27
1 (27) Prepared (also subject responsible if other) No. EID/OR/RR ELAULAP and EJEPSIM EID-09:013745 Uen Approved Checked Date Rev Reference EID/OR/R [Yohanes Prasetyo] 2009-10-01 A SECOND CARRIER IMPLEMENTATION

Second Carrier

Embed Size (px)

DESCRIPTION

vv

Citation preview

Page 1: Second Carrier

1 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

SECOND CARRIER IMPLEMENTATION

2 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Contents

1 Description 4

2 Pre-requisites 4 21 Tools 4 22 Hardware 4 23 Script 5 24 Others 5

3 SECOND CARRIER PROCEDURES 6 31 Flowchart 6 32 Create Backup CV 7 33 Lock Node B 7 34 Install Additional Hardware 8 341 3412 8 342 3206M amp 3107 10 35 RAX Board Installation 12 351 RAX Board Position 12 3511 3412 Digital Subrack 12 3512 3107 3106 3206 3116 3216 Digital Subrack 13 3513 3418 and 3518 Digital Subrack 13 352 RAX Board Installation 13 3521 Install RAX Board 13 353 Unlock RAX Board 14 36 TX-HS Board Installation 15 361 TX-HS Board Position 16 3611 3412 Digital Subrack 16 3612 3107 3106 3206 3116 3216 Digital Subrack 16 3613 3418 and 3518 Digital Subrack 17 362 TX-HS Board Installation 17 3621 Install TX-HS Board 17 363 Unlock TX-HS Board 18 37 Configure Cabling 19 371 3412 19 372 3107 3206M 3308 with RU22 20 38 Run Second Carrier Script 21 381 Run second carrier script on RBS 21 382 Run second carrier script on RNC 22 39 Create CV after Reconfiguration 22 310 Inform RNC to Unlock Node B 23

4 Verification Test 24 41 Hardware Verification 24 411 341234183518 24 4111 OBIF 24 4112 RRU22 24 412 31073106320631163216 24 4121 RUIF 24 4122 RU22 24 4123 FU12 24

3 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

413 RAX Board 24 42 Node B Configuration 25 421 RBS Local Cell 25 422 Sector amp Carrier 26 43 Test Call 26

5 Concluding Routines 26

6 Reference 27

4 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

1 Description

This document is created to support implementation second carrier especially in Telkomsel 3G project The varieties of Node-B used are RBS 3107 3106 3116 3206F 3206M 3216 3412 3418 and 3518 The Second carrier can be designed for R99+HSPA or R99 only or HSPA only which one is best suited for the Operator The configuration for each frequency will be based on the agreement between Ericsson and Operator The frequency used for the carriers should be specified in the agreement and design Usually the existing frequency is used both for R99+HSDPA so it is wise to do minimum changes on the existing carrier as it will impact on longer downtime in the particular RBS Please note that the Bandwidth range which can be handled by Ericsson RRU22RU22 right now is only 15 MHz on 2100MHz frequencies

2 Pre-requisites

21 Tools

Thin Client Laptop

o Windows 2000 XP

o Internet Explorer 50+ Mozilla Firefox

o Java (JRE) 14

o Moshell Tools (optional)

Connection Cables

o RS232 Cable

o RJ45 Cable

Screwdriver

o Torx Screw Driver (82025)

22 Hardware

3412 OBIF RRU22 and Connection Cables

3107 3206F 3308 RU22 and Connection Cables

RAX Board

5 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

23 Script

Second Carrier Scripts in RBS and RNC

24 Others

Prepare NIW (Network Interruption Warning) needed for the activity

Prepare permit letter and keys to the site (for replacing or adding new RRU22RU22 only)

Prepare remote access (for remote configuration)

Prepare the Change Request (CR)

Coordination with Integrator or RNC team before activity

6 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3 SECOND CARRIER PROCEDURES

31 Flowchart

Start

Create Back up

CV

Inform RNC to

Lock Node-B

Replace Existing

RU21RRU11 or

Add new RU22

RRU22

Confogure Cabling

Insert Additional

RAX and TX-HS (if

necessary)

Run Second

Carrier script in

RBS and RNC

Create new CV

after

reconfiguration

Inform RNC to

Unlocked Node-B

Perform Test Call

END

Figure 1 Workflow 2nd Carrier Implementation

7 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

32 Create Backup CV

Backup CV should be created for any rollback procedure purposes

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

33 Lock Node B

Inform RNC that Node B is ready for reconfiguration and ask RNC to bring Node B out of service and ready for reconfiguration Concurrently RNC will perform second carrier reconfiguration on RNC side

The following states on Node B refer to out-of-service condition

A RAX Board operational state LED is off

B TX Board operational state LED is off

8 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

34 Install Additional Hardware

The following hardware should be installed in the Node B

1 Radio Unit Modules

RRU22 (RBS3412 3418 3518)

RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)

2 RAX Board (Depend on RBS Type)

3 TX-HS Board (If necessary depends on the design)

341 3412

3412 Cabinet

9 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

RRU22

10 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

342 3206M amp 3107

For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)

3206M Cabinet

11 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3107 Cabinet

12 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

35 RAX Board Installation

Second RAX Board is needed on second carrier implementation

351 RAX Board Position

3511 3412 Digital Subrack

On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9

13 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3512 3107 3106 3206 3116 3216 Digital Subrack

On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4

3513 3418 and 3518 Digital Subrack

On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board

352 RAX Board Installation

3521 Install RAX Board

Install RAX board on the proper slot The following steps should be performed

1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8

14 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Installed RAX board and tighten the screw

353 Unlock RAX Board

RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 2: Second Carrier

2 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Contents

1 Description 4

2 Pre-requisites 4 21 Tools 4 22 Hardware 4 23 Script 5 24 Others 5

3 SECOND CARRIER PROCEDURES 6 31 Flowchart 6 32 Create Backup CV 7 33 Lock Node B 7 34 Install Additional Hardware 8 341 3412 8 342 3206M amp 3107 10 35 RAX Board Installation 12 351 RAX Board Position 12 3511 3412 Digital Subrack 12 3512 3107 3106 3206 3116 3216 Digital Subrack 13 3513 3418 and 3518 Digital Subrack 13 352 RAX Board Installation 13 3521 Install RAX Board 13 353 Unlock RAX Board 14 36 TX-HS Board Installation 15 361 TX-HS Board Position 16 3611 3412 Digital Subrack 16 3612 3107 3106 3206 3116 3216 Digital Subrack 16 3613 3418 and 3518 Digital Subrack 17 362 TX-HS Board Installation 17 3621 Install TX-HS Board 17 363 Unlock TX-HS Board 18 37 Configure Cabling 19 371 3412 19 372 3107 3206M 3308 with RU22 20 38 Run Second Carrier Script 21 381 Run second carrier script on RBS 21 382 Run second carrier script on RNC 22 39 Create CV after Reconfiguration 22 310 Inform RNC to Unlock Node B 23

4 Verification Test 24 41 Hardware Verification 24 411 341234183518 24 4111 OBIF 24 4112 RRU22 24 412 31073106320631163216 24 4121 RUIF 24 4122 RU22 24 4123 FU12 24

3 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

413 RAX Board 24 42 Node B Configuration 25 421 RBS Local Cell 25 422 Sector amp Carrier 26 43 Test Call 26

5 Concluding Routines 26

6 Reference 27

4 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

1 Description

This document is created to support implementation second carrier especially in Telkomsel 3G project The varieties of Node-B used are RBS 3107 3106 3116 3206F 3206M 3216 3412 3418 and 3518 The Second carrier can be designed for R99+HSPA or R99 only or HSPA only which one is best suited for the Operator The configuration for each frequency will be based on the agreement between Ericsson and Operator The frequency used for the carriers should be specified in the agreement and design Usually the existing frequency is used both for R99+HSDPA so it is wise to do minimum changes on the existing carrier as it will impact on longer downtime in the particular RBS Please note that the Bandwidth range which can be handled by Ericsson RRU22RU22 right now is only 15 MHz on 2100MHz frequencies

2 Pre-requisites

21 Tools

Thin Client Laptop

o Windows 2000 XP

o Internet Explorer 50+ Mozilla Firefox

o Java (JRE) 14

o Moshell Tools (optional)

Connection Cables

o RS232 Cable

o RJ45 Cable

Screwdriver

o Torx Screw Driver (82025)

22 Hardware

3412 OBIF RRU22 and Connection Cables

3107 3206F 3308 RU22 and Connection Cables

RAX Board

5 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

23 Script

Second Carrier Scripts in RBS and RNC

24 Others

Prepare NIW (Network Interruption Warning) needed for the activity

Prepare permit letter and keys to the site (for replacing or adding new RRU22RU22 only)

Prepare remote access (for remote configuration)

Prepare the Change Request (CR)

Coordination with Integrator or RNC team before activity

6 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3 SECOND CARRIER PROCEDURES

31 Flowchart

Start

Create Back up

CV

Inform RNC to

Lock Node-B

Replace Existing

RU21RRU11 or

Add new RU22

RRU22

Confogure Cabling

Insert Additional

RAX and TX-HS (if

necessary)

Run Second

Carrier script in

RBS and RNC

Create new CV

after

reconfiguration

Inform RNC to

Unlocked Node-B

Perform Test Call

END

Figure 1 Workflow 2nd Carrier Implementation

7 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

32 Create Backup CV

Backup CV should be created for any rollback procedure purposes

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

33 Lock Node B

Inform RNC that Node B is ready for reconfiguration and ask RNC to bring Node B out of service and ready for reconfiguration Concurrently RNC will perform second carrier reconfiguration on RNC side

The following states on Node B refer to out-of-service condition

A RAX Board operational state LED is off

B TX Board operational state LED is off

8 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

34 Install Additional Hardware

The following hardware should be installed in the Node B

1 Radio Unit Modules

RRU22 (RBS3412 3418 3518)

RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)

2 RAX Board (Depend on RBS Type)

3 TX-HS Board (If necessary depends on the design)

341 3412

3412 Cabinet

9 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

RRU22

10 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

342 3206M amp 3107

For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)

3206M Cabinet

11 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3107 Cabinet

12 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

35 RAX Board Installation

Second RAX Board is needed on second carrier implementation

351 RAX Board Position

3511 3412 Digital Subrack

On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9

13 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3512 3107 3106 3206 3116 3216 Digital Subrack

On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4

3513 3418 and 3518 Digital Subrack

On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board

352 RAX Board Installation

3521 Install RAX Board

Install RAX board on the proper slot The following steps should be performed

1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8

14 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Installed RAX board and tighten the screw

353 Unlock RAX Board

RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 3: Second Carrier

3 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

413 RAX Board 24 42 Node B Configuration 25 421 RBS Local Cell 25 422 Sector amp Carrier 26 43 Test Call 26

5 Concluding Routines 26

6 Reference 27

4 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

1 Description

This document is created to support implementation second carrier especially in Telkomsel 3G project The varieties of Node-B used are RBS 3107 3106 3116 3206F 3206M 3216 3412 3418 and 3518 The Second carrier can be designed for R99+HSPA or R99 only or HSPA only which one is best suited for the Operator The configuration for each frequency will be based on the agreement between Ericsson and Operator The frequency used for the carriers should be specified in the agreement and design Usually the existing frequency is used both for R99+HSDPA so it is wise to do minimum changes on the existing carrier as it will impact on longer downtime in the particular RBS Please note that the Bandwidth range which can be handled by Ericsson RRU22RU22 right now is only 15 MHz on 2100MHz frequencies

2 Pre-requisites

21 Tools

Thin Client Laptop

o Windows 2000 XP

o Internet Explorer 50+ Mozilla Firefox

o Java (JRE) 14

o Moshell Tools (optional)

Connection Cables

o RS232 Cable

o RJ45 Cable

Screwdriver

o Torx Screw Driver (82025)

22 Hardware

3412 OBIF RRU22 and Connection Cables

3107 3206F 3308 RU22 and Connection Cables

RAX Board

5 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

23 Script

Second Carrier Scripts in RBS and RNC

24 Others

Prepare NIW (Network Interruption Warning) needed for the activity

Prepare permit letter and keys to the site (for replacing or adding new RRU22RU22 only)

Prepare remote access (for remote configuration)

Prepare the Change Request (CR)

Coordination with Integrator or RNC team before activity

6 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3 SECOND CARRIER PROCEDURES

31 Flowchart

Start

Create Back up

CV

Inform RNC to

Lock Node-B

Replace Existing

RU21RRU11 or

Add new RU22

RRU22

Confogure Cabling

Insert Additional

RAX and TX-HS (if

necessary)

Run Second

Carrier script in

RBS and RNC

Create new CV

after

reconfiguration

Inform RNC to

Unlocked Node-B

Perform Test Call

END

Figure 1 Workflow 2nd Carrier Implementation

7 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

32 Create Backup CV

Backup CV should be created for any rollback procedure purposes

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

33 Lock Node B

Inform RNC that Node B is ready for reconfiguration and ask RNC to bring Node B out of service and ready for reconfiguration Concurrently RNC will perform second carrier reconfiguration on RNC side

The following states on Node B refer to out-of-service condition

A RAX Board operational state LED is off

B TX Board operational state LED is off

8 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

34 Install Additional Hardware

The following hardware should be installed in the Node B

1 Radio Unit Modules

RRU22 (RBS3412 3418 3518)

RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)

2 RAX Board (Depend on RBS Type)

3 TX-HS Board (If necessary depends on the design)

341 3412

3412 Cabinet

9 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

RRU22

10 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

342 3206M amp 3107

For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)

3206M Cabinet

11 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3107 Cabinet

12 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

35 RAX Board Installation

Second RAX Board is needed on second carrier implementation

351 RAX Board Position

3511 3412 Digital Subrack

On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9

13 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3512 3107 3106 3206 3116 3216 Digital Subrack

On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4

3513 3418 and 3518 Digital Subrack

On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board

352 RAX Board Installation

3521 Install RAX Board

Install RAX board on the proper slot The following steps should be performed

1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8

14 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Installed RAX board and tighten the screw

353 Unlock RAX Board

RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 4: Second Carrier

4 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

1 Description

This document is created to support implementation second carrier especially in Telkomsel 3G project The varieties of Node-B used are RBS 3107 3106 3116 3206F 3206M 3216 3412 3418 and 3518 The Second carrier can be designed for R99+HSPA or R99 only or HSPA only which one is best suited for the Operator The configuration for each frequency will be based on the agreement between Ericsson and Operator The frequency used for the carriers should be specified in the agreement and design Usually the existing frequency is used both for R99+HSDPA so it is wise to do minimum changes on the existing carrier as it will impact on longer downtime in the particular RBS Please note that the Bandwidth range which can be handled by Ericsson RRU22RU22 right now is only 15 MHz on 2100MHz frequencies

2 Pre-requisites

21 Tools

Thin Client Laptop

o Windows 2000 XP

o Internet Explorer 50+ Mozilla Firefox

o Java (JRE) 14

o Moshell Tools (optional)

Connection Cables

o RS232 Cable

o RJ45 Cable

Screwdriver

o Torx Screw Driver (82025)

22 Hardware

3412 OBIF RRU22 and Connection Cables

3107 3206F 3308 RU22 and Connection Cables

RAX Board

5 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

23 Script

Second Carrier Scripts in RBS and RNC

24 Others

Prepare NIW (Network Interruption Warning) needed for the activity

Prepare permit letter and keys to the site (for replacing or adding new RRU22RU22 only)

Prepare remote access (for remote configuration)

Prepare the Change Request (CR)

Coordination with Integrator or RNC team before activity

6 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3 SECOND CARRIER PROCEDURES

31 Flowchart

Start

Create Back up

CV

Inform RNC to

Lock Node-B

Replace Existing

RU21RRU11 or

Add new RU22

RRU22

Confogure Cabling

Insert Additional

RAX and TX-HS (if

necessary)

Run Second

Carrier script in

RBS and RNC

Create new CV

after

reconfiguration

Inform RNC to

Unlocked Node-B

Perform Test Call

END

Figure 1 Workflow 2nd Carrier Implementation

7 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

32 Create Backup CV

Backup CV should be created for any rollback procedure purposes

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

33 Lock Node B

Inform RNC that Node B is ready for reconfiguration and ask RNC to bring Node B out of service and ready for reconfiguration Concurrently RNC will perform second carrier reconfiguration on RNC side

The following states on Node B refer to out-of-service condition

A RAX Board operational state LED is off

B TX Board operational state LED is off

8 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

34 Install Additional Hardware

The following hardware should be installed in the Node B

1 Radio Unit Modules

RRU22 (RBS3412 3418 3518)

RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)

2 RAX Board (Depend on RBS Type)

3 TX-HS Board (If necessary depends on the design)

341 3412

3412 Cabinet

9 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

RRU22

10 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

342 3206M amp 3107

For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)

3206M Cabinet

11 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3107 Cabinet

12 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

35 RAX Board Installation

Second RAX Board is needed on second carrier implementation

351 RAX Board Position

3511 3412 Digital Subrack

On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9

13 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3512 3107 3106 3206 3116 3216 Digital Subrack

On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4

3513 3418 and 3518 Digital Subrack

On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board

352 RAX Board Installation

3521 Install RAX Board

Install RAX board on the proper slot The following steps should be performed

1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8

14 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Installed RAX board and tighten the screw

353 Unlock RAX Board

RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 5: Second Carrier

5 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

23 Script

Second Carrier Scripts in RBS and RNC

24 Others

Prepare NIW (Network Interruption Warning) needed for the activity

Prepare permit letter and keys to the site (for replacing or adding new RRU22RU22 only)

Prepare remote access (for remote configuration)

Prepare the Change Request (CR)

Coordination with Integrator or RNC team before activity

6 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3 SECOND CARRIER PROCEDURES

31 Flowchart

Start

Create Back up

CV

Inform RNC to

Lock Node-B

Replace Existing

RU21RRU11 or

Add new RU22

RRU22

Confogure Cabling

Insert Additional

RAX and TX-HS (if

necessary)

Run Second

Carrier script in

RBS and RNC

Create new CV

after

reconfiguration

Inform RNC to

Unlocked Node-B

Perform Test Call

END

Figure 1 Workflow 2nd Carrier Implementation

7 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

32 Create Backup CV

Backup CV should be created for any rollback procedure purposes

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

33 Lock Node B

Inform RNC that Node B is ready for reconfiguration and ask RNC to bring Node B out of service and ready for reconfiguration Concurrently RNC will perform second carrier reconfiguration on RNC side

The following states on Node B refer to out-of-service condition

A RAX Board operational state LED is off

B TX Board operational state LED is off

8 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

34 Install Additional Hardware

The following hardware should be installed in the Node B

1 Radio Unit Modules

RRU22 (RBS3412 3418 3518)

RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)

2 RAX Board (Depend on RBS Type)

3 TX-HS Board (If necessary depends on the design)

341 3412

3412 Cabinet

9 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

RRU22

10 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

342 3206M amp 3107

For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)

3206M Cabinet

11 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3107 Cabinet

12 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

35 RAX Board Installation

Second RAX Board is needed on second carrier implementation

351 RAX Board Position

3511 3412 Digital Subrack

On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9

13 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3512 3107 3106 3206 3116 3216 Digital Subrack

On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4

3513 3418 and 3518 Digital Subrack

On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board

352 RAX Board Installation

3521 Install RAX Board

Install RAX board on the proper slot The following steps should be performed

1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8

14 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Installed RAX board and tighten the screw

353 Unlock RAX Board

RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 6: Second Carrier

6 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3 SECOND CARRIER PROCEDURES

31 Flowchart

Start

Create Back up

CV

Inform RNC to

Lock Node-B

Replace Existing

RU21RRU11 or

Add new RU22

RRU22

Confogure Cabling

Insert Additional

RAX and TX-HS (if

necessary)

Run Second

Carrier script in

RBS and RNC

Create new CV

after

reconfiguration

Inform RNC to

Unlocked Node-B

Perform Test Call

END

Figure 1 Workflow 2nd Carrier Implementation

7 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

32 Create Backup CV

Backup CV should be created for any rollback procedure purposes

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

33 Lock Node B

Inform RNC that Node B is ready for reconfiguration and ask RNC to bring Node B out of service and ready for reconfiguration Concurrently RNC will perform second carrier reconfiguration on RNC side

The following states on Node B refer to out-of-service condition

A RAX Board operational state LED is off

B TX Board operational state LED is off

8 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

34 Install Additional Hardware

The following hardware should be installed in the Node B

1 Radio Unit Modules

RRU22 (RBS3412 3418 3518)

RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)

2 RAX Board (Depend on RBS Type)

3 TX-HS Board (If necessary depends on the design)

341 3412

3412 Cabinet

9 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

RRU22

10 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

342 3206M amp 3107

For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)

3206M Cabinet

11 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3107 Cabinet

12 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

35 RAX Board Installation

Second RAX Board is needed on second carrier implementation

351 RAX Board Position

3511 3412 Digital Subrack

On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9

13 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3512 3107 3106 3206 3116 3216 Digital Subrack

On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4

3513 3418 and 3518 Digital Subrack

On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board

352 RAX Board Installation

3521 Install RAX Board

Install RAX board on the proper slot The following steps should be performed

1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8

14 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Installed RAX board and tighten the screw

353 Unlock RAX Board

RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 7: Second Carrier

7 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

32 Create Backup CV

Backup CV should be created for any rollback procedure purposes

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

33 Lock Node B

Inform RNC that Node B is ready for reconfiguration and ask RNC to bring Node B out of service and ready for reconfiguration Concurrently RNC will perform second carrier reconfiguration on RNC side

The following states on Node B refer to out-of-service condition

A RAX Board operational state LED is off

B TX Board operational state LED is off

8 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

34 Install Additional Hardware

The following hardware should be installed in the Node B

1 Radio Unit Modules

RRU22 (RBS3412 3418 3518)

RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)

2 RAX Board (Depend on RBS Type)

3 TX-HS Board (If necessary depends on the design)

341 3412

3412 Cabinet

9 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

RRU22

10 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

342 3206M amp 3107

For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)

3206M Cabinet

11 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3107 Cabinet

12 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

35 RAX Board Installation

Second RAX Board is needed on second carrier implementation

351 RAX Board Position

3511 3412 Digital Subrack

On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9

13 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3512 3107 3106 3206 3116 3216 Digital Subrack

On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4

3513 3418 and 3518 Digital Subrack

On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board

352 RAX Board Installation

3521 Install RAX Board

Install RAX board on the proper slot The following steps should be performed

1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8

14 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Installed RAX board and tighten the screw

353 Unlock RAX Board

RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 8: Second Carrier

8 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

34 Install Additional Hardware

The following hardware should be installed in the Node B

1 Radio Unit Modules

RRU22 (RBS3412 3418 3518)

RU22 (Radio Subrack ndash Slot No 1 2 3 (3107 3206M 3116 and 3216) and Slot No 2 4 6 (3106 and 3206F)

2 RAX Board (Depend on RBS Type)

3 TX-HS Board (If necessary depends on the design)

341 3412

3412 Cabinet

9 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

RRU22

10 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

342 3206M amp 3107

For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)

3206M Cabinet

11 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3107 Cabinet

12 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

35 RAX Board Installation

Second RAX Board is needed on second carrier implementation

351 RAX Board Position

3511 3412 Digital Subrack

On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9

13 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3512 3107 3106 3206 3116 3216 Digital Subrack

On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4

3513 3418 and 3518 Digital Subrack

On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board

352 RAX Board Installation

3521 Install RAX Board

Install RAX board on the proper slot The following steps should be performed

1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8

14 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Installed RAX board and tighten the screw

353 Unlock RAX Board

RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 9: Second Carrier

9 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

RRU22

10 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

342 3206M amp 3107

For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)

3206M Cabinet

11 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3107 Cabinet

12 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

35 RAX Board Installation

Second RAX Board is needed on second carrier implementation

351 RAX Board Position

3511 3412 Digital Subrack

On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9

13 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3512 3107 3106 3206 3116 3216 Digital Subrack

On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4

3513 3418 and 3518 Digital Subrack

On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board

352 RAX Board Installation

3521 Install RAX Board

Install RAX board on the proper slot The following steps should be performed

1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8

14 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Installed RAX board and tighten the screw

353 Unlock RAX Board

RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 10: Second Carrier

10 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

342 3206M amp 3107

For these types of RBS the existing RU21 will be replaced by RU22 that will be installed after Node B in out-of-service state (locked)

3206M Cabinet

11 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3107 Cabinet

12 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

35 RAX Board Installation

Second RAX Board is needed on second carrier implementation

351 RAX Board Position

3511 3412 Digital Subrack

On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9

13 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3512 3107 3106 3206 3116 3216 Digital Subrack

On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4

3513 3418 and 3518 Digital Subrack

On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board

352 RAX Board Installation

3521 Install RAX Board

Install RAX board on the proper slot The following steps should be performed

1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8

14 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Installed RAX board and tighten the screw

353 Unlock RAX Board

RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 11: Second Carrier

11 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3107 Cabinet

12 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

35 RAX Board Installation

Second RAX Board is needed on second carrier implementation

351 RAX Board Position

3511 3412 Digital Subrack

On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9

13 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3512 3107 3106 3206 3116 3216 Digital Subrack

On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4

3513 3418 and 3518 Digital Subrack

On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board

352 RAX Board Installation

3521 Install RAX Board

Install RAX board on the proper slot The following steps should be performed

1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8

14 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Installed RAX board and tighten the screw

353 Unlock RAX Board

RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 12: Second Carrier

12 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

35 RAX Board Installation

Second RAX Board is needed on second carrier implementation

351 RAX Board Position

3511 3412 Digital Subrack

On 3412 RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 4th slot So the additional RAX Board will be on slot number 5 6 7 8 and 9

13 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3512 3107 3106 3206 3116 3216 Digital Subrack

On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4

3513 3418 and 3518 Digital Subrack

On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board

352 RAX Board Installation

3521 Install RAX Board

Install RAX board on the proper slot The following steps should be performed

1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8

14 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Installed RAX board and tighten the screw

353 Unlock RAX Board

RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 13: Second Carrier

13 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

3512 3107 3106 3206 3116 3216 Digital Subrack

On those RBSes RAX board is occupying slot number 4-9 Usually the first RAX board is installed in the 9th slot So the additional RAX Board will be on slot number 8 7 6 5 and 4

3513 3418 and 3518 Digital Subrack

On those RBSes RAX board is occupying slot number 3-6 Usually the first RAX board is installed in the 6th slot So the additional RAX Board will be on slot number 5 4 and 3 Slot number 3 can also be used for ET board

352 RAX Board Installation

3521 Install RAX Board

Install RAX board on the proper slot The following steps should be performed

1 Open dummy board on the slot where RAX Board will be installed Loosen the screw using torx screw driver 8

14 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Installed RAX board and tighten the screw

353 Unlock RAX Board

RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 14: Second Carrier

14 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Installed RAX board and tighten the screw

353 Unlock RAX Board

RAX Board will be auto configure by RBS When the RAX Board is inserted RBS will create the MO in the slot occupied by the New RAX Board RAX board will be on locked state To unlock the RAX Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the RAX Board resides

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 15: Second Carrier

15 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

b Right clicks on the new RAX Board then click unlock

36 TX-HS Board Installation

Second TX-HS Board might be needed on second carrier implementation If the existing TX-HS board is TX-HS15 and you are using HSDPA 5 codescell-carrier then you would need to consider additional TX-HS15 board or replacing the existing one to enable HSDPA 5codescc in all cell-carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 16: Second Carrier

16 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

361 TX-HS Board Position

3611 3412 Digital Subrack

On 3412 TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 10th slot So the additional TX-HS Board will be on slot number 11

3612 3107 3106 3206 3116 3216 Digital Subrack

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 17: Second Carrier

17 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

On those RBSes TX-HS board is occupying slot number 10 and 11 Usually the first TX-HS board is installed in the 11th slot So the additional TX-HS Board will be on slot number 10

3613 3418 and 3518 Digital Subrack

On those RBSes TX board is occupying slot number 7 and 8 Usually the first RAX board is installed in the 8th slot So the additional TX Board will be on slot number 7

362 TX-HS Board Installation

3621 Install TX-HS Board

Install TX-HS board on the proper slot The following steps should be performed

1 Open dummy board on the slot where TX-HS Board will be installed Loosen the screw using torx screw driver 8

2 Installed TX-HS board and tighten the screw

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 18: Second Carrier

18 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

363 Unlock TX-HS Board

TX-HS Board will be auto configure by RBS When the TX-HS Board is inserted RBS will create the MO in the slot occupied by the New TX-HS Board TX-HS board will be on locked state To unlock the TX-HS Board follow the steps below

a Open EMAS and then go to Equipment section and open the sub rack where the TX-HS Board resides

b Right clicks on the new TX-HS Board then click unlock

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 19: Second Carrier

19 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

37 Configure Cabling

371 3412

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 20: Second Carrier

20 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Table 5 RRU | OBIF2 Board Connections

Product No Description Qty Routing and Slot Position

TSR 899 071[n](1) Cable 1 From RRUs through CFKA to

SUB12A12

TSR 899 071[n] Cable 1 From RRUs through CFKB to

SUB12B12

TSR 899 071[n] Cable 1 From RRUs through CFKC to

SUB12C12

TSR 899 071[n] Cable 1 From RRUs through CFKD to

SUB12D12

TSR 899 071[n] Cable 1 From RRUs through CFKE to

SUB12E12

TSR 899 071[n] Cable 1 From RRUs through CFKF to

SUB12F12

372 3107 3206M 3308 with RU22

Connection Diagram of RAX ndashTX-RUIF-RU22-FU12

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 21: Second Carrier

21 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

Cabling of RUIF to RU22

38 Run Second Carrier Script

381 Run second carrier script on RBS

1 Open EMAS click on ldquoModify RBS Equipmentrdquo

Use script ldquoAdd_2nd _carrier_RBS_feederxmlrdquo for RBS 3107 3106 3206 3116 and 3216 Or use script ldquoAdd_2nd_carrier_RBS_opticxmlrdquo for RBS 3412 3418 and 3518

Add_2ndCarrier_RBS_feederxml (Command Line)

Add_2ndCarrier_RBS_opticxml (Command Line)

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 22: Second Carrier

22 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

2 Open EMAS click on Configuration then choose Run command Files

Use script ldquoset_hscodemordquo to change the numhscoderesources and numeulresources to match the desired configuration Eg If the RBS is configured with fixed HSDPA 5codescc for 6 cell-carriers then we need to set the numhscoderesources to 2 (equal 2x15 codes)

Or we can set it manually using moshell with these commands (where X indicates the slot number which TX-HS board located)

lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numHsCodeResources 2 lset Subrack=1Slot=XPlugInUnit=1TxDeviceGroup=1numEulResources 1

382 Run second carrier script on RNC

Run script ldquoAdd_cell_2nd_carriermo

39 Create CV after Reconfiguration

CV should be created both in RBS and RNC after reconfiguration and should be set as startable CV

1 Open EMAS then go to Software Section on dropped down menu

2 Expand Node Expand SwManagement

3 Right Click on Configuration Versions Click on Create CV The following pop up window will appear On CV name fill in the name of the CV without any space Then click OK

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 23: Second Carrier

23 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

5 Right click on new created CV then choose ldquoSet Startablerdquo Then Reload the RBS with the CV

310 Inform RNC to Unlock Node B

Inform RNC that reconfiguration has been done on Node B and ask them to unlock the new cells

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 24: Second Carrier

24 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

4 Verification Test

41 Hardware Verification

411 341234183518

4111 OBIF

Verify that OBIF are on unlocked amp enabled state

4112 RRU22

Verify that OBIF are on unlocked amp enabled state

412 31073106320631163216

4121 RUIF

Verify that the RUIF is unlocked amp enabled state

4122 RU22

Verify that all RU22 are on unlocked amp enabled state

4123 FU12

Verify that all FU12 are on unlocked amp enabled state

413 RAX Board

Verify that the new inserted RAX Board in on unlocked and enabled state

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 25: Second Carrier

25 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

42 Node B Configuration

421 RBS Local Cell

a Open EMAS and go to Radio Network section

b Verify that all RBSLocallCell is enabled

Notes S1C1 Sector 1 Carrier 1 S1C2 Sector 1 Carrier 2 S2C1 Sector 2 Carrier 1 S2C2 Sector 2 Carrier 2 S3C1 Sector 3 Carrier 1 S3C2 Sector 3 Carrier 2

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 26: Second Carrier

26 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

422 Sector amp Carrier

Open EMAS and go to Radio Network section Then go to Sector Verify that all logical channels (R99 amp HSPA) are available in all carriers amp sectors The following logical channels are for HSPA

a EULHSUPA EDchResources

b HSDPA HsDschResources

43 Test Call

Test call should be carried out after Node B in-service At least the following test call is performed on all sectors

1 Voice call in F1 by locking the cells in F2

2 Voice call in F2 by locking the cells in F1

5 Concluding Routines

Before leaving the sites ensure that the following actions have been performed

a Make sure no alarm appears at the RBS and RNC or the same alarm as before EUL Configuration procedure

b Make sure that the RBS is back ON-AIR and REMOTABLE

c Tidy the site and leave it in the same condition as you found it

d Lock all doors to the site

e Reportcontact Ericsson supervisor

f Reportcontact Customer PIC

If the activity is done remotely ensure that the following actions have been performed

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)

Page 27: Second Carrier

27 (27) Prepared (also subject responsible if other) No

EIDORRR ELAULAP and EJEPSIM EID-09013745 Uen Approved Checked Date Rev Reference

EIDORR [Yohanes Prasetyo] 2009-10-01 A

a Make sure no alarm appears at the RBS and RNC or the same alarm as before

EUL Configuration procedure

b Make sure that the Cell Cells which are reconfigured back in operation again

c Verify that the number of cells which are operational before and after is the same or at least the cells being reconfigured is not affected

d Reportcontact Ericsson Supervisor and Project Manager and Customer PIC

6 Reference

ALEX Library for RBS in P5 P6 or P7 Software

General Requirement Entering Customers Lives site EID-08007545 Uen A

ALEX Library for RNC in P5 P6 or P7 Software

Change Request (CR) either from customer from Ericsson Radio Network Design (RND) or from Ericsson Network Performance Improvement (NPI)