RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

RICS COBRA 201823 – 24 April 2018RICS HQ, London, UK

In association with

Page 2: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

RICS COBRA 2018The Construction, Building and Real Estate Research Conference of the Royal Institution of Chartered Surveyors

Held in London, UK in association with University College London

23 – 24 April 2018RICS HQ, London, UK

© RICS, 2018ISBN: 978-1-78321-240-8ISSN: 2398-8614

Royal Institution of Chartered Surveyors Parliament SquareLondonSW1P 3ADUnited Kingdom

rics.org/cobraconference

The papers in this proceeding are intended for knowledge sharing, stimulate debate, and research findings only. This publication does not necessarily represent the views of RICS or University College London.

11 Urban construction management: the role of ICT and emerging technologies in external stakeholder management

Page 3: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

COBRA 2018

URBAN CONSTRUCTION MANAGEMENT: THE ROLE OF ICT AND EMERGING TECHNOLOGIES IN EXTERNAL STAKEHOLDER MANAGEMENT

Michael Curran1, John Spillane2 and Daniel Clarke-Hagan3 1,3School of Natural and Built Environment, David Keir Building, Queen's University Belfast,

Stranmillis Road, Belfast, BT9 5AG 2School of Engineering, Schrodinger Building, University of Limerick, Limerick, Ireland, V94 T9PX

ABSTRACT

Urban construction projects are renowned for their dynamic complexities, which can adversely affect the external stakeholders surrounding the project. Complex collaboration and communication amongst stakeholders has resulted in the fast development of ICT in the construction industry, which tends to lag behind other industries considering technological advancements. Therefore, this paper aims to identify and document methods of ICT and emerging technologies used in the management and engagement of external stakeholders on urban construction projects. In addressing this aim, the core objective is to identify what methods of ICT are involved in the management and engagement of the stakeholders in these inherently risky environments. The methodology undertaken is qualitatively based, encompassing a descriptive literature review and four exploratory cases study interviews with project managers in an Irish construction company. The data accumulated is examined using mind mapping software, and cognitively summarised, which identified the Internet in particular, BIM, VR / AR and 3D Laser Scanning as methods of communicating with stakeholders. This research demonstrates and strengthens that when face-to-face communication is unavailable, the Internet, through Email and Social Media usage, can be implemented as a suitable method of ICT in the management and engagement of external stakeholders on urban construction projects.

Keywords: community engagement, emerging technologies, external stakeholder management, information and communications technology (ICT), urban development.

INTRODUCTION According to Keivani (2010), the urban population is continuing to outgrow the rural population, and Yang, et al. (2017) estimate that the global urban population will reach 67% by 2050. Urban areas are classed as being complex and dynamic systems (Roberts and Sykes 2000), where construction sites are typically commonplace (Spillane, et al. 2013). Rapid urbanisation has seen construction projects grow in increased size and complexity (Luo, et al. 2017), requiring multi-disciplinary collaboration among project participants and stakeholders (Jiao, et al. 2013). Furthermore, stakeholder concerns in this area are interconnected with complex and dynamic interdependencies (Mok, et al. 2017), and as a result of increased project 1 [email protected] 2 [email protected] 3 [email protected]

Page 4: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

complexity, Information and Communications Technologies (ICT) have had to develop at a very fast pace (Taxén and Lilliesköld 2008). However, the construction industry tends to lag behind other industries when taking advantage of new technologies and innovative practices (Peansupap 2012), and it is slow to integrate technological advances (CICA 2002). Although information technologies are universal, they remain elusive in construction management (Lee, et al. 2013), due to the complex processes of construction projects and their large numbers of participants and stakeholders (Wang, et al. 2007). Hosseini, et al. (2013) note that many studies have focussed on the potential for harnessing new ICT technology, for the good of the construction industry. However, research on how ICT and emerging technologies can assist in the management of stakeholders in complex urban projects is scant, in particular the external stakeholders who can have both a positive or negative effect on the overall success of a project (Nash, et al. 2010). Therefore, to address this issue and to fulfil a concise but prevalent gap in the research area, it is necessary to recognise and present results, based on the actuality of events that emerge when constructing in such surroundings. To approach an intriguing facet of interest, this research aims to establish and document, within an urban context, how ICT and emerging technologies can assist on-site project managers in the management and engagement of external stakeholders, during the whole lifecycle of a construction project. This is realised by undertaking a sequential mixed method approach, encompassing qualitative techniques for analysis including a literature review and semi-structured interviews, and using mind mapping software which can be cognitively summarised. From this research, the core objective is to identify what methods of ICT are involved in the management and engagement of the stakeholders in these inherently risky environments. In addressing this aim, it is anticipated that this study will assist and aid project managers in identifying suitable methods of ICT and emerging technologies, in the management and engagement of external stakeholders on urban construction projects.

URBAN CONSTRUCTION AND EXTERNAL STAKEHOLDER MANAGEMENT Cicmil and Marshall (2005) consider construction projects to be complex and uncertain in nature, with the element of risk being greater in urban projects (Jung, et al. 2015). Construction sites are a common feature within urban areas, and the number and variety of stakeholders involved in construction projects can make effective and efficient collaboration difficult (Marshall-Ponting and Aouad 2005). Stakeholders are viewed as individuals or groups who can affect or be affected by a construction project (Yang 2010), and their interests are considered by Bal, et al. (2011) to be the most important for the overall success of a construction project. A popular categorisation is to distinguish between internal and external stakeholders (Zedan and Miller 2016). Internal stakeholders are those who are formally members of the project coalition and hence usually support the project (Winch 2004), whereas external stakeholders are those who are not formally members, but can affect or be affected by the project in a significant way (Chinyio and Olomolaiye 2010). Even though external stakeholders have no contractual relationship with the project (Elmahroug, et al. 2014), their expectations are considered to be comparatively more critical and pressing than their internal counterparts (Chan and Oppong 2017). Li, et

Page 5: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

al. (2013) support that failure to accommodate the concerns of the public and other external stakeholders in large construction projects can lead to severe resistance, and may eventually kill the project (Mok, et al. 2017). Furthermore, the consideration of external stakeholders is important because it extends stakeholder concerns from being mainly organisational and business driven towards being more globally orientated (Feige, et al. 2011), with a wider sense of social and environmental responsibility (Pivo and Fisher 2010). Nevertheless, both internal and external stakeholders are important considerations in construction project development (Oppong, et al. 2017), thus making stakeholder management an essential concept for the successful completion of construction projects (Collinge and Harty 2013). Also, Widén, et al. (2013) emphasise that a structured process of stakeholder engagement is an integral part of the construction innovation process, as Yang and Shen (2015) advocate that engaging stakeholders in the construction sector is an important consideration for stakeholder management. Yu, et al. (2017) affirm that stakeholder management can be used to deal with complex stakeholder issues surrounding urban projects.

Ict and emerging technologies in the construction industry Mak (2001) observes that the construction industry is seen by many as being backward in deploying technology, in particular ICT. In recent times, ICT has been adopted for construction project management, and its introduction and development has influenced project management practices to take a new turn, taking advantage of newly developed management tools and the latest technologies (Ahuja, et al. 2009). Adriaanse, et al. (2010) define ICT as a digital coordination and collaboration tool, used for communicating and sharing project information between participating organisations in a construction project. ICT facilitates communication and improves integration (Peansupap and Walker 2006), and Ahuja, et al. (2010) agree that ICT provides opportunities for real time access of information, and improves coordination and collaboration between project stakeholders. However, the construction industry is still confronted with great communication difficulties in sharing information among participants (Voordijk and Adriaanse 2016). Information produced by too many sources can contribute to industry fragmentation (Jaafar, et al. 2007), and numerous participants using different technologies can actually hinder the adaption of ICT and technology (Arslan, et al. 2005). Nevertheless, Goulet (1977) stresses that technology is critical for development, and the adoption of emerging technologies is an important challenge for the future of construction (Cook and Chatterjee 2015). Holt, et al. (2015) support that emerging technology offers the best opportunity to improve the construction process, through better integration and efficiency. Some current and emerging technologies in the construction industry that have the potential to assist with stakeholder management include the Internet, Building Information Modelling, Virtual Reality / Augmented Reality and 3D Laser Scanning.

Internet Although not necessarily an emerging technology, using the Internet to exchange information remains a very important method of communicating (Chan and Leung 2004). Nitithamyong and Skibniewski (2004) claim that the Internet is the technology that best facilitates a collaborative working environment in a construction project. A project manager can share information electronically at a very low cost using the

Page 6: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

Internet, compared to other communication means (Ahuja, et al. 2009), and the use of the Internet as a communication platform can help information transfer more effectively during the construction process (Deng, et al. 2001).

Building Information Modelling (BIM) BIM technology is changing the construction industry (Sun, et al. 2017), and it is gaining popularity across the globe (Dutta, et al. 2016). BIM involves building a digital prototype of a model and simulating it in a digital world (Collins 2013), and as a result buildings can be inspected from various angles (Crotty 2012). Azhar, et al. (2015) believe that BIM encourages integration of the roles of all stakeholders on a project, and represents a new paradigm within the construction industry. Bryde, et al. (2013) concur that BIM has the potential to be the catalyst for project manager's to better integrate the different stakeholders involved in modern construction projects.

Virtual Reality / Augmented Reality Virtual Reality (VR) technology is a computer generated simulation of the real world, where the user is able to both view and manipulate the contents of that simulated environment (Goulding, et al. 2012). Augmented Reality (AR) is a variation of VR that creates an environment in which digital information is inserted in a predominantly real-world view (Wang, et al. 2013). VR immerses the user in a completely virtual world without any contact from the surrounding real world (Izkara, et al. 2007), whereas AR allows the user to see the real world with virtual objects composited into the real world (Azuma 1997). Woksepp (2007) describes how VR generates efficient communication between stakeholders, and AR technology can enable all project members to collaborate in an efficient way throughout the construction process (Jiao, et al. 2013).

3D Laser Scanning 3D Laser Scanning can produce information rich 3D digital models of objects without physical contact with the objects (Vosselman and Mass 2010). Wood and Madgwick (2016) note that 3D Laser Scanning links well with BIM and VR/AR, but the main difference is that laser scanning systems need an existing building to produce a model, whereas BIM produces a model before it is built (Alomari, et al. 2016). 3D Laser scanning has a variety of applications on construction projects, and the captured data can be useful to the entire project team (Shanbari, et al. 2016). It has been one of the most popular recent measurement tools in the construction industry (Kim, et al. 2016), and using this technology to build a model and capture data is beneficial to all project stakeholders (Eastman, et al. 2008).

METHODOLOGY This study is at the inception of an introductory piece of research, which intends to contribute to both academia and industry. The subject being considered is at the elementary stage of an extensive topic, and it is anticipated that the preliminary findings of this paper will be used to further supplement the results at the conclusion of the whole study. Taking the theoretical position this paper and subsequent research is founded upon into consideration, a critical realism approach is contemplated and adopted. As the nature of this study primarily addresses the opinions of human participants, a subjectivist approach is applied to the ontology, providing a basis for the case study methodology. A qualitative methodology encompassing an informative

Page 7: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

literature review is undertaken, followed by four exploratory case study interviews with construction professionals within a large construction company. The subject of theory in the context of the interactions between construction projects and their physical and social environments is also worthy for consideration; however, this is beyond the scope of this paper due to the preliminary nature of the study in question.

Literature Review A literature review is the foundation of any research (Saunders, et al. 2003), and an extensive desk based literature review is undertaken in this study, with literature considered from a range of sources including journal articles, conference proceedings and academic reports. The literature is assessed and a thorough insight into the research is gained, whilst also obtaining possible factors for inclusion in the subsequent analysis. This provides a core basis of information and supporting material, which can be included for consideration and discussion during the interview process, and also pave the way for further study where necessary.

Case Studies Merriam (1994) states that qualitative case studies are based on information collected from interviews and observations, and Yin (2014) argues that it is the most suitable approach for investigating the 'how' and 'why' research questions. Thus, in this study, case study interviews incorporating individual data collection is applied qualitatively. The identification and selection of case studies for inclusion in this paper is based on selective and convenience sampling, to ensure that the participants have the sufficient knowledge to discuss the research topic in question, and also in relation to their accessibility to the researcher. However, due to the study's preliminary nature, further investigation on the subject will use different selection techniques such as quota and random sampling, incorporating a sequential selection strategy. Also, it is anticipated that a much wider audience will be contacted during further research, until saturation of the data instrument has been achieved. Four interviews are undertaken to complement the literature review, and also to verify the factors identified. The format of the interviews were semi-structured, as this form uses open and closed ended questioning, but questions are asked in no specific order or schedule (Naoum 2007). This method allows questions to lead from one to another quite easily, enabling interviewees the opportunity to provide as much information as possible. Due to accessibility to the researcher, a large construction company based in the north of Ireland was identified for participation, and the case study interviewees were selected from within the company. Four Project Managers (PM) formed the basis for the individual interviews, and they were identified with respect to their availability for interview, and the current project they were working on, relevant to urban construction site environments. Considering the issues surrounding ethics, each participant selected was informed of the nature of the research, its purpose and what will happen to the resultant data. The identities of those involved will remain strictly private, and confidential information (company name, client details etc.) is not disclosed to maintain anonymity. The case study participants include a PM with eight years experience working on a student accommodation scheme; a PM with twenty years experience working on a private residential scheme; a PM with fifteen years experience working on a hotel scheme; and a PM with 10 years experience working on another student accommodation scheme. All four case studies are live projects and new urban developments, located in various cities across the UK and Ireland.

Page 8: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

QUALITATIVE ANALYSIS The interview questions commenced with the researcher gaining general background information on the participants and the case study in particular, with an emphasis on stakeholder issues. This was followed by identifying what methods of communication they use with external stakeholders throughout the entire project lifecycle, and what methods of ICT and emerging technologies (if any), they use to communicate, engage and manage external stakeholders on the project. The data gathered from the case study interviews is then qualitatively assessed and cognitively summarised using mind mapping software. A mind mapping software application called Banxia Decision Explorer® is used for this research, which builds a visual representation of ideas and can provide a focus for debate, reflection and progression. It clarifies thinking and can be used to map thoughts and ideas gathered from interviews, acting as an effective stimulus to focus on paramount issues (Brightman 2002). Decision Explorer® can undertake three forms of analysis; Central, Domain and Cluster. They logically express how each factor or 'concept' is linked and interpreted, and each concept was discussed in some form by all of the interviewees. Central Analysis calculates a score to determine how central a concept is in the model, Domain Analysis shows concepts which have many links, and Cluster Analysis finds groups of closely linked concepts and the results are then placed into sets. Combining the data from the four interviews, the Internet, BIM, VR / AR and 3D Laser Scanning were all identified and discussed as methods of ICT and emerging technologies, used to manage and engage external stakeholders on urban construction projects. However, the research establishes that the Internet, through its different mediums, is the main method extensively used by the interviewees, followed by the recent introduction of BIM within their company. Due to limitations on space, the concept analysis results have been omitted, but the methods identified by each interviewee are illustrated below in Table 1.

Table 1: Methods of ICT and Emerging Technologies for External Stakeholder Management

Case 1 Case 2 Case 3 Case 4

INTERNET: x x x x

• Email x x x x

• Social Media x x

• Project Blog x

• Microsoft Teams x

BIM x x

VR / AR x

3D LASER SCANNING x

Page 9: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

DISCUSSION – METHODS OF ICT AND EMERGING TECHNOLOGIES IN EXTERNAL STAKEHOLDER MANAGEMENT

Internet

Using the Internet as a method of managing and engaging with external stakeholders was discussed extensively by all four interviewees. Sarshar and Isikdag (2004) consider the Internet as a very cost effective solution to communication problems, coupled with the increased speed of information transfer (Ahuja, et al. 2009). When face-to-face meetings with stakeholders were not easily arranged, the interviewees noted that emails were the next best method to use. Emails remain a very popular form of communication over the Internet because they are free and easy to use, reference and prioritise (Wilson 2014). Furthermore, two of the interviewees spoke about the use of Social Media in the form of Twitter. Social Media is characterised by interactivity, where participants can freely send, receive and process content for use by others (Aula 2010). Its services include social networking websites such as Facebook and Twitter, messaging applications such as WhatsApp and Microsoft Teams, and diary-type websites such as Blogs. Regular Twitter updates such as photos of each site and succinct comments on the project's progress are frequently posted, however, both interviewees noted that this is done by the company IT Manager who is based in the head office, and not by them. The interviewee on the first student accommodation scheme discussed how he is implementing a Blog on the company website throughout the duration of the project, with monthly progress reports and photo updates of the site. Also, he stated that this platform is used to highlight fundraising events and community initiatives that he and his site team are involved in, which he feels improves the corporate image of the company. The interviewee on the hotel scheme mentioned a new instant messaging application that he uses called Microsoft Teams, which works like a group email to keep in regular contact with local residents and other external stakeholders. Waters, et al. (2009) believe that interactivity plays an important role in developing relationships online with stakeholders, and Manetti and Ballucci (2016) corroborate that social media and social networks are powerful mechanisms for reaching and keeping in touch with a large number of stakeholders, thus guaranteeing an interactive dialogue with them at a very low cost. Derks, et al. (2015) also acknowledge that devices such as smart phones and tablets afford greater flexibility in working behaviours and sharing of information. Moreover, Saxton and Guo (2011) conclude that through strategically targeted content, firms can mobilise stakeholders, build meaningful relationships and ultimately foster increased accountability and public trust.

BIM The interviewee on the hotel scheme discussed BIM in detail, but pointed out that it is very client driven and only a handful of projects throughout the company are implementing BIM at present. He believes that it is a very expensive tool to work with, but he can see its benefits in possibly showing external stakeholders potential models of future projects at public consultation meetings. The interviewee also recognises that the company will probably have no other choice but to phase BIM in all of their future projects, to keep up to date with government policies and other technological advances. The awareness and usage of BIM amongst construction

Page 10: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

practitioners is increasing (NBS 2014), and as construction projects become more complex, new technologies including BIM have been proposed for tackling the construction industry's production problems (Gledson and Greenwood 2014). In the UK, BIM has emerged at the forefront of the Government's agenda, with the publication of the UK Government Construction Strategy (HM Government 2013). This strategy has mandated the compulsory use of collaborative BIM on all public construction projects by 2016 (Georgiadou 2016), which reflects the challenging issues regarding stakeholder collaboration and the manner of managing information (Sebastian 2011).

VR / AR

The interviewee on the private residential scheme stressed that VR and AR is not being utilised within the company at present. However, he is aware of another ongoing project in the same city as his own scheme, consisting of a sports stadium redevelopment, where club supporters and other interested stakeholders have been given the opportunity to view the new stadium before it is built, through the use of VR and AR. Whyte (2002) concurs that short videos or virtual walkthroughs which simulate the view of a person walking through the building can rapidly improve stakeholders understanding of the project.

3D Laser Scanning

The interviewee on the second student accommodation scheme recognised the concept of 3D Laser Scanning and how its data capture could be beneficial to project stakeholders. However, he admitted having little knowledge of it, due to it not being implemented within the company at present, and further stating that BIM was the main technology being phased on other company projects.

CONCLUSION AND RECOMMENDATIONS In essence, the focus of this study considers the methods of ICT and emerging technologies used to manage and engage external stakeholders on urban construction sites. Urban construction projects are renowned for their dynamic complexities, requiring collaboration and communication amongst all stakeholders. As a result, ICT in the construction industry has had to develop quickly in recent years, and project managers are tasked with ensuring that the management and engagement of external stakeholders is carried out accordingly, through appropriate implementation of ICT and emerging technologies. Considering the results captured from the literature review, case study interviews and cluster analysis, the Internet, BIM, VR / AR and 3D Scanning were all identified as methods of ICT and emerging technologies used to manage and engage external stakeholders on urban construction projects. In particular, Emails, Social Media, Blogs and Instant Messaging Applications via the Internet were established as the most popular methods of managing and engaging external stakeholders. However, the relevant methods identified from the interviewees are case study specific, and only a concise, subjective view of the topic is produced, not a generalised view. Nevertheless, this study provides a foundation to advance and expand into more detailed research, and supports continuous research on a largely neglected area. It is recommended that future case studies are identified using other methods of sampling, and include companies that are actively using some of the emerging technologies. It would also be beneficial to garner the opinions of the external stakeholders

Page 11: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

themselves, and to verify if communication and engagement with them through ICT and technology is a sufficient method to meet stakeholder needs. Also, additional case studies that are considered for qualitative analysis can be developed quantitatively through the use of questionnaire surveys, introducing another method to the area of research. Nevertheless, this research demonstrates and strengthens to project managers, that when face-to-face communication is unavailable, the Internet, through the use of Email and Social Media, can be used as a suitable method of ICT in the management and engagement of external stakeholders on urban construction projects. REFERENCES Adriaanse, A., Voordijk, H. and Dewulf, G. (2010). The use of interorganisational ICT

in United States construction projects. Automation in Construction, 19[1], 73–83.

Ahuja, V., Yang, J. and Shankar, R. (2009). Benefits of collaborative ICT adoption for building project management. Construction Innovation, 9[3], 323-340.

Ahuja, V., Yang, J. and Shankar, R. (2010). Benchmarking framework to measure extent of ICT adoption for building project management. Journal of Construction Engineering and Management, 136[5], 538-545.

Alomari, K., Gambatese, J. and Olsen, M.J. (2016), 'Role of BIM and 3D laser scanning on job sites from the perspective of construction project management personnel', In: Construction Research Congress 2016, pp. 2532-2541.

Arslan, G., Tuncan, M., Birgonul, M.T. and Dikmen. I. (2005). E-bidding proposal preparation system for construction projects. Building and Environment, 41[10], 1406-1413.

Aula, P. (2010). Social media, reputation risk and ambient publicity management. Strategy and Leadership, 38[6], 43-49.

Azhar, S., Khalfan, M. and Maqsood, T. (2015). Building information modelling (BIM): now and beyond. Construction Economics and Building, 12[4], 15-28.

Azuma, R.T. (1997). A survey of augmented reality. Presence: Tele-operators and virtual environments, 6[4], 355-385.

Bal, M., Bryde, D. and Fearon, D. (2011), 'A model of stakeholder management strategies for sustainable construction', In: Egbu, C. and Lou, E.C.W., (Eds.) 27th Annual ARCOM Conference, Sept. 5-7 2011, Association of Researchers in Construction Management, Bristol, England, pp. 1165-1174.

Brightman, J.R. (2002). An Introduction to Decision Explorer. Banxia Software Ltd: Cumbria.

Bryde, D., Broquetas, M. and Volm, J.M. (2013). The project benefits of building information modelling (BIM). International Journal of Project Management, 31[7], 971-980.

Chan, A.P. and Oppong, G.D. (2017). Managing the expectations of external stakeholders in construction projects. Engineering, Construction and Architectural Management, 24[5], 736-756.

Page 12: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

Chan, S.L. and Leung, N.N. (2004). Prototype web-based construction project management system. Journal of Construction Engineering and Management, 130[6], 935-943.

Chinyio, E. and Olomolaiye, P. (2010). Construction Stakeholder Management. Wiley-Blackwell: Oxford.

Cicmil, S. and Marshall, D. (2005). Insights into collaboration at the project level: complexity, social interaction and procurement mechanisms. Building Research and Information, 36[6], 523-535.

Collinge, W.H. and Harty, C.F. (2013), 'Evolving designs and stakeholder contributions to the briefing process', In: Smith, S.D. and Ahiaga-Dagbui, D.D. (Eds.) 29th Annual ARCOM Conference, Sept. 2-4 2013, Association of Researchers in Construction Management, Reading, England, pp. 137-146.

Collins, B. (2013, August 13). BIM the future for sector. The Irish News. Confederation of International Contractors' Association (CICA). (2002). Industry as a

partner for sustainable development, the United Kingdom. Cook, D. and Chatterjee, P. (2015). Our Changing World: let's be ready. RICS

Futures: London. Crotty, R. (2012). The impact of Building Information Modelling – Transforming

Construction. Routledge: New York. Deng, Z.M., Li, H., Tam, C.M., Shen, Q.P. and Love, P.E.D. (2001), ‘An Application

of the Internet based project management system’, Automation in Construction, Vol. 10, pp. 239-246.

Derks, D., Duin, D., Tims, M., and Bakker, A.B. (2015). Smartphone use and work-home interference: The moderating role of social norms & employee work engagement. Journal of Occupational and Organizational Psychology, 88[1], 155.

Dutta, K., Chong, H.Y., Wang, X. and Zekavat, P.R. (2016), 'A Review of Achieving Sustainable Development through Building Information Modelling in the AECO Industries', In: Annual RICS COBRA Conference, Sept. 20-22 2016, Royal Institute of Chartered Surveyors, Toronto, Canada.

Eastman, C., Teicholz, P., and Liston, K. (2008). BIM Handbook: A Guide to Building Information Modelling for Owners, Managers, Designers, Engineers, and Contractors. John Wiley and Sons: New Jersey.

Elmahroug, M.H, Tutesigensi, A. and Brookes, N.J. (2014), 'Integrating external stakeholder identification and project initiation in civil engineering infrastructure projects', In: Raiden, A.B. and Aboagye-Nimo, E., (Eds.) 30th Annual ARCOM Conference, Sept. 1-3 2014, Association of Researchers in Construction Management, Portsmouth, England, pp. 935-944.

Feige, A., Wallbaum, H. and Krank, S. (2011). Harnessing stakeholder motivation: towards a Swiss sustainable building sector. Building Research & Information, 39[5], 504-517.

Georgiadou, M.C. (2016), 'Building Information Modelling in UK Construction Projects: A State of the Art Review', In: Annual RICS COBRA Conference, Sept. 20-22 2016, Royal Institute of Chartered Surveyors, Toronto, Canada.

Page 13: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

Gledson, B.J. and Greenwood, D. (2014), 'The implementation and use of 4D BIM and virtual construction', In: Raiden, A.B. and Aboagye-Nimo, E., (Eds.) 30th Annual ARCOM Conference, Sept. 1-3 2014, Association of Researchers in Construction Management, Portsmouth, England, pp. 935-944.

Goulding, J., Nadim, W., Petridis, P. and Alshawi, M. (2012). Construction industry offsite production: A virtual reality interactive training environment prototype. Advanced Engineering Informatics, 26[1], 103-116.

Goulet, D. (1977). Uncertain promise: value conflicts in technology transfer. IDOC and Overseas Development Council, New York.

HM Government. (2013). Construction 2025, Industrial Strategy: Government and industry in partnership. London.

Holt, E.A., Benham, J. and Fitzgerald Bigelow, B. (2015), 'Emerging Technology in the Construction Industry: Perceptions from Construction Industry Professionals', In: 122nd ASEE Annual Conference and Exposition, American Society for Engineering Education, Seattle.

Hosseini, R., Chileshe, N., Zou, J. and Baroudi, B. (2013), 'Approaches of implementing ICT technologies within the construction industry', In: Australasian Journal of Construction Economics and Building-Conference Series, February 2013, 1[2], pp. 1-12.

Izkara, J.L., Pérez, J., Basogain, X. and Borro, D. (2007), 'Mobile augmented reality, an advanced tool for the construction sector', In: 24th W78 Conference, Maribor, Slovenia. pp. 190-202.

Jaafar, M., Aziz, A.R.A., Ramayah, T. and Saad, B. (2007). Integrating information technology in the construction industry: Technology readiness assessment of Malaysian contractors. International Journal of Project Management, 25[2], 115-120.

Jiao, Y., Zhang, S., Li, Y., Wang, Y. and Yang, B. (2013). Towards cloud augmented reality for construction application by BIM and SNS integration. Automation in Construction, 33, 37-47.

Jung, T.H., Lee, J., Yap, M.H. and Ineson, E.M. (2015). The role of stakeholder collaboration in culture-led urban regeneration: A case study of the Gwangju project, Korea. Cities, 44, 29-39.

Keivani, R. (2010). A review of the main challenges to urban sustainability. International Journal of Urban Sustainable Development, 1[1-2], 5-16.

Kim, M.K., Wang, Q., Park, J.W., Cheng, J.C., Sohn, H. and Chang, C.C. (2016). Automated dimensional quality assurance of full-scale precast concrete elements using laser scanning and BIM. Automation in Construction, 72, 102-114.

Lee, J.H., Song, J.H., Oh, K.S. and Gu, N. (2013). Information lifecycle management with RFID for material control on construction sites. Advanced Engineering Informatics, 27[1], 108-119.

Li, T.H., Ng, S.T. and Skitmore, M. (2013). Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach. Automation in Construction, 29, 123-135.

Page 14: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

Luo, L., He, Q., Jaselskis, E.J. and Xie, J. (2017). Construction Project Complexity: Research Trends and Implications. Journal of Construction Engineering and Management, 143[7], 04017019.

Mak, S. (2001). A model of information management for construction using information technology. Automation in Construction, 10[2], 257-263.

Manetti, G. and Bellucci, M. (2016). The use of social media for engaging stakeholders in sustainability reporting Accounting, Auditing and Accountability Journal, 29[6], 985-1011.

Marshall-Ponting, A.J. and Aouad, G. (2005). An nD modelling approach to improve communication processes for construction. Automation in Construction, 14[3], 311-321.

Merriam, S.B. (1994). Case Study Research in Education. Jossey-Bass: San Francisco. Mok, K.Y., Shen, G.Q. and Yang, R.J. (2017). A network theory-based analysis of

stakeholder issues and their interrelationships in large construction projects: a case study. International Journal of Construction Management, 17[3], 210-227.

Naoum, S.G. (2007). Dissertation Research and Writing for Construction Students, 2nd Edition. Butterworth-Heinemann: Oxford.

Nash, S., Chinyio, E., Gameson, R. and Suresh, S. (2010), 'The dynamism of stakeholders' power in construction projects', In: Egbu, C (Ed.), 26th Annual ARCOM Conference, 6-8 September 2010, Association of Researchers in Construction Management, Leeds, England, pp. 471-480.

National Building Specification (NBS). (2014), NBS National BIM Report 2014. Royal Institute of British Architects, London.

Nitithamyong, P. and Skibniewski, M.J. (2004). Web-based construction project management systems: how to make them successful?. Automation in Construction, 13[4], 491-506.

Oppong, G.D., Chan, A.P. and Dansoh, A. (2017). A review of stakeholder management performance attributes in construction projects. International Journal of Project Management, 35[6], 1037-1051.

Peansupap, V. (2012). An Exploratory Approach To The Diffusion Of ICT In A Project Environment.

Peansupap, V. and Walker, D.H.T. (2006). Innovation diffusion at the implementation stage of a construction project: a case study of information communication technology. Construction Management and Economics, 24[3], 321-332.

Pivo, G. and Fisher, J.D. (2010). Income, value, and returns in socially responsible office properties. Journal of Real Estate Research, 32[3], 243–270.

Roberts, P. and Sykes, H. (2000). Urban Regeneration: A Handbook. SAGE Publications: London.

Sarshar, M. and Isikdag, U. (2004). A survey of ICT use in the Turkish construction industry. Engineering, Construction and Architectural Management, 11[4], 238-247.

Page 15: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

Saunders, M., Lewis, P. and Thornhill, A. (2003). Research Methods for Business Students. Prentice Hall: Harlow.

Saxton, G.D. and Guo, C. (2011). Accountability online: Understanding the Web-based accountability practices of non-profit organisations. Non-profit and Voluntary Sector Quarterly, 40, 270–295.

Sebastian, R. (2011). Changing roles of the clients, architects and contractors through BIM. Engineering, Construction and Architectural Management, 18[2], 176-187.

Shanbari, H.A., Blinn, N.M. and Issa, R.R. (2016). Laser scanning technology and BIM in construction management education. Journal of Information Technology in Construction (ITcon), 21[14], 204-217.

Spillane, J.P., Flood, M., Oyedele, L.O, von Meding, J.K. and Konanahalli, A. (2013), 'Urban high-density construction sites and their surrounding community: issues encountered and strategies adopted by contractors', In: Smith, S.D. and Ahiaga-Dagbui, D.D. (Eds.), 29th Annual ARCOM Conference, Sept. 2-4 2013, Association of Researchers in Construction Management, Reading, England, pp. 871-880.

Sun, C., Jiang, S., Skibniewski, M.J., Man, Q. and Shen, L. (2017). A literature review of the factors limiting the application of BIM in the construction industry. Technological and Economic Development of Economy, 23[5], 764-779.

Taxén, L. and Lilliesköld, J. (2008). Images as action instruments in complex projects. International Journal of Project Management, 26[5], 527-536.

Voordijk, H. and Adriaanse, A. (2016). Engaged scholarship in construction management research: the adoption of information and communications technology in construction projects. Construction Management and Economics, 34[7-8], 536-551.

Vosselman, G.V. and Mass, H.G. (2010). Airborne and Terrestrial Laser Scanning. Whittles: Scotland.

Wang, L.C., Lin, Y.C. and Lin, P.H. (2007). Dynamic mobile RFID-based supply chain control and management system in construction. Advanced Engineering Informatics, 21[4], 377-390.

Wang, X., Kim, M.J., Love, P.E. and Kang, S.C. (2013). Augmented Reality in built environment: Classification and implications for future research. Automation in Construction, 32, 1-13.

Waters, R.D., Burnett, E., Lamm, A. and Lucas, J. (2009). Engaging stakeholders through social networking: How non-profit organizations are using Facebook. Public Relations Review, 35[2], 102-106.

Whyte, J. (2002). Virtual Reality and the Built Environment. Routledge: England. Widén, K., Olander, S. and Atkin, B. (2013). Links between successful innovation

diffusion and stakeholder engagement. Journal of Management in Engineering, 30[5], 04014018.

Wilson, T. (2017), 'Advantages and Disadvantages of Email', Time Management Success, [Online], Available at: http://www.time-management-success.com/advantages-and-disadvantages-of-email.html

Page 16: RICS COBRA 2018...management and engagement of external stakeholders on urban construction projects. Keywords: community engagement, emerging technologies, external stakeholder management,

rics.org/cobraconference

Winch, G.M. (2004), 'Managing Project Stakeholders', In: Morris, P.W.G. and Pinto, J.K. (Eds.), The Wiley Guide to Managing Projects. John Wiley and Sons Inc: New Jersey.

Woksepp, S. (2007). Virtual Reality in Construction: Tools, Methods and Processes. Doctoral Dissertation, Lulea University, Sweden.

Wood, H.L. and Madgwick, D. (2016), 'Embedding Emerging Technology in Built Environment Education', In: Annual RICS COBRA Conference, Sept. 20-22 2016, Royal Institute of Chartered Surveyors, Toronto, Canada.

Yang, B., Xu, T. and Shi, L. (2017). Analysis on sustainable urban development levels and trends in China's cities. Journal of Cleaner Production, 141, 868-880.

Yang, J. (2010). A Framework for Stakeholder Management in Construction Projects. Department of Building and Real Estate, The Hong Kong Polytechnic University, Hong Kong.

Yang, R.J. and Shen, G.Q.P. (2015). Framework for Stakeholder Management in Construction Projects. Journal of Management in Engineering, 31(4).

Yin, R.K. (2014). Case Study Research: Design and Methods, 5th Edition. Thousand Oaks, Sage Publications: California.

Yu, T., Shen, G.Q., Shi, Q., Lai, X., Li, C.Z. and Xu, K. (2017). Managing social risks at the housing demolition stage of urban redevelopment projects: A stakeholder-oriented study using social network analysis. International Journal of Project Management, 35[6], 925-941.

Zedan, S. and Miller, W.F. (2016), 'An evaluation of stakeholder management approach for improving energy efficiency outcomes in housing', In: 7th International Conference on Energy and Environment of Residential Buildings, Queensland University of Technology, Australia.