1
SD_092106_54 W_UTM14_AERIAL_15427 W_SD_AERIAL_008 W_UTM14_11012 SSC2SDSA003 S_UTM14_SD_020 W_UTM14_11012 2210+00 2225+44 2278+20 2330+94 2340+00 ML-SD-DY-0576.0000 ML-SD-DY-0577.0000 ML-SD-DY-0579.0000 ML-SD-DY-0581.0000 ML-SD-DY-0583.0000 ML-SD-DY-0585.0000 2 30" O.D. X 0.386" W.T., API -5LX-70 W/FBE COATING 3 30" O.D. X 0.516" W.T., API -5LX-70 W/FBE COATING & 2211+35 2341+45 MATCHLINE 2210+00 MATCHLINE 2340+00 AS-BUILT ALIGNMENT 1. THE MAXIMUM OPERATING PRESSURE (MOP) IS 1440 PSIG. 2. THE MINIMUM TEST PRESSURE WAS 1801 PSIG. LOYS ALVIN GRAY, III ML-SD-DY-0576.0000 COUNTY ROAD 18 (141ST STREET) NATURAL GROUND TOP OF PIPE AS-BUILT ALIGNMENT 1. THE MAXIMUM OPERATING PRESSURE (MOP) IS 1440 PSIG. 2. THE MINIMUM TEST PRESSURE WAS 1801 PSIG. KEYSTONE MAINLINE (NPS 30 2008) LUDDEN SECTION SPREAD 2A DISCIPLINE 03 SHEET 18 OF 19 SHEETS STA. 2211+35 TO STA. 2341+45 UEI LOYS ALVIN GRAY, III SD CE9004 1832 1832-03-ML-02-018 2 2217+64 FENCE 2219+63 P.I. 00°42'22" LT. 2223+13 P.I. 00°49'26" RT. 2226+24 FENCE 2229+18 P.I. 00°14'56" RT. 2249+40 BEGIN SLOUGH 2249+81 CL SLOUGH 2250+40 END SLOUGH 2252+96 EDGE OF ROAD 2253+09 CL 140TH STREET 2253+21 EDGE OF ROAD 2253+30 FENCE 2274+94 P.I. 07°02'01" RT. 2275+23 P.I. 02°34'23" RT. 2278+72 P.I. 05°02'47" RT., 2279+56 FENCE 2280+57 WATER EDGE 2280+63 CL MUD CREEK 2280+71 WATER EDGE 2292+10 P.I. 01°34'08" LT. 2298+60 P.I. 05°47'41" RT. 2303+84 P.I. 03°25'23" RT. 2304+64 P.I. 03°16'56" LT. 2305+73 FIBER OPTIC CABLE 2305+90 EDGE OF ROAD 2306+02 CL COUNTY ROAD 18 2306+14 EDGE OF ROAD 2306+38 NORTHERN NATURAL 2306+97 P.I. 03°31'12" LT. 2316+00 BEGIN SLOUGH 2317+45 CL SLOUGH 2318+39 END SLOUGH 2339+63 P.I. 00°18'26" RT. 2339+94 BEGIN DRAIN 2340+07 CL DRAIN 2340+22 END DRAIN 2216+30 FENCE 2218+28 P.I. 00°42'22" LT. 2221+77 P.I. 00°49'26" RT. 2224+88 FENCE 2227+81 P.I. 00°14'56" RT. 2230+88 P.I. 00°46'04" LT. 2237+98 P.I. 00°03'17" LT. 2247+50 P.I. 00°03'60" RT. 2248+02 BEGIN SLOUGH 2248+44 CL SLOUGH 2249+02 END SLOUGH 2251+58 EDGE OF ROAD 2251+71 CL 140TH STREET 2251+83 EDGE OF ROAD 2251+92 FENCE 2273+55 P.I. 07°02'01" RT. 2273+84 P.I. 02°34'23" RT. 2278+16 FENCE 2279+16 WATER EDGE 2279+22 CL MUD CREEK 2279+30 WATER EDGE 2280+49 P.I. 08°38'15" LT. 2281+22 P.I. 09°46'51" LT. 2290+68 P.I. 01°34'08" LT. 2297+18 P.I. 05°47'41" RT. 2302+41 P.I. 03°25'23" RT. 2303+22 P.I. 03°16'56" LT. 2304+30 FIBER OPTIC CABLE 2304+47 EDGE OF ROAD 2304+59 CL COUNTY ROAD 18 2304+71 EDGE OF ROAD 2304+95 NORTHERN NATURAL 2305+54 P.I. 03°31'12" LT. 2306+26 P.I. 03°15'57" RT. 2314+56 BEGIN SLOUGH 2316+02 CL SLOUGH 2316+95 END SLOUGH 2324+39 P.I. 00°07'56" LT. 2338+18 P.I. 00°18'26" RT. 2338+49 BEGIN DRAIN 2338+62 CL DRAIN 2338+77 END DRAIN MP 260 MP 259 5,215' FBE 2 110' FBE & ARO BR. 3 2305+64 2306+74 4,134' FBE 2 80' FBE & ARO O.C. 3 2252+69 2253+49 3,471' FBE 2 COUNTY ROAD 18 RD-SD-DY-0581.0000 2304+59 140TH STREET 140TH STREET RD-SD-DY-0577.0000 2251+71 MATCHLINE 2211+35 MATCHLINE 2341+45 ML-SD-DY-0577.0000 ML-SD-DY-0579.0000 ML-SD-DY-0581.0000 ML-SD-DY-0583.0000 ML-SD-DY-0585.0000 MUD CREEK 12,820' 190' 2217+33 9.2' CVR. 2220+11 5.5' CVR. 2221+72 8.4' CVR. 2228+61 5.3' CVR. 2264+57 6.4' CVR. 2280+46 8.1' CVR. 2282+88 4.5' CVR. 2288+19 6.0' CVR. 2305+59 4.5' CVR. 6.0' CVR. 2313+12 4.9' CVR. 2316+39 6.6' CVR. 2335+64 5.3' CVR. PIPELINE WARNING SIGNS 4 EA CATHODIC TEST STATION 1 EA AERIAL MARKER 1 EA PIPELINE MARKERS 0 EA 2280+78 2283+38 2219+29 2219+55 2315+92 2318+31 ABRASION RESISTANT OVERCOAT (141ST STREET) (141ST STREET) (141ST STREET) 2232+25 P.I. 00°46'04" LT. 2239+35 P.I. 00°03'17" LT. 2248+88 P.I. 00°03'60" RT. 2277+33 P.I. 05°02'47" RT. 2281+90 P.I. 08°38'15" LT. 2282+63 P.I. 09°46'51" LT. 2307+69 P.I. 03°15'57" RT. 2325+83 P.I. 00°07'56" LT. (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) MATCHLINE 2340+00 MATCHLINE 2210+00 2316+03 P.I. 00°15'18" RT. 2317+47 P.I. 00°15'18" RT. 2218+28 P.I. 00°42'22" LT. 2221+77 P.I. 00°49'26" RT. 2227+81 P.I. 00°14'56" RT. 2230+88 P.I. 00°46'04" LT. 2237+98 P.I. 00°03'17" LT. 2247+50 P.I. 00°03'60" RT. 2273+55 P.I. 07°02'01" RT. 2273+84 P.I. 02°34'23" RT. 2280+49 P.I. 08°38'15" LT. 2281+22 P.I. 09°46'51" LT. 2290+68 P.I. 01°34'08" LT. 2297+18 P.I. 05°47'41" RT. 2302+41 P.I. 03°25'23" RT. 2303+22 P.I. 03°16'56" LT. 2305+54 P.I. 03°31'12" LT. 2306+26 P.I. 03°15'57" RT. 2324+39 P.I. 00°07'56" LT. 2338+18 P.I. 00°18'26" RT. 2277+33 P.I. 05°02'47" RT. 2316+03 P.I. 00°15'18" RT. LAT. 45.364801 LONG. -97.950394 LAT. 45.350325 LONG. -97.950225 MP 261 LAT. 45.335911 LONG. -97.95023 2327+07 M.P. 261 2274+27 M.P. 260 2221+47 M.P. 259 (24) (24) TEST SECTION 3B-1 ILTO-024-2010 11) TO DETERMINE THE MILE POST AT A GIVEN LOCATION, ADD THE 3D STATION NUMBER FROM THIS SEGMENT TO STATION NUMBER 11453+73 AND DIVIDE BY 5280. 5.2' CVR. CLR. UNK. (ABOVE) GAS PIPELINE 7.5' CVR. M.P. 258.81 TO M.P. 261.27 FOR CONTINUATION SEE DWG. 1832-03-ML-02-017 FOR CONTINUATION SEE DWG. 1832-03-ML-02-019 10/02/01 1) ALL CHAINAGES ARE IN FEET UNLESS OTHERWISE SPECIFIED. 2) DATUM ELEVATION AND PROJECTION ARE BASED ON MEAN SEA LEVEL AND NAD 83. 3) FIELD PIPE LOCATING REQUIRED TO DETERMINE PLACEMENT OF PIPELINE WITHIN PERMANENT EASEMENT. 4) UNLESS OTHERWISE NOTED, 48 INCHES MINIMUM COVER EXCEPT 36 INCHES IN AREAS OF CONSOLIDATED ROCK. 5) NO ACTUAL AS-BUILT GROUND SHOTS WERE TAKEN AT THIS LOCATION. THE PROFILE REPRESENTS A PROJECTION FROM SHOTS TAKEN AT 150' TO 250' INTERVALS. 8) ORIGINAL IN-SERVICE DATE OF THE KEYSTONE PIPELINE (PHASE 1): JUNE 30, 2010. 9) CPS CALCULATION DATE: MAY 2010. 10) ORION STATION SERIES NUMBER: 1182700. 6) THE TYPE OF COATING APPLIED TO THE FIELD WELDS DURING THE ORIGINAL CONSTRUCTION WAS TWO COMPONENT LIQUID EPOXY. THE COATING PRODUCTS USED WERE DENSO 7200 OR SPC SP-2888. 7) THE SUBSTANTIAL CONSTRUCTION COMPLETION DATE, BASED ON CALIPER PIG RUN, WAS SEPTEMBER 01, 2009 FOR M.P. 195.68 TO M.P. 218.50, SEPTEMBER 02, 2009 FOR M.P. 218.50 TO M.P. 259.00 AND OCTOBER 08, 2009 FOR M.P. 259.21 TO M.P. 301.75. AMSDEN LAKE TRIB. GAS PIPELINE 7.0' CVR. 3.5' CLR. (ABOVE) TEST SECTION 2A-4 ILTO-024-2010 2251+96 260

SD1832-018 1832-18 (1) · 2012. 4. 16. · 2 30" o.d. x 0.386" w.t., api -5lx-70 w/fbe coating 3 30" o.d. x 0.516" w.t., api -5lx-70 w/fbe coating & 2 211 + 35 2 341 + 45 m a t c

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • SD_092106_54

    W_UTM14_AERIAL_15427

    W_SD_AERIAL_008

    W_UTM14_11012SSC2SDSA003

    S_UTM14_SD_020

    W_UTM14_11012

    2210

    +00

    2225

    +44

    2278

    +20

    2330

    +94

    2340

    +00

    ML-SD-DY-0576.0000 ML-SD-DY-0577.0000 ML-SD-DY-0579.0000 ML-SD-DY-0581.0000 ML-SD-DY-0583.0000 ML-SD-DY-0585.0000

    2 30" O.D. X 0.386" W.T., API -5LX-70 W/FBE COATING3 30" O.D. X 0.516" W.T., API -5LX-70 W/FBE COATING &

    2211

    +35

    2341

    +45

    MAT

    CH

    LIN

    E

    221

    0+00

    MAT

    CH

    LIN

    E 2

    340+

    00

    AS-BUILT ALIGNMENT

    1. THE MAXIMUM OPERATING PRESSURE (MOP) IS 1440 PSIG.2. THE MINIMUM TEST PRESSURE WAS 1801 PSIG.

    LOYS ALVIN GRAY, III

    ML-SD-DY-0576.0000 CO

    UN

    TY R

    OA

    D 1

    8 (1

    41S

    T S

    TRE

    ET)

    NATURAL GROUND

    TOP OF PIPE

    AS-BUILT ALIGNMENT

    1. THE MAXIMUM OPERATING PRESSURE (MOP) IS 1440 PSIG.2. THE MINIMUM TEST PRESSURE WAS 1801 PSIG.

    KEYSTONE MAINLINE (NPS 30 2008) LUDDEN SECTION

    SPREAD 2A DISCIPLINE 03

    SHEET 18 OF 19 SHEETS

    STA. 2211+35 TO STA. 2341+45

    UEI

    LOYS ALVIN GRAY, III SD CE9004

    1832

    1832-03-ML-02-018 2

    2217

    +64

    FE

    NC

    E

    2219

    +63

    P.I.

    00°

    42'2

    2" L

    T.

    2223

    +13

    P.I.

    00°

    49'2

    6" R

    T.

    2226

    +24

    FE

    NC

    E

    2229

    +18

    P.I.

    00°

    14'5

    6" R

    T.

    2249

    +40

    BE

    GIN

    SLO

    UG

    H22

    49+8

    1 C

    L S

    LOU

    GH

    2250

    +40

    EN

    D S

    LOU

    GH

    2252

    +96

    ED

    GE

    OF

    RO

    AD

    2253

    +09

    CL

    140T

    H S

    TRE

    ET

    2253

    +21

    ED

    GE

    OF

    RO

    AD

    2253

    +30

    FE

    NC

    E

    2274

    +94

    P.I.

    07°

    02'0

    1" R

    T.22

    75+2

    3 P

    .I. 0

    2°34

    '23"

    RT.

    2278

    +72

    P.I.

    05°

    02'4

    7" R

    T.,

    2279

    +56

    FE

    NC

    E

    2280

    +57

    WA

    TER

    ED

    GE

    2280

    +63

    CL

    MU

    D C

    RE

    EK

    2280

    +71

    WA

    TER

    ED

    GE

    2292

    +10

    P.I.

    01°

    34'0

    8" L

    T.

    2298

    +60

    P.I.

    05°

    47'4

    1" R

    T.

    2303

    +84

    P.I.

    03°

    25'2

    3" R

    T.23

    04+6

    4 P

    .I. 0

    3°16

    '56"

    LT.

    2305

    +73

    FIB

    ER

    OP

    TIC

    CA

    BLE

    2305

    +90

    ED

    GE

    OF

    RO

    AD

    2306

    +02

    CL

    CO

    UN

    TY R

    OA

    D 1

    8

    2306

    +14

    ED

    GE

    OF

    RO

    AD

    2306

    +38

    NO

    RTH

    ER

    N N

    ATU

    RA

    L

    2306

    +97

    P.I.

    03°

    31'1

    2" L

    T.

    2316

    +00

    BE

    GIN

    SLO

    UG

    H

    2317

    +45

    CL

    SLO

    UG

    H

    2318

    +39

    EN

    D S

    LOU

    GH

    2339

    +63

    P.I.

    00°

    18'2

    6" R

    T.23

    39+9

    4 B

    EG

    IN D

    RA

    IN23

    40+0

    7 C

    L D

    RA

    IN23

    40+2

    2 E

    ND

    DR

    AIN

    2216

    +30

    FE

    NC

    E

    2218

    +28

    P.I.

    00°

    42'2

    2" L

    T.

    2221

    +77

    P.I.

    00°

    49'2

    6" R

    T.

    2224

    +88

    FE

    NC

    E

    2227

    +81

    P.I.

    00°

    14'5

    6" R

    T.

    2230

    +88

    P.I.

    00°

    46'0

    4" L

    T.

    2237

    +98

    P.I.

    00°

    03'1

    7" L

    T.

    2247

    +50

    P.I.

    00°

    03'6

    0" R

    T.22

    48+0

    2 B

    EG

    IN S

    LOU

    GH

    2248

    +44

    CL

    SLO

    UG

    H22

    49+0

    2 E

    ND

    SLO

    UG

    H

    2251

    +58

    ED

    GE

    OF

    RO

    AD

    2251

    +71

    CL

    140T

    H S

    TRE

    ET

    2251

    +83

    ED

    GE

    OF

    RO

    AD

    2251

    +92

    FE

    NC

    E

    2273

    +55

    P.I.

    07°

    02'0

    1" R

    T.22

    73+8

    4 P

    .I. 0

    2°34

    '23"

    RT.

    2278

    +16

    FE

    NC

    E

    2279

    +16

    WA

    TER

    ED

    GE

    2279

    +22

    CL

    MU

    D C

    RE

    EK

    2279

    +30

    WA

    TER

    ED

    GE

    2280

    +49

    P.I.

    08°

    38'1

    5" L

    T.22

    81+2

    2 P

    .I. 0

    9°46

    '51"

    LT.

    2290

    +68

    P.I.

    01°

    34'0

    8" L

    T.

    2297

    +18

    P.I.

    05°

    47'4

    1" R

    T.

    2302

    +41

    P.I.

    03°

    25'2

    3" R

    T.23

    03+2

    2 P

    .I. 0

    3°16

    '56"

    LT.

    2304

    +30

    FIB

    ER

    OP

    TIC

    CA

    BLE

    2304

    +47

    ED

    GE

    OF

    RO

    AD

    2304

    +59

    CL

    CO

    UN

    TY R

    OA

    D 1

    8

    2304

    +71

    ED

    GE

    OF

    RO

    AD

    2304

    +95

    NO

    RTH

    ER

    N N

    ATU

    RA

    L

    2305

    +54

    P.I.

    03°

    31'1

    2" L

    T.23

    06+2

    6 P

    .I. 0

    3°15

    '57"

    RT.

    2314

    +56

    BE

    GIN

    SLO

    UG

    H

    2316

    +02

    CL

    SLO

    UG

    H

    2316

    +95

    EN

    D S

    LOU

    GH

    2324

    +39

    P.I.

    00°

    07'5

    6" L

    T.

    2338

    +18

    P.I.

    00°

    18'2

    6" R

    T.23

    38+4

    9 B

    EG

    IN D

    RA

    IN23

    38+6

    2 C

    L D

    RA

    IN23

    38+7

    7 E

    ND

    DR

    AIN

    MP260

    MP259

    5,215' FBE

    2 110'FBE & ARO BR.

    3

    2305

    +64

    2306

    +74

    4,134' FBE

    2 80'FBE & ARO O.C.

    3

    2252

    +69

    2253

    +49

    3,471' FBE

    2

    CO

    UN

    TY R

    OA

    D 1

    8R

    D-S

    D-D

    Y-0

    581.

    0000

    2304+59

    140T

    H S

    TRE

    ET

    140T

    H S

    TRE

    ET

    RD

    -SD

    -DY

    -057

    7.00

    00

    2251+71

    MA

    TCH

    LIN

    E 2

    211+

    35

    MA

    TCH

    LIN

    E 2

    341+

    45

    ML-SD-DY-0577.0000 ML-SD-DY-0579.0000

    ML-SD-DY-0581.0000

    ML-SD-DY-0583.0000

    ML-SD-DY-0585.0000

    MUD CREEK

    12,820'190'

    2217

    +33

    9.2

    ' CV

    R.

    2220

    +11

    5.5

    ' CV

    R.

    2221

    +72

    8.4

    ' CV

    R.

    2228

    +61

    5.3

    ' CV

    R.

    2264

    +57

    6.4

    ' CV

    R.

    2280

    +46

    8.1

    ' CV

    R.

    2282

    +88

    4.5

    ' CV

    R.

    2288

    +19

    6.0

    ' CV

    R.

    2305

    +59

    4.5

    ' CV

    R.

    6

    .0' C

    VR

    .

    2313

    +12

    4.9

    ' CV

    R.

    2316

    +39

    6.6

    ' CV

    R.

    2335

    +64

    5.3

    ' CV

    R.

    PIPELINE WARNING SIGNS 4 EACATHODIC TEST STATION 1 EAAERIAL MARKER 1 EA

    PIPELINE MARKERS 0 EA

    2280

    +78

    2283

    +38

    2219

    +29

    22

    19+5

    5

    2315

    +92

    2318

    +31

    ABRASION RESISTANT OVERCOAT

    (141

    ST

    STR

    EE

    T)(1

    41S

    T S

    TRE

    ET)

    (141

    ST

    STR

    EE

    T)

    2232

    +25

    P.I.

    00°

    46'0

    4" L

    T.

    2239

    +35

    P.I.

    00°

    03'1

    7" L

    T.

    2248

    +88

    P.I.

    00°

    03'6

    0" R

    T.

    2277

    +33

    P.I.

    05°

    02'4

    7" R

    T.

    2281

    +90

    P.I.

    08°

    38'1

    5" L

    T.22

    82+6

    3 P

    .I. 0

    9°46

    '51"

    LT.

    2307

    +69

    P.I.

    03°

    15'5

    7" R

    T.

    2325

    +83

    P.I.

    00°

    07'5

    6" L

    T.

    (BA

    RB

    ED

    WIR

    E)

    (BA

    RB

    ED

    WIR

    E)

    (BA

    RB

    ED

    WIR

    E)

    (BA

    RB

    ED

    WIR

    E)

    (BA

    RB

    ED

    WIR

    E)

    (BA

    RB

    ED

    WIR

    E)

    (BA

    RB

    ED

    WIR

    E)

    (BA

    RB

    ED

    WIR

    E)

    MA

    TCH

    LIN

    E 2

    340+

    00

    MA

    TCH

    LIN

    E 2

    210+

    00

    2316

    +03

    P.I.

    00°

    15'1

    8" R

    T.23

    17+4

    7 P

    .I. 0

    0°15

    '18"

    RT.

    2218

    +28

    P.I.

    00°

    42'2

    2" L

    T.

    2221

    +77

    P.I.

    00°

    49'2

    6" R

    T.

    2227

    +81

    P.I.

    00°

    14'5

    6" R

    T.

    2230

    +88

    P.I.

    00°

    46'0

    4" L

    T.

    2237

    +98

    P.I.

    00°

    03'1

    7" L

    T.

    2247

    +50

    P.I.

    00°

    03'6

    0" R

    T.

    2273

    +55

    P.I.

    07°

    02'0

    1" R

    T.22

    73+8

    4 P

    .I. 0

    2°34

    '23"

    RT.

    2280

    +49

    P.I.

    08°

    38'1

    5" L

    T.22

    81+2

    2 P

    .I. 0

    9°46

    '51"

    LT.

    2290

    +68

    P.I.

    01°

    34'0

    8" L

    T.

    2297

    +18

    P.I.

    05°

    47'4

    1" R

    T.

    2302

    +41

    P.I.

    03°

    25'2

    3" R

    T.23

    03+2

    2 P

    .I. 0

    3°16

    '56"

    LT.

    2305

    +54

    P.I.

    03°

    31'1

    2" L

    T.

    2306

    +26

    P.I.

    03°

    15'5

    7" R

    T.

    2324

    +39

    P.I.

    00°

    07'5

    6" L

    T.

    2338

    +18

    P.I.

    00°

    18'2

    6" R

    T.

    2277

    +33

    P.I.

    05°

    02'4

    7" R

    T.

    2316

    +03

    P.I.

    00°

    15'1

    8" R

    T.

    LAT. 45.364801LONG. -97.950394

    LAT. 45.350325LONG. -97.950225

    MP261 LAT. 45.335911LONG. -97.95023

    2327

    +07

    M.P

    . 261

    2274

    +27

    M.P

    . 260

    2221

    +47

    M.P

    . 259

    (24) (24)

    TEST SECTION 3B-1ILTO-024-2010

    11) TO DETERMINE THE MILE POST AT A GIVEN LOCATION, ADD THE 3D STATION NUMBER FROM THIS SEGMENT TO STATION NUMBER 11453+73 AND DIVIDE BY 5280.

    5.2'

    CV

    R.

    CLR

    . UN

    K. (

    AB

    OV

    E)

    G

    AS

    PIP

    ELI

    NE

    7

    .5' C

    VR

    .

    M.P. 258.81 TO M.P. 261.27

    FOR

    CO

    NTI

    NU

    ATIO

    N S

    EE

    DW

    G.

    1832

    -03-

    ML-

    02-0

    17

    FOR

    CO

    NTI

    NU

    ATIO

    N S

    EE

    DW

    G.

    1832

    -03-

    ML-

    02-0

    19

    10/02/01

    1) ALL CHAINAGES ARE IN FEET UNLESS OTHERWISE SPECIFIED.

    2) DATUM ELEVATION AND PROJECTION ARE BASED ON MEAN SEA LEVEL AND NAD 83.

    3) FIELD PIPE LOCATING REQUIRED TO DETERMINE PLACEMENT OF PIPELINE WITHIN PERMANENT EASEMENT.

    4) UNLESS OTHERWISE NOTED, 48 INCHES MINIMUM COVER EXCEPT 36 INCHES IN AREAS OF CONSOLIDATED ROCK.

    5) NO ACTUAL AS-BUILT GROUND SHOTS WERE TAKEN AT THIS LOCATION. THE PROFILE REPRESENTS A PROJECTION FROM SHOTS TAKEN AT 150' TO 250' INTERVALS.

    8) ORIGINAL IN-SERVICE DATE OF THE KEYSTONE PIPELINE (PHASE 1): JUNE 30, 2010.

    9) CPS CALCULATION DATE: MAY 2010.

    10) ORION STATION SERIES NUMBER: 1182700.

    6) THE TYPE OF COATING APPLIED TO THE FIELD WELDS DURING THE ORIGINAL CONSTRUCTION WAS TWO COMPONENT LIQUID EPOXY. THE COATING PRODUCTS USED WERE DENSO 7200 OR SPC SP-2888.

    7) THE SUBSTANTIAL CONSTRUCTION COMPLETION DATE, BASED ON CALIPER PIG RUN, WAS SEPTEMBER 01, 2009 FOR M.P. 195.68 TO M.P. 218.50, SEPTEMBER 02, 2009 FOR M.P. 218.50 TO M.P. 259.00 AND OCTOBER 08, 2009 FOR M.P. 259.21 TO M.P. 301.75.

    AMSDEN LAKE TRIB.

    G

    AS

    PIP

    ELI

    NE

    7

    .0' C

    VR

    .

    3.5

    ' CLR

    . (A

    BO

    VE

    )

    TEST SECTION 2A-4ILTO-024-2010 2251+96

    260