Sands Macao Hotel - presentation 1 Sands Macao Hotel - PPT.pdf · • Sands Macao Hotel opened on May

Embed Size (px)

Text of Sands Macao Hotel - presentation 1 Sands Macao Hotel - PPT.pdf · • Sands Macao Hotel opened on...

Sands Macao HotelSands Macao Hotel

I ll H h S d MIt all Happens here Sands Macao

Site Plan

Sands Macao HotelSands Macao Hotel Sands Macao Hotel opened on May 18, 2004 as

Macao's first gaming facility owned by an international g g y yoperator. It quickly redefined Macaos gaming experience and set the standard for future development on the Macao peninsula.

Area is 141,000m2 approximately Casino and 51 luxury suites opened in May 2004 New podium Casino area opened in August 2006p p g Additional hotel tower and 238 additional suites opened

in October 2007 500 table games and about 1 100 slot machines500 table games and about 1,100 slot machines

approximately 1 no theater 6 specialty restaurants and 2 fast food outlets including 6 specialty restaurants and 2 fast food outlets, including

a popular 24 hours outlet

Sands Macao HotelSands Macao Hotel

Engineering FactsEngineering Facts

17 nos 1600kVA transformers 17 nos 1600kVA transformers 3 nos chiller plants for Casino, Theater

and Hotel area including 15 nos chillersand Hotel area, including 15 nos chillers with 8000RT totally

5 nos LPG boilers total 4800kW capacity 5 nos LPG boilers, total 4800kW capacity 56 sets elevators and escalators

Sands Macao HotelSands Macao Hotel Indoor Generator

Sands Macao HotelSands Macao Hotel Chiller Plant

Sands Macao HotelSands Macao Hotel Cooling Tower

Sands Macao HotelSands Macao Hotel LPG Boiler

Environmental Objective and Targetsj g

5% A l R d ti f El t i l E 5% Annual Reduction of Electrical Energy

5% Annual Reduction of Water Usageg

Provision of Environmental & Safety Training and Information to Team Member

Set Up the Green Procurements and Set Up the Green Procurements and Supply Chain Policy

Sands Macao HotelSands Macao HotelThis is a results of the following measures taken:-

Completed Projects E dit l l 1 Energy audit level 1 Replacement of existing lamps with high efficiency

lamps, such as compact fluorescent or LED lamps p , p p De-lamping at back of house area Linked up part of the two individual chilled water

systems of Casino and New Podium to optimize chiller plants capacity and energy effectiveness of New Podium systemNew Podium system

Casino chiller plant automation

Action for the Reduction of Electrical Energygy

Energy audit level 1 d t dwas conducted

Replace the existing lamps with high ffi i l hefficiency lamps, such

as compact fluorescent or LED lamps De lamping at the BOH De-lamping at the BOH area

Sands Macao HotelSands Macao Hotel Casino chiller plant automation

Sands Macao HotelSands Macao HotelOperation enhancement

With the advantage of cold weather in winter, we minimized the numbers of Hotel chillers running at mid night with the residual chilled water

li d th i i l f f li ith f ll tili d we applied the principle of free cooling with fully utilized pretreated air via PAU to lower the cooling load of casino chiller plant

Hotel chiller plants were set to the returned chilled water reset pmode

Adjustment to the time schedule of exterior lighting and signage with reference to the daytime

Close monitoring of the indoor temperature to avoid Close monitoring of the indoor temperature to avoid unnecessary cooling in the properties

Preventive maintenance is in progress to ensure the working conditions and efficiency of E&M equipment to minimize the l f / tloss of energy/water

Action for the Reduction of Electrical Energygy

Linked up part of the two p pchilled water systems of Casino and New Podium to optimize chiller plants p pcapacity and energy effectiveness of new podium systemp y

Casino chiller plant automation project was completedcompleted

Replacement of deteriorate fins of casino cooling towerscooling towers

Table for Total Electrical Energy Consumption for Sands (2008 & 2009)( )

Year Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

2008 Electricity Consumption (Kwh) 5,769,859 5,177,983 6,000,404 6,430,957 6,996,420 7,001,049 7,512,487 7,284,486 7,127,671 6,842,082 5,789,074 5,554,318

2009 Electricity Consumption (Kwh) 5 245 294 5 175 135 5 554 744 5 569 734 6 265 736 6 599 935 7 048 174 6 933 704 6 533 353 5 937 738Consumption (Kwh) 5,245,294 5,175,135 5,554,744 5,569,734 6,265,736 6,599,935 7,048,174 6,933,704 6,533,353 5,937,738 - -

Saving in Electricity

Consumption (Kwh) 524,565 2,848 445,660 861,223 730,684 401,114 464,313 350,782 594,318 904,344 - -

Saving Electrical gCost (MOP) 593,289 3,230 504,395 931,030 788,398 432,785 513,910 388,258 658,480 1,020,438 - -

Saving Electrical Cost (USD) 73,847 402 62,782 115,886 98,133 53,869 63,967 48,327 81,962 127,015 - -

S i iSaving in Electricity

Consumption (%) 10.00% 0.06% 8.02% 15.46% 11.66% 6.08% 6.59% 5.06% 9.10% 15.23% - -

Total Electrical Energy Consumption for Sands (2008 & 2009)gy p ( )

7 000 000

8,000,000

6,000,000

7,000,000

4,000,000

5,000,000

20082009

2,000,000

3,000,000

0

1,000,000

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

Sands Macao HotelSands Macao HotelBesides electricity, we also made the saving in LPG and water consumption:

Completed Projects

Installation of water restrictors to the hotel suites showers, water points at kitchens, staff toilets and changing room shower cubicles g g

Casino hot water supply was diverted to the newer and higher efficiency boilers at new podium

Independent water heaters were installed at the hotel staff changing rooms to avoid the unnecessary starting and low loading of new podium y g g pcentral boiler plants

Set up automatic water treatment systems for water features to minimize the times of cleaning and so the drain-off water

On-going Project

Major rectification of Casino CCMS is in progress, tentative completion at June 2009

Action for the Reduction of Water Usageg

Installation of water restrictors to the hotel suites showers, water points at kitchens staffpoints at kitchens, staff toilets and changing room shower cubicles

Installation of Automatic irrigation System

Table for Total Water Consumption for Sands (2008 & 2009)

Year Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

2008 Water Consumption (M 3) 59,690 61,365 60,868 63,504 76,296 66,047 73,458 71,712 73,261 74,256 50,306 52,448

2009 Water Consumption (M 3) 51 286 57 553 53 509 52 867 61 147 57 319 60 791 63 836 62 618 57 403(M 3) 51,286 57,553 53,509 52,867 61,147 57,319 60,791 63,836 62,618 57,403 - -

Saving in Water Consumption (M 3) 8,404 3,812 7,359 10,637 15,149 8,728 12,667 7,876 10,643 16,853 - -

Saving in W t C tWater Cost (MOP) 36,894 16,735 32,306 46,696 66,504 38,316 55,608 34,576 46,723 73,985 - -

Saving in Water Cost (USD) 4,592 2,083 4,021 5,812 8,278 4,769 6,922 4,304 5,816 9,209 - -

Saving in Water Consumption (%) 14.08% 6.21% 12.09% 16.75% 19.86% 13.21% 17.24% 10.98% 14.53% 22.70% - -

Total Water Consumption for Sand (2008 & 2009)p ( )

80 000

90,000

60,000

70,000

80,000

40,000

50,00020082009

20,000

30,000

0

10,000

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Decp y g p

Sands Macao HotelSands Macao HotelEfforts from other departments

HR encourage the team members to awareness of energy saving via posters and weekly newsenergy saving via posters and weekly news

Housekeeping will reset the temperature and turn off lighting in suites after the guests checking out.

F&B had posters and instructions for their team members awareness of energy saving

In future, we will keep on focus on the energy issues and make furtherenergy issues and make further enhancement.

Environmental & Safety Training

All New Team Member must gone through themust gone through the environmental training during orientation program

Environmental & Safety Training (such as; fire g ( ;extinguisher training, chemical handling & storage training)storage training)

Distribution of Environment Information

Environment NoticeEnvironment Notice Board

Environment Tips on pTV slide show

Green Procurement & Supply Chain PolicyGreen Procurement & Supply Chain PolicyPurposes:to guide the way to perform procurement and supply chain services by considering any possibilities to minimize impact to environment and g y p phow to achieve environmental sustainability

Letter to Vendor for Green InitiativesLetter to Vendor for Green InitiativesPurposes:to explain green procurement initiatives to vendors to seek for their supports

Gaming Equipment Related

1. Gaming Furniture Renew / Repair/Reuse ~ wherever &

whenever possible, instead of purchase new; unless specification does not matchunless specification does not match.

2. Gaming Accessories Trade In Old Items for Vendor to recycle/reuse; i.e.

Card Vault Carrier.

Reuse card carrier

IT/AV, SYSTEM RELATED VENDORSItem Green

AreaDescription Brand Supporting

DocumentInitiatives

Desktop & Laptop

Poison Material free

Over 90% desktop and laptop using in Venetian are the products from Lenovo.Lenovo is a member of an eco declaration system that enforces

l i d d t lit t l