Quick Installation Guide RTN 910Huawei-RTN910

Citation preview

  • Installation ProcessCommissioning ProcessPrecautionsInstructions and Precautions for Handling BoardsPrecautions for Handling the Toggle Lever SwitchPrecautions for Handling IF JumpersPrecautions for Handling IF CablesPrecautions for Handling IF BoardsTools for Installation1. Introduction to the RTN 910 Equipment1.1 Ports1.2 Installation Holes on Both Sides of the Chassis

    2. Installing the RTN 9102.1 Installing the Chassis in the 19-Inch Cabinet2.2 Installing the Chassis in the ETSI Cabinet2.3 Wall-Mounting the Chassis2.4 Desk-Mounting the Chassis

    3. Optical:Installing the E1 Panel3.1 Fixing Floating Nuts3.2 Fixing the E1 Panel3.3 Installing PGND Cables on the E1 Panel

    4. Installing Boards5. Installing IDU Cables5.1 Installing PGND Cables5.2 Installing Power Cables5.3 Installing E1 Cables5.4 Installing Ethernet Service Cables5.5 Installing XPIC Cables5.6 Installing IF Jumpers5.7 Installing Fibers5.8 Installing STM-1e Cables5.9 Installing NM Cables5.10 Installing Orderwire Phone Cables5.11 Installing External Clock Cables5.12 Installing Asynchroncus and Synchroncus Data Cables5.13 Installing External Alarm Cables5.14 Cable Layout Effectiveness

    6. Powering On the Equipment7. Configuring NE Data (by Using the Web LCT)8. Configuring NE Data (by Using the Hand-Held Tool)9. Aligning Antennas9.1 Aligning Single-Polarized Antennas9.2 Aligning Dual-Polarized Antennas

    10. Checking the Radio Link Status11. Checking the Installation