Upload
scott-stoops
View
224
Download
2
Embed Size (px)
DESCRIPTION
Â
Citation preview
ScottStoopS p o r t f o l i o
ExpEriEncEMANICA ARCHITECTURE: 1915 West 43rd Avenue, Kansas City, Kansas 66103, Architecture Intern, May 2014 - December 2014
Golden State Warriors New Arena: I was an integral team member from concept through the end of schematic design. As a team member, I helped make the Project Designer’s concepts and sketches reality by drafting, picking up red-lines, and small design tasks. I developed and managed matrices and diagrams for pre permitting documents. I arranged and drafted the main and upper concourses.
Development of Proprietary Concepts: I was the leader of a team that updated a proprietary modular stadium design concept into Revit. We created fully scheduled modular units and arrangement diagrams to facilitate a streamlined, modular design process. I led the team in developing presentations for internal use and marketing for the concept.
KWIKSHOP, 4841 West 6th Street, Lawrence, Kansas, 66049, Clerk, June 2010 - May 2014
rEsumE
EducationTHE UNIVERSITY OF KANSAS, Master of Architecture Degree, Expected Graduation: May 2015
skillsAutoCAD: 7 months professional experience and a design-build projectRevit: 4 collaborative projects and many individual studiosSketchup: 7 months professional experience in collaborative modellingOther Notable Proficiencies:3D Studio Max + Vray, Photoshop, InDesign, Microsoft Office, FloVENT, PC
intErEstsBIM Applications, Three-Dimensional Visualization, Architectural Photography
awardsThe Architects Newspaper Best of Design 2013, Student-Built Honorable Mention, Dirt Works Studio 2013, KU Field Station Gateway
HUD Innovation in Affordable Housing 2014, Merit Award, Arch 609 2014, CHWC Affordable Sustainablility House
Stud
ent w
ork
lawrence performing
artS center
ku field Station gateway
lawrence public library
Jayhawk blvd buS Stop
topeka energy houSe
pro
feSS
ion
al w
ork
Seed concept Stadium
golden State warriorS new arena
lawrence performing artS center
The Lawrence Performing Arts Center and Operatic Theatre is the 110,000 square foot home of the Free State Opera Company. The building houses all of the spaces and shops for the producing opera company. A 300-car parking garage is included to serve the busy massachusetts street downtown district and accommodate patrons. The performing arts center is centered around the 1,200-seat opera theatre, and the 400-seat recital hall it contains.
In conceiving the form for this project, my partner and I took on the challenge of creating a megastructure to combine the seemingly disparate uses of the building. A large orange bulb floats over the lobby and recital hall. The tension of the space between the opera theatre and recital hall creates a new level of intrigue in the lobby, the social reason for this building.
ma
SS. S
tree
t do
wn
tow
n d
iStr
ict
old
weS
t la
wre
nc
e reS
iden
tial d
iStr
ict
The building faces south to welcome patrons from the downtown district. The parking garage orients itself to the north to welcome traffic off of sixth street and I-70.
lobby level and landScape
north elevation South elevation
weSt elevation
eaSt elevation
recital hall balcony level orcheStra level
firSt balcony level top balcony level
The form is dominated by three distinct parts: the infrastructural role of the parking garage, the rigid programatic stage and backstage mass, and the more expressive auditoria and lobby.
longitudinal Section
The overlapping panels and backlighting articulate the surfaces and help distribute sound throughout the recital hall. When the lights dim, the space is the perfect backdrop for an ensemble performance.
The vertical circulation becomes a prominent formal gesture and provides performing arts patrons with space to see and be seen.
ku field Station gateway
ku field Station gateway
The KU Field Station Gateway was a Dirt Works Studio design-build project. In this studio I was faced with a new series of challenges: a client, a budget, and a 16-person design team. The gateway was designed and built in one semester, was completed under the $8,000 budget, and was delivered on time. The project delivers in its demarkation of place by separating the public and private space, and through its layers of signage. I was awarded the position of head project architect, as such I was in charge of the synthesis of ideas that led to the project’s design as well as the production of construction documents.
The gateway’s form was derived from the ecotone that the project lies on, a division of nature, and a division of property. With a material palate of earth and forest, the rammed earth wall emerges from the earth of the prairie as a wide mass and reaches into the trees of the forest to a slender, wood-capped peak.
The stabilized rammed earth wall was optimized to use the least cement possible by supplementing fly ash in its place. The wall is capped by a shou-sugi-ban style cedar scupper fastened with stainless steel nuts.
This design-build project allowed me to experiment with materials, taught me about the iterative process of design, and gave me leadership experience. As the head designer I was asked to lead many steps along the way; I coordinated our concrete work, lead the steel team that reinvented the cattle gate, and headed the masonry team. I learned how much a project can change from conception to completion. As a team, we faced many challenges and had to devise strategies for how to overcome them. The KU Field Station Gateway project was the first time I took on a leadership role in an architectural setting; this studio gave me a taste of what it would be like as a project team leader in the profession.
golden State warriorS new arena
golden State warriorS arena
A new arena for the Golden State Warriors has been in development since mid-2013 and has undergone many design and personnel changes. I was a member of the project team from the end of concept design through the end of schematic design. At MANICA Architecture, a firm of 7-15 people, everyone’s input is considered and everyone takes an active role in the formation of the design. The 18,000-seat event center and arena is only part of the 11 acre, 1.5 million square foot development. Two mid-rise office/retail towers flank a large public plaza in front of the event center. A smaller restaurant and retail building faces the bay. All of this sits on a multi-level at-grade and below-grade parking facility for nearly 950 cars.
The Golden State Warriors hope to not only build a state-of-the-art event center capable of housing NBA games and concert events, they want to provide an avenue for growth in the booming Mission Bay South neighborhood. The project will trigger the completion of the bayside park and other infrastructure improvements as well as providing high-end office space to the overflowing business community.
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 9
EXECUTIVE SUMMARY
Access to 450 South St. Garage
Park
P22
Par
k P
22
PROJECT LOCATION
Fig. 4 Fig. 5
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 9
EXECUTIVE SUMMARY
Access to 450 South St. Garage
Park
P22
Par
k P
22
PROJECT LOCATION
Fig. 4 Fig. 5
San franciSco
One of the key milestones for this project was the completion of the major phase document that coincided with the end of the schematic design phase. This document is the first step in a long process for city zoning approval and permitting. For this document, I developed and managed many diagrams and matrices. I learned about the politics of large scale architecture through one of the most political projects in the country.
MISSION BAY MAJOR PHASE APPLICATIONB l o c k s 2 9 - 3 2
T H E G O L D E N S TAT E W A R R I O R S E V E N T C E N T E R A N D M I X E D U S E D E V E L O P M E N T
Pre-Submittal Draft Major Phase Application submitted by the Golden State Warriors to the Office of Community Investment and Infrastructure on December 10, 2014.
Fig. 1
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 35
SITE PLANS
PEDESTRIAN STAGING AREAS AND CIRCULATION
Open path of travelPath through building interior
LEGENDSite perimeter: Post-event pedestrian queuing space Site interior: Pedestrian Circulation and Access Options
16 ft
12.5 ft
12.5 ft
4,050 ft2 10,870 ft29 ft
37 ft
1,165 ft2
24 ft
5,480 ft2
4,850 ft2
35 ft
92 ft
33 ft
86 ft
12 ft18 ft45 ft
P22
P22
Fig. 28 Fig. 29 MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 48
Fig. 45
Elevation Comparison
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
OFFICE/RETAIL PARKING ARENA TRUCK DOCK
PRACTICE FACILITY
ARENA
ILLUSTRATIVE MATERIALS
MISSION BAY MAJOR PHASE APPLICATIONB l o c k s 2 9 - 3 2
T H E G O L D E N S TAT E W A R R I O R S E V E N T C E N T E R A N D M I X E D U S E D E V E L O P M E N T
Pre-Submittal Draft Major Phase Application submitted by the Golden State Warriors to the Office of Community Investment and Infrastructure on December 10, 2014.
Fig. 1
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 35
SITE PLANS
PEDESTRIAN STAGING AREAS AND CIRCULATION
Open path of travelPath through building interior
LEGENDSite perimeter: Post-event pedestrian queuing space Site interior: Pedestrian Circulation and Access Options
16 ft
12.5 ft
12.5 ft
4,050 ft2 10,870 ft29 ft
37 ft
1,165 ft2
24 ft
5,480 ft2
4,850 ft2
35 ft
92 ft
33 ft
86 ft
12 ft18 ft45 ft
P22
P22
Fig. 28 Fig. 29
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 66
DEVELOPMENT CHARACTER
ILLUSTRATIVE MATERIALS
Fig. 64: Concept Sketch from Southwest Corner – 16th Street Office and Main Plaza Ramp
reSponSibilitieS
My personal responsibilities while on this project were on many facets, with different software, and at varying scales. Early in the development of the current scheme, I modeled the project in Sketchup and integrated daily changes from the design team at large. Implementing a new sheet process for the office in AutoCAD considerably reduced the time spent picking up red-lines and printing. Throughout the project I picked up red-lines and helped maintain the master area matrix.
Over time I became an integral member of the arena design team. Arranging several program spaces on the event level, including staff lockers, event lockers, and media spaces, I was able to gain knowledge of the NBA Arena Standards. I laid out the visitor amenities on the main and upper concourses, updating fixture matrices and keeping the building compliant with the NBA Arena Standards and the California Building Code based on the changing design and seating numbers. Maintaining the section parti and elevation comparison diagram throughout the project helped illustrate the different floors.
As a member of the major phase document team I helped incorporate comments and produce content. Creating the graphic site plan helped the documents diverse diagrams have a cohesive look. I produced illustrative building sections for the arena and the office towers. Creating and maintaining matrices became one of my tasks to help keep the document on schedule.
I was in charge of drafting documents for mock-ups of the luxury products to be built for sales purposes, as well as designing and preparing drawings for the sales center that will be used to sell the luxury products of the event center.
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 50
Event Level / Subgrade Level 1 Parking
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Subgrade Parking Level 1: Middle parking level and loading dock level, located at -10’0’’Practice Court: Floor of Golden State Warriors Practice Facilities, located at -14’0’’ Event Level: Floor of the basketball court a significant back-of-house and guest amenity space within the Event Center, located at -6’0’’
ILLUSTRATIVE MATERIALS
Fig. 47
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 51
Ground Level / Upper Parking
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Entry Plaza: Southeast plaza below the proscenium gateway, located at grade on Terry Francois Boulevard
ILLUSTRATIVE MATERIALS
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
Fig. 48
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 50
Event Level / Subgrade Level 1 Parking
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Subgrade Parking Level 1: Middle parking level and loading dock level, located at -10’0’’Practice Court: Floor of Golden State Warriors Practice Facilities, located at -14’0’’ Event Level: Floor of the basketball court a significant back-of-house and guest amenity space within the Event Center, located at -6’0’’
ILLUSTRATIVE MATERIALS
Fig. 47
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 51
Ground Level / Upper Parking
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Entry Plaza: Southeast plaza below the proscenium gateway, located at grade on Terry Francois Boulevard
ILLUSTRATIVE MATERIALS
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
Fig. 48
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 52
Plaza Level / Event Center Mezzanine and Offices
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Mezzanine: Level at which guests enter the Event Center from the Main Plaza, located at +10’0’’
ILLUSTRATIVE MATERIALS
Fig. 49
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 53
Event Center Main Concourse Level
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Main Concourse: Primary access to Event Center’s GA lower seating bowl, located at +26’0’’
ILLUSTRATIVE MATERIALS
Fig. 50
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 53
Event Center Main Concourse Level
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Main Concourse: Primary access to Event Center’s GA lower seating bowl, located at +26’0’’
ILLUSTRATIVE MATERIALS
Fig. 50
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 52
Plaza Level / Event Center Mezzanine and Offices
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Mezzanine: Level at which guests enter the Event Center from the Main Plaza, located at +10’0’’
ILLUSTRATIVE MATERIALS
Fig. 49
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 54
Event Center Suite Level
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Suite Level: Traditional Suite seating options for Event Center attendees, located at +39’0’’Food Hall Roof: Roof height of the northeast corner structure will measure +41’0’’
ILLUSTRATIVE MATERIALS
Fig. 51
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 55
Event Center Theater / Loge Level
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Loge Level: Theater Box seating options for Event Center attendees, located at +51’0’’
ILLUSTRATIVE MATERIALS
Fig. 52
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 54
Event Center Suite Level
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Suite Level: Traditional Suite seating options for Event Center attendees, located at +39’0’’Food Hall Roof: Roof height of the northeast corner structure will measure +41’0’’
ILLUSTRATIVE MATERIALS
Fig. 51
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 55
Event Center Theater / Loge Level
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Loge Level: Theater Box seating options for Event Center attendees, located at +51’0’’
ILLUSTRATIVE MATERIALS
Fig. 52
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 56
Event Center Upper Concourse / Offices Level
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Upper Concourse: Primary access to Event Center upper seating bowl, located at +63’0’’
ILLUSTRATIVE MATERIALS
Fig. 53
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 57
Bayfront Terrace / Offices Level
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Bayfront Terrace: Floors of the elevated Bayfront Terrace, located at approximately +76’0’’ (lower level) and +100’0’’ (upper level)
ILLUSTRATIVE MATERIALS
Fig. 54
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 57
Bayfront Terrace / Offices Level
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Bayfront Terrace: Floors of the elevated Bayfront Terrace, located at approximately +76’0’’ (lower level) and +100’0’’ (upper level)
ILLUSTRATIVE MATERIALS
Fig. 54
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 56
Event Center Upper Concourse / Offices Level
ZONE/FUNCTION COLOR KEY
ARENAIce Floor/RetractablesConcourse/CirculationPractice CourtsSuitesLounge/Club(M/W)ToiletsFood and BeverageLockers/Other Sport RoomsMedia/PressSponsor/RetailOffices/AdminBOH/StorageVertical CirculationTechnical (MEP)Seating Bowl
ANCILLARY DEVELOPMENTOfficeRetailNight Time EntertainmentParking
OFFICE TOWER ROOF +160’-0”
OFFICE TOWER FLOOR 9 +145’-6”
ROOFTOP MECHANICAL +177’-0”
OFFICE TOWER FLOOR 8 +131’-0”
OFFICE TOWER FLOOR 7 +116’-6”
TOWER HEIGHT LIMIT on South Street
OFFICE TOWER FLOOR 6 +102’-0”
OFFICE TOWER FLOOR 5 +87’-6”
OFFICE TOWER FLOOR 4 +72’-9”
OFFICE TOWER FLOOR 3 +58’-0”
OFFICE TOWER FLOOR 2 +43’-3”
OFFICE TOWER FLOOR 1 +28’-6”CONCOURSE LEVEL RETAIL +26’-0”
PLAZA LEVEL RETAIL +10’-0”26’-0
”
16’-0
”10
’-0”
14’-9
”14
’-9”
14’-9
”14
’-9”
14’-6
”14
’-6”
14’-6
”14
’-6”
14’-6
”17
’-0”
160’
-0”
GRADE LEVEL at 3rd & 16th +3’-0”GRADE LEVEL at SOUTH ST. TOWER +1’-0”
GRADE LEVEL at TFB +0’-0” (GSW PROJECT DATUM)
SUBGRADE PARKING LEVEL 1 -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
PLAZA LEVEL +10’-0”
LEVEL 950 +177’-0”
LEVEL 900 +160’-0”
LEVEL 850 +146’-6”
LEVEL 800 +135’-0”
LEVEL 700 +103’-0”
LEVEL 650 +87’-0”
LEVEL 600 +76’-0”
LEVEL 500 +63’-0”
LEVEL 400 +51’-0”
LEVEL 300 +39’-0”
LEVEL 200 +26’-0”
LEVEL 100 +10’-0”
ARENA LOADING -10’-0”
SUBGRADE PARKING LEVEL 2 -22’-0”
EVENT LEVEL -6’-0”
MEZZANINE +10’-0”
MAIN CONCOURSE +26’-0”
SUITE LEVEL +39’-0”
LOGE +51’-0”
UPPER CONCOURSE +63’-0”
BAYFRONT TERRACE FLOOR +76’-0”
AHU MEZZANINE +87’-0”
LAST ROW OF UPPER DECK +92’-0”
ROOFDECK OF BAYFRONT TERRACE +97’-0”
BOTTOM OF TRUSS +101’-0”
CATWALK +103’-0”
LOW ROOF FINISH ELEVATION +113’-3”
PERIMETER OF HIGH ROOF +127’-0”
ROOF FINISH ELEVATION +135’-0”
6’-0
”10
’-0”
16’-0
”13
’-0”
12’-0
”12
’-0”
13’-0
”13
’-0”
5’-0
”5’-0
”10
’-3”
13’-9
”
PRACTICE COURTS -14’-0”
PLAYER PARKING -10’-0”
CLEAR HEIGHT/B.O.S. +11’-0”
CLEAR HEIGHT/T.O.S. +22’-0”
CLEAR HEIGHT/B.O.S. +4’-6”
LOADING DOCK FLOOR -10’-0”
Bottom of Structure +8’-2”
Parking - Bottom of Structure -1’-6”GRADE LEVEL PARKING +0’-0”
Upper Concourse: Primary access to Event Center upper seating bowl, located at +63’0’’
ILLUSTRATIVE MATERIALS
Fig. 53
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 46
ILLUSTRATIVE MATERIALS
ELEVATIONS
EAST ELEVATION
NORTH ELEVATION
These elevations apply only to the proposed massing for development on Blocks 29-32, and are not intended to suggest ideas for building facades, skin or materials. “Secondary Arena Entry” will be the main entrance to smaller events in the arena “theater” (cut-down bowl configuration).
SOUTH STREET OFFICE TOWER
16TH STREET OFFICE TOWER
TERRACE
FOOD HALL
FOOD HALL
SOUTH STREET OFFICE TOWER 16TH STREET OFFICE TOWER
ARENA
SECONDARY ARENA ENTRY
PARKING GARAGE ENTRY
TERRACE
ARENA MECHANICAL PENTHOUSE
MECHANICAL PENTHOUSE
MECHANICAL PENTHOUSE
Fig. 41
Fig. 42
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 46
ILLUSTRATIVE MATERIALS
ELEVATIONS
EAST ELEVATION
NORTH ELEVATION
These elevations apply only to the proposed massing for development on Blocks 29-32, and are not intended to suggest ideas for building facades, skin or materials. “Secondary Arena Entry” will be the main entrance to smaller events in the arena “theater” (cut-down bowl configuration).
SOUTH STREET OFFICE TOWER
16TH STREET OFFICE TOWER
TERRACE
FOOD HALL
FOOD HALL
SOUTH STREET OFFICE TOWER 16TH STREET OFFICE TOWER
ARENA
SECONDARY ARENA ENTRY
PARKING GARAGE ENTRY
TERRACE
ARENA MECHANICAL PENTHOUSE
MECHANICAL PENTHOUSE
MECHANICAL PENTHOUSE
Fig. 41
Fig. 42
reflection
Through this project I learned about the complexity and personnel involved in large scale architectural work. This project was subject to the NBA Arena Design Standards, the California Building Code, and the San Francisco Mission Bay South Design for Development documents; I was able to work closely with each of these throughout my time on the project and ensure compliance. I gained professional experience in AutoCAD, Sketchup, Photoshop, and several other programs. As an intern working on many different projects, under several different people, I learned to manage other people’s expectations of how I would manage my time and successfully completed the work requested of me. I was able to see the evolution of the design and learned from the input of the design professionals on the project, the public, the city, the owners, and countless others.
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 47
ILLUSTRATIVE MATERIALS
ELEVATIONS
SOUTH ELEVATION
WEST ELEVATION
These elevations apply only to the proposed massing for development on Blocks 29-32, and are not intended to suggest ideas for building facades, skin or materials. “Secondary Arena Entry” will be the main entrance to smaller events in the arena “theater” (cut-down bowl configuration).
16TH STREET OFFICE TOWERSOUTH STREET OFFICE TOWER
ARENA
STREET LEVEL RETAIL GATE HOUSE
SOUTH STREET OFFICE TOWER
16TH STREET OFFICE TOWER ARENA
PARKING GARAGE/SERVICE ENTRY
STREET LEVEL RETAIL
SECONDARY ARENA ENTRY
MECHANICAL PENTHOUSE MECHANICAL PENTHOUSE
MECHANICAL PENTHOUSE
Fig. 43
Fig. 44
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 47
ILLUSTRATIVE MATERIALS
ELEVATIONS
SOUTH ELEVATION
WEST ELEVATION
These elevations apply only to the proposed massing for development on Blocks 29-32, and are not intended to suggest ideas for building facades, skin or materials. “Secondary Arena Entry” will be the main entrance to smaller events in the arena “theater” (cut-down bowl configuration).
16TH STREET OFFICE TOWERSOUTH STREET OFFICE TOWER
ARENA
STREET LEVEL RETAIL GATE HOUSE
SOUTH STREET OFFICE TOWER
16TH STREET OFFICE TOWER ARENA
PARKING GARAGE/SERVICE ENTRY
STREET LEVEL RETAIL
SECONDARY ARENA ENTRY
MECHANICAL PENTHOUSE MECHANICAL PENTHOUSE
MECHANICAL PENTHOUSE
Fig. 43
Fig. 44
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 47
ILLUSTRATIVE MATERIALS
ELEVATIONS
SOUTH ELEVATION
WEST ELEVATION
These elevations apply only to the proposed massing for development on Blocks 29-32, and are not intended to suggest ideas for building facades, skin or materials. “Secondary Arena Entry” will be the main entrance to smaller events in the arena “theater” (cut-down bowl configuration).
16TH STREET OFFICE TOWERSOUTH STREET OFFICE TOWER
ARENA
STREET LEVEL RETAIL GATE HOUSE
SOUTH STREET OFFICE TOWER
16TH STREET OFFICE TOWER ARENA
PARKING GARAGE/SERVICE ENTRY
STREET LEVEL RETAIL
SECONDARY ARENA ENTRY
MECHANICAL PENTHOUSE MECHANICAL PENTHOUSE
MECHANICAL PENTHOUSE
Fig. 43
Fig. 44
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 47
ILLUSTRATIVE MATERIALS
ELEVATIONS
SOUTH ELEVATION
WEST ELEVATION
These elevations apply only to the proposed massing for development on Blocks 29-32, and are not intended to suggest ideas for building facades, skin or materials. “Secondary Arena Entry” will be the main entrance to smaller events in the arena “theater” (cut-down bowl configuration).
16TH STREET OFFICE TOWERSOUTH STREET OFFICE TOWER
ARENA
STREET LEVEL RETAIL GATE HOUSE
SOUTH STREET OFFICE TOWER
16TH STREET OFFICE TOWER ARENA
PARKING GARAGE/SERVICE ENTRY
STREET LEVEL RETAIL
SECONDARY ARENA ENTRY
MECHANICAL PENTHOUSE MECHANICAL PENTHOUSE
MECHANICAL PENTHOUSE
Fig. 43
Fig. 44
MAJOR PHASE APPLICATION | MISSION BAY BLOCKS 29 - 32 GOLDEN STATE WARRIORS 47
ILLUSTRATIVE MATERIALS
ELEVATIONS
SOUTH ELEVATION
WEST ELEVATION
These elevations apply only to the proposed massing for development on Blocks 29-32, and are not intended to suggest ideas for building facades, skin or materials. “Secondary Arena Entry” will be the main entrance to smaller events in the arena “theater” (cut-down bowl configuration).
16TH STREET OFFICE TOWERSOUTH STREET OFFICE TOWER
ARENA
STREET LEVEL RETAIL GATE HOUSE
SOUTH STREET OFFICE TOWER
16TH STREET OFFICE TOWER ARENA
PARKING GARAGE/SERVICE ENTRY
STREET LEVEL RETAIL
SECONDARY ARENA ENTRY
MECHANICAL PENTHOUSE MECHANICAL PENTHOUSE
MECHANICAL PENTHOUSE
Fig. 43
Fig. 44
Scott StoopS
418 John Doy court
Lawrence, KS, [email protected]
913.980.3406
In my journey through architecture school I have often asked myself why I chose this career. I used to think I was in it for prestige and money but after six years of college I have found a different answer.
I want to be an architect so that I can leave my mark on the world. I want to work at the edge of art and science. I want to be an innovator. I want to make a difference in the lives of people. I want my work to be original. I want to be an active participant in a business. I want to be a professional. I want to work on and lead teams. I want to help others achieve their goals. I want my work to mean something to people, whether they know I was the architect or not.
Thank you for your time and consideration.