12
INFSO-RI-223782 SA1 Status Report Status and Progress of the ETICS-SA1 Activity ETICS2 All Hands Meeting Alberto AIMAR CERN Budapest 22-24 June 2009

SA1 Status Report

  • Upload
    lucio

  • View
    62

  • Download
    0

Embed Size (px)

DESCRIPTION

SA1 Status Report. Status and Progress of the ETICS-SA1 Activity. ETICS2 All Hands Meeting. Alberto AIMAR. CERN. Budapest 22-24 June 2009. Status of the ETICS Services in one Slide. Release and Development Infrastructure Procedures, tests, release candidate, etc - PowerPoint PPT Presentation

Citation preview

Page 1: SA1 Status Report

INFSO-RI-223782

SA1 Status ReportStatus and Progress of the ETICS-SA1 Activity

ETICS2 All Hands Meeting Alberto AIMARCERN

Budapest22-24 June 2009

Page 2: SA1 Status Report

INFSO-RI-223782

Status of the ETICS Services in one Slide

• Release and Development Infrastructure

• Procedures, tests, release candidate, etc

• Repository for all Binaries and Reports

• Production Platforms extended: SL5 and MAC OS X

• Automatic Deployment

• Nightly development installations, and other ETICS WPs

• Plug-ins Development

• Integration of several new plugins

• Metrics Disseminator

• Display metrics collected, trends etc

• AQCM Metrics and Reports

• Production of the AQCM reports

• Project Dashboards

• Show status of a project in one web page

2

ETICS2 All Hands MeetingSA1 Status Report

Page 3: SA1 Status Report

INFSO-RI-223782

Ongoing Work (I)

• Infrastructure of the ETICS Services

• Maintenance and support. Updates

• Several improvements and maintenance

• web services, repository, web interface editors, client, etc

• Multi-node Testing

• Defined, configure deploy and launch distributed tests

• Plug-ins development

• Findbugs, CCC, CKJM, etc

• Jobs Submitters interface

• in order to be able to submit to other “batch” systems

• Dynamic Virtualization. WNs on demand

• Start a VM of the platform needed and execute client, send back results

3

ETICS2 All Hands MeetingSA1 Status Report

Page 4: SA1 Status Report

INFSO-RI-223782

Ongoing Work (II)

• AQCM Reports

• Generating the report, metrics missing but OTW

• Metrics Disseminator

• Display the metrics collected by the plugins

• Dashboard

• Just started. Shows last builds, direct links to metrics and reports

To be Started (soon)

• SLA’s with 2 projects

• Privacy, authentication

• Accounting, logging, costs

• Import/Export from other systems

4

ETICS2 All Hands MeetingSA1 Status Report

Page 5: SA1 Status Report

INFSO-RI-223782

SA1 Plan for Year 2

5

ETICS2 All Hands MeetingSA1 Status Report

Page 6: SA1 Status Report

INFSO-RI-223782

Collaboration across Activities

New Submission Engines SA2New plug-ins + Integration JRA2 Multi-node Distr. Testing JRA2A-QCM + Metrics NA2Cross Submission JRA1Dissemination Material NA2 Documentation & Support SA2

6

ETICS2 All Hands MeetingSA1 Status Report

Page 7: SA1 Status Report

INFSO-RI-223782

All SA1 information is here

7

ETICS2 All Hands MeetingSA1 Status Report

Page 8: SA1 Status Report

INFSO-RI-223782

EU Review: Future Plans

Continue to provide the Services

Maintain, Upgrade, Provide new Externals, New Platforms

Integration of Work of Other Activities

Metrics and Testing Plugins

A-QCM Reports and Certification

ETICS Services with gLite and UNICORE

Sustainability of the Services

Extended Monitoring for Other Infrastructures

Control and Report on the Usage of the ETICS Infrastructure

Implementation of New Privacy, Authentication and Authorization Policies

Steps to define the costs associated to User Projects and to support of different platforms.

Attracting New Users Projects

Interfaces to Existing Build Systems

Web Task-Oriented Interfaces

Test of Integration of ETICS Services with External Resources

8

Brussels, 3 April 2009SA1 - Service Management

Page 9: SA1 Status Report

INFSO-RI-223782

EU Review: Conclusions and Outlook

Main Objectives (and Additional Achievements) of the First Year

Automation, Performance, Virtualization, High Availability

Small delays will be recovered in Year 2, resources now available.

Maintenance and Upgrade of the Services

Platforms, Updates, Virtual Images, External Software

Urgent Requests for Main User Projects

Year 2 Outlook: Focus on Sustainability

Usage of External Resources for CPU (WN) and Storage

Privacy, Authorization, Security

Integrate Submission Engines, Testing and Metrics Plugins, A-QCM Certification

9

Brussels, 3 April 2009SA1 - Service Management

Page 10: SA1 Status Report

INFSO-RI-223782

SA1 Deliverables

DSA1.1 – Execution plan for 12 months of infrastructure operation M03

This deliverable describes the execution plan for the first half of the ETICS 2 project, including the core service roadmap and the infrastructure deployment plan.

DSA1.2 – ETICS Core Services Design Specification M06

This deliverable describes the overall ETICS 2 core services.

DSA1.3 – ETICS Site Service Level Agreement M09

This deliverable describes the Service Level Agreements upon which the ETICS service will be provided. The SLAs will define the service level the users can expect from the service in terms of availability, accessibility and support.

DSA1.4 – Execution plan for second 12 months of infrastructure operation M12

This deliverable describes the execution plan for the second half of the ETICS 2 project, including the core service roadmap and the infrastructure deployment plan.

DSA1.5 – Infrastructure and core services certification and usage report M21

This deliverable reports on the release management cycles and certification of the ETICS 2 infrastructure and core services, including lessons learned and corrective action to apply.

10

ETICS2 All Hands MeetingSA1 Status Report

OK

OK

OK

DONE

Page 11: SA1 Status Report

INFSO-RI-223782

SA1 Issues

• Resources• Was difficult to hire people early …

• … now could be difficult to retain people

• Adding developers takes time, we focus on specific tasks

• Receive show-stoppers requests from EGEE• Sometimes conflicting, sometimes not using the solution

• Sustainability of the ETICS Services• SA1 needs clear direction from the PMB• Be deployable in other environments that CERN• For Open Organizations vs for Private Commercial uses• We must aim at scenarios that are feasible • Invest (partners) resources in those scenarios• New development must start now (privacy, import export, etc) but we

have no resources

11

ETICS2 All Hands MeetingSA1 Status Report

Page 12: SA1 Status Report

INFSO-RI-223782

Work of the Technical SessionsProposed Topics

Multi-node Distr. Testing

New Submission Engines+ Bootstrapper integration

New plug-ins + IntegrationA-QCM Reports + Disseminator

Ongoing SA1 development activities and changesDashboard Design, Property Editors

Impact Infrastructure, Web Services, Web Interface,Clients and RepositorySomething else? Please ask for changes or new discussions

12

ETICS2 All Hands MeetingSA1 Status Report