34
14 | Page Rotostat Services Private Limited List of works in the field of Annual Maintenance 1. Reliance Industrial Limited – Dahej Sole Service Provider for Annual Maintenance Contract of Plants CA, GCU/CKR, CPP, EOEG, ETP, EVA, IOP, OSP, HDPE, PVC, VCM, PET3, PTA5, CPP3. 1) Rotary Equipment And Static Equipments. 2) Fabrication of Piping And structural. 3) Scaffolding. 4) Auto Warehouse. 2. Reliance Industrial Limited – Hazira Sole Service Provider for Annual Maintenance Contract of Plants PE1, PE2, PP1, PBR3, SBR, ETH, PVC, PT1, PT2, PT3, EF2, TF1, ME1, ME2, ME3, VCM, CPP, BD1, ARO, BT1, CRA. 1) Rotary Equipments. 3. Reliance Industrial Limited – Silvassa Sole Service Provider for Annual Maintenance Contract for entire Fibre Complex 1) Rotary Equipments. 2) Static Equipments. 3) Fabrication of Piping And Structural. 4) Winders & Associated Spinning Equipments. 5) Automatic Product Handling System. 6) Air Handling Unit Operation & Monitoring. 4. Reliance Industrial Limited – Patalganga Sole Service Provider for Annual Maintenance Contract for Petrochemical Complex of Plants PTA, PX, LAB, EC, Utility, PSF, PFY. 1) Rotary Equipments. Annual Maintenance Contract for Fibre Complex 1) Rotary Equipments. 2) Static Equipments. 3) Fabrication of Piping And Structural.

Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

Embed Size (px)

Citation preview

Page 1: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

14 | P a g e

Rotostat Services Private Limited

List of works in the field of Annual Maintenance

1. Reliance Industrial Limited – Dahej

Sole Service Provider for Annual Maintenance Contract of Plants CA, GCU/CKR,

CPP, EOEG, ETP, EVA, IOP, OSP, HDPE, PVC, VCM, PET3, PTA5, CPP3.

1) Rotary Equipment And Static Equipments.

2) Fabrication of Piping And structural. 3) Scaffolding. 4) Auto Warehouse.

2. Reliance Industrial Limited – Hazira

Sole Service Provider for Annual Maintenance Contract of Plants PE1, PE2, PP1,

PBR3, SBR, ETH, PVC, PT1, PT2, PT3, EF2, TF1, ME1, ME2, ME3, VCM, CPP, BD1, ARO,

BT1, CRA.

1) Rotary Equipments.

3. Reliance Industrial Limited – Silvassa

Sole Service Provider for Annual Maintenance Contract for entire Fibre Complex

1) Rotary Equipments.

2) Static Equipments.

3) Fabrication of Piping And Structural. 4) Winders & Associated Spinning Equipments.

5) Automatic Product Handling System.

6) Air Handling Unit Operation & Monitoring.

4. Reliance Industrial Limited – Patalganga

Sole Service Provider for Annual Maintenance Contract for Petrochemical

Complex of Plants PTA, PX, LAB, EC, Utility, PSF, PFY.

1) Rotary Equipments.

Annual Maintenance Contract for Fibre Complex

1) Rotary Equipments.

2) Static Equipments.

3) Fabrication of Piping And Structural.

Page 2: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

15 | P a g e

Aug 2016 : Rotary job during PBR AUG16 Shutdown at RIL Hazira. Aug 2016 : PTA Fin Fans Inspection Job at RIL Hazira. Aug 2016 : Installation of Water Pump At Lodhivali Township. Aug 2016 : Rotary Equipment and Finfan Pm Jobs at RIL Hazira. Aug 2016 : Vacuum Pump Overhauling PTA1 SD 2016 at RIL Hazira. Aug 2016 : Service For Motor Overhauling PTA 1 at RIL Hazira. July 2016 : Overhauling of ID fan GB803 at RIL Patalganga. July 2016 : Overhauling of pump GB801C at RIL Patalganga. July 2016 : Rotary job for CCPP construction at RIL Hazira. July 2016 : Oxygen Compressor Overhauling at RIL Hazira. June 2016 : HGPI of 21-GTG- 4 at Eleme Petrochemicals, Nigeria June 2016 : Inspection & Overhauling of Lean Gas Compressor at GPU, GAIL

India Ltd at Gandhar Complex. June 2016 : Dismantling & Inspection of Frame 7 running gear, removal of

(4#) of piston assemblies and valves of Compressor at HPCL Mumbai.

Rotary Equipment’s

Gas Turbine Steam Turbine

Compressors Turbo Compressors

Pumps & Motors, Fans, Blowers

Extruder

Page 3: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

16 | P a g e

June 2016 : PTA Dryer inspection and ASD OH at RIL Hazira. June 2016 : PTA2 Finfan Replacement & PM ASD-16 at RIL Hazira. June 2016 : PTA-2 Rotary Equipment PM Jobs ASD-2016 at RIL Hazira. June 2016 : MTR O/H Job during PTA2 Plant at RIL Hazira. June 2016 : P-900 rotor Assembly & dismantling at RIL Hazira May 2016 : Major OH of 25 MW AT ACC, Raipur. May 2016 : CMI Modification &Upgradation Jobs at RIL Patalganga April 2016 : Electric Motor Replacement at RIL Patalganga. April 2016 : M302-Repair & O/H Centrifugal Pump at RIL Hazira. March 2016 : G1-301M Oxygen RX Main Motor Removal Sd2016 March 2016 : GB2601A/B/S Complete Refurbishment at RIL Hazira. March 2016 : Major Inspection by dismantling & Assembling of Rotor at ONGC

Hazira. Feb 2016 : PTA-2 VACUUM PUMP OVERHAULING at RIL Hazira. Feb 2016 : HGPI of GT#2 Gas Turbine at IOCL Vadodara. Feb 2016 : Major Overhaul 16MW at Jubilant life sciences limited Feb 2016 : Major Inspection of GT#3 Gas Turbine at ONGC Hazira. Jan 2016 : Major Inspection of Frame # 6 Gas Turbine at IOCL Vadodara. Jan 2016 : Extended HGPI of Frame # 6 Gas Turbine at RRVUNL, Ramgarh. Jan 2016 : Major Overhaul at of Steam Turbine at Kauntam Paper

Page 4: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

17 | P a g e

Nov 2015 : Dismantling & Inspection of Frame 7 running gear, removal of (4#) of piston assemblies and valves of Compressor at HPCL Mumbai.

Dec 2015 : Rotor Replacement of GT-3 Generator at Eleme Petrochemicals,

Nigeria Sept 2015 : GT2 Fuel Nozzle Replacement at RIL PMD. Aug 2015 : GT2 Fuel Nozzle Replacement at EC plant, RIL PMD. Aug 2015 : Overhauling of ESSAREC and ESSARAX machine at Essar

Jamnagar. April 2015 : GT2 Fuel Nozzle Replacement. Feb 2015 : GT2 Fuel Nozzle Replacement at RIL Patalganga. Aug 2014 : Overhauling Of 23.6 Mw STG at Renuka Sugar Ltd, Maharashtra Aug 2014 : Revival of Skoda Make 10.5 Mw Steam Turbines at Birla

Copper, Dahej June 2014 : Dismantling of 25MW Gen at RIL – Nagothane May 2014 : Major Inspection of GT -2 Fr # 5 Gas Turbine at Iffco – Aonla,

UP. April 2014 : Major Overhauling of GT 2, Frame 6 Gas Turbine at Port Harcourt,

Nigeria April 2014 : Major inspection and overhauling of MHI turbine - 1-KT-1 and 1- KT-2 at Port-hartcourt, Nigeria April 2014 :Overhauling of Steam Turbine at Tuticorin, Tamil Nadu March 2014 :Minor Overhaul of 10MW Siemens Steam Turbine -

Near Chandigarh March 2014 : Major Inspection of Frame #5 @ RIL, Nagothane

Page 5: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

18 | P a g e

Aug 2013 : Overhauling of Steam Turbine 18MW & Gear Box at Dalmia Cement

Plant, Trichy Tamil Nadu Dec 2013 : Major Inspection of GT#3 of Fr#6 at IOC, Baroda. Nov 2013 :Major Overhauling of Steam Turbine @ RIL-Dahej Sept 2013 : Major Inspection of GT#5 @ HPCL, Mumbai May 2013 : Major Inspection Job GT-2, ESSAR HAZIRA May 2013 : Alignment work for GT-3, ESSAR HAZIRA May 2013 : Supervisory and execution services for Standard HGPI HCPP-1 at

ESSAR Steel, HAZIRA May 2013 :Alignment Work of Fr. Ix GT -3, At Essar Power Limited, Hazira. Feb 2013 : Major Inspection of Gas Turbine # 2 along with up – rate at ONGC – Uran – reg Feb 2013 : Overhauling of Franco Tosi Steam Turbine 205MW at RLPC, Qatar. Jan 2013 : Overhauling of Gas Turbine Generator & Load Gear at

Indorama, Port Harcourt, Nigeria. Jan 2013 : Major Inspection of Fr 3 Gas Turbine at HPCL, Mumbai. Dec 2012 : Erection & Commissioning of Siemens Steam Turbine at GFL

Dahej, Gujarat. Sep 2012 : Major Inspection of GT 1 of Frame 6 Gas Turbine at RIL, Hazira. Aug 2012 : Major Inspection of GT 4 of Frame 6 Gas Turbine at RIL, Hazira. July 2012 : LGB Overhauling & Alignment of GT 4 at RIL, Hazira.

Page 6: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

19 | P a g e

July 2012 : Major Inspection of GT 2 along with exhaust casing

replacement work and Gear Boxes at IOCL, Baroda. July 2012 : Hot Gas Path Inspection of Frame 3 Gas Turbine at IOCL, Digboi June 2012 : Hot Gas Inspection of Frame 3 GT#2 along with replacement

of Stg#2 Bucket at IOC-Digboi June 2012 : Hot Gas Path Inspection of Fr. IX Gas Turbine (GT 2) at Essar

Power Limited, Hazira.

June 2012 : Major Inspection of Fr. VI Gas Turbine with Generator at IOCL, Haldia.

June 2012 : Hot Gas Path Inspection of Fr. Ix (GT 2) At Essar Power Limited,

Hazira. June 2012 : Major Inspection (Uprate) of Frame# 5 (2 Units) at RIL Nagothane. May 2012 : Hot Gas Path Inspection at M/S. NRL Numaligarh, Assam. May 2012 : Hot Gas Path Inspection Fr#6 at GT#3 at M/s. IPGCL,

New Delhi. April 2012 : Major Inspection of Frame 5 at IFFCO – Phulpur April 2012 : Service for Gas Turbine – 1 Alignment work at Essar Power Limited, Hazira April 2012 : Services for Fr. Ix GT -1, Alignment Work At Essar Power Ltd,

Hazira April 2012 : Overhauling of Franco Tosi Steam Turbine 205MW at RLPC Qatar. March 2012 : Major Inspection (Uprate) of Frame# 5 (2 Units) at RIL Nagothane - reg

Page 7: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

20 | P a g e

Feb 2012 : Major Inspection of Gas Turbine # 5 at RIL Jamnagar – rag Feb 2012 : Major Inspection of Frame VI Gas Turbine at Reliance Industries Limited, Hazira Feb 2012 : Bearing No.2 & 3 Inspection of Fr. IX Gas Turbine At Essar

Power Limited, Hazira Feb 2012 : Bearing no.2 & 3 Inspection of Frame IX Gas Turbine at ESSAR POWER LIMITED (Hazira). Jan 2012 : Combustion Inspection of GT#6 at Reliance Utilities Pvt. Ltd., (SEZ) – Jamnagar of Frame-9E Jan 2012 : Gas Turbine Uprate (Major Inspection) of Fr#6 at RIL Dahej Jan 2012 : Combustion Inspection of Gt#6 At Reliance Utilities Pvt. Ltd.

(SEZ) – Jamnagar of Fr. Ix March 2011 : Extended HGPI along with bearing No 2,3,4,5 Inspection, Generator Rotor replacement and Load coupling replacement of GTG 1 at Essar Power Limited Hazira, Surat, Gujarat. Dec 2011 : Services for Gt-3 HGPI Fr. Ix At Bhander Power Limited,

Hazira Dec 2011 : Services for GT-3 HGPI (Frame 9) at Bhander Power Limited Hazira Dec 2011 : Overhauling of Frame 6 GT-2 at RIL Hazira Dec 2011 : Services of STG#2 Minor Inspection at Bhander Power Limited Hazira Oct 2011 : Major Inspection of Frame 6 Gas Turbine at RIL Baroda Aug 2011 : Overhauling work of Gas Turbine unit 6 (Frame 6) at RIL Hazira

Page 8: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

21 | P a g e

June 2011 : Bearing Inspection of Gas Turbine 3 at Essar Power Limited Hazira June 2011 : Major Inspection of Frame 6 Gas Turbine 7 at RIL Hazira April 2011 : Major Inspection of Frame 5 Gas Turbine 2 at BVFCL Namrup Assam March 2011 : Hot Gas Inspection of Frame 5 Gas Turbine at IFFCO-ANOLA, Bareilly Feb 2011 : Major Inspection of Frame 6 Gas Turbine at RIL Hazira Feb 2011 : Major Inspection of Gas Turbine 2 at TCL Babrala Feb 2011 : Major Inspection of Gas Turbine 1 at IPGCL at New Delhi Jan 2011 : Major Overhauling of Frame 6 Gas Turbine at Port Harcourt, Nigeria Jan 2011 : Major Inspection of Frame 5 Gas Turbine at KSFL Shajahanpur Jan 2011 : Overhauling of Mitsui GTG2 & GTG3 at HPCL Mumbai. Jan 2011 : Hot Gas Path Inspection & Compressor Inspection, GT of CCPP, unit no.2 at GSECL Dhuvaran Jan 2011 : Gas Turbine Combustion Inspection at RIL Naroda. Jan 2011 : Overhauling of MITSUI make STG # 2 at HPCL, Mumbai. Dec 2010 : Combustion Inspection of Frame V at RIL, Naroda, Gujarat. Nov 2010 : Bearing Inspection of 230MW capacity ALSTOM make GT26 gas turbine at GBPS Utran

Page 9: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

22 | P a g e

Nov 2010 : Replacement of GT2 Exciter Bearing at RIL Patalganga Oct 2010 : Major Inspection of Frame 3 at Gail User Oct 2010 :Major Inspection & Generator Inspection of Gas Turbine 2 at

TPL Vatva Oct 2010 :Major Inspection & Generator Inspection of Frame 5 Gas Turbine

4 at IOCL Digboi Oct 2010 : Major Inspection & Generator Inspection of Frame 6 Gas Turbine at RIL Patalganga Oct 2010 : Major Inspection of Frame 6 Gas Turbine at RIL Hazira Oct 2010 : Extended Hot Gas Path Inspection of Frame 6 Gas Turbine (Unit 1 & 3) at GACL Dahej Sept 2010 : Major Inspection of Frame 6 Gas Turbine at RIL Hazira Sept 2010 : Bearing Inspection of Frame 6 Gas Turbine at IOCL Mathura Sept 2010 : Hot Gas Path Inspection of Frame 6 Gas Turbine at RRVUNL Ramgarh Aug 2010 : Major Inspection of Frame 5 Gas Turbine at RIL Nagothane Aug 2010 : Major Inspection of Frame 6 Gas Turbine at Utran Aug 2010 : Major Inspection with modification of Frame 6 Gas Turbine at HPCL, Haldia Aug 2010 : Hot Gas Path Inspection of Frame 6 Gas Turbine at RIL Jamnagar Aug 2010 : Hot Gas path Inspection load Gear Box of Frame 6 FA Gas Turbine at Dubaran

Page 10: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

23 | P a g e

July 2010 : Combustion Inspection of Frame 6 Gas Turbine at IPCL Baroda July 2010 : Hot Gas Path Inspection of Frame 6 Gas Turbine at Dholpur July 2010 : Hot Gas Path Inspection of Frame 6 at IPCL Baroda July 2010 : Hot Gas Path Inspection of Frame 9 at GIPCL Baroda July 2010 : Hot Gas Path Inspection of Frame 9 Gas Turbine at Essar Power Limited Hazira June 2010 : Combustion Inspection of Frame 6 Gas Turbine at Ril Dahej June 2010 : Train Alignment of Frame IX GTG 1 at Essar Jamnagar. June 2010 : Alignment of Steam Turbine to compressor and Compressor to expander at Deepak Fertilizer Taloja. June 2010 : Overhauling of Cracked Gas compressor Turbine at RIL, Dahej. June 2010 : Alignment of Steam Turbine to compressor and Compressor to expander at Deepak Fertilizer Taloja. June 2010 : Overhauling of Cracked Gas compressor Turbine at RIL Dahej. May 2010 : Major Inspection of GTG at GSEC Utran. April 2010 : Major Inspection of GT # 2 at NRL, Numaligarh April 2010 : Overhauling of 7.2 MW Mitsui make at HPCL, Mumbai. Mar 2010 : Major Inspection of Frame -VI Gas Turbine at RIL – Hazira Mar 2010 : Major Inspection of Frame -V Gas Turbine at ESSAR STEEL LTD - Hazira

Page 11: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

24 | P a g e

Feb 2010 : Hot Gas Path Inspection of GT #2 at Torrent Power, Vatwa, Ahmedabad Jan 2010 : Combustion Inspection of Fr#6 at GAFC Baroda Jan 2010 : Major Inspection of GT#1 at RIL-Jamnagar

Jan 2010 : Major Inspection of Frame – VI Gas Turbine at RIL-Hazira Jan 2010 : HGPI of Frame – VI Gas Turbine at Sai Regency Power Corpn Ltd, Ramnathpuram Jan 2010 : HGPI of Frame – VI Gas Turbine at RIL-Naroda, Jan 2010 : HGPI of Frame – IX Gas Turbine at Essar Power Ltd, Hazira Dec 2010 : Overhauling of MITSUI make STG # 3 at HPCL, Mumbai. Dec 2009 : Combustion Inspection of Fr# 6 at GSFC –Baroda Dec 2009 : Combustion & Baroscopic Inspection of GT-2 Frame-V at Haldia Refinery Nov 2009 : Major Inspection & Generator Inspection of Fr#6 GT # 1 at

IOCL –Baroda.

Nov 2009 : LGB replacement, alignment, coupling, and bearing inspection Jobs on GT # 2 at IOCL- Haldia

Nov 2009 : Combustion Inspection of GT # 2 at HPL Power Plant Haldia Nov 2009 : Major Inspection of Frame – VI Gas Turbine at RIL-Hazira Oct 2009 : Major Inspection & Generator Inspection of GT # 1 at TPL Vatwa Oct 2009 : Combustion Inspection of Fr # IV, GT # 1 at RRVUNL-Dholpur

Page 12: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

25 | P a g e

Oct 2009 : Combustion Inspection of Frame –VI Gas Turbine at REL – Goa. Oct 2009 : Hot Gas Path Inspection of GT # 7 at RIL-Jamnagar Oct 2009 : STG Inspection with train alignment at BPOL, Hazira, Surat. Sept 2009 : Combustion Inspection & full GTG alignment of Frame V at RIL, Nagothane, Maharashtra. Aug 2009 : Hot Gas Path Inspection of Frame IX GTG at Bhander Power Limited, Hazira. July 2009 : Hot Gas Path inspection of GTG # 7 at RIL, Hazira. July 2009 : Major Inspection of Mitsui makes GTG at HPCL, Mumbai Refinery. July 2009 : Overhauling of GTG #2 at IOCL Baroda July 2009 : Extended Hot Gas Path Inspection at IOCL Haldia July 2009 : Major Inspection of GT # 2 at PPCL New Delhi June 2009 : Overhauling of GTG #3 at IOCL Baroda June 2009 : Additional Mechanical & Instrumentation job during CI at IOCL Mathura June 2009 : Major Inspection of Frame VI GT #1 at GIPCL Baroda June 2009 : Hot Gas Path Inspection of GT #3 at IOCL Baroda June 2009 : Replacement of LGB gear set of GT #2 at IOCL Baroda June 2009 : Hot Gas Path Inspection of GT VII at RIL Hazira June 2009 : Combustion Inspection of GTG in CPP at RIL Dahej

Page 13: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

26 | P a g e

June 2009 : Extended Hot Gas Path Inspection at Maruti Udyog Ltd Gurgaon

June 2009 : Combustion Inspection of Frame VI Gas Turbine Unit #2 at IOCL Baroda. June 2009 : Hot Gas Path Inspection of Frame IX GT #4 at GIPCL Baroda July 2009 : Overhauling of 57 MW Steam Turbine Siemens-5569 (STG1) at Bhander Power Limited. April 2009 : Overhauling of Mitsui Gas Turbine No. 1 at HPCL MUMBAI April 2009 : Major Inspection, LGB, AGB & Generator Inspection on Frame 5 at CPCL, Chennai. April 2009 : Combustion Inspection of Frame 6 of GT# 3 at IOCL, Vadodara. March 2009 : Overhauling of Steam Turbine, 2MCL527 & 2BCL306a of Co2 Compressor Train of Urea-II, Iffco, Anola March 2009 : Hot Gas Path Inspection of BHEL Supplied Frame 6581 Gas Turbine Unit no. 9 at RIL Hazira. March 2009 : Major Inspection of Thomassen make GT at IFFCO, Aonla. Feb 2009 : Hot Gas Path Inspection of THOMESSEN supplied Frame 6541 Gas Turbine Unit no. 2 at RIL Hazira. Feb 2009 : Hot Gas Path Inspection of GT# 2 at Maruti Suzuki Limited, Gurgaon, Haryana. Feb 2009 : LGB Vibrations checking & rectification of Frame 6 at RRVUNL, Ramgarh. Feb 2009 : Major Inspection & Generator Inspection on Frame 3 at IOCL, Digboi, Assam.

Page 14: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

27 | P a g e

January 2009 : Hot Gas Path Inspection of BHEL Supplied Frame 6581 Gas Turbine Unit no. 8 at RIL Hazira. January 2009 : Train alignment of Frame IX Gas Turbine (unit no. 1&2) at Essar Power, Surat Dec 2008 : Hot Gas Path Inspection FR-6 Gas Turbine at RIL Hazira. Dec 2008 : CI/BI of Fr-5 GT # 1, 2, 3 at IOC – Mathura. Nov 2008 : Combustion Inspection of Fr-6, GT # 3 at IOC Baroda. Nov 2008 : Load Gear Box Inspection and Additional Jobs for Load Coupling on Fr-6 GT # at 1 at RIL – Baroda. Oct 2008 : Major Inspection of Fr-6 GT # 2 at GSEC – Utran Oct 2008 : Hot Gas Inspection and Replacement of 3rd Stage. Bucket of Fr-6 GT # 2 & 5 at RIL Jamnagar Oct 2008 : Major Inspection and Gear Box of GT # 1 at NRL Numaligarh, Assam Oct 2008 : Hot Gas Path Inspection of GT # 2 Evonik Industries, Haldia Oct 2008 : Dismantling and box up of diff. parts/accessories during various type of maintenance of GT Barauni Refinery Oct 2008 : Major Inspection of Frame-6 Gas Turbine at RIL Baroda Oct 2008 : Major Inspection of Frame 6 GT# 2 at GSEC URAN.

Oct 2008 : HGPI & Bearing Inspection & 3rd stage bucket replacement of Frame 6 GT# 2 & 5 at RIL Jamnagar. Oct 2008 : Major Inspection & Gear Box Inspection of Frame 6 GT#1 at NRL, Numaligarh, Assam.

Page 15: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

28 | P a g e

Oct 2008 : Erection Testing & Commissioning of Fr-6 Gas Turbine – for Generator Sets & their Aux. BOP, with Related Piping etc 2 X 30 MW, EPCC Package – 7 (GTG & HRSG), at IOCL – Gujarat Refinery , Jawahar Nagar Baroda Oct 2008 : Hot Gas Path Inspection of GT# 2 at Evonik Industries, Haldia. Oct 2008 : Damages assessment & rebuild of Frame 9E GT# 2A at NTPC Kawas, Surat. Sept 2008 : Hot Gas Path Inspection and Replacement of # 3rd Stage, Bucket of Fr-6 GT # 3 at RIL – Jamnagar Sept 2008 : Hot Gas Path Inspection and Bearing Inspection GE Frame 6 GT maintenance Sept 2008 : HGPI & Bearing Inspection & 3rd stage bucket replacement of GE Frame 6. Sept 2008 : HGPI & 3rd stage bucket replacement of Frame 6 GT# 3 at RIL Jamnagar. Aug 2008 : Inspection of LGB along with vibration analysis on Frame 6 of GT # 2 at RIL, Vadodara. Aug 2008 : Major Inspection of Frame 6 at IOCL, Vadodara. Aug 2008 : Major Inspection & Generator Inspection on Fr 6, GT at IOCL Baroda. Aug 2008 : Additional Jobs on Load Gear Box Inspection along with vibration analysis on Fr-6, GT # 2 at RIL – Baroda Aug 2008 : Erection & Commissioning of on – line water wash system of Fr-9 GT # 1 at NTPC – Kayamkulam. July 2008 : Hot Gas path inspection of Frame-9 GT # 2 at NTPC –

Kayamkulam

Page 16: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

29 | P a g e

July 2008 : Up-gradation of Fr-5 Gas Turbine and Generator at ONGC Hazira July 2008 : Man power services of various categories for Gas Turbine # 11 Damage Rectification work at GSEG – Hazira June 2008 : Up – Gradation of Frame V Gas Turbine and generator at ONGC – Hazira June 2008 : Hot Gas Path Inspection, Inspection of BRG 1 & 2, Alignments and AGB Inspection of Frame VI GT # 1 at RRVUNL – Ramgarh June 2008 : Combustion Inspection of Frame VI GT # 1 & 3 at GSECL – Utran June 2008 : Additional Job of Replacement of Stage 3 Buckets of Frame VI GT # 1 at GSFC – Vadodara June 2008 : Attending High Vibration Problem on Frame VI GT # 1 at RRVUNL – Ramgarh June 2008 : Erection & Commissioning of 15 MW STG API Ispat Raipur June 2008 : Erection, Testing, Pre – Commissioning and Commissioning of 1 X 33 MW STG Sets at M/S HEG, Mandideep. May 2008 : Major Inspection AGB, LGB, Inspection & Generator Inspection On Frame VI GT # 2 M/S IOCL – Baroda May 2008 : LGB Inspection Frame GT RIL – Vadodara May 2008 : Combustion Inspection of GT # 1 at Stage Encotee Haldia April 2008 : Major Inspection & Generator Inspection on Frame – VI GT # 3 at M/S BPCL Mumbai. April 2008 : Erection Testing & Commissioning Together With Material Handling of 1 X 21 MW GTG (frame – V GT) with Auxiliaries &

Page 17: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

30 | P a g e

Piping ETC for 1X 21 MW GTG Based Cogeneration Captive Power Plant of BRPL DHDT Project At Bongaigaon Refinery & Petrochemicals Ltd, ASAM April 2008 : Erection Testing & Commissioning Together with Material Handling of 1 X 21 MW STG (Frame – V GT) with Auxiliaries & piping ETC for 1 X 31 MW GTG based Cogeneration Captive power plant of BRPL DHDT Project at Bongaigaon Refinery & Petrochemicals Ltd. Assam March 2008 : “C” Inspection of Gas Turbine # 12 Major Overhauling GT makes Alstom Type GT#8 at GSEG Hazira March 2008 : Additional Stay during Revamping Jobs of Frame V GT # 3 at ONGC – Hazira March 2008 : Gas Turbine Combustion Inspection at Sri Lanka March 2008 : Major Inspection of Frame 6 GTG # 8 in RIL, Jamnagar. March 2008 : Additional Problem Shooting of Frame 6 GTG # 4 in RIL, Jamnagar. March 2008 : Overhauling & Preventive Maintenance of GTG, STG, Compressor, Pumps & Other Rotary Equipments in RIL, Dahej, Bharuch. Feb 2008 : Hot Gas Path Inspection & Replacement of 3rd Stage Bucket of Frame 6 GT # 4 in RIL, Jamnagar. Feb 2008 : Hot Gas Path Inspection & Replacement of 3rd Stage Bucket of Frame 6 GT # 1 in RIL Jamnagar. Feb 2008 : Hot Gas Path Inspection Frame 6 GT # 9 In RIL Jamnagar. Feb 2008 : Major Inspection of Frame 3 GTG # 1 in IOC, Digboi. Feb 2008 : Load Gear Set Replacement of GTG # 2 in RIL, Patalganga, Maharashtra.

Page 18: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

31 | P a g e

Feb 2008 : Major Inspection of GTG # 1 Frame 6 in IOCL, Panipat. Jan 2008 : Major Inspection of Frame – 3 Gas Turbine # 1 at IOC – Digboi, Assam Jan 2008 : Hot Gas Path Inspection for Frame VI Gas Turbine # 9 at RIL – Jamnagar Jan 2008 : Hot Gas Path Inspection And Replacement of 3rd Stage Bucket And Shroud For Frame VI Gas Turbine # 1 at RIL Jamnagar Jan 2008 : Hot Gas Path Inspection And Replacement of 3rd Stage Bucket And Shroud For Frame VI Gas Turbine # 4 at RIL Jamnagar Jan 2008 : Rectification of Lube Oil Leak from Bearing No. 2 of GT in IOCL Mathura. Jan 2008 : Maintenance & Overhauling of Various Rotary Equipments (GT, ST & compressors) in CFCL, KOTA. Jan 2008 : Major Inspection of GTG # 12 in GSEG, Hazira. Jan 2008 : Bearing & Mechanical Seal Replacement Job (STG) in RIL Vadodara. Jan 2008 : Bottom Shaft & Bearing Replacement Job (STG) in RIL Vadodara. Jan 2008 : Steam Turbine (Scoda) Alignment Job in Essar Steel Hazira, Surat. Jan 2008 : Overhauling & Commissioning of Various Steam Turbine, Reciprocating & Centrifugal Compressors in IFFCO, Phulpur. Jan 2008 : Bearing Inspection Job of Steam Turbine in United Phosphorous.

Page 19: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

32 | P a g e

Jan 2008 : Steam Turbine (HP) Overhauling in IOCL, Mathura. Dec 2007 : Overhauling of Mitsui Gas Turbine No. 2 at HPCL MUMBAI Dec 2007 : Hot Gas Path Inspection of Frame V Gas Turbine # 2 at ONGC – Uran Dec 2007 : Hot Gas Path Inspection of Frame VI Gas Turbine # 8 at RIL – Jamnagar Dec 2007 : Hot Gas Path Inspection of Frame VI Gas Turbine # 2 at GIPCL Baroda. Dec 2007 : Major Overhauling of Frame 9E Gas Turbine & Generator at

Essar Power Hazira. Aug 2007 : Hot Gas Path Inspection of Frame IX Gas Turbine # 1 Essar

Power Corporation Limited, Hazira, Surat, Gujarat. April 2007 : Hot Gas Path Inspection of Frame V of Gas Turbine No. 1 at ONGC – URAN March 2007 : Combustion Inspection of Frame VI of GTG at RIL Jamnagar. March 2007 : Combustion Inspection of Frame V Gas Turbine No.3 at IOCL – MATHURA March 2007 : Major Inspection of Frame VI Gas Turbine No. 1 at GSECL – UTRAN March 2007 : Hot Gas Path Inspection Frame VI of Gas Turbine No. 1 at IOCL – BARODA Feb 2007 : Gas Turbine Major Overhauling of Gas Turbine No. 11 at GSEG – HAZIRA.

Page 20: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

33 | P a g e

Feb 2007 :Combustion Inspection of Frame IX of Gas Turbine No. 1 at Pragati Power (PRAGATI – NEW DELHI).

Dec 2007 : Overhauling of 30 MW Turbine & Generator (Two Units) At Torrent Power - Ahmedabad Dec 2007 : Overhauling of Mitsui GTG 7 MW at HPCL Mumbai Nov 2007 : Overhauling of Steam Turbine (TK – 1421) for Process Air Compressor (PAC) in Amm - I Plant at IFFCO – Bareilly Sept 2007 : Overhauling of 15 MW back pressure type Nippon make STG (including replacement of rotor & diaphragms) at Birla Cellulosic, Kosamba, Kharach, Surat, Gujarat. July 2007 : Overhauling of Gear Box of 55 MW Steam Turbine with Bearing Inspection of Generator and Alignment of Entire Train for Axial Condenser in BHANDER POWER HAZIRA (SURAT) June 2007 : Erection & commissioning of 15 MW STG at API Ispat, Raipur April 2007 : Overhauling of Siemens Make Turbine Mode EHNK – 25/28/19 – 3A in Methanol Plant at Deepak Fertilizer, Taloja. March 2007 : Overhauling of 55 MW BHEL Make Steam Turbine at GIPCL, Baroda. March 2007 : Swapping of GTG Generator Rotor with STG Generator Rotor at IPCL, Nagothane. Feb 2007 : Erection & Commissioning of 16 MW STG at Century Mills at Lalkuan, Uttaranchal. Feb 2007 : Overhauling of Steam Turbine and Alignment with Gear Box at Bhander Power Surat. Feb 2007 : Overhauling of Steam Turbine and Generator at IPCL, Nagothane

Page 21: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

34 | P a g e

Jan 2007 : Overhauling of Siemens Make Steam Turbine with Charge Gas Compressor, Propylene Gas Compressor and Ethylene Gas Compressor in GOP Plant at IPCL Baroda. Jan 2007 : Overhauling of STG at GIPCL, Vadodara. Oct 2006 : Generator Works of Frame V Gas Turbine No. 1 at ONGC – HAZIRA. Oct 2006 : Revamping of Frame V Gas Turbine No. 2 at ONGC – HAZIRA. Oct 2006 : Combustion Inspection of Frame VI Turbine No. 2 at RIL – PATALGANGA. Oct 2006 : Revamping of Frame V of Gas Turbine No. 1 at OCGC – HAZIRA. Sept 2006 : Combustion Inspection of Frame VI Gas Turbine No. 2 at IOC – BARODA. Sept 2006 : Hot Gas Path Inspection of Gas Turbine No. 2 at HPCL – HALDIA. Sept 2006 : Hot Gas Path Inspection of Gas Turbine No. 2 at ESSAR POWER HAZIRA. Aug 2006 :Gas Turbine Major Inspection, Accessory & Load Gear Box Overhauling GT C & I Miscellaneous Activities at RIL – GOA. Aug 2006 : Major Inspection of Frame V of Gas Turbine at BPCL – MUMBAI. July 2006 : Major Inspection of Frame V of Gas Turbine No. 1 at IOC – HALDIA. May 2006 : Hot Gas Path Inspection of Frame VI of Gas Turbine, at IPCL GANDHAR.

Page 22: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

35 | P a g e

May 2006 : Major Inspection of Frame VI of Gas Turbine No. 3 at IOC – BARODA. May 2006 : Turbine Bearing No. 2 Inspection of Frame VI of Gas Turbine No. 3 at BPCL – MUMBAI. May 2006 : Combustion Inspection of Gas Turbine No. 1 AT HPL – HALDIA. April 2006 : Hot Gas Path Inspection of Frame VI Gas Turbine No. 1 at IOC – BARODA. April 2006 : Major Inspection of Frame V, 20 MW Gas Turbine No. 1 at MUL – GURGAON. March 2006 : Major Inspection of Gas Turbine, LGB, AGB & Generator of Frame V of Gas Turbine No. 1 (033) at CFCL – KOTA. March 2006 : Major Inspection (Mechanical, Electrical & Instrumentation Job) of Gas Turbine No. 1 of Barauni Refinery, at IOC – BARAUNI. March 2006 : Hot Gas Path Inspection of Frame VI of Gas Turbine No. 1, 2, 3 & 5 at RIL – JAMNAGAR. Feb 2006 : Hot Gas Path Inspection Old Frame VI of Gas Turbine No. 1 at GIPCL – BARODA (BHEL MAKE). Feb 2006 : Hot Gas Path Inspection of Frame VI of Gas Turbine No. at GIPCL BARODA. Jan 2006 : Major Inspection of Gas Turbine, LGB, AGB, & Generator of Frame V OF Gas Turbine No. 1 at PONDICHERRY POWER (BHEL MAKE). Nov 2005 : Hot Gas Path Inspection of Frame VI OF Gas Turbine No.2 at RIL – PATALGANGA (BHEL – MAKE).

Page 23: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

36 | P a g e

Nov 2005 : Major Inspection of Gas Turbine, LGB, AGB & Generator Frame III Gas Turbine No. 2 IOC – DIGBIO.

Nov 2005 :Combustion Inspection of Frame IX of Gas Turbine No. 1 & 2. At

NTPC – KAYAMKULAM (GE MAKE). Nov 2005 :Hot Gas Path Inspection of Frame IX DLN Gas Turbine No. 2 at

PPCL – DELHI (GE MAKE). Oct 2005 : Combustion Inspection of Gas Turbine OF Frame VI gas turbine no.2, 8, 3, & 5 at RIL – JAMNAGAR (BEHL MAKE). Sept 2005 : Major Inspection of Gas Turbine No. 1 at HPL – HALDIA (EGT MAKE). Aug 2005 : Hot Gas Path Inspection of Frame 6 Gas Turbine at Gujarat State

Electric Company Limited (previously known as Gujarat State Electricity Board), UTRAN.

Aug 2005 : Combustion Inspection OF Frame 6 Gas Turbine at Indian Petrochemical Corporation Limited, Dahej, GUJARAT. Aug 2005 : Hot Gas Path Inspection and bearing inspection of Frame VI Gas Turbine at Reliance Energy Limited, GOA, INDIA. Aug 2005 : Hot Gas Path Inspection of Frame VI Gas Turbine at L & T AMERILE (EGT – MAKE). Aug 2005 : Major Inspection of GT & Generator Inspection of Frame VI Gas Turbine No. 3 at RIL – JAMNAGAR. Aug 2005 : Major Inspection of Generator including Electrical Diagnostic Test of Stator, Rotor & Exciter Type TARI – 800 – 26 (GT- Frame VI). Aug 2005 : Hot Gas Path Inspection of GT Frame V 702 at IMDO GULF – JADISHPUR, TURBO – TECHNICA (GENP MAKE).

Page 24: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

37 | P a g e

Aug 2005 : Overhauling of 210 MW of Steam Turbine of LP Turbine overhauling, HPE Inspection, FS Inspection and Auxiliary systems overhauling at Nuclear Power Corporation of India Limited, TARAPUR, and MAHARASHTRA. July 2005 : Major Overhauling of 50 MW BHEL make Steam Turbine Generator at Gujarat Industries Power Corporation Limited, Gujarat. July 2005 : Major Inspection of Frame V Gas Turbine at Reliance Industries Limited, Jamnagar. July 2005 : Hot Gas path Inspection of 145 MW Gas Turbine Generator OF ABB make and its auxiliaries (GT #3). July 2005 : Major Inspection of Frame 6 Gas Turbine Generator at Gujarat Industries Power Corporation Limited, Gujarat. July 2005 : Major Inspection of Frame V Gas Turbine at Oil and Natural Gas Company Limited, Hazira, Gujarat. July 2005 : Hot Gas Path Inspection of Frame IX at Essar Power Limited,

Hazira, Surat, Gujarat. July 2005 :Major Inspection of ALSTHOM makes 106 MW Gas turbine of

Frame 9 E (unit # 2) for National Thermal Power Corporation Limited, Kawas, and Gujarat.

June 2005 : Hot Gas Path Inspection of Gas No. 3 at NTPC – AURIYA (BHEL MAKE). June 2005 : Combustion Inspection of Frame VI Gas Turbine at Reliance Industries Limited, Jamnagar, Gujarat. June 2005 : Major Inspection of 145 MW Gas Turbine Generator OF ABB make and its auxiliaries (GT #2) and extended combustion inspection OF (GT # 4) at AURIYA, Uttar Pradesh.

Page 25: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

38 | P a g e

June 2005 : Major Inspection OF Frame IX Gas Turbine OF EGT make at National Thermal Power Corporation Limited, Kawas.

May 2005 : Major Overhauling of Gas Turbine No. 2 & its Auxiliaries And Major Inspection of Gas Turbine No. 2 at NTPC – AURAIYA (MHI – MAKE). May 2005 : Combustion Inspection of Gas Turbine No. 4 at NTPC – AURAIYA (MHI – MAKE). May 2005 : Hot Gas Path Inspection of Frame VI OF Gas Turbine No. 2 at GSEL – UTRAN. May 2005 : Combustion Inspection of Frame VI at IPCL – GANDHAR (BHEL – MAKE). May 2005 : Combustion Inspection of Gas Turbine & Generator Frame VI OF Gas Turbine No. 3. At GIPCL – BARODA (BHEL – MAKE). May 2005 : Combustion Inspection of Frame VI OF Gas Turbine No. 1 & 3 at GSEL – UTRAN. May 2005 : Major Inspection of Gas Turbine, LGB, AGB Generator 7 Auxiliaries OF Frame VI OF Gas Turbine No. 1 at HPL- HALDIA(EGT- MAKE). May 2005 : Combustion Inspection of Frame VI Gas Turbine at Indian Petrochemicals Corporation Limited, Dahej. May 2005 : Major Inspection OF Frame VI Gas Turbine at Gujarat Industries Power Corporation Limited, Baroda, Gujarat. April 2005 : Major Inspection of Gas Turbine at RIL - JAMNAGAR April 2005 : Combustion Inspection of Frame VI GT No. 1, 2, & 3 at IOC – BARODA (BHEL – MAKE). March 2005 : Hot Gas Path Inspection of Frame V Gas Turbine OF Thomassen make at IFFCO, Phulpur.

Page 26: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

39 | P a g e

March 2005 : Major Inspection of Frame V Gas Turbine at Oil & Natural Gas Corporation Limited, Hazira. March 2005 : Hot Gas Path Inspection of Frame VI Gas Turbine at Numaligarh Refinery, Assam. March 2005 : Hot Gas Path Inspection of Frame VI Gas Turbine No. 2 at NUMALI GARH REFINERY LTD. (GNP – MAKE) Feb 2005 : Major Inspection of Frame VI Gas Turbine at Gujarat State Fertilizer Corporation, Baroda, Gujarat. Feb 2005 : Hot Gas Path Inspection of Frame VI Gas Turbine at Bharat Petroleum Corporation Limited, Mumbai. Feb 2005 : Major Inspection of ABB makes 160 MW Gas Turbine at National Thermal Power Corporation Limited (NTPC), Jhanor, Gujarat. Jan 2005 : Major Inspection of Frame V Gas Turbine Generator at Indian Petrochemicals Corporation Limited, Gujarat. Jan 2005 : Major Inspection of Frame V Gas Turbine Generator at Reliance Industries Limited, Patalganga. Jan 2005 : Major Inspection of Frame V Gas Turbine at Reliance Industries Limited, Jamnagar.

Page 27: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

40 | P a g e

Aug 2016 : PTA & CTA drier tube doubling job at RIL Hazira. June 2016 : PTA Dryer inner row tubes Replacement at RIL Hazira. June 2016 : Scaffolding erection for bhukhikhadi at RIL Dahej. June 2016 : Contract for Exchanger replacement jobs during VCM SD at RIL

Dahej. April 2016 : Laying RO water line from EOEG tank Farm to CPP1culvert at

RIL Dahej May 2016 : Scaffolding preparation for EOT crane service at RIL Dahej. May 2016 : Laying RO water line from PTA 36” header to New ETP OSBL at

RIL Dahej March 2016 : ASP compressor diffuser inspection & cleaning at RIL Dahej. March 2016 : Occasional Fabrication & Static Maintenance job at RIL Dahej. Feb 2016 : Supply, Fabrication & Erection of Natural Gas Pipeline at ONGC

Petro Additions Limited- Dahej Feb 2016 : Motor Removal & Re-installation of HT motors at RIL Dahej

Static Equipment’s

Heat Exchangers Pressure Vessels Columns Agitator Scaffolding

Fabrication

Page 28: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

41 | P a g e

Jan 2016 : Static Job for Pre-commissioning at Reliance Utilities and Power Pvt. Limited

Jan 2016 : K320, K950 Compressor Overhauling & Overhauling of K115

gearbox at RIL Dahej Jan 2016 : Hydro-testing of Heat exchanger in CCPP Dec 2015 : Removal & re-fixing of MBR Membrane cassette for cleaning at

RIL Dahej Nov 2015 : Major Overhauling of C2R, C3R (Elliot Make) Compressor &

Turbine at ONGC Petro Additions Limited- Dahej. Nov 2015 : Aluminum Oxide 16 Mesh Grid Blasting of C2R, C3R casing &

diaphragm Oct 2015 : H801-Repair & Maintenance Jobs (YORK compressor 1 &

compressor 2) Sept 2015 : Extruder Die Plate Replacement, LDPE Sept 2015 : K401 Res Comp O/H, Residual Gas Compressor Overhauling,

Oxygen Comp O/H During Meg1 SD Aug 2015 : Major Overhauling of CGC (Elliot Make) Compressor & Turbine at

ONGC Petro Additions Limited- Dahej. Aug 2015 : BOG Compressor Motor Swap 7A to 7C at Gujarat Chemical Port

Terminal Co. Ltd. Aug 2015 : Overhauling of ESSAREC and ESSARAX machine at Essar

Jamnagar. July 2015 : CT-2 Cooling Water Pump Loading, Unloading. June 2015 : Fuel Gas Line Replacement/Fabrication. June 2015 : Fabrication & Fixing Of New Bobbin Stand.

Page 29: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

42 | P a g e

June 2015 : Replacement of Gland Seal Of Extruder at RIL NMD May 2015 : Alignment of compressor motor at Gujarat Chemical Port Terminal

Co. Ltd. May 2015 : Fire Water Pump Erection & Alignment Job. May 2015 : Internal cleaning of vessels & media filling in side-stream filter.

April 2015 : M473X Dryer Flue Head Bolts Replacement at PMD.

April 2015 : Preservation of Rotary equipments at PTA-6.

April 2015 : Divertor Damper Bearing Replacement

Feb 2015 : K301 Overhauling IMPL CLEANING MEG3 SD at RIL Hazira.

Feb 2015 : OXY COMP O/H DURING MEG3 SD at RIL Hazira.

Jan 2015 : Overhauling of LDPE extruder (30-X -01)at RIL Nagothane.

Jan 2015 : Replacement of Extrusion Hopper (30V15) in LDPE plant at RIL

Nagothane.

Jan 2015 : Major Overhauling work for Dresser-Rand make turbo compressors

(CGC, C2R, C3R) at RIL Nagothane.

Jan 2015 : Overhauling of Gear Box C3071 at RIL Patalganga.

Jan 2015 : Motor Replacement Job at RIL Patalganga.

Dec 2014 : Providing Services for G1401 Agitator at RIL Patalganga.

Dec 2014 : Hydrotest of Heat Exchangers in PTA6 at RIL Dahej.

Dec 2014 : Overhauling of MAAG pump & Gear Box at Ril Dahej.

Page 30: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

43 | P a g e

Oct 2014 : Pump Loading, Shifting, O/H & Alignment At Ril Hazira.

Sept 2014 : Overhauling of Main Air Compressor At Ril Hazira.

Sept 2014 : Pumps Overhauling in CKR at Ril Hazira.

Sept 2014 : Blinding/Deblinding For Isbl Piping At Ril Hazira.

Sept 2014 : Misc Cold Work At Ril Hazira.

Sept 2014 : Overhauling of C2R, FGC And Expander At Ril Hazira.

Aug 2014 : Overhauling Of Oxygen Compressor At Ril Hazira.

Aug 2014 : Hydrotest of Heat Exchangers in PTA5 at DMD, Dahej.

July 2014 : Motor Removal & Installation & Alignment in MEG SD At RIL

Dahej.

July 2014 : Oxygen Compressor Overhauling at RIL Hazira.

July 2014 : CCT Pump Loading, Unloading & Alignment at RIL Hazira.

July 2014 : Overhauling Of York Compressor at RIL Dahej.

June 2014 : MAAG Pump & Gear Box Maintenance Job at RIL Dahej.

May 2014 : MISC. Static Maintance JOBS OF PVC Shutdown At Ril Dahej.

May 2014 : Assistance for GFD Gearboxes Overhauling @ RIL, Patalganga

May 2014 : Compressor overhauling jobs @ RIL- Hazira

April 2014 : Misc Static job of PVC Shutdown @ RIL, Dahej

April 2014 : Misc Rotary jobs in PVC plant @ RIL, Dahej

April 2014 : PTA Dryer Air Seal Drum Overhauling @ RIL, Patalganga

Page 31: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

44 | P a g e

April 2014 : CG Compressor LP and MP Seals inspection and replacement jobs

at GCU, RIL-Dahej.

March 2014 : Compressor Overhauling services in ETH plant @ RIL, Hazira

March 2014 : Dryer Overhauling jobs during PTA 3 ASD @ RIL, Hazira

March 2014 : Rotary Equipment Insp OH Job at VCM plnat @ RIL, Hazira

March 2014 : Rotary Equipments OH jobs during PTA 3 ASD @ RIL, Hazira

March 2014 : PTA 1 Centrifuge job in FSD @RIL- Hazira

Feb 2014 : PTA-2 Centrifuge Job in FSD @ RIL- Hazira

Feb 2014 : Motor Replacement job @ RIL- Patalganga

Feb 2014 : Multistage job of pumps @ RIL- Patalganga

Jan 2014 : Rotary Pre-Commissioning & Commissioning At RIL Dahej.

Dec 2013 : KOBE compressor overhauling job @ RIL- Dahej

Dec 2013 : Centrifuge Overhauling services in PTA-1 & 2 @ RIL- Hazira

Nov 2013 : Screw Conveyor job in FSD @ RIL- Hazira

Nov 2013 : ASU cold box air exp. Turbine overhauling @ RIL- Hazira

Nov2013 : PM & Maintenance jobs in FSD @ RIL_ Hazira

Nov2013 : Reactor Feed pump overhauling job @ RIL- Hazira

Nov2013 : Overhauling of K202 compressor @ RIL- Dahej

Nov 2013 : Preservation of equipment for PET-3 project @ RIL-Dahej

Nov 2013 : Upgradation of Extruder ZSK 300 to 320 @ RIL- Dahej

Page 32: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

45 | P a g e

Oct 2013 : Compressor overhauling jobs @ RIL- Hazira

Oct 2013 : Rotary valve seal replacement job @ RIL- Patalganga

Sept 2013 :Overhauling of Chlorine Compressor at CA plant, RIL, Dahej

Aug 2013 : Replacement of motor at CPP-I, RIL Dahej

June 2013 : Overhauling of Various Equipments during Shutdown of PTA

Plant at Reliance Industries Ltd, Patalganga

June 2013 : Overhauling of C133- Suzler PAC & GHH machine in PTA plant,

Overhauling of C3071 machine in PX plant, MANTURBO,

Patalganga

May 2012 : Overhauling of Cycle Gas Compressor & Gear Box Train

configuration (Mitsui engg. Company and Ship Building Co.)

at Reliance Nagothane.

May 2012 : Overhauling of EO Compressor & Gear box Train

Configuration(IHI Japan Make) at Reliance, Nagothane.

April 2012 : Overhauling jobs of rotary equipments in Deepak Fertilizers

and Petrochemicals Corp. Ltd.

March 2012 : Export Oil Pumps Revamping job at Cairn Energy India Pty

Limited, Barmer

Feb 2012 : Major SHUT DOWN at Reliance Industries Limited, Patalganga for

Page 33: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

46 | P a g e

Overhauling of compressor, pumps, agitator, seal artridge

replacement, maintenance of critical valves, sleeve replacement’s and

all other critical ROTARY equipments.

Feb, 2012 : Overhauling of reciprocating hyper & primary compressor at

RIL Baroda

Feb, 2012 : Repair & Overhauling of Centrifugal pumps including

removal & reinstallation at RIL Patalganga

Jan 2012 : Overhauling of Main Air Blower and Flue Gas Expander

(JAMNAX 4) at Reliance Jamnagar

Jan 2012 : Overhauling of Extruder and Agitator at RIL Baroda

Dec 2011 : Overhauling of Reclaim Compressor K-320 at RIL Dahej

Nov 2011 : Overhauling of MAN Turbo make Centrifugal Compressor

(JAMISO) at RIL Jamnagar

Nov 2011 : Overhauling of MAN Turbo make Centrifugal Compressor

(JAMPFUEL) at RIL Jamnagar

Nov 2011 : Overhauling of MAN Turbo make Centrifugal Compressor

(JAMPLAT 2) at RIL Jamnagar

Nov 2011 : Overhauling of MAN Turbo make Centrifugal Compressor

(JAMPLAT 1) at RIL Jamnagar

Page 34: Rotostat Services Private Limited - Al-Adwani. Groupaladwanigroup.com/Rotostat-List-of-works.pdf · Rotostat Services Private Limited ... of Frame # 6 Gas Turbine at IOCL Vadodara

47 | P a g e

Oct 2011 : Overhauling of Main Air Blower and Flue Gas Expander

(JAMNAX – 3) at RIL Jamnagar

Oct 2010 : Bearing Inspection 1 & 2 at IOCL Baroda

Dec 2009 : Inspection of bearing No.1 & 2 at IOC-Baroda

April 2009 : Replacement of LGB Gears & Bearing at RIL Baroda.

Jan 2009 : AGB Replacement & machine alignment at AES, Sri Lanka.

Jan 2009 : Combustion and Baroscopic Inspection at Torrent Power

Ahmedabad

Jan 2008 : Overhauling of Rotary Machines in IFFCO, Aonla.

June 2005 : Rotor swapping job of Turbo Generator at Indian oil Corporation

Limited, Baroda.