67
SD Group WELCOME T0 SD GROUP ESTABLISHED : 2000 SALES : 110 Cr EMPLOYEES : 800+

SDE PRESENTATION PUNE PLANT

Embed Size (px)

Citation preview

Page 1: SDE PRESENTATION PUNE PLANT

SD Group

WELCOME

T0 SD GROUP

ESTABLISHED : 2000

SALES : 110 Cr

EMPLOYEES : 800+

Page 2: SDE PRESENTATION PUNE PLANT

SD Group

• SD Engineerstech Pvt. Ltd, Plant 1 & 2

(Fixtures, SPMs & Robotic Cells )

• SD Auto Components Pvt. Ltd

( BIW Parts-Stamping & Welded Assys.)

• SD Brakes India Pvt. Ltd

( Automobile Breaks)

FARIDABAD

PUNE

• SD Engineerstech Pvt. Ltd. Plant-1

(BIW Parts-Stamping & Welded Assys.)

OUR PRESENCE

• SD Engineerstech Pvt. Ltd. Plant-2

( Sheet Metal & weld Assy Production)

Future Plan-Fixtures &Automation Division at Sanand Ahmedabad

Future plan-BIW Parts manufacturing Facility at Pune- Plot available in Chakan MIDC

Page 3: SDE PRESENTATION PUNE PLANT

AC

CO

LE

DE

S

2000 Company Established .

2003 Fixture Manufacturing Start. First Fixture for MSIL.

2005 Press Tool Division Started.

2006 SD Auto Components P Ltd formed.

2007 Design & Marketing Office opened at Gurgaon.

2008 Technical Collaboration with YM Giken. JAPAN

2009 Technical Collaboration with YM Giken. JAPAN

2010

2011 Converted to SD Engineerstech P Ltd.

SD Brakes Formed.

2012 SD Auto Comp. Plant 1 & Plant 2 Merged.

SDE Pune Plant-1 Started .

TS Certification to SD Auto Comp..

SD Group

2013 SDE Pune Plant -2 Started .

Page 4: SDE PRESENTATION PUNE PLANT

• AUTOMOTIVE 4 WHEELERS ( CARS & BUSES) 2 WHEELERS. COMMERCIAL VEHICLES

• EARTHMOVING INDUSTRY • CONSTRUCTION EQUIPMENTS • RAILWAY

BUSINESS SECTOR

Page 5: SDE PRESENTATION PUNE PLANT

OUR VALUABLE CUSTOMERS

5

Tier 1 Suppliers

O.E.M

Indirect Customers

Page 6: SDE PRESENTATION PUNE PLANT

ORGANISATION STRUCTURE

6

Managing Director Mr. S. P. Singh

SD Engineerstech PLANT 1 - FBD

Mr. Nishant Priyadarshi

Marketing Dept.

Design Dept

Simulation Dept.

Tool Room Dept.

Stores Dept.

Electrical Dept.

Robotics & Automation Dept.

Accounts Dept.

HR Dept.

SD Engineerstech PLANT 2 - FBD Mr. Vipul Kalra

Marketing Dept.

Design Dept

Simulation Dept.

Tool Room Dept.

Stores Dept.

Electrical Dept.

Robotics & Automation Dept.

Accounts Dept.

HR Dept.

SD Engineerstech PLANT 2 – PUNE Mr. S.P.Mishra

Marketing Dept.

Design Dept

Simulation Dept.

Tool Room Dept.

Stores Dept.

Electrical Dept.

Robotics & Automation Dept.

Accounts Dept.

HR Dept.

SD Auto Comps -Faridabad

Mr. U.S. Sharma

Marketing Dept.

Design Dept

Simulation Dept.

Production Dept.

Stores Dept

Maintenance Dept.

Services Dept.

Accounts Dept.

HR Dept.

SD Engineerstech Pvt. Ltd.-Plant-

2,Pune Mr. Saroj Parida

Marketing Dept.

Production Dept.

Stores Dept

Maintenance Dept.

Services Dept.

Accounts Dept.

HR Dept.

Page 7: SDE PRESENTATION PUNE PLANT

PROJECT DEVELOPMENT PROCESS

7

CAD DATA / DRAWING STUDY

PROCESS PLANNING

DESIGNING

3D MODEL REVIEW

GUN STUDY / SIMULATION

APPROVAL BY CUSTOMER

2D DRAWING / DETAILING

MANUFACTURING / ASSY

INSPECTION

TRIAL / PRIMARY BUY OFF

COMMISSIONING

AFTER SALES SERVICE & SUPPORT

Page 8: SDE PRESENTATION PUNE PLANT

SIMULATION & OFFLINE PROGRAMMING

8

ROBOT SIMULATION & OFFLINE PROGRAMMING

• Visualization of automation and application in real time. • Higher quality designs for automation. • System review for better accuracy and schemes. • Collision detection test and prevention. • Robot reachability to select proper robot with accurate dimensions. • Proper placement of robot and layout design. • Eliminates the threat of safety issues. • Cycle time validation. • Reduction in onsite programming time. • Programming of complex path is easy.

Page 9: SDE PRESENTATION PUNE PLANT

ROBOT PARTNERS

9

S.D. Engineerstech Robotics Team has immense experience of working with all the leading Industrial Robots. Our staff has also attended various training

programs to update their knowledge regarding the latest technological updates in their products.

Page 10: SDE PRESENTATION PUNE PLANT

TWO WHEELERS CUSTOMERS - DIRECT

10

Direct – OEM’s

Direct – Tier 1 Suppliers

In-Direct – OEM’s

Page 11: SDE PRESENTATION PUNE PLANT

PROJECT ACCOMPLISHED FOR TWO WHEELERS

11

Robotic Mig Welding Cell for Main Full Frame Comp.

Customer: Suzuki Motorcycle

Page 12: SDE PRESENTATION PUNE PLANT

PROJECT ACCOMPLISHED FOR TWO WHEELERS

12

Robotic Mig Welding Cell for Main Half Frame Comp

Customer: Suzuki Motorcycle

Page 13: SDE PRESENTATION PUNE PLANT

PROJECT ACCOMPLISHED FOR TWO WHEELERS

13

Robotic Welding Cell for Main Frame Model

Customer: Yamaha Motorcycles India

TOTAL 15 CELLS HAVE BEEN DELIVERED FOR DIFFERENT MODELS.

Page 14: SDE PRESENTATION PUNE PLANT

PROJECT ACCOMPLISHED FOR TWO WHEELERS

14

Complete Robotic Welding Line of Complete Frame of Harley Davidson Bike. Total 21 Equipments Developed for welding & Checking complete Frame. Customer: Harley Davidson Motorcycles

Page 15: SDE PRESENTATION PUNE PLANT

PROJECT ACCOMPLISHED FOR TWO WHEELERS

15

Complete Robotic Welding Line of Complete Frame of Harley Davidson Bike. Total 21 Equipments Developed for welding & Checking complete Frame. Customer: Harley Davidson Motorcycles

Page 16: SDE PRESENTATION PUNE PLANT

PROJECT ACCOMPLISHED FOR TWO WHEELERS

16

Complete Robotic Welding Line of Complete Frame of Harley Davidson Bike. Total 21 Equipments Developed for welding & Checking complete Frame. Customer: Harley Davidson Motorcycles

Page 17: SDE PRESENTATION PUNE PLANT

PROJECT ACCOMPLISHED FOR TWO WHEELERS

17

Fuel Cock Robotic Welding Cell Customer: Hero MotoCorp AAHC & I-SMART Variants

Page 18: SDE PRESENTATION PUNE PLANT

PROJECT ACCOMPLISHED FOR TWO WHEELERS

18

Robotic Welding Line for K74A – Main Pipe and Rear Assembly Customer: Indo Autotech

Scope of Supply: 03 Nos. of Robotic Welding Cell 11 Manual Welding Fixture 08 Inspection Gauges 01 MIG Welding SPM

Page 19: SDE PRESENTATION PUNE PLANT

PROJECT ACCOMPLISHED FOR TWO WHEELERS

19

Robotic Welding Cell for Cross Member KTEA – Stage 1 & 2 Customer: Indo Autotech

Page 20: SDE PRESENTATION PUNE PLANT

PROJECT ACCOMPLISHED FOR TWO WHEELERS

20

Robotic Welding Cell for Bridge Component Fork Top Customer: Indo Autotech

Page 21: SDE PRESENTATION PUNE PLANT

PROJECT ACCOMPLISHED FOR TWO WHEELERS

21

OP 10

OP 20

OP 30 OP 40

Final Comp

Main Frame Manual Welding Project Code: AAPB

Customer: OMAX Auto

Page 22: SDE PRESENTATION PUNE PLANT

PROJECT ACCOMPLISHED FOR TWO WHEELERS

22

Hydraulic End Forming SPM Customer: Indo Autotech

Page 23: SDE PRESENTATION PUNE PLANT

23

DIP Type Leakage Testing SPM for Fuel Tank

Customer: Suzuki Motorcycles

PROJECT ACCOMPLISHED FOR TWO WHEELERS

Page 24: SDE PRESENTATION PUNE PLANT

24

Scooter UZ – Front Foot Rest Pipe Cutting SPM

Customer: Suzuki Motorcycles

PROJECT ACCOMPLISHED FOR TWO WHEELERS

Page 25: SDE PRESENTATION PUNE PLANT

25

PROJECT ACCOMPLISHED FOR TWO WHEELERS

Muffler Component – Robotic Welding Fixture Project Code: KWSA Customer: Mark Exhaust

Page 26: SDE PRESENTATION PUNE PLANT

26

PROJECT ACCOMPLISHED FOR TWO WHEELERS

Muffler Component – 2 Torch MIG Welding SPM Project Code: KWSA Customer: Mark Exhaust

Page 27: SDE PRESENTATION PUNE PLANT

27

PROJECT ACCOMPLISHED FOR TWO WHEELERS

Handle Drilling SPM

We have expertise in Manufacturing Drilling SPM’s as we have successfully commissioned handle drilling SPM’s for following model’s: • KRPY • KSPL • KTEJ • KWFL • KYJA • KWSA • KWFG

Customer – Mark Exhaust

Page 28: SDE PRESENTATION PUNE PLANT

28

Drilling SPM for Plastic Fuel Tank – Suzuki Motorcycles

PROJECT ACCOMPLISHED FOR TWO WHEELERS

Page 29: SDE PRESENTATION PUNE PLANT

29

PROJECT ACCOMPLISHED FOR TWO WHEELERS

MHYA Muffler Welding SPM’s Customer: Munjal Auto

Page 30: SDE PRESENTATION PUNE PLANT

PROJECT ACCOMPLISHED FOR BIW PARTS-4 WHEELERS

Page 31: SDE PRESENTATION PUNE PLANT

BIW PARTS- MARUTI

Page 32: SDE PRESENTATION PUNE PLANT

BIW PARTS– MARUTI

Page 33: SDE PRESENTATION PUNE PLANT

BIW PARTS – M&M

Page 34: SDE PRESENTATION PUNE PLANT

BIW PARTS– M&M

Page 35: SDE PRESENTATION PUNE PLANT

BIW PARTS- HONDA

Page 36: SDE PRESENTATION PUNE PLANT

SD ENGINEERSTECH PVT.LTD. –PLANT-2 PUNE

Page 37: SDE PRESENTATION PUNE PLANT

COMPONENT NAME :- SEAT FRAME MY15 & EAGLE

Page 38: SDE PRESENTATION PUNE PLANT

COMPONENT NAME :-U-301 SEAT FRAME

Page 39: SDE PRESENTATION PUNE PLANT
Page 40: SDE PRESENTATION PUNE PLANT
Page 41: SDE PRESENTATION PUNE PLANT

COMPONENT NAME:- CHASSES U220 & U202

Page 42: SDE PRESENTATION PUNE PLANT
Page 43: SDE PRESENTATION PUNE PLANT

COMPONENT NAME :- YBA Cook Book

Page 44: SDE PRESENTATION PUNE PLANT
Page 45: SDE PRESENTATION PUNE PLANT
Page 46: SDE PRESENTATION PUNE PLANT

COMPONENT NAME :-HF BUMPER B562

Page 47: SDE PRESENTATION PUNE PLANT

COMPONENT NAME:-3G LOWER CONTROLLER ARM & UPPER CONTROLLER ARM

Page 48: SDE PRESENTATION PUNE PLANT
Page 49: SDE PRESENTATION PUNE PLANT
Page 50: SDE PRESENTATION PUNE PLANT

COMPONENT NAME :-LOWER CONTROLLER ARM & UPPER CONTROLLER ARM RT64 4x2

Page 51: SDE PRESENTATION PUNE PLANT
Page 52: SDE PRESENTATION PUNE PLANT
Page 53: SDE PRESENTATION PUNE PLANT

COMPONENT NAME :-NAL P15 Hot End

Page 54: SDE PRESENTATION PUNE PLANT
Page 55: SDE PRESENTATION PUNE PLANT

COMPONENT NAME :-20150113-S101 Gasoline

Page 56: SDE PRESENTATION PUNE PLANT

COMPONENT NAME :-O2

Page 57: SDE PRESENTATION PUNE PLANT
Page 58: SDE PRESENTATION PUNE PLANT

TENNECO MUFFLER INSPECTION GAUGE

COMPONENT NAME :- EICHER PRO 1110

Page 59: SDE PRESENTATION PUNE PLANT

DOUBLE END DRIVE SPM FOR 205_HOT_END_24 12 2015 SMIL MUFFLER

Page 60: SDE PRESENTATION PUNE PLANT

TORCH ROTARY SPM FOR W205 MUFFLER

Page 61: SDE PRESENTATION PUNE PLANT

ROBOTIC CELL FOR CAT CON MUFFLER

Page 62: SDE PRESENTATION PUNE PLANT

DRY TYPE LEAKGE TESTING SPM W205 HOT END

Page 63: SDE PRESENTATION PUNE PLANT

BOLT TIGHTING SPM MSKH S101

Page 64: SDE PRESENTATION PUNE PLANT

ROBOTIC WELDING FIXTURE JCIX104

Page 65: SDE PRESENTATION PUNE PLANT

WELDING FIXTURES TARILER ASSEMBLY CNH-WINDALS

Page 66: SDE PRESENTATION PUNE PLANT

L0509453 WIRE FRAME CHECKING FIXTURE-DSC

Page 67: SDE PRESENTATION PUNE PLANT

Contact: S.P.Mishra SBU Head Mob:08806839421 [email protected]