33
42AHSE9123 2.3164 PROSSER 010 A REPORT ON OVERBURDEN DRILLING TULLY TOWNSHIP BY C. ROCKINGHAM WESTERN MINES LIMITED OCTOBER 1979 RECEIVED DEC SECIIOH

RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

42AHSE9123 2.3164 PROSSER 010

A REPORT ON

OVERBURDEN DRILLING

TULLY TOWNSHIP

BY

C. ROCKINGHAM

WESTERN MINES LIMITED

OCTOBER 1979

RECEIVEDDEC

SECIIOH

Page 2: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

INTRODUCTION;

During the fall of 1979 a programme of overburden

drilling was completed by Western Mines Limited on claims

held in Tully Township.

Page 3: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

PROPERTY;

The property consists of eighty-seven claims which are

located in Tully and Prosser Townships. The claims are as

follows:

P.339239 to P.339253 - 15 claims

P.452503 to P.452508 - 6 claims

P.501046 to P.501065 - 20 claims

P.501071 to P.501092 - 22 claims

P.504762 to P.504784 - 23 claims

P.505807 - l claim

FIELD PROGRAM:

A field program of overburden and bedrock drilling was

carried out under contract to Bradley Bros, for Western Mines

Limited.

During the period from October 9 to October 16, fourteen

overburden drill holes were drilled. Total footage drilled was

1582.5 feet. All overburden was sampled except the clay sections

The depth of holes varied from 56 feet in hole 79-27 to greater

than 324 feet in hole 79-29 which failed to reach bedrock.

The location of the holes are as follows:

Page 4: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

t9

Drill Hole

79-20

79-21

79-22

79-23

79-24

79-25

79-26

79-27

79-28

79-29

A 79-30

79-31

79-32

79-33

3.

Claim

P. 501081

P. 501076

P. 501074

P. 501071

P. 501072

P. 501051

P. 501053

P. 501052

P. 501047

P. 452505

P. 501085

P. 501083

P. 339252

P. 339253

The work is being filed under Section 86-18 of the Mining Act,

An assessment credit of 1361 days is submitted against the

following claims.

Page 5: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

DESCRIPTION OF OVERBURDEN AND BEDROCK DRILLING AND SAMPLING;

The equipment was a Longyear drill converted to dual

tube reverse circulation. It is mounted on a Nodwell FN-160

carrier. Power for the drill is taken from the drill engine

with aid of hydraulics. The drill string comprised 9 foot

sectional dual-tube rods of 2 15/15" size and a standard tri-

cone 15/16 bit. Rapid and reliable penetration and recovery

of glacial overburden is achieved with a combination of air and

water and a 20 foot continuous feed.

Water is pumped down between the outer and inner tubes

to exit near the bit cone. The resultant mixture of water and

sediment is returned up the centre tube of the drill string and

discharges through a l foot diameter steel funnel (cyclone) into

a j^ 300 gallon water recovery tank, thus allowing for recycling

of drill water.

Silt/ sand gravel are collected below the discharge

cyclone in 5 gallon plastic pails which rest upon a steel grate

lying on the top of the recovery tank. The clay size fraction

is allowed to overflow the pail into the tank. Figure 2, which

is reproduced from G.S.C. Open File #116, 1972, is a schematic

version of this sampling system.

A 10 mesh Tyler screen is placed over the bucket to

allow the geologist to continuously log the nature of the coarser

Page 6: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

drift particles, i.e. sand, gravel and till chunks, and a portion

of the -t-10 mesh fraction may be temporarily retained for field

geological examination. In normal practice, however, the +10

mesh fraction is dumped into the bucket at the end of each run

so that all sediment, exclusive of clay fines, are available

for laboratory investigation. Samples are bagged from each run

at periodic intervals are transported to a central laboratory.

Drilling continues below the glacial drift section

into bedrock for depths of l ft. to 5 ft. The +10 mesh bedrock

chips, which are up to 1/2" in diameter, are collected on the

Tyler screen during drilling and kept separately from -10 mesh

bedrock fines which pass into the sample bucket.

LABORATORY TEST WORK;

The samples, as received from the drill, are sent to

the Overburden Management Ltd., in Ottawa, for heavy metal

separation. The samples are passed through a 10 mesh screen and

the -10 mesh part (most of the sample) is passed over a shaking

table and the heavys and lights are separated. The heavy fraction

is dried, mixed with a solution of methylene iodide of 3.35G and

the heavy part of the heavys are collected. A 3/4 split of the

heavy segment is then sent to the Bondar-Clegg Laboratory for

analysis of copper, zinc, lead, nickel, silver, and gold.

Bedrock chips from each hole are also collected, examined

and analysed.

December 10, 1979.

Page 7: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

(

Tyler Screen (10 mesh)

)

Direcl Wafer Supply

Figure 2. Simplified version of Dual Tube Drilling System.

Page 8: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

OVERBURDEN DRILL HOLE LOGS

HOLES 79-20 to 79-33

APPENDIX III

Page 9: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

SUMMARY OF DRILLING

TULLY TOWNSHIP - OCTOBER 1 979

Hole No.

79-20

79-21

79-22

79-23

79-24

79-25

79-26

79-27

79-28

79-29

79-30

79-31

79-32

79-33

T.D.

69'

62'

77'

80'

68.5'

133'

150'

56'

70'

324'

112'

110'

154'

121 '

Clay Depth

56'

53'

72'

72'

48'

52'

71'

44'

56'

128'

100

38'

31'

21'

Gravel Till

56 -

53 -

72 -

72 -

48 -

52 -

71 -

44 .

56 -

128 -

100 -

38 -

31 -

21 -

and/or Depth

66'

58.5'

73.5'

77'

54'

131'

146'

51'

67.5'

324'

109'

107'

150.5'

118'

Depth in Bedrock

3'

3.5'

3.5'

3'

4.5'

2'

4'

5'

2.5'

-

3'

3'

3.5'

3'

Remarks

Andesite - no sulfides

Rhyolite fragmental

Dacite

Dacite

Meta-Sedimentary rock - chlorite rich

Andesite tuff

Andesite

Graphitic metasedimentary rock

Rhyolite tuff

Hole failed to reach bedrock

Andesite (?) altered to green clay

Rhyolite

Dacite tuff

Dacite

Page 10: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

CLIENTTU'CST/rg/o M /EJES_____ DATE: O^T 1 C /"H HOLE 0O& *?S"33

GEO./SAMPLERC. "Roc^/MCrH/^M fe^oV TWP.:ft/^/^c^/iv Sto.?

CONTRACTOR/DRILLER : (y^/^T^A; G A G-A.

BIT NO.: ^ 3Z3 NTS:

FIELD LOCATION:

, r A/ A/ to o \

Log (inches) Sanple No, Overburden Description Notes i Analyses

Hole No. Page No.

Page 11: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

CLIEENT: Ifr HOLE #065133^ GEO./SAMPLER C^. 6.

CONTRACTOR/ DRILLER :

BIT NO.:

ft/US. . Q/^QAJg

FIELD LOCATION:

f * N M W *\

NTS:

Log (inches)

IO

30

1*0

100-

. * -l l

. * 1 .J JL * '*•' "• 0

- - .•.•*. ./..*.. -- -'v..- ^ ••'.'' V-

Sanple No.

1^-33- 12.

Overburden Description

loiTM5^7* 6**-*.*

TIM.ITW

Notes S Analyses

Hole No.

11-33

Page No.

l A Z.

Page 12: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

MINJS.S DATE:GEO. /SAMPLER; C . fl. 3oYTWP.;

CONTRACTOR/ DRILLER :

BIT NO.:

HOLE # Og*?*}*

PROV.:FIELD

NTS:

Log (inches) Sample No.

LOCATION: l TOO Klsjg o? "7*1 - S |

Notes S. AnalysesOverburden Description

Page 13: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

CLIE1 g ST E

GEO./SAMPLER .C. 6.

DATE:

TWP.:

l b"- 14

CONTRACTOR/ DRILLER ;

HOLE

RRQV

LOCATION: WKjg

BIT NO.: 5^3^.4 NTS:

Log (Inches Sample No Overburden Description Notes S Analyses

\0

*: V.7.*-

; *!'*V

o. .*. .*.6 ft" . .t . -.

-

Hole No. Page No.

U9 Z

Page 14: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

m:CLIENT: M/VIE5

GEO . /SAMPLER^ . E.

DATE; P**?* l J* -/f*

TWP.:

CONTRACTOR/ DRILLER

BIT NO.:

HOLE #

PROV

Cr*QVgFIELD LOCATION: . |

NTS:

Log (inches

loo—l

,* * * t t

'o * ot * * t

*

.0 -or . *0 * ', ** *

Sample No

o 3

71-31-04

- SI-OS-

Overburden Description Notes S Analyses

- T i*-*-

KETU^NJ

ST?*) UMTM

fiAM-S

"^77

ySAV SflwO

Hole No. Page No.

Page 15: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

CLIEW: DATE:OCr HOLE

GEO./SAMPLERCi

CONTRACTOR/

fi.

DRILLER

BIT NO.:

^ ̂(yA g T**/

FIELD LOCATION: S C

NTS:

Log (inches) Sample No. Overburden Description Notes S Analyses* * o* *** * A .* *. ft

110- lo-o jM6HT

TMC fti**rit*a6 TO

y^

**s

Hole No.

1*30Page No.

Page 16: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

CLIENT: MfK/eS DATE: OCT

GEO./SAMPLER :C

CONTRACTOR/ DRILLER :

fi. ?oY TWP. :

HOLE #

PROV.:

0*^1-3*

Q-.

BIT NO.: S"*32-4 NTS:

LOCATION: •14

Log (inches)

JO

**

t *

Sample No Overburden Description Notes S Analyses

J VV— * ——————————————— ....Hole No.

1V30Page No.

lo? 2

Page 17: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

. tueSTgJUj M WCS DATE: OCT lS-l^/77 HOLE GEO./SAMPLER:^.

LOCATION :U*ff IT R,BIT NO.:

Log (inches) Sample No Overburden Description Notes S Analyses

f*l

l ll*i '

' ^1

'.r'

Tret,

Hole No. Page No.

Page 18: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

CLIENTi U/eSTJSrtM Mf*VC5

GEO. /SAMPLER ;

CONTRACTOR/

6.

DATE: OCT

TWP.;

HOLE |Qfi

PROV.;

DRILLER

BIT NO.:

grtferw QflQAig.

NTS:

FIELDLOCATION: tugyr tA#K O*

-K

Log (inches)

i-r, V* * **

•"l

--'•' ;- 'i * i- 1.- -.

t 0

. . o ' ** A * '. o o

o .Y

.'-o.

' J-'V'J' '* ' ' -

- 1-..

Sample No. Overburden Description

QftflES

MO

ftoUlO'B*

fl-Zf -3Z

• l*

BAL.US

Notes S Analyses

Hole No. Page No.

3^4

Page 19: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

GEO./SAMPLER .-Cj,

CONTRACTOR/ DRILLER

BIT NO.:

ft.a /i os.

Cfrt

DATE: OCT tVK I J1 HOLE

TWP.;TU*q-V______ PROV.: -————

FI ELDLOCATION: U*CfT 8^/^K */* QuSKf+A

NTS:

Log (inches)

/VX

AX

*/NX'NX'

* ^0

* o'

0* v

^^^^^^^ jk* J*

.

r) -/' * '

i -/•i•'/* - i . i , ,•v -*. 1 11 '

r

Sample No

NO

Overburden Description

fl *o o

Notes S Analyses

Hole No. Page No.

Page 20: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

E^CLIENT: Ul6STC**/ MfU&S

GEO./SAMPLER : C . 1*OCKiMQ*Wf ft

Q*CrAI?

DATE: OCT

TWP.:

HOLE #O6

PROV.:

CONTRACTOR/ DRILLER

BIT NO.: NTS:

LOCATION:

l- 14

Log (inches)

2.0-

30-

AXAX Ax *^ AX AX

AX AX

AX

AX

AXAX-

AX

AX

AX

AXX""

AX

Sample No Overburden Description Notes 4 Analyses

Hole No. Page No.

Page 21: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

CLI Em: MlAie.S

GEO./SAMPLER:C.

DATE:

TWP.:

HOLE

: c- FIELD LOCATION:

BIT NO.: NTS:

Log (Inches)

lo-:

2.0-

4*-

60-

t l

* t••^ VHMM

*

o/ -vA/

O

7/7777

Sample No.

•OJ

Overburden Description Notes S Analyses

Hole No.

71Page No.

Page 22: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

*CLIENT: DATE: HOLE

B. "RoV TWP.:

CONTRACTOR/ DRILLER : Gr.

6*03.LOCATION: ? O

BIT NO.: NTS:: 42. C.Log (inches) Sample No Overburden Description Notes 8t Analyses

10 —

o* - 0.0 O *

~ SAN ir

llQZj - o j

Hole No. Page No.

Page 23: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

CLINT: W65Te*M MIA/E.5 *-TP.

GEO./SAMPLER;

CONTRACTOR/ DRILLER ;

BIT NO.: 5

G. GA&

DATE: O C.-T t*, in ? HOLE #

TWP.: T (JULY_____ PROV.:

FIELDLOCATION: ^——-

NTS:

Log (inches)

MO

1*0. " *0 - 1

o o o

Sanple No. Overburden Description

c AU v* *-

VA *v or GA. AU e u

WJ-

lW

J-

F

Notes S Analyses

Hole No. Page No.

Page 24: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

CLIENT: n/f

GEO. /SAMPLER:

CONTRACTOR/ DRILLER :

BIT NO.: 5 1

t T e&x/ Ai i

NWT-rSAS i

8 R APL f Y G. G A A AS F

*.6W

ivfii t-7^ DATE: OcT it. i^7* HOLE # 7"*-^6

e*cKinX**H*wTWP.: TfUt.V PROV.: o A/-T

*r*o* *-T^ FIELD LOCATION:

NTS: M 2.- /q -/y

*

. ^^—

^ I

—* 0 —

-Z^ ~W Z •J*--i-

~

^-f—

f'~i—

Log (inches)

rv *V AX/NX /V

/\/ *v /v/XX*" ^SX

XN** XV "**/

r~***r s\S~

f*** *\*-

;vxw ^"^'XN-* xvX*

* . *H

. .. . .• ;. -*.- ' .* * .t *' . c '

. .*

*V*o .'o

^ ®*. e tf . i . - '

-

-—

~

-—

——

-

~.

-

-•~

~

M

Sample No.

-

•* - -v

T'

-n-w-aa

.7*-X*.-03

M

7f-*4-*

Overburden Description

*

^

•*

v4(^veo *,*.AY

^v ^^ f^ w m ̂ ̂ T *9 ̂ | rw^V)

3-Q1 ™J-*^V-

x .. Gt^^fi'i.t y J/A/V^ oTOt^AtC/'A'Ai.Ttt.l. 6*LL O

J 4-^*

Notes S Analyses

-

,

;

Hole No. Page No.

•*o*. i y i ^ ^.* * A"t l C'^C A.

Page 25: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

CI Eh tugSTg&A/ H/A/IS5 DATE; Oc!r

GEO./SAMPLER: C

CONTRACTOR/ - DRILLER : UT-

BIT NO.:

g,HOLE #

PROv.:FIELD , ,^ t LOCATION: ' 'OO lUMUJ o

NTS:

Overburden Description Notes S Analyses

Page 26: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

CLIENNT: DATE: l*,

GEO . /SAMPLER jC. g.

HOLE

PROV.:

CONTRACTOR/ DRILLER

BIT NO.:

*: *f .

FIELD LOCATION: U/Alw o r ^ t O6

NTS:

Log (inches)

10 —

1*0—

. *

Sanple No. Overburden Description

ftw*

Notes S Analyses

Hole No. Page No.

Page 27: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

CLIENT: WE6TEK.V DATE: PcTT. t-a^

GEO. /SAMPLER:

HOLE #

PROV.: Q

CONTRACTOR/ DRILLER : g.

FIELD LOCATION:

BIT NO.: .5y NTS:

Log (inches)

ra —

70

S f/ O

Sample No. Overburden Description

3-^n r A h t-j

Notes S Analyses

Hole No. Page No.

'f'

Page 28: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

CLIEflP tv& DATE : OCT / O/?*} HOLE i 08

GEO./SAMPLER: E .

CONTRACTOR/ DRILLER ;

BIT NO.: NTS:

FIELD LOCATION:

a/14

TWP

x^V-

j)ere-/*- — --o ^^

Log (inches) Sample No, Overburden Description Notes S Analyses

•*- oy*' */ o- '/* 7

Hole No. Page No.

Page 29: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

CLIEN™

GEO./SAMPLER: a urrE*./

DATE: Q(xr to / 97f

TWP.:

HOLE # 79

PROV.:

CONTRACTOR/ DRILLER ;

BIT NO.:

g A 6 T'/l /i/FIELD LOCATION:

NTS:

Log (inches)

14

7*

/X.

Sanple No. Overburden Description

-ie

emr

? A A. * B D c t A

Notes S Analyses

Hole No. Page No.

Page 30: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

: WSSTRN Mi MISS C .

GEO. /SAMPLER: fc .

CONTRACTOR/ DRILLER :

BIT NO.:

DATE; QC.T /O/79 HOLE #Ofi

TWP.: TO^LV PROV.:*

Q- . FIELD ,XK 'LOCATION: l OOO to.

NTS: A/14 c.**Log (inches)

30—

40 ~

6' '

///////y-

Sample No

0101

Overburden Description

AND 60 7*

02. SoMff

. ***"

M i Mo * itiP ire)

mm

Notes S Analyses

Hole No. Page No.

Page 31: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

GEO./SAMPLER:

DATE: flCT 16 up y HOLE if 7 9

TWP.: T ULLY PROY.:CONTRACTOR/ B RA D L G Y DRILLER : g^tf r/1 v g

FIELD LOCATION:

BIT NO.: NTS:

Log (inches)

tlc

-ST O

* *

Sample No.

.71-J

Overburden Description Notes S Analyses

Hole No. Page No.

Page 32: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

504775*504778

504769504770

339253 3f9252

l-50/O77 '3OIO74

79-31 2 SOI083M\5OI09O 5O4781504782

P IPTgj-215070 76 ISO/00/

50/07850/0719— —— —— L ^ __

\4525O8 452SO7

45250645250350/OS/ . 501054P

—048^50/049

5OtO56 '5C/O6/

WESTERN MINES LIMITED

BUSKEOAU ?*OPEKTYt ONTARIO

CLAIM MAP

Overburden Drill Hole

DATE: January 1979

42A14See123 8.3164 PROSSER 200

Page 33: RPT ON OBD TULLY TWP · 42ahse9123 2.3164 prosser 010 a report on overburden drilling tully township by c. rockingham western mines limited october 1979 received dec seciioh

PROSSER TWP.

I28O/670 266/220 196/145

265/I9O 77/90

S02/I20

WEST BUSKEGAU PROJECTWESTERN-DUPONT JOINT VENTURE

LEGEND1979 O.B Drill Hole location

1978 C. B. Drill Hole location from heavyI m etal fraction TULLY TOWNSHIP

© GSC O.B. Drill Hole location

OVERBURDEN DRILL HOLESLOCATION AND SECTIONS

SCALE: l ' =

42A14SE8123 2.3164 PROSSER 210