    Risk

    Risk Assessment Overv iew

    Dr. Att ia Hus sien Gomaa

    Maintenance Engin eer ing Cons ultant

    2008

    Engin eer ing s ervice - Am erican Un iversi ty in Cairo (AUC)

  • 7/28/2019 Risk Assessement 01 04 07

    2/9

    Risk 2Risk Based Appro ach Part I - Dr. Att ia Gom aa - 2007

    Objectives:

    Minimize the risk of failures/hazards

    Minimize Hazard (HSE effect)

    Maximum Operation Efficiency

    Optimal Program (Maintenance,

    Inspection, Job, item) Maximize Reliability & Availability

    Minimize Unplanned/Planned

    Minimize Downtime

    Minimize Cost

    Risk Assessment

    (Proact ive Approach)

    It is a powerfu l systemat ic methodologyto m inim ize the risk of failure/hazards

    for cr i t ical act iv i t ies o r i tems o r sys tems

    Cost

    Balance

    Safety &

    Quality

  • 7/28/2019 Risk Assessement 01 04 07

    3/9

    Risk 3Risk Based Appro ach Part I - Dr. Att ia Gom aa - 2007

    Modern Approaches: (System level)

    Risk Based Maintenance - Reliability Centered Maintenance (RCM)Optimal maintenance Program

    Risk Based Inspection (RBI)

    Optimal inspection Program

    Classical Approaches: (Item level) Application Root Cause Analysis (RCA) Item hazard

    Root Cause Failure Analysis (RCFA) Item failure

    Job Safety Analysis (JSA) Job hazard

    Hazard Operation Study (HAZOP) Design hazard

    Failure Mode Effect Criticality Analysis (FMEA) Failure hazard

    Risk Assessment Approaches

    (Proact ive Approach)

  • 7/28/2019 Risk Assessement 01 04 07

    4/9

    Risk 4Risk Based Appro ach Part I - Dr. Att ia Gom aa - 2007

    Top 5 Targets

    (2)To

    prevent

    failures/

    Hazards

    (3)To

    discover

    hidden

    failures/Hazards

    (4)To

    detect

    early

    Failures/Hazards

    (5)To

    Minimize

    the r isk of

    failures/Hazards

    (1)To

    correct

    failures/

    Hazards

    Reactive

    Pol icy 80 Proact ive

    Pol icy >15

  • 7/28/2019 Risk Assessement 01 04 07

    5/9

    Risk

    Why Risk Assessment?

  • 7/28/2019 Risk Assessement 01 04 07

    6/9

    Risk 6Risk Based Appro ach Part I - Dr. Att ia Gom aa - 2007

    Causes Of Inc idents %:

    1) 30% Poor Maintenance & Insp ect ion25% Backlog, 20% Qual ity, 15% Spares, 20% Planning & Feedback,

    5% Poor housekeeping, 15% Others

    2) 25% Process & Operator error

    90% Unsafe acts & 10% Unsafe conditions such as poor layout

    3) 20% Poor Management (Process, HSE, Maintenanc e, .. etc.)

    70% Information, Planning & Control, 20% Awareness & Culture, 10% others

    4) 15% Design Deficiency

    50% Design error, 35% Mater ials, 15% others

    5) 10% Oth ers

    Egyptian Oil & Gas Industries - Nature of Accidents

    Based on d ata from 5 Egypt ian Companies

    Last 10 years Acc ident & Incident History & Brain Storming

    Prepared b y Dr. Att ia Gomaa, 2007, Inpr int.

  • 7/28/2019 Risk Assessement 01 04 07

    7/9Risk 7Risk Based Appro ach Part I - Dr. Att ia Gom aa - 2007

    80%

    12%

    5% 3%

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    Human factors Process

    factors

    Enviromental

    factors

    Others

    Egyptian Oil & Gas Industries - Nature of Accidents

    Based on d ata from 5 Egypt ian Companies

    Last 10 years Acc ident & Incident History & Brain Storming

    Prepared b y Dr. Att ia Gomaa, 2007, Inpr int.

  • 7/28/2019 Risk Assessement 01 04 07

    8/9Risk 8Risk Based Appro ach Part I - Dr. Att ia Gom aa - 2007

    %Main Item

    301) Piping systems

    252) Tanks

    83) Heat Exchangers

    74) Valves

    55) Towers46) Compressors

    37) Pumps

    28) Gages

    16Others100Total

    Egyptian Oil & Gas Industries - Nature of Accidents

    Based on data from 5 Egypt ian Companies

    Last 10 years Acc ident & Incident History & Brain Storming

    Prepared b y Dr. Att ia Gomaa, 2007, Inp rint.

    Crit ical Items

    (A

    Ru le 80/20)

    Failure/Hazard

    Improvement:

    RCA

    FMEA

    RCM