPLEMENTATION
2 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Contents
1 Description 4
2 Pre-requisites 4 21 Tools 4 22 Hardware 4 23 Script 5 24 Others 5
3 SECOND CARRIER PROCEDURES 6 31 Flowchart 6 32 Create Backup CV 7 33 Lock Node B 7 34 Install Additional Hardware 8 341 3412 8 342 3206M amp 3107 10 35 RAX Board Installation 12 351 RAX Board Position 12 3511 3412 Digital Subrack 12 3512 3107 3106 3206 3116 3216 Digital Subrack 13 3513 3418 and 3518 Digital Subrack 13 352 RAX Board Installation 13 3521 Install RAX Board 13 353 Unlock RAX Board 14 36 TX-HS Board Installation 15 361 TX-HS Board Position 16 3611 3412 Digital Subrack 16 3612 3107 3106 3206 3116 3216 Digital Subrack 16 3613 3418 and 3518 Digital Subrack 17 362 TX-HS Board Installation 17 3621 Install TX-HS Board 17 363 Unlock TX-HS Board 18 37 Configure Cabling 19 371 3412 19 372 3107 3206M 3308 with RU22 20 38 Run Second Carrier Script 21 381 Run second carrier script on RBS 21 382 Run second carrier script on RNC 22 39 Create CV after Reconfiguration 22 310 Inform RNC to Unlock Node B 23
4 Verification Test 24 41 Hardware Verification 24 411 341234183518 24 4111 OBIF 24 4112 RRU22 24 412 31073106320631163216 24 4121 RUIF 24 4122 RU22 24 4123 FU12 24
3 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
413 RAX Board 24 42 Node B Configuration 25 421 RBS Local Cell 25 422 Sector amp Carrier 26 43 Test Call 26
5 Concluding Routines 26
6 Reference 27
4 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
1 Description
This document is created to support implementation second carrier especially in Telkomsel 3G project The varieties of Node-B used are RBS 3107 3106 3116 3206F 3206M 3216 3412 3418 and 3518 The Second carrier can be designed for R99+HSPA or R99 only or HSPA only which one is best suited for the Operator The configuration for each frequency will be based on the agreement between Ericsson and Operator The frequency used for the carriers should be specified in the agreement and design Usually the existing frequency is used both for R99+HSDPA so it is wise to do minimum changes on the existing carrier as it will impact on longer downtime in the particular RBS Please note that the Bandwidth range which can be handled by Ericsson RRU22RU22 right now is only 15 MHz on 2100MHz frequencies
2 Pre-requisites
21 Tools
Thin Client Laptop
o Windows 2000 XP
o Internet Explorer 50+ Mozilla Firefox
o Java (JRE) 14
o Moshell Tools (optional)
Connection Cables
o RS232 Cable
o RJ45 Cable
Screwdriver
o Torx Screw Driver (82025)
22 Hardware
3412 OBIF RRU22 and Connection Cables
3107 3206F 3308 RU22 and Connection Cables
RAX Board
5 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
23 Script
Second Carrier Scripts in RBS and RNC
24 Others
Prepare NIW (Network Interruption Warning) needed for the activity
Prepare permit letter and keys to the site (for replacing or adding new RRU22RU22 only)
Prepare remote access (for remote configuration)
Prepare the Change Request (CR)
Coordination with Integrator or RNC team before activity
6 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3 SECOND CARRIER PROCEDURES
31 Flowchart
Start
Create Back up
CV
Inform RNC to
Lock Node-B
Replace Existing
RU21RRU11 or
Add new RU22
RRU22
Confogure Cabling
Insert Additional
RAX and TX-HS (if
necessary)
Run Second
Carrier script in
RBS and RNC
Create new CV
after
reconfiguration
Inform RNC to
Unlocked Node-B
Perform Test Call
END
Figure 1 Workflow 2nd Carrier Implementation
7 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
32 Create Backup CV
Backup CV should be created for any rollback procedure purposes
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
33 Lock Node B
Inform RNC that Node B is ready for reconfiguration and ask RNC to bring Node B out of service and ready for reconfiguration Concurrently RNC will perform second carrier reconfiguration on RNC side
The following states on Node B refer to out-of-service condition
A RAX Board operational state LED is off
B TX Board operational state LED is off
8 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
34 Install Additional Hardware
The following hardware should be installed in the Node B
1 Radio Unit Modules
RRU22 (RBS3412 3418 3518)
RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)
2 RAX Board (Depend on RBS Type)
3 TX-HS Board (If necessary depends on the design)
341 3412
3412 Cabinet
9 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
RRU22
10 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
342 3206M amp 3107
For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)
3206M Cabinet
11 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3107 Cabinet
12 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
35 RAX Board Installation
Second RAX Board is needed on second carrier implementation
351 RAX Board Position
3511 3412 Digital Subrack
On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9
13 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3512 3107 3106 3206 3116 3216 Digital Subrack
On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4
3513 3418 and 3518 Digital Subrack
On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board
352 RAX Board Installation
3521 Install RAX Board
Install RAX board on the proper slot The following steps should be performed
1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8
14 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Installed RAX board and tighten the screw
353 Unlock RAX Board
RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
2 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Contents
1 Description 4
2 Pre-requisites 4 21 Tools 4 22 Hardware 4 23 Script 5 24 Others 5
3 SECOND CARRIER PROCEDURES 6 31 Flowchart 6 32 Create Backup CV 7 33 Lock Node B 7 34 Install Additional Hardware 8 341 3412 8 342 3206M amp 3107 10 35 RAX Board Installation 12 351 RAX Board Position 12 3511 3412 Digital Subrack 12 3512 3107 3106 3206 3116 3216 Digital Subrack 13 3513 3418 and 3518 Digital Subrack 13 352 RAX Board Installation 13 3521 Install RAX Board 13 353 Unlock RAX Board 14 36 TX-HS Board Installation 15 361 TX-HS Board Position 16 3611 3412 Digital Subrack 16 3612 3107 3106 3206 3116 3216 Digital Subrack 16 3613 3418 and 3518 Digital Subrack 17 362 TX-HS Board Installation 17 3621 Install TX-HS Board 17 363 Unlock TX-HS Board 18 37 Configure Cabling 19 371 3412 19 372 3107 3206M 3308 with RU22 20 38 Run Second Carrier Script 21 381 Run second carrier script on RBS 21 382 Run second carrier script on RNC 22 39 Create CV after Reconfiguration 22 310 Inform RNC to Unlock Node B 23
4 Verification Test 24 41 Hardware Verification 24 411 341234183518 24 4111 OBIF 24 4112 RRU22 24 412 31073106320631163216 24 4121 RUIF 24 4122 RU22 24 4123 FU12 24
3 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
413 RAX Board 24 42 Node B Configuration 25 421 RBS Local Cell 25 422 Sector amp Carrier 26 43 Test Call 26
5 Concluding Routines 26
6 Reference 27
4 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
1 Description
This document is created to support implementation second carrier especially in Telkomsel 3G project The varieties of Node-B used are RBS 3107 3106 3116 3206F 3206M 3216 3412 3418 and 3518 The Second carrier can be designed for R99+HSPA or R99 only or HSPA only which one is best suited for the Operator The configuration for each frequency will be based on the agreement between Ericsson and Operator The frequency used for the carriers should be specified in the agreement and design Usually the existing frequency is used both for R99+HSDPA so it is wise to do minimum changes on the existing carrier as it will impact on longer downtime in the particular RBS Please note that the Bandwidth range which can be handled by Ericsson RRU22RU22 right now is only 15 MHz on 2100MHz frequencies
2 Pre-requisites
21 Tools
Thin Client Laptop
o Windows 2000 XP
o Internet Explorer 50+ Mozilla Firefox
o Java (JRE) 14
o Moshell Tools (optional)
Connection Cables
o RS232 Cable
o RJ45 Cable
Screwdriver
o Torx Screw Driver (82025)
22 Hardware
3412 OBIF RRU22 and Connection Cables
3107 3206F 3308 RU22 and Connection Cables
RAX Board
5 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
23 Script
Second Carrier Scripts in RBS and RNC
24 Others
Prepare NIW (Network Interruption Warning) needed for the activity
Prepare permit letter and keys to the site (for replacing or adding new RRU22RU22 only)
Prepare remote access (for remote configuration)
Prepare the Change Request (CR)
Coordination with Integrator or RNC team before activity
6 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3 SECOND CARRIER PROCEDURES
31 Flowchart
Start
Create Back up
CV
Inform RNC to
Lock Node-B
Replace Existing
RU21RRU11 or
Add new RU22
RRU22
Confogure Cabling
Insert Additional
RAX and TX-HS (if
necessary)
Run Second
Carrier script in
RBS and RNC
Create new CV
after
reconfiguration
Inform RNC to
Unlocked Node-B
Perform Test Call
END
Figure 1 Workflow 2nd Carrier Implementation
7 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
32 Create Backup CV
Backup CV should be created for any rollback procedure purposes
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
33 Lock Node B
Inform RNC that Node B is ready for reconfiguration and ask RNC to bring Node B out of service and ready for reconfiguration Concurrently RNC will perform second carrier reconfiguration on RNC side
The following states on Node B refer to out-of-service condition
A RAX Board operational state LED is off
B TX Board operational state LED is off
8 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
34 Install Additional Hardware
The following hardware should be installed in the Node B
1 Radio Unit Modules
RRU22 (RBS3412 3418 3518)
RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)
2 RAX Board (Depend on RBS Type)
3 TX-HS Board (If necessary depends on the design)
341 3412
3412 Cabinet
9 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
RRU22
10 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
342 3206M amp 3107
For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)
3206M Cabinet
11 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3107 Cabinet
12 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
35 RAX Board Installation
Second RAX Board is needed on second carrier implementation
351 RAX Board Position
3511 3412 Digital Subrack
On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9
13 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3512 3107 3106 3206 3116 3216 Digital Subrack
On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4
3513 3418 and 3518 Digital Subrack
On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board
352 RAX Board Installation
3521 Install RAX Board
Install RAX board on the proper slot The following steps should be performed
1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8
14 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Installed RAX board and tighten the screw
353 Unlock RAX Board
RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
3 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
413 RAX Board 24 42 Node B Configuration 25 421 RBS Local Cell 25 422 Sector amp Carrier 26 43 Test Call 26
5 Concluding Routines 26
6 Reference 27
4 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
1 Description
This document is created to support implementation second carrier especially in Telkomsel 3G project The varieties of Node-B used are RBS 3107 3106 3116 3206F 3206M 3216 3412 3418 and 3518 The Second carrier can be designed for R99+HSPA or R99 only or HSPA only which one is best suited for the Operator The configuration for each frequency will be based on the agreement between Ericsson and Operator The frequency used for the carriers should be specified in the agreement and design Usually the existing frequency is used both for R99+HSDPA so it is wise to do minimum changes on the existing carrier as it will impact on longer downtime in the particular RBS Please note that the Bandwidth range which can be handled by Ericsson RRU22RU22 right now is only 15 MHz on 2100MHz frequencies
2 Pre-requisites
21 Tools
Thin Client Laptop
o Windows 2000 XP
o Internet Explorer 50+ Mozilla Firefox
o Java (JRE) 14
o Moshell Tools (optional)
Connection Cables
o RS232 Cable
o RJ45 Cable
Screwdriver
o Torx Screw Driver (82025)
22 Hardware
3412 OBIF RRU22 and Connection Cables
3107 3206F 3308 RU22 and Connection Cables
RAX Board
5 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
23 Script
Second Carrier Scripts in RBS and RNC
24 Others
Prepare NIW (Network Interruption Warning) needed for the activity
Prepare permit letter and keys to the site (for replacing or adding new RRU22RU22 only)
Prepare remote access (for remote configuration)
Prepare the Change Request (CR)
Coordination with Integrator or RNC team before activity
6 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3 SECOND CARRIER PROCEDURES
31 Flowchart
Start
Create Back up
CV
Inform RNC to
Lock Node-B
Replace Existing
RU21RRU11 or
Add new RU22
RRU22
Confogure Cabling
Insert Additional
RAX and TX-HS (if
necessary)
Run Second
Carrier script in
RBS and RNC
Create new CV
after
reconfiguration
Inform RNC to
Unlocked Node-B
Perform Test Call
END
Figure 1 Workflow 2nd Carrier Implementation
7 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
32 Create Backup CV
Backup CV should be created for any rollback procedure purposes
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
33 Lock Node B
Inform RNC that Node B is ready for reconfiguration and ask RNC to bring Node B out of service and ready for reconfiguration Concurrently RNC will perform second carrier reconfiguration on RNC side
The following states on Node B refer to out-of-service condition
A RAX Board operational state LED is off
B TX Board operational state LED is off
8 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
34 Install Additional Hardware
The following hardware should be installed in the Node B
1 Radio Unit Modules
RRU22 (RBS3412 3418 3518)
RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)
2 RAX Board (Depend on RBS Type)
3 TX-HS Board (If necessary depends on the design)
341 3412
3412 Cabinet
9 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
RRU22
10 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
342 3206M amp 3107
For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)
3206M Cabinet
11 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3107 Cabinet
12 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
35 RAX Board Installation
Second RAX Board is needed on second carrier implementation
351 RAX Board Position
3511 3412 Digital Subrack
On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9
13 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3512 3107 3106 3206 3116 3216 Digital Subrack
On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4
3513 3418 and 3518 Digital Subrack
On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board
352 RAX Board Installation
3521 Install RAX Board
Install RAX board on the proper slot The following steps should be performed
1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8
14 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Installed RAX board and tighten the screw
353 Unlock RAX Board
RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
4 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
1 Description
This document is created to support implementation second carrier especially in Telkomsel 3G project The varieties of Node-B used are RBS 3107 3106 3116 3206F 3206M 3216 3412 3418 and 3518 The Second carrier can be designed for R99+HSPA or R99 only or HSPA only which one is best suited for the Operator The configuration for each frequency will be based on the agreement between Ericsson and Operator The frequency used for the carriers should be specified in the agreement and design Usually the existing frequency is used both for R99+HSDPA so it is wise to do minimum changes on the existing carrier as it will impact on longer downtime in the particular RBS Please note that the Bandwidth range which can be handled by Ericsson RRU22RU22 right now is only 15 MHz on 2100MHz frequencies
2 Pre-requisites
21 Tools
Thin Client Laptop
o Windows 2000 XP
o Internet Explorer 50+ Mozilla Firefox
o Java (JRE) 14
o Moshell Tools (optional)
Connection Cables
o RS232 Cable
o RJ45 Cable
Screwdriver
o Torx Screw Driver (82025)
22 Hardware
3412 OBIF RRU22 and Connection Cables
3107 3206F 3308 RU22 and Connection Cables
RAX Board
5 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
23 Script
Second Carrier Scripts in RBS and RNC
24 Others
Prepare NIW (Network Interruption Warning) needed for the activity
Prepare permit letter and keys to the site (for replacing or adding new RRU22RU22 only)
Prepare remote access (for remote configuration)
Prepare the Change Request (CR)
Coordination with Integrator or RNC team before activity
6 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3 SECOND CARRIER PROCEDURES
31 Flowchart
Start
Create Back up
CV
Inform RNC to
Lock Node-B
Replace Existing
RU21RRU11 or
Add new RU22
RRU22
Confogure Cabling
Insert Additional
RAX and TX-HS (if
necessary)
Run Second
Carrier script in
RBS and RNC
Create new CV
after
reconfiguration
Inform RNC to
Unlocked Node-B
Perform Test Call
END
Figure 1 Workflow 2nd Carrier Implementation
7 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
32 Create Backup CV
Backup CV should be created for any rollback procedure purposes
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
33 Lock Node B
Inform RNC that Node B is ready for reconfiguration and ask RNC to bring Node B out of service and ready for reconfiguration Concurrently RNC will perform second carrier reconfiguration on RNC side
The following states on Node B refer to out-of-service condition
A RAX Board operational state LED is off
B TX Board operational state LED is off
8 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
34 Install Additional Hardware
The following hardware should be installed in the Node B
1 Radio Unit Modules
RRU22 (RBS3412 3418 3518)
RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)
2 RAX Board (Depend on RBS Type)
3 TX-HS Board (If necessary depends on the design)
341 3412
3412 Cabinet
9 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
RRU22
10 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
342 3206M amp 3107
For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)
3206M Cabinet
11 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3107 Cabinet
12 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
35 RAX Board Installation
Second RAX Board is needed on second carrier implementation
351 RAX Board Position
3511 3412 Digital Subrack
On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9
13 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3512 3107 3106 3206 3116 3216 Digital Subrack
On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4
3513 3418 and 3518 Digital Subrack
On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board
352 RAX Board Installation
3521 Install RAX Board
Install RAX board on the proper slot The following steps should be performed
1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8
14 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Installed RAX board and tighten the screw
353 Unlock RAX Board
RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
5 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
23 Script
Second Carrier Scripts in RBS and RNC
24 Others
Prepare NIW (Network Interruption Warning) needed for the activity
Prepare permit letter and keys to the site (for replacing or adding new RRU22RU22 only)
Prepare remote access (for remote configuration)
Prepare the Change Request (CR)
Coordination with Integrator or RNC team before activity
6 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3 SECOND CARRIER PROCEDURES
31 Flowchart
Start
Create Back up
CV
Inform RNC to
Lock Node-B
Replace Existing
RU21RRU11 or
Add new RU22
RRU22
Confogure Cabling
Insert Additional
RAX and TX-HS (if
necessary)
Run Second
Carrier script in
RBS and RNC
Create new CV
after
reconfiguration
Inform RNC to
Unlocked Node-B
Perform Test Call
END
Figure 1 Workflow 2nd Carrier Implementation
7 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
32 Create Backup CV
Backup CV should be created for any rollback procedure purposes
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
33 Lock Node B
Inform RNC that Node B is ready for reconfiguration and ask RNC to bring Node B out of service and ready for reconfiguration Concurrently RNC will perform second carrier reconfiguration on RNC side
The following states on Node B refer to out-of-service condition
A RAX Board operational state LED is off
B TX Board operational state LED is off
8 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
34 Install Additional Hardware
The following hardware should be installed in the Node B
1 Radio Unit Modules
RRU22 (RBS3412 3418 3518)
RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)
2 RAX Board (Depend on RBS Type)
3 TX-HS Board (If necessary depends on the design)
341 3412
3412 Cabinet
9 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
RRU22
10 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
342 3206M amp 3107
For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)
3206M Cabinet
11 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3107 Cabinet
12 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
35 RAX Board Installation
Second RAX Board is needed on second carrier implementation
351 RAX Board Position
3511 3412 Digital Subrack
On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9
13 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3512 3107 3106 3206 3116 3216 Digital Subrack
On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4
3513 3418 and 3518 Digital Subrack
On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board
352 RAX Board Installation
3521 Install RAX Board
Install RAX board on the proper slot The following steps should be performed
1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8
14 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Installed RAX board and tighten the screw
353 Unlock RAX Board
RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
6 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3 SECOND CARRIER PROCEDURES
31 Flowchart
Start
Create Back up
CV
Inform RNC to
Lock Node-B
Replace Existing
RU21RRU11 or
Add new RU22
RRU22
Confogure Cabling
Insert Additional
RAX and TX-HS (if
necessary)
Run Second
Carrier script in
RBS and RNC
Create new CV
after
reconfiguration
Inform RNC to
Unlocked Node-B
Perform Test Call
END
Figure 1 Workflow 2nd Carrier Implementation
7 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
32 Create Backup CV
Backup CV should be created for any rollback procedure purposes
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
33 Lock Node B
Inform RNC that Node B is ready for reconfiguration and ask RNC to bring Node B out of service and ready for reconfiguration Concurrently RNC will perform second carrier reconfiguration on RNC side
The following states on Node B refer to out-of-service condition
A RAX Board operational state LED is off
B TX Board operational state LED is off
8 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
34 Install Additional Hardware
The following hardware should be installed in the Node B
1 Radio Unit Modules
RRU22 (RBS3412 3418 3518)
RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)
2 RAX Board (Depend on RBS Type)
3 TX-HS Board (If necessary depends on the design)
341 3412
3412 Cabinet
9 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
RRU22
10 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
342 3206M amp 3107
For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)
3206M Cabinet
11 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3107 Cabinet
12 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
35 RAX Board Installation
Second RAX Board is needed on second carrier implementation
351 RAX Board Position
3511 3412 Digital Subrack
On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9
13 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3512 3107 3106 3206 3116 3216 Digital Subrack
On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4
3513 3418 and 3518 Digital Subrack
On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board
352 RAX Board Installation
3521 Install RAX Board
Install RAX board on the proper slot The following steps should be performed
1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8
14 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Installed RAX board and tighten the screw
353 Unlock RAX Board
RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
7 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
32 Create Backup CV
Backup CV should be created for any rollback procedure purposes
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
33 Lock Node B
Inform RNC that Node B is ready for reconfiguration and ask RNC to bring Node B out of service and ready for reconfiguration Concurrently RNC will perform second carrier reconfiguration on RNC side
The following states on Node B refer to out-of-service condition
A RAX Board operational state LED is off
B TX Board operational state LED is off
8 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
34 Install Additional Hardware
The following hardware should be installed in the Node B
1 Radio Unit Modules
RRU22 (RBS3412 3418 3518)
RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)
2 RAX Board (Depend on RBS Type)
3 TX-HS Board (If necessary depends on the design)
341 3412
3412 Cabinet
9 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
RRU22
10 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
342 3206M amp 3107
For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)
3206M Cabinet
11 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3107 Cabinet
12 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
35 RAX Board Installation
Second RAX Board is needed on second carrier implementation
351 RAX Board Position
3511 3412 Digital Subrack
On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9
13 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3512 3107 3106 3206 3116 3216 Digital Subrack
On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4
3513 3418 and 3518 Digital Subrack
On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board
352 RAX Board Installation
3521 Install RAX Board
Install RAX board on the proper slot The following steps should be performed
1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8
14 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Installed RAX board and tighten the screw
353 Unlock RAX Board
RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
8 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
34 Install Additional Hardware
The following hardware should be installed in the Node B
1 Radio Unit Modules
RRU22 (RBS3412 3418 3518)
RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)
2 RAX Board (Depend on RBS Type)
3 TX-HS Board (If necessary depends on the design)
341 3412
3412 Cabinet
9 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
RRU22
10 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
342 3206M amp 3107
For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)
3206M Cabinet
11 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3107 Cabinet
12 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
35 RAX Board Installation
Second RAX Board is needed on second carrier implementation
351 RAX Board Position
3511 3412 Digital Subrack
On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9
13 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3512 3107 3106 3206 3116 3216 Digital Subrack
On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4
3513 3418 and 3518 Digital Subrack
On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board
352 RAX Board Installation
3521 Install RAX Board
Install RAX board on the proper slot The following steps should be performed
1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8
14 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Installed RAX board and tighten the screw
353 Unlock RAX Board
RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
9 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
RRU22
10 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
342 3206M amp 3107
For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)
3206M Cabinet
11 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3107 Cabinet
12 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
35 RAX Board Installation
Second RAX Board is needed on second carrier implementation
351 RAX Board Position
3511 3412 Digital Subrack
On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9
13 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3512 3107 3106 3206 3116 3216 Digital Subrack
On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4
3513 3418 and 3518 Digital Subrack
On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board
352 RAX Board Installation
3521 Install RAX Board
Install RAX board on the proper slot The following steps should be performed
1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8
14 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Installed RAX board and tighten the screw
353 Unlock RAX Board
RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
10 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
342 3206M amp 3107
For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)
3206M Cabinet
11 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3107 Cabinet
12 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
35 RAX Board Installation
Second RAX Board is needed on second carrier implementation
351 RAX Board Position
3511 3412 Digital Subrack
On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9
13 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3512 3107 3106 3206 3116 3216 Digital Subrack
On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4
3513 3418 and 3518 Digital Subrack
On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board
352 RAX Board Installation
3521 Install RAX Board
Install RAX board on the proper slot The following steps should be performed
1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8
14 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Installed RAX board and tighten the screw
353 Unlock RAX Board
RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
11 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3107 Cabinet
12 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
35 RAX Board Installation
Second RAX Board is needed on second carrier implementation
351 RAX Board Position
3511 3412 Digital Subrack
On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9
13 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3512 3107 3106 3206 3116 3216 Digital Subrack
On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4
3513 3418 and 3518 Digital Subrack
On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board
352 RAX Board Installation
3521 Install RAX Board
Install RAX board on the proper slot The following steps should be performed
1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8
14 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Installed RAX board and tighten the screw
353 Unlock RAX Board
RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
12 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
35 RAX Board Installation
Second RAX Board is needed on second carrier implementation
351 RAX Board Position
3511 3412 Digital Subrack
On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9
13 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3512 3107 3106 3206 3116 3216 Digital Subrack
On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4
3513 3418 and 3518 Digital Subrack
On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board
352 RAX Board Installation
3521 Install RAX Board
Install RAX board on the proper slot The following steps should be performed
1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8
14 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Installed RAX board and tighten the screw
353 Unlock RAX Board
RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
13 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
3512 3107 3106 3206 3116 3216 Digital Subrack
On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4
3513 3418 and 3518 Digital Subrack
On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board
352 RAX Board Installation
3521 Install RAX Board
Install RAX board on the proper slot The following steps should be performed
1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8
14 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Installed RAX board and tighten the screw
353 Unlock RAX Board
RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
14 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Installed RAX board and tighten the screw
353 Unlock RAX Board
RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
15 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
b Right clicks on the new RAX Board then click unlock
36 TX-HS Board Installation
Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
16 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
361 TX-HS Board Position
3611 3412 Digital Subrack
On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11
3612 3107 3106 3206 3116 3216 Digital Subrack
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
17 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10
3613 3418 and 3518 Digital Subrack
On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7
362 TX-HS Board Installation
3621 Install TX-HS Board
Install TX-HS board on the proper slot The following steps should be performed
1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8
2 Installed TX-HS board and tighten the screw
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
18 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
363 Unlock TX-HS Board
TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below
a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides
b Right clicks on the new TX-HS Board then click unlock
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
19 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
37 Configure Cabling
371 3412
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
20 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Table 5 RRU | OBIF2 Board Connections
Product No Description Qty Routing and Slot Position
TSR 899 071[n](1) Cable 1 From RRUs through CFKA to
SUB12A12
TSR 899 071[n] Cable 1 From RRUs through CFKB to
SUB12B12
TSR 899 071[n] Cable 1 From RRUs through CFKC to
SUB12C12
TSR 899 071[n] Cable 1 From RRUs through CFKD to
SUB12D12
TSR 899 071[n] Cable 1 From RRUs through CFKE to
SUB12E12
TSR 899 071[n] Cable 1 From RRUs through CFKF to
SUB12F12
372 3107 3206M 3308 with RU22
Connection Diagram of RAX ndashTX-RUIF-RU22-FU12
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
21 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
Cabling of RUIF to RU22
38 Run Second Carrier Script
381 Run second carrier script on RBS
1 Open EMAS click on ldquoModify RBS Equipmentrdquo
Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518
Add_2ndCarrier_RBS_feederxml (Command Line)
Add_2ndCarrier_RBS_opticxml (Command Line)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
22 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
2 Open EMAS click on Configuration then choose Run command Files
Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)
Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)
lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1
382 Run second carrier script on RNC
Run script ldquoAdd_cell_2nd_carriermo
39 Create CV after Reconfiguration
CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV
1 Open EMAS then go to Software Section on dropped down menu
2 Expand Node Expand SwManagement
3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
23 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV
310 Inform RNC to Unlock Node B
Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
24 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
4 Verification Test
41 Hardware Verification
411 341234183518
4111 OBIF
Verify that OBIF are on unlocked amp enabled state
4112 RRU22
Verify that OBIF are on unlocked amp enabled state
412 31073106320631163216
4121 RUIF
Verify that the RUIF is unlocked amp enabled state
4122 RU22
Verify that all RU22 are on unlocked amp enabled state
4123 FU12
Verify that all FU12 are on unlocked amp enabled state
413 RAX Board
Verify that the new inserted RAX Board in on unlocked and enabled state
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
25 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
42 Node B Configuration
421 RBS Local Cell
a Open EMAS and go to Radio Network section
b Verify that all RBSLocallCell is enabled
Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
26 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
422 Sector amp Carrier
Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA
a EULHSUPA EDchResources
b HSDPA HsDschResources
43 Test Call
Test call should be carried out after Node B in-service At least the following test call is performed on all sectors
1 Voice call in F1 by locking the cells in F2
2 Voice call in F2 by locking the cells in F1
5 Concluding Routines
Before leaving the sites ensure that the following actions have been performed
a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure
b Make sure that the RBS is back ON-AIR and REMOTABLE
c Tidy the site and leave it in the same condition as you found it
d Lock all doors to the site
e Reportcontact Ericsson supervisor
f Reportcontact Customer PIC
If the activity is done remotely ensure that the following actions have been performed
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)
27 (27) Prepared (also subject responsible if other) No
EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference
EIDORR [Yohanes Prasetyo] 2009-10-01 A
a Make sure no alarm appears at the RBS and RNC or the same alarm as before
EUL Configuration procedure
b Make sure that the Cell Cells which are reconfigured back in operation again
c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected
d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC
6 Reference
ALEX Library for RBS in P5 P6 or P7 Software
General Requirement Entering Customers Lives site EID-08007545 Uen A
ALEX Library for RNC in P5 P6 or P7 Software
Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)