Rob Hearne RIBA Project experience

Rob Hearne recent projects 2017

Embed Size (px)

Citation preview

Page 1: Rob Hearne recent projects 2017

Rob Hearne RIBA Project experience

Page 2: Rob Hearne recent projects 2017

1 New Street Square EC4. 2013-16 16-storey commercial building in the City of London with 2-level basement. 24,000 sq m for Land Securities. 20-year lease taken by Deloitte as flagship to their New Street Square campus. Client-side involvement as part of Land Securities CMT (Client Monitoring Team). Helping administer the Employers Requirements in coordination with the novated consultant team and main contractor Skanska. Managing change with the Employer’s Agent through construction on site to PC (Practical Completion) and through Defects Liability Period and Deloitte fit-out.

rob hearne Page 2 recent projects - RPP 04/01/2017

Page 3: Rob Hearne recent projects 2017

Park House Oxford Street W1 – 2013

0.42 Ha, 45,000 sq m mixed-use development for Land Securities, Acquired by Qatar National Bank. 7 floors of office space (up to 3-way tenant splits), 11 retail units including flagship stores and 39 high specification residential units. 2 levels of basement including car parking for 56 cars and 269 cycles. Plant rooms and 6 bore holes. Client-side involvement as part of the CMT (Client Monitoring Team). Helping administer the Employers Requirements in coordination with the novated consultant team and main contractor Mace. Managing change with the Employer’s Agent through construction on site to PC (Practical Completion) and through Defects Liability Period. Ongoing professional services with REM for architecture related changes.

rob hearne Page 3 recent projects - RPP 04/01/2017

Page 4: Rob Hearne recent projects 2017

Jumeira Garden City - Dubai 2009

SOM Masterplan for 8Km New CBD in Dubai. SOM London involved particularly in East Park district. 5.5 million m2 (BUA) of mixed-use development. The project is currently on-hold. Involvement primarily as technical coordinator on various aspects of the project, including infrastructure generally: utilities / new technologies / servicing (‘Smart Boulevard’) / parking, traffic and transport management strategy. Secondary role was project liaison to consultants and SOM, Dubai and Chicago.

rob hearne Page 4 recent projects - SOM 04/01/2017

Page 5: Rob Hearne recent projects 2017

Leamouth Peninsular London 2007 - 2008

Mixed use development, peninsular site of 4.7 Ha. 180,000 sqm accommodation across 12 buildings, including 10 high-rise up to 27 stories height. Residential component of approximately 2000 homes. A public promenade, a school, an arts centre, creative workspaces, shops, offices, a nursery, community centre, parking and new bridge access across the Lea to Canning Town. Involvement as technical coordinator on various aspects of the project including the bridges, construction phase 1 for the first building - Building N complete 2008, regular participation in client and consultant meetings and liaising with LBTH Building Control. Main project was put on hold 2008.

rob hearne Page 5 recent projects - SOM 04/01/2017

Page 6: Rob Hearne recent projects 2017

Leicester Performing Arts Centre £61.5m 2003 - 2007. 13,000 sqm internal space, including 750 seat Auditorium and 350 seat black-box studio theatre. Designed as an ‘inside-out’ theatre with a stage at ground level as an extension of the foyer, which is itself a continuation of the external square. 4.5m high monolithic, dead-loaded glass separates the inside from the outside, below a transom-only façade hung from the storey-height roof steelwork. Involvement in design development with particular responsibility for detailing of all external envelope packages, shell and core – including site attendance throughout the build. rob hearne Page 6 recent projects – Rafael Viňoly Architects 04/01/2017

Page 7: Rob Hearne recent projects 2017

Oxford University Radcliffe Observatory Masterplan 2005 - 2007. 100,000sqm of new accommodation for the University of Oxford on 4.3 Hectare £40m site. New campus, library and academic facilities. Involvement as Project Manager for both ROQ Masterplan and separate ROQ Infrastructure projects, liaising with Estates department and consultant teams to help compile reports and exhibitions for public consultation and submission to Oxford City Council for adoption. rob hearne Page 7 recent projects - Rafael Viňoly Architects 04/01/2017

Page 8: Rob Hearne recent projects 2017

Mahler4 Office Tower Amsterdam 2002 - 2004.

24-storey landmark 32,000m2, Amsterdam £27m, Management of all external envelope packages including design development and detailing through to fabrication. Liaising with Dutch co-architects and site attendance through construction. Working closely with Rafael and RVA - NY technical director Charles Blomberg. rob hearne Page 8 recent projects - Rafael Viňoly Architects 04/01/2017

Page 9: Rob Hearne recent projects 2017

Vincent Street, London SW6 2000 - 2002. 204 flats across 9 new buildings including a new London Ambulance Service station as section 106 agreement. 17332 sq m £33m. Responsibility for all technical aspects of the production information packages for 9 buildings and site attendance for the first building including discharge of planning section 106 - London Ambulance Service station.

rob hearne Page 9 recent projects- Assael Architecture 04/01/2017

Page 10: Rob Hearne recent projects 2017

Journey Zone – Millennium Dome 1998 - 2000

£20m pavilion and exhibition contents for Ford Europe. Inception to completion working in both Imagination design and production departments, and as site architect to completion.

rob hearne Page 10 recent projects - Imagination 04/01/2017

Page 11: Rob Hearne recent projects 2017

sketches of proposed furniture and glass support brackets

rob hearne Page 11 recent projects 04/01/2017