6
l e e m a l o n e [email protected] Cell :646.337.5417 PROFESSIONAL: KELLY ARCHITECTS -Los Angeles (June 12’ – Present) DMG L.A. Permits, Construction documents SANDER ARCHITECTS -Los Angeles (June 11’ – June 12’) Oswald Residence L.A. / Newport Beach CA Design Development, Permits, Construction documents, Consultant coordination. DALLA COSTA DESIGN GROUP inc. -Los Angeles (Oct.10’ – May 11’) Maurice Law Offices L.A./ Saskatoon Canada - Design Development, Lighting, Door, Finishes schedule. Construction Documents (Bid Set), Consultant coordination. GERNER KRONICK + VALCARCEL -New York City (Feb.05’ – Oct.08’) Brooklyn College Student Center Renovation NYC - Site Survey, Produced all working drawings, construction administration, MEP Coordination, Lighting and Audio Video Coordination, Client G.C. meetings, Dept. of Bldgs Public Assembly Filing, Punch lists -Unsupervised. MTV / Paramount Pictures Screening Room & Bar NYC - Survey, Lead Design working with MTV interiors staff & GKV Interiors Manager, Document Production, Const. Admin, Punchlists, Meeting Min. – Unsupervised MTV Cafeteria Renovation NYC - Survey, Collaboration on Design with Rianna Heddens, Construction Documents, Lighting Design Coordination, Construction Admin. Punch lists Meeting min. – Unsupervised 14W Entry Lobby Wash. DC. - Lead design direction, Coordination with local Firm & Client, Construction Documents, Schedules, GKV Interiors coordination. – Unsupervised 14W Community Bar & Lounge Wash. DC - Design Development (during Lobby production), Coordination of finishes for a continuous aesthetic, Schedules, Details, Light Specifications, Coordination with local office and Client. – Unsupervised Treadwell Skidmore Façade Renovation NYC - Construction Documents, Landmark approvals, Survey, Site Meetings, Engineering Coordination, Meeting min. – Co. manager Benita Welch SOFTWARE: Revit 09’ 3D Studio 09’ AutoCad 2012 Vectorworks PhotoShop CS Sketch-up ARCHICad Illustrator Indesign EDUCATION: Lawrence Technological Institute – Southfield, Mich. City University of New York School of Architecture and Urban Design – New York, NY LAIAD (Los Angeles Institute of Architecture and Design) Transf. Sci Arc Undergrad prog. - Expect date. (2015) Ref: Available upon request.

Resume / Wk Samples

Embed Size (px)

DESCRIPTION

small body of work

Citation preview

Page 1: Resume / Wk Samples

l e e m a l o n e

[email protected] Cell :646.337.5417

PROFESSIONAL:

KELLY ARCHITECTS -Los Angeles (June 12’ – Present)

DMG L.A. – Permits, Construction documents

SANDER ARCHITECTS -Los Angeles (June 11’ – June 12’)

Oswald Residence L.A. / Newport Beach CA – Design Development, Permits, Construction documents, Consultant coordination.

DALLA COSTA DESIGN GROUP inc. -Los Angeles (Oct.10’ – May 11’)

Maurice Law Offices L.A./ Saskatoon Canada - Design Development, Lighting, Door, Finishes schedule. Construction Documents (Bid Set), Consultant coordination.

GERNER KRONICK + VALCARCEL -New York City (Feb.05’ – Oct.08’)

Brooklyn College Student Center Renovation NYC -Site Survey, Produced all working drawings, construction administration, MEP Coordination, Lighting and Audio Video Coordination, Client G.C. meetings, Dept. of Bldgs Public Assembly Filing, Punch lists -Unsupervised.

MTV / Paramount Pictures Screening Room & Bar NYC -Survey, Lead Design working with MTV interiors staff & GKV Interiors Manager, Document Production, Const. Admin, Punchlists, Meeting Min. – Unsupervised

MTV Cafeteria Renovation NYC -Survey, Collaboration on Design with Rianna Heddens, Construction Documents, Lighting Design Coordination, Construction Admin. Punch lists Meeting min. – Unsupervised

14W Entry Lobby Wash. DC. -Lead design direction, Coordination with local Firm & Client, Construction Documents, Schedules, GKV Interiors coordination. – Unsupervised

14W Community Bar & Lounge Wash. DC -Design Development (during Lobby production), Coordination of finishes for a continuous aesthetic, Schedules, Details, Light Specifications, Coordination with local office and Client. – Unsupervised

Treadwell Skidmore Façade Renovation NYC -Construction Documents, Landmark approvals, Survey, Site Meetings, Engineering Coordination, Meeting min. – Co. manager Benita Welch SOFTWARE:

Revit 09’ 3D Studio 09’ AutoCad 2012 Vectorworks PhotoShop CS Sketch-up ARCHICad Illustrator Indesign

EDUCATION:

Lawrence Technological Institute – Southfield, Mich. City University of New York School of Architecture and Urban

Design – New York, NY LAIAD (Los Angeles Institute of Architecture and Design) Transf. Sci Arc Undergrad prog. -

Expect date. (2015)

Ref: Available upon request.

Page 2: Resume / Wk Samples
Page 3: Resume / Wk Samples

6th FLOOR AUDITORIUM SEATING -COMBINED GOLD ROOMS

5'-0"

4'-6"

EQ.

4'-4

"

1'-2"

1'-1

"

1/8" = 1' - 0"

PA 6-1

5'-0

"

4'-2

"

3'-8

"

4'-4"

242 243 244 245 246

254 255 256 257 258

266 267 268 269 270

278 279 280 281 282

290 291 292 293 294

EQ.EQ.

4'-6"

EQ.

EQ.

EQ.

EQ

. EQ

.

C L

1.5

hr.

(new

)

1.5

hr.

(new

)

unra

ted

(new

)

1.5 hr

.

(new)

unra

ted

(new

)

1.5 hr.(new)

1.5

hr.

(new

)

1.5

hr.

(new

)

1.5

hr.

(new

)

I

E

OUTDOOR

DN UP

DN UP

DN DN UPUP

(NO WORK)

STAIR A(NO WORK)

STAIR HALL B

CRYSTAL RM.613

STORAGE604

COAT605STORAGE 1

608

I.T.606

MEN609

WOMEN611

SERVING PANTRY615

CHAIR STORAGE617

(NO WORK) (NO WORK)

(NO WORK)

(NO WORK)

SAFE AREA602

GOLD RM. 1618

MAROON RM.603

1a

LOBBY616

ELEV. #3

ELEV. #4

ELEV. #2

1a1a 1 2 3 4 5 6 7 8 9 1b

A

B

Ba

C

DCa

EX'G

unra

ted

(new

)EX

'G

EX'G

CORRIDOR607

ELEV. 2 LOBBY601

(2) 36" 1-1/2 HRF.P.S.C. DOOR

AREA 1OCCUPANCY GROUP "F-1b"

OCCUPANT LOAD: 155 PEOPLE NET FLOOR AREA 1,332SF

8.59 SQ. FT./ OCCUPANT 6 VIEWING POSITIONS

(2)

44"

1-1/

2 H

RF.

P.S.

C. D

OO

RS

(2) 36" 1-1/2 HRF.P.S.C. DOORS

AREA 2OCCUPANCY GROUP "F-1b"NET FLOOR AREA 2,973SFOCCUPANT LOAD: 343 PEOPLE

(1) 44" 1-1/2 HRF.P.S.C.DOOR

ELEV. 3 LOBBY607A

STAIR C

GOLD RM. 2619

DF

(NO WORK)

SS

W

W

WW

E

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

W

TR

AV

EL

DIS

TA

NC

E 4

2'-8

" (P

RIM

AR

Y)

CAPACITY SIGN CAPACITY SIGN

E E E EE E E E E E E

E

EE

3EU

4EU

A

C

B8'-0

"

PRIMARY( max. 100')

1ST LEG

TOTAL

SECONDARY( max. 125')

2ND LEG

3RD LEG x 1.254TH LEG x 1.4

(2)

44"

1-1/

2 H

RF.

P.S.

C. D

OO

RS

(2) 36" 1-1/2 HRF.P.S.C. DOORS

DOOR "A"

DOOR

"B"

AREA 3OCCUPANCY GROUP: ACCESSORY OCCUPANT LOAD: 5 PEOPLENET FLOOR AREA 522 SF104.4 SQ.FT./ OCCUPANT

1

2

3

155

303

5

4 2

465

3EU

4EU

80

80 320

240

3EU

2EU

80

80 160

240

W

DOOR

"C"

DOOR "D" DOOR "E"

DOOR "F"

AREA 4OCCUPANCY GROUP: ACCESSORY OCCUPANT LOAD: 2 PEOPLENET FLOOR AREA 377SF

(2) 30" 1-1/2 HRF.P.S.C. DOORSWHEELCHAIR LOCATIONS

SAFE AREANET FLOOR AREA: 947 SF2SF/PERSON = 474 PEOPLE

W

4.5EU

1.5EU

A

B

8'-7"

4'-11"

80

80

360

240

937

(3)3'-0"

(2)3'-0"

125 562

375

600

4.5EU

3EU4.5EU3EU 125

W

STAIR # WIDTHPERSONS/

UNIT OF WIDTH CAPACITY

TOTAL

DOOR WIDTHPERSONS/UNIT

FROM SAFE AREACAPACITY

TOTAL

WIDTH INUNITS

WIDTH INUNITS

DOOR WIDTH WIDTH IN UNITS EGRESS CAPACITYPERSONS/UNIT OF WIDTH

DOOR WIDTH WIDTH IN UNITS

C

D

TOTAL

EGRESS CAPACITYPERSONS/

UNIT OF WIDTH

TRAVEL DISTANCE - AREA 2PRIMARY PT - A

( max. 100')

1ST LEG

TOTAL

SECONDARY PT - A ( max. 125')

2ND LEG

3RD LEG x 1.25

4TH LEG x 1.4

STAIR # WIDTHPERSONS/

UNIT OF WIDTH CAPACITY

TOTAL

DOOR WIDTH PERSONS/UNITFROM SAFE AREA

CAPACITY

TOTAL

WIDTH INUNITS

WIDTH INUNITS

MAX. OCCUPANCY OF 6TH FLOOR (EXITING LOAD)

AREA OCCUPANTS

TOTAL

E RECESSED FLUORESCENT DOWNLIGHT ON EMERGENCY BATTERY BALLAST

SYMBOLS

I RECESSED POP-DOWN EMERGENCY LIGHTS

PRIMARY PATH OF TRAVEL

SECONDARY PATH OF TRAVEL

W

RECESSED CEILING LED EDGE-LIT EXIT SIGN.

WALL-MOUNT LED EDGE-LIT EXIT SIGN.

WHEELCHAIR

NEW 2HR. RATED WALL ASSEMBLY

NOT INCLUDED W/ SQ.FTG. CALCULATION

EXISTING 4" HOLLOW CONC. BLOCK WALL W/ PLASTER TO BOTH SIDES; 9'-6". INSTALL 2HR SHAFTWALL FROM BELOW LINE OF PLASTER TO SLAB ABOVE

MOVABLE CHAIRS, FASTENED TOGETHER

EXISTING WALL TO REMAIN

EXISTING 2hr WALL TO REMAIN

DETERMINATION OF EXIT AND ACCESS REQUIREMENTS

OCCUPANCYGROUP

CLASSIFICATION

MAXIMUM TRAVELDISTANCE WITHINASSEMBLY SPACE

PRIMARY SECONDARY

AISLE AND CROSSAISLE CAPACITY(PEOPLE/UNIT

WIDTH)

DOORS OR OPENINGSCAPACITY

(PEOPLE/UNIT WIDTH)

FROM ASSEMBLYSPACE

FROM SAFEAREA

STAIRS ANDESCALATORS

CAPACITY(PEOPLE/UNIT

WIDTH)

RAMPS, CORRIDORS,SAFE AREAS, EXITPASSAGE WAYS

CAPACITY(PEOPLE/UNIT WIDTH)

F-1brequired

100 125 90 80 125 80 100

EMERGENCYLIGHTS

REMOTEPOINT - B

EMERGENCYLIGHTS

AREA 4OCCUPANCY GROUP: ACCESSORY OCCUPANT LOAD: 2 PEOPLENET FLOOR AREA 377SF188.5 SQ.FT./ OCCUPANT

TRAVEL DISTANCE 62' (SECONDARY)

REMOTEPOINT

TRAVEL DISTANCE - AREA 1

26'-3"

9'-8"

12'-00'

47'-11"

14'28'

20'

0'

62'

31'-0"

2'-2"

0'

0'

33'-2"

24'

25'

0'

61'-6"

A

B

2 (3'-0")

2 (3'-8")

80

80 320

240

560

A

C

8'-7"

4'-1"

80 360

16080

749

(3)3'-0"

3'-0"

125 562

187

520

125

TOTAL

960

AREA 2OCCUPANCY GROUP "F-1b"OCCUPANT LOAD: 303 PEOPLE NET FLOOR AREA 2,973SF9.81 SQ. FT./ OCCUPANT8 VIEWING POSITIONS

E

F

WHEELCHAIRLOCATION

TOTAL STAIR CAPACITY FROM 6TH FLOOR

STAIR # WIDTHPERSONS/

UNIT OF WIDTH CAPACITY

A

B

C

8'-7"

4'-11"

4'-1"

80

80

360

240

16080

TOTAL 1124

DOOR WIDTHPERSONS/UNIT

FROM SAFE AREACAPACITY

TOTAL

(3)3'-0"

(2)3'-0"

3'-0"

125 562

375

187

760

WIDTH INUNITS

4.5EU

3EU

2EU

WIDTH INUNITS

4.5EU

3EU

1.5EU

125

125

F-1b

STAIR CAPACITY FROM 6TH FLOOR FOR AREA 1 F-1b

DOOR OPENINGS FROM ASSEMBLY SPACE - AREA 1 F-1b DOOR OPENINGS FROM ASSEMBLY SPACE - AREA 2 F-1b

STAIR CAPACITY FROM 6TH FLOOR FOR AREA 2 F-1bSTAIR CAPACITY FROM 6TH FLOOR FOR AREA 1 F-1b

2 (3'-0")

2 (3'-8")

2 (3'-0")

(3'-8")

1 2 3 4 5 6 7 8 9 10

11 12 13 14 15 16 17 18 19 20

21 22 23 24 25 26 27 28 29 30 31 32

33 34 35 36 37 38 39 40 41 42 43 44

45 46 47 48 49 50 51 52 53 54 55 56

57 58 59 60 61 62 63 64 65 66 67 68

69 70 71 72 73 74 75 76 77 78 79 80

81 82 83 84 85 86 87 88 89 90 91 92

93 94 95 96 97 98 99 100 101 102 103 104

101 102 103 104 105 106 107 108 109 110 111 112

154

125 126 127 128 129 130 131 132 133 134 135 136

137 138 139 140 141 142 143 144 145 146 147 148

149 150 151 152 153 154 155 156 157 158 159 160

161 162 163 164 165 166 167 168 169 170 171 172

172 173 174 175 176 177 178 179 180 181 182 183

184 185 186 187 188 189 190 191 192 193 194 195

196 197 198 199 200 201 202 203 204 205 206 207

208 209 210 211 212 213 214 215 216 217 218 219

218 219 220 221 222 223 224 225 226 227 228 229

230 231 232 233 234 235 236 237 238 239 240 241

247 248 249 250 251 252 253

259 260 261 262 263 264 265

271 272 273 274 275 276 277

283 284 285 286 287 288 289

295 296 297 298 299 300 301

302 303

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99 1

00 1

01 1

02 1

03

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

141

142

143

144

145

146

147

148

149

150

151

152

153

155

1

2

3

4

5

6

7

8

113 114 115 116 117 118 119 120 121 122 123 124

WHEELCHAIRLOCATION

ASSEMBLY NOTES:

ALL REQUIRED EXITS FROM PUBLIC ASSEMBLY SPACES SHALL BE CLASS 1 EXITS LEADING TO ADJACENT SAFE AREA AND ALL CLASS 1 EXITS SHALL ACCOMMODATE 100% OF THE EXITING CAPACITY FOR THE PUBLIC ASSEMBLY SPACES AS PER SEC. 27 -- 534 (d) (3) OF THE CODE.

NON-FIXED SEATING WILL BE REMOVED TO ACCOMODATE WHEELCHAIRS.

MOVABLE CHAIRS MUST BE FASTENED + ORGANIZED DURING SETUP TO PRESERVE THE INTEGRITY OF THE ROW.

NO ASSEMBLY SPACE SHALL BE LOCATED WITHIN 250FT. OF ANY OCCUPANCY CONTAINING EXPLOSIVE CONTENTS.

1.

2.

3

4.

TR

AV

EL

DIS

TA

NC

E 6

3'-6

" (S

EC

ON

DA

RY

)

TR

AV

EL

DIS

TA

NC

E 6

1'-6

" (S

EC

ON

DA

RY

)

TR

AV

EL

DIS

TA

NC

E 3

3'-2

" (P

RIM

AR

Y)

REMOTEPOINT - A

PRIMARY PT - B( max. 100')

SECONDARY PT - B ( max. 125')

26'

25'

32'

8'

0'

12'-6"

0'

42'-8" 63' - 6"

(PR

IMA

RY

)

4.5EU

2EU

I

W

(9'-9" x 1.25) (16' x 1.25)

(10' x 1.25)

(26' + 6')

(10' x 1.25) 12'-6"(2'-2" x 1.25) 2'-8"

TR

AV

EL

DIS

TA

NC

E 4

7'-1

1"

28'-0" TOTAL DISTANCE

EX'G

38'-9" TOTAL DISTANCE30'-2" TOTAL DISTANCE

Gerner Kronick + Valcarcel Architects, PC443 Park Avenue SouthNew York, NY 10016Tel: 212. 679. 6362Fax: 212. 679. 5877www.gkvarchitects.com

CLIENT:

ARCHITECT:

Drawing No.:Project No.:

Date:

Scale:

Drawing Title:

No. Issue Date

Revisions

434-01

City University Of New YorkDepartment Of Design Construction & Management555 West 57th Street, 10th FloorNew York, NY 10019Tel: 212. 541. 0195Fax: 212. 541. 0496

CLIENT:Brooklyn CollegeThe City University Of New York2900 Bedford AvenueBrooklyn, NY 11210-2889Tel: 718. 951. 5094Fax: 718. 951. 4860

PROJECT LOCATION:Brooklyn College Student Center2705 Campus Rd.Brooklyn, NY 11210Tel: 718. 951. 5842Fax: 718. 859. 3057

A/V CONSULTANT:Cerami & Associates, Inc.404 Fifth AvenueNew York, NY 10018Tel: 212. 370. 1776Fax: 212. 370. 1736www.ceramiassociates.com

MEP ENGINEERS:Collado Engineering116 South BroadwayTarrytown, NY 10591Tel: 914. 332. 7658Fax: 914. 332. 7659www.acollado-eng.com

STRUCTURAL ENGINEER:Rodney D. Gibble Consulting Engineer1123 Broadway, Suite 917New York, NY 10018Tel: 212. 989. 2853Fax: 212. 989. 4017www.rdgengineers.com

EXPEDITOR:Milrose Consultants, Inc.333 7th Avenue, 6th FloorNew York, NY 10001Tel: 212. 643. 4545Fax: 212. 643. 4859www.milrose.com

THE STUDENT CENTER6th + 7th FLOOR

RENOVATION

1 PUBLIC ASSEMBLY FILING 01.04.06

01.04.06

1 ISSUE FOR FILING 03.23.06

1 ISSUE FOR FILING 08.21.07

Page 4: Resume / Wk Samples
Page 5: Resume / Wk Samples

NEW ROOF PENETRATION INTO ZODIAC SPACE FOR RETURNAIR; 20"X20" SEE MECH DWGS.

EXISTING SKYLIGHT BEYOND

NEW 2HR FIRE RATEDWALL ASSEMBLY, SEE PARTITION TYPES

FIN. CEILING @ ZODIAC RM.8' - 7 1/2" A.F.F.

SKYLIGHT ROOF SLAB @12' - 1" A.F.F. VIF

ZODIAC ROOM - 711 SAFE AREA - 701

STORAGE - 707

FIN. CLG @ SAFE AREA8' - 0" A.F.F.

NEW INSULATED RETURN AIR DUCTS; SEE MECH. DWGS; CONNECT INTO EXISTING RETURN AIR DUCT NEAR UNIT

NEW ACOUSTIC CEILING, ACT-01

CLOSE OFF EXISTINGRETURN AIR DUCT

COVER EXIST. RA OPENING, SEE PARTITION TYPES.

NEW FURRING;SEE PARTITION TYPES

EXISTING (W14x22)

EXISTING (W18x60)EXISTING (W18x35)

EXISTING CURVED GYP. BD.FASCIA; EXISTING SUPPORTFRAMEWORK.

A/C UNIT

SECTION @ ZODIAC RM. RETURN PLENUM 1/2"=1'-0"1

OLD MASONRY FIREPLACE

EXISTING MASONRYWALL

5IA-61

EXISTING (W10x11)

NEW ACOUSTIC TILE CEILING, ACT-02

NEW SURFACE MTD. LIGHT FIXTURE

EXISTING RA DUCT + ROOF PENETRATION

LINE OF EXISTING BEAM BEYOND

NEW BOOT, CONNECT TO NEW RAG CENTERED OVER DOOR.

RCP DETAIL @ SOLARIUM / SAFE AREA 1 1/2"=1'-0"3

DETAIL SECTION @ SOLARIUM / SAFE AREA 1 1/2"=1'-0"2

EXIST. ROOF PENETRATION FOR SUPPLY DUCT

ACT-02

EXIST. SUPPLY DUCT THROUGH ROOF

JOG RATED PARTITION AROUND NEW SUPPLY BOOT WITHIN SOFFIT

LINE OFNEW LINEAR DIFFUSER BELOW

B.O. RA SOFFIT7' - 2" A.F.F.

B.O. BEAM8' - 0" A.F.F., VIF

FIN. CLG @ SAFE AREA8' - 4 1/2" A.F.F.

DETAIL SECTION @ DOOR 710B SOFFIT RETURN

1 1/2"=1'-0"4

NEW SOFFIT, WALL TYPE #7, MAINTAIN 2 HR RATING UP TO EXIST SLAB.

1/2"

1/2"

ELEVATOR LOBBY 708

SOLARIUM 710

DETAIL SECTION @ RETURN DUCT OPENING

1 1/2"=1'-0"5

NEW DUCT

NEW DUCT

EXIST'G STEEL BEAM W/FIREPROOFING

EXIST'G STEEL DECK

EXIST'G CONCRETE SLAB

EXIST'G INSULATION

CAP FLASHING

CAP RECEIVER

WATERPROOF FLASHINGTO EXTEND AROUND DUCT

2 NEW ROOF OPENINGSFOR RA DUCTS FROM

ZODIAC PLENUM

BLOCKING

4" CANT STRIP AROUND 4SIDES, WATERPROOFED

2" RIGID INSULATION(EXPANDED POLYSTYRENE)

EXIST'G BUILT-UP ROOFING

BASE FLASHING

NEW CHANNELS TO FRAMEOUT OPENING W/ SPRAYON FIREPROOFING - See

Structural DwgsEXIST'G STEEL BEAM W/ FIREPROOFINGEXIST'G STEEL BEAM W/ FIREPROOFING

2hr. RATED WALL

NEW GWB. SOFFIT

NEW CEILING TILE, ACT-02

NEW 2HR FIRE RATED WALL, JOG AROUND NEW BOOT

NEW GWB SOFFIT, ALIGN W/ BOTTOM OF ADJ. BM.

SAFE AREA 701

SOLARIUM 710

EXISTING DUCT

NEW SUPPLY BOOT

ROOF SLAB

NEW LINEAR 2-SLOTDIFFUSER, SEE MECH DWGS.

B.O. ROOF SLAB8'- 10 1/2" A.F.F.

FIN. CLG. @ SOLARIUM8' - 4 1/2" A.F.F.

B.O. NEW SOFFIT8' - 0" A.F.F.

1 1/2"MIN

3_

LINE OF SOFFIT BEYOND

Gerner Kronick + Valcarcel Architects, PC443 Park Avenue SouthNew York, NY 10016Tel: 212. 679. 6362Fax: 212. 679. 5877www.gkvarchitects.com

CLIENT:

ARCHITECT:

Drawing No.:Project No.:

Date:

Scale:

Drawing Title:

No. Issue Date

Revisions

434-01

City University Of New YorkDepartment Of Design Construction & Management555 West 57th Street, 10th FloorNew York, NY 10019Tel: 212. 541. 0195Fax: 212. 541. 0496

CLIENT:Brooklyn CollegeThe City University Of New York2900 Bedford AvenueBrooklyn, NY 11210-2889Tel: 718. 951. 5094Fax: 718. 951. 4860

PROJECT LOCATION:Brooklyn College Student Center2705 Campus Rd.Brooklyn, NY 11210Tel: 718. 951. 5842Fax: 718. 859. 3057

A/V CONSULTANT:Cerami & Associates, Inc.404 Fifth AvenueNew York, NY 10018Tel: 212. 370. 1776Fax: 212. 370. 1736www.ceramiassociates.com

MEP ENGINEERS:Collado Engineering116 South BroadwayTarrytown, NY 10591Tel: 914. 332. 7658Fax: 914. 332. 7659www.acollado-eng.com

STRUCTURAL ENGINEER:Rodney D. Gibble Consulting Engineer1123 Broadway, Suite 917New York, NY 10018Tel: 212. 989. 2853Fax: 212. 989. 4017www.rdgengineers.com

EXPEDITOR:Milrose Consultants, Inc.333 7th Avenue, 6th FloorNew York, NY 10001Tel: 212. 643. 4545Fax: 212. 643. 4859www.milrose.com

THE STUDENT CENTER6th + 7th FLOOR

RENOVATION

1 90% CD SET 8/12/05

2 100% CD SET 9/20/05

IA-61

CEILING DETAILS / HVAC

07.20.05

AS NOTED

Page 6: Resume / Wk Samples

1aKITCHEN SCHEDULE

CODE ITEM MANUFACTURER FINISH CONTACTCA-02 Carpet - Broadloom Patcraft, or equal #10070 - 30's; color: 70709 - Kelly Pam Wild @ Patcraft, 212-545-8033

CAB-03 Flat-Front, Therm-o-foil Door (upper) Benecke-Kaliko Arctic White HG www.petermeier.com

CAB-04 Flat-Front, Therm-o-foil Door (lower) Benecke-Kaliko Black HG www.petermeier.com

CT-02 12" x 24" Cermainc Floor Tile Ceramica Sant'Agostino Tile: Carpet; color: Sabbia www.nemotile.com 212-505-0009 x235 Matt Karlin

ST-02 1-1/4" Stone Slab Caesar Stone, or Equal 2141 Blizzard, Polished CaesarStone 718-777-9780 Rene Pecquex

WF-02 - DELETED 5" x 3/8"Engineered, Prefinished Strip Flooring Armstrong Floors BP441NALG - Beckford/Natural (oak) Armstrong Floors, Michael Foster, 800-356-9301

EQ-01A Refrigerator/Freezer GE GTH21KCWBB, 66-3/4H x 30-1/4"D x 32-3/4Wide

EQ-02A Microwave/Hood GE Spacemaker Over-the-Range JNM1541SMSS, 29-7/8"Wide

EQ-03A Dishwasher GE Profile Built-in PDW7800NWW, 24"wide

EQ-04 All-in-One Clothes Washer/Dryer LG WM3431 HW, 23-5/8"wide

EQ-05A Free-standing Oven GE JBP66DMBB, 30"wide

HW-01 Kitchen Mixer Moen - Level Model 7100 - Polished Chrome Marc Schuster 800-386-6636

HW-02 Stainless Steel Undercounter Sink Sterling - McAllister Single Basin #11447, 23-3/8" x 17-11/6" www.sterlingplumbing.com

HW-03 Cabinet Pull Hafele, or Equal 101.79.904, Aluminum-Colored Metal Flush Handle www.hafeleonline.com

1bKITCHEN SCHEDULE (Alternate)

2KITCHEN PLAN SCALE: 3/4"=1'-0"

2'-3" V.I.F. 2'-9" V.I.F. 2'-9"

V.I.

F

2'-1

"

1'-1

"

3"

3"

4"

align

1 1/2" 3/4"

14'-1" ( V.I.F.)

HW-02 HW-01

EQ-04

CAB-01

CT-01

ST-01

WF-01

EQ-03EQ-03A

CAB-04

CT-02

WF-02

ST-02

2"

1"

3/4"

1KITCHEN PLAN (flooring layout)

SCALE: 3/4"=1'-0"

FU

LL

TIL

E

LINE OF KICKGUARD / HORZ. START POINT

EQ-04 EQ-01EQ-05

V.I

.F.

FU

LL

TIL

E

EQ-03

LINE OF COUNTER ABOVE

EQ-03A

EQ-05AEQ-01A

CT-01CT-02

CA-01CA-02

CODE ITEM MANUFACTURER FINISH CONTACTCA-01 - NEW Carpet - Broadloom Patcraft, or Equal #10070 - 30's; color: 70107 - Hepburn Pam Wild @ Patcraft; 212-545-8033

CAB-01 Flat-Front, Therm-o-foil Door Benecke-Kaliko Cinnamon Maple www.petermeier.com

CAB-02 Flat-Front, Therm-o-foil Door Benecke-Kaliko Antique White Jasmine HG www.petermeier.com

CT-01 12" x 24" Cermainc Floor Tile Ceramica Sant'Agostino Tile: Carpet; color: Brown www.nemotile.com 212-505-0009 x235 Matt Karlin

ST-01 1-1/4" Stone Slab Caesar Stone, or Equal 2200 Desert Limestone, Polished CaesarStone 718-777-9780 Rene Pecquex

WF-01 - DELETED 5" x 3/8"Engineered, Prefinished Strip Flooring Armstrong Floors BP441CALG - Beckford/Canyon Armstrong Floors, Michael Foster, 800-356-9301

EQ-01 Refrigerator/Freezer GE GTH21SCWSS, 66-3/4H x 30-1/4"D x 32-3/4Wide

EQ-02 Microwave/Hood GE Spacemaker Over-the-Range JNM1541SMSS, 29-7/8"Wide

EQ-03 Dishwasher GE Profile Built-in PDW7880NSS, 24"wide

EQ-04 All-in-One Clothes Washer/Dryer LG WM3431 HW, 23-5/8"wide

EQ-05 Free-standing Oven GE JBP66SMSS, 30"wide

HW-01 Kitchen Mixer Moen - Level Model 7100 - Polished Chrome Marc Schuster 800-386-6636

HW-02 Stainless Steel Undercounter Sink Sterling - McAllister Single Basin #11447, 23-3/8" x 17-11/6" www.sterlingplumbing.com

HW-03 Cabinet Pull Hafele, or Equal 101.79.904, Aluminum-Colored Metal Flush Handle www.hafeleonline.com

1'-6

"3'-0

"

7'-8

"

2'-0

"

ADJ. SHELVES

6'-6

"1

'-2"

MILLWORK PANEL AT REFR. SIDE

1"

1'-1

1"3'-0

"2

'-0"

7'-5

"

6'-1

1"

7 1/

2"

4SECTION

SCALE: 3/4"=1'-0"

EQ-02CAB-02

CAB-01EQ-05

CAB-02

HW-01

CAB-01

2'-3" EQ.a

3KITCHEN ELEVATION

SCALE: 3/4"=1'-0"

EQ.a EQ.a EQ.a EQ.bEQ.b V.I.F. EQ.cEQ.c

5

IA-120

4"

EQ. d V.I.F. V.I.F. 1"

6

IA-120

4

IA-120

2'-9"

1'-1

0"

5'-8

"

2'-6"

2'-9" 2'-0 1/4" EQ. d

2'-3"

EQ-01

1/2"

CAB-01

ST-01

HW-01

CAB-01 CAB-02 CAB-01

CAB-01

HW-03

CAB-01PAINTED GYP.BD.

PUSH / PULL LATCH CLOSERS

3"

3"

align

CAB-03 CAB-04CAB-04

CAB-04

ST-02

CAB-04

CAB-04

EQ-01A

EQ.a

3"

7'-5

"

ADJ. SHELVES

EQ-04

2'-6"

6"

1'-0

"E

Q.

EQ

.E

Q.

CABINET HINGES

CAB-04

EQ-02A

EQ-05A

CAB-03

CAB-03

CAB-04

5SECTION

SCALE: 3/4"=1'-0" 6

SECTION

SCALE: 3/4"=1'-0"

N.T.S.

IA-120

LTD

TH

IS D

OC

UM

EN

T I

S T

HE

PR

OP

ER

TY O

F D

AV

IS,

CA

RT

ER

, S

CO

TT

.

IT I

S T

O B

E U

SE

D F

OR

TH

E S

PE

CIF

IC P

RO

JE

CT

ID

EN

TIF

IED

OR

RE

FE

RR

ED

TO

HE

RE

IN O

R E

XT

EN

SIO

NS

TO

TH

IS P

RO

JE

CT

, IN

WH

OL

E O

R P

AR

T.

` D

A V

I S

~

C A

R T

E R

~ S

C O

T T

ALL

RIG

HTS

RE

SE

RV

ED

.

1

A

2 3 4

B

D

5

E

1 2 3 4 5

SCALE

DATE

DRAWN BY

CHECKED BY

DRAWING NUMBER

SHEET OF

PROJECT TITLE

PROJECT NO.

DRAWING TITLE

1325 W Street, NW

14WTITLE12

REVISIONS

June 27, 2008

Washington, D.C.

PROGRESS SET 05/23/08

GMP / PERMIT SET 06/27/08