S TOPLIGHT PIZZA WIND POWERED ENTERTAINMENT Nicole Feliciano (Team Lead) John Figueira (Team Member) Noor Husain (Team Member) Kyle Grotjohn (Team member)

Embed Size (px)

Text of S TOPLIGHT PIZZA WIND POWERED ENTERTAINMENT Nicole Feliciano (Team Lead) John Figueira (Team Member)...

  • Slide 1
  • S TOPLIGHT PIZZA WIND POWERED ENTERTAINMENT Nicole Feliciano (Team Lead) John Figueira (Team Member) Noor Husain (Team Member) Kyle Grotjohn (Team member) Dr. Albright (Faculty Advisor) Jenifer miller (industry advisor) Dr. Kennedy (Client) Dr. Nuxoll (Class Advisor)
  • Slide 2
  • O UTLINE Introduction Project overview Milestones Accomplished Milestones Additional Milestones Upcoming Milestones Design component Issues/Concern Conclusion
  • Slide 3
  • I NTRODUCTION The project is a wind belt generator that will be used to charge a modern cell phone battery. Requirements//Components: Wind: Energy source which cause oscillation. Magnets: Excite Coils/Faradays Law. Coils: Induces a magnetic field, that causes charge at the load. Membrane: Moves magnets to change magnetic field causing voltage. Rectifier: ADC converter. Battery: Load, and holds charge.
  • Slide 4
  • M ILESTONES A CCOMPLISHED :- * Accomplished on 9/28/2012.Completed Website.Submit part list for approval.Due: Functional Specification, advisor-approved draft (ver 0.95) *Accomplished on 10/05/2012.Due: Functional Specification, final draft (ver 1.0)
  • Slide 5
  • M ILESTONES A DDITIONAL : Order parts list-10/07/2012 Finish building the frame-10/20/2012 Find the minimum threshold voltage for the rectifier-10/23/2012
  • Slide 6
  • MILESTONES UPCOMING First Prototype Constructed -10/31/2012 Due: Design Document, first complete draft (ver 0.9)-11/02/2012 Due: Design Document, advisor-approved draft (ver 0.95) Deadline: Team Meeting with Peter Rachor- 11/09/2012 Due: Design Document, final draft (ver 1.0)Final Budget- 11/16/2012 November Program Reviews Due-11/30/12 NOTE: Change milestones >>PLAN B