2
Vertiss PLUS™ Module Holding side clip for module Module holder Vertical rails 585,5 mm 598 mm Center distance from end Center distance from middle STANDARD MOUNTING INSTRUCTIONS FOR CONCRETE LOADBEARING SUPPORT STANDARD MOUNTING INSTRUCTIONS FOR CONCRETE LOADBEARING SUPPORT STANDARD MOUNTING INSTRUCTIONS FOR CONCRETE LOADBEARING SUPPORT MOUNTING SYSTEM Module JVI0003 Vertical rails JVRAIL_U_791.5 JVRAIL_U_1583 JVRAIL_U_2374.5 JVRAIL_U_3957.5 Holding side clip for module JVCLIP Screws and bolts JVW0207 Screw for clip JVWM8GF Nut JVW02031 threaded rod Growing medium JVSUB16L Module holder JVBAC_597 Vertical rails, module holder, side clips, screws and bolts, module and growing medium. Also check the quantities received with the delivery note. 1 MAKE SURE TO CHECK AND DIFFERENTIATE THE DIFFERENT ITEMS 2 Front view Top view Pay attention to the direction of the rails ! ! 585,5 mm MOUNTING OF THE VERTICAL RAILS Draw the first vertical line with a laser or equivalent and in accordance with the manufacturer’s instructions for the fixing devices (i.e. SPIT, HILTI ….). Do not forget to calculate enough space on each side for the irrigation tubes. Use the rails as a drilling template and mark with a pencil the holes to be drilled in the wall. Drill the holes with the appropriate diametre for the fixing device (not included). Set the first column of rail(s). From this first rail, measure 585.5 mm and mark the second referene line. Drill your support and mount the second rail. Always check the level and the distance between the rails ! The distance between the center of the lines is 585.5 for each side of the green wall and 598 in the middle of the green wall. See drawing ! This is important to have a well centered structure. Choose the type of anchoring (or specific chemical sealing plugs) for your support (solid or hollow masonry). Calculate the spare space necessary for the fixing devices and the irrigation tubes on each side of the greenwall. 3 4 MOUNTING OF THE MODULE HOLDER Once you have installed all vertical rails, mount the module holder following the diagram below. The module holder must be installed inside the U rails, not outside. MOUNTING OF THE SIDE CLIPS Proceed with the side clips. Make sure to always mount them inside the U rail.

SANDARD MU SUCS F CC L SUPPT SANDARD MU SUCS F CC L SUPPT SANDARD MU SUCS F CC … · 2019. 11. 19. · SANDARD MU SUCS F CC L SUPPT SANDARD MU SUCS F CC L SUPPT SANDARD MU SUCS F

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SANDARD MU SUCS F CC L SUPPT SANDARD MU SUCS F CC L SUPPT SANDARD MU SUCS F CC … · 2019. 11. 19. · SANDARD MU SUCS F CC L SUPPT SANDARD MU SUCS F CC L SUPPT SANDARD MU SUCS F

Vertiss PLUS™Module

Holding side clip for module

Module holder

Vertical rails

585,5 mm 598 mm

Center distance from endCenter distance from middle

STANDARD MOUNTING INSTRUCTIONS FOR CONCRETE LOADBEARING SUPPORT STANDARD MOUNTING INSTRUCTIONS FOR CONCRETE LOADBEARING SUPPORTSTANDARD MOUNTING INSTRUCTIONS FOR CONCRETE LOADBEARING SUPPORT

MOUNTING SYSTEM

ModuleJVI0003

Vertical railsJVRAIL_U_791.5JVRAIL_U_1583

JVRAIL_U_2374.5JVRAIL_U_3957.5

Holding side clip for moduleJVCLIP

Screws and boltsJVW0207 Screw for clip

JVWM8GF NutJVW02031 threaded rod

Growing mediumJVSUB16L

Module holderJVBAC_597

Vertical rails, module holder, side clips, screws and bolts, module and growing medium. Also check the quantities received with the delivery note.

1 MAKE SURE TO CHECK AND DIFFERENTIATE THE DIFFERENT ITEMS 2Front view

Top view

Pay attention to the direction of the rails!

!

585,5 mm

MOUNTING OF THE VERTICAL RAILS

Draw the first vertical line with a laser or equivalent and in accordance with the manufacturer’s instructions for the fixing devices (i.e. SPIT, HILTI ….). Do not forget to calculate enough space on each side for the irrigation tubes.Use the rails as a drilling template and mark with a pencil the holes to be drilled in the wall.

Drill the holes with the appropriate diametre for the fixing device (not included).Set the first column of rail(s).From this first rail, measure 585.5 mm and mark the second referene line. Drill your support and mount the second rail. Always check the level and the distance between the rails !The distance between the center of the lines is 585.5 for each side of the green wall and 598 in the middle of the green wall. See drawing ! This is important to have a well centered structure.

Choose the type of anchoring (or specific chemical sealing plugs) for your support (solid

or hollow masonry). Calculate the spare space necessary for the fixing devices and the irrigation tubes on each side of the greenwall.

3 4MOUNTING OF THE MODULE HOLDER

Once you have installed all vertical rails, mount the module holder following the diagram below. The module holder must be installed inside the U rails, not outside.

MOUNTING OF THE SIDE CLIPS

Proceed with the side clips. Make sure to always mount them inside the U rail.

Page 2: SANDARD MU SUCS F CC L SUPPT SANDARD MU SUCS F CC L SUPPT SANDARD MU SUCS F CC … · 2019. 11. 19. · SANDARD MU SUCS F CC L SUPPT SANDARD MU SUCS F CC L SUPPT SANDARD MU SUCS F

!

STANDARD MOUNTING INSTRUCTIONS FOR CONCRETE LOADBEARING SUPPORT STANDARD MOUNTING INSTRUCTIONS FOR CONCRETE LOADBEARING SUPPORTINSTRUCTIONSStandard mounting instructions for concrete loadbearing support (For any other support please contact us).5

3/7

PLANTING OF THE MODUL

4. Fill the empty space around the rootball with growing medium and press lightly.Add substrate to the second row of plantingcells; always leave space for the root ball.

1. Drill a drainage hole in the bottomof the module in order to allow wateroverflow between the modules.

2. Fill the bottom of the module andleave room for the root ball.

3. Place the root ball of the plant.

Repeat these steps to the top of the module.

MOUNTING OF THE PLANTED MODULS TO THE METAL STRUCTURE.

Now that the modules are planted, proceed with the installation of the modules onto the metal structure.Place the module inside the module holder/bracket, put it upright against the vertical rails, turn down the side clips on the module and screw them onto it. Proceed in the same way with all modules.

N. B. : for practical reasons, we recommend that you perform the installation of the modules line by line so that you can place the drip line.

A water recovery system made out of stainless steel or equivalent underneath the bottom modules is necessary.

6

This document is for information only, to be considered as an example and not as a detailed contract document for installation. Please contact our customer support for any technical questions.

UK Supplier and [email protected]: 01895 835544